Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Similar documents
Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Transmission Project Report 2009 Section 6.5: Twin Cities Zone

Total Three Months 8. Breastfed Two Weeks 5. Total Twelve Months 12. Breastfed Twelve Months 13. Total Two Weeks 4. Initiated Breastfeeding 3

2017 Total 2017 Calendar Year Unduplicated Minnesota WIC Participation Count by City of Residence Minnesota WIC Information System

Residential Real Estate Activity Report 2000 Edition

Minnesota Biennial Transmission. Zone Meeting 8

Sub Regional RTEP Committee Mid-Atlantic

Falcon-Midway 115 kv Line Uprate Project Report

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

MTEP14 West SPM #2. ATC, DPC, XEL Project Review. April 2, 2014

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

7.7 Southeast Zone. Transmission Projects Report Section 7: Needs

Chapter 7 - Appendix A

Metro Transit Service Improvement Plan

MTEP13 SPM #2- Central Region. March 25, 2013

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

SOUTHWEST TRANSIT SEPTEMBER 2017 RIDER SURVEY. 1. What city do you live in? 2. How many years have you been a rider on SWT?

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

Minnesota Biennial Transmission. Zone Meeting 8

Interconnection Feasibility Study Report Request # GI

2016 SPP Transmission Expansion Plan Project List Kansas Projects

Supplemental Report on the NCTPC Collaborative Transmission Plan

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Sub Regional RTEP Committee Mid-Atlantic

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Appendix B. Summary of Changes to the Year Assessment

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

SERTP rd Quarter Meeting

Highly Constrained Elements Within ATC Footprint

South Dakota 890 Study

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition

Transitways. Chapter 4

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

Key to Status Fields in the Project List

Western Area Power Administration

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Q0044 interconnection at

Feasibility Study Report

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

15 Nelson-Marlborough Regional Plan

Appendix D Black Hills Project Summary

Sub Regional RTEP Committee South

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

MILLIGAN SOLAR PROJECT

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

System Impact Study Report

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Illinois State Report

SPP Notification to Construct

CUSTOMER/ TWIN ARROWS PROJECT

Overview of Table 1 PERCENT CHANGES BETWEEN 2009 AND 2010, SELECTED MINNESOTA HEALTH STATISTICS. Category Percent Change

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Sub Regional RTEP Committee South

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

2015 ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT

Transmission Expansion Advisory Committee

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Feasibility Study Report

New Jersey State Report

Feasibility Study Report

Connection Engineering Study Report for AUC Application: AESO Project # 1674

New 115 kv Disconnect Switches at Bloomsburg MTS

Interconnection System Impact Study Report Request # GI

FREQUENTLY ASKED QUESTIONS

Black Hills Project Summary

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Pacific Gas and Electric Company s Revised 2015 Annual Progress

APPENDIX E: Project Need and Description

VACAR 2015 SUMMER PEAK RELIABILITY STUDY

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Reliability Analysis Update

Interconnection Feasibility Study Report GIP-084-FEAS-R2

APPENDIX E: Project Need and Description

ERCOT Independent Review of Houston Import RPG Project

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

FREQUENTLY ASKED QUESTIONS

SERTP rd Quarter Meeting

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Sub Regional RTEP Committee - Southern. August 19, 2011

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Recommended Transportation. Capital Improvement Program

6.4 West Central Zone

Sub-Regional RTEP Committee PJM South

2016 HOUSI NG COUNT S

Sub Regional RTEP Committee Mid-Atlantic

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Local Transmission Plan. Rev. 1: April 2018

The Long-Range Transmission Plan

PG&E s 2012 Request Window Proposals

North Oregon Coast Area Study. Adam Lint

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Transcription:

Twin Cities Minnesota Zone Meeting Xcel Energy May 11, 2005 Bloomington, MN

Overview of Presentation Xcel Energy Projects: Aldrich to St Louis Park 115 kv line Eden Prairie to Edina 115 kv line Eden Prairie - Minnetonka Area Carver County - Waconia Area Chisago to Apple River Project High Bridge to Rogers Lake 115 kv line Blue Lake generation outlet

Overview of Presentation New Koch to Inver Hills 115 kv line line #2 Prairie Island to Red Rock 345 kv circuit #2 Oakdale to Tanners Lake 115 kv line Champlin to Champlin Tap to Crooked Lake 115 kv New Yankee Doodle 115 kv source Twin Cities 345/115 kv transformer capacity Twin Cities Fault current issue

Aldrich-St Louis Park 115 kv

Aldrich-St Louis Park 115 kv Line Need: Under some summer peak conditions, the line may overload Worst case outage of the 345 kv double circuit carrying the Parkers Lake-Dickinson line and the Parkers Lake Elm Creek line; Solution: Re-conductor the line by summer 2006 to enable it to carry more power

Edina-Eden Prairie 115 kv Line

Edina-Eden Prairie 115 kv Line Need: Under some summer peak conditions, a one mile section of this line may overload Outage of the double circuit carrying the Parkers Lake-Cedar Lake and Parkers Lake-Bassett Creek 115 kv lines Proposed Solution: Upgrade line to 600 amps by reconductoring 4.7 miles of 795 ACSR with 795 ACSS Upgrade switch at Edina substation to 3000 amps

Excelsior- Westgate 69 kv reconductor 2006 Eden Prairie- Minnetonka Transmission System Westgate 80 MVAR capacitor 2008

Eden Prairie-Minnetonka Area Needs: Outage of Scott County-Chaska 69 kv line overloads Excelsior-Westgate 69 kv line in 2006 Outage of Westgate-Eden Prairie 115 kv double circuit line results in low voltage in 2008 Outage of Scott County-Chaska 69 kv line overloads the reconductored Excelsior-Westgate 69 kv line in 2011

Eden Prairie Minnetonka Area Short-term upgrades: Reconductor Excelsior-Deephaven-Westgate 69 kv line and Westgate 115 kv capacitor Expected in-service of 2006 (line) and 2008 (capacitor) Long-term upgrade: Scott Co - Westgate 69 kv rebuild to 115 kv (approximately 2011) Will be reviewed again in upcoming twin cities long range studies

Westgate to Scott County 115 kv line option Westgate to Scott County 69 kv line rebuild to 115 kv (2011)

Carver County Waconia Area Transmission System To Big Swan - Victor Winsted Millerbernd To Dickinson Lester Prairie N.O. N.O. Hollywood St. Boni To Hutchinson New Germany West Waconia Option 2 Rebuild to 115 kv from Glencoe to West Waconia in 2008 To McLeod Waconia To McLeod Glencoe N.O. Plato N.O. Bus tie x Young America To Black Dog High Isle Option 1 - Rebuild to 115 kv From Glencoe to Carver County in 2008 Carver Co. Key 69 kv 115 kv 230 kv Xcel Energy GRE

Carver Co - Waconia Area Needs: During summer peak load conditions, the Glencoe-Young America 69 kv line may overload by 2008 outage of future McLeod-Glencoe 115 kv line

Carver Co Waconia Area Long-term upgrade options for 2008: Rebuild Glencoe-Carver Co 69 kv line to 115 kv Rebuild Glencoe to West Waconia 69 kv line and reconfigure 69 kv system to 115 kv Expected to begin review studies by end of 2005 Plan to file CON Spring 2006

Chisago Apple River Project Needs: Outage of Apple River 69 kv source may result in overload of Arden Hills-Birch 69 kv line Outage of Apple River 69 kv source may result in low voltage at Shafer, Scandia, and Sand Lake Outage of Arden Hills 69 kv source may result in overload of Apple River-Garfield 69 kv line Using operating procedures to defer upgrades into the later 2000 s.

Chisago Apple River Project Options examined: Chisago-Lawrence Creek 115 kv line and Lawrence Creek-Apple River 161 kv line. Recommended plan Chisago-Apple River 69 kv line rebuild Reconfigure 69 kv system and add reactive support Distributed generation is cost prohibited Update: Project approved in Wisconsin. Certificate Of Need still needs to be filed in Minnesota

Chisago Co-Lawrence Creek 115 kv line Lawrence Creek-Apple River 161 kv line New Lawrence Creek substation

Rebuild Chisago-Apple River 69 kv line New Lawrence Creek substation

High Bridge-Rogers Lake 115 kv Line

High Bridge-Rogers Lake 115kV Line Need: This has the potential to overload under certain operating conditions Operating procedure: generation redispatch (being reviewed annually) New Factor: High Bridge and Riverside generation are scheduled to be upgraded and converted from coal to gas/steam combined plants as part of the Metropolitan emission reduction program (MERP)in 2008-2009 High Bridge to Rogers Lake 115 kv line overload is aggravated by the MERP projects

High Bridge-Rogers Lake 115kV Line Status: MISO is almost completed transmission service request studies for the High Bridge and Riverside generation upgrades Found that High Bridge and Riverside generation Upgrades cause overload of High Bridge to Rogers Lake 115 kv during certain transmission outages

Blue Lake Generation Increase Project Need: Generation increase of about 395 MW at Xcel Energy s Blue Lake Substation in Shakopee Plant is in-service Plant required additional transmission outlet Solution: Interconnecting to the existing McLeod to Black Dog 230 kv Moved Black Dog 230/115 kv transformer Blue Lake Reconductor 8 miles of Blue Lake to Black Dog 230 kv and operate at 115 kv

Blue Lake generation increase project

New Koch to Inver Hills 115 kv #2 Need: Under summer peak conditions, existing Koch to Inver Hills 115 kv may overload for Outage of Black Dog to Riverwood 115 kv line Solution: Build 2 nd Inver Hills to Koch Refinery 115 kv along with substation equipment upgrades at Inver Hills and Koch Refinery substations 2007 expected in-service date

New Koch to Inver Hills 115 kv #2

Prairie Island to Red Rock 345 kv circuit #2 Increase ground clearance of Red Rock to Prairie Island 345 kv circuit #2 High Voltage Transmission to South and East of Twin Cities Metro

Prairie Island to Red Rock 345 kv circuit #2 Uprate Need: One of the two parallel 345 kv lines build to an older standard Under some summer peak load conditions, this line may have insufficient ground clearance Outage of the double circuit from Blue Lake to Prairie Island and parallel Prairie Island to Red Rock 345 kv line. Solution: Increase the line clearance Expected in-service of 2006

Oakdale to Tanners Lake 115 kv Need: Under some Summer peak load conditions, the line may overload Outage of Red Rock to Woodbury 115 kv line Recommendation: Upgrade 5 mile Oakdale to Tanners Lake 115 kv Expect final decision in early 2006

Oakdale to Tanners Lake 115 kv

Champlin to Champlin Tap 115 kv Need: Under some Summer peak load conditions, the line may overload Outage of the 345 kv double circuit Elm Creek to Parkers Lake line and the Sherburne County to Coon Creek 345 kv line Recommendation: Upgrade capacity of 2.4 miles line in 2007 Expect final decision in early 2006

Champlin to Champlin Tap 115 kv

Champlin Tap to Crooked Lake 115 kv Need: Under some Summer peak load conditions, the line may overload Outage of Coon Creek to Parkwood 115 kv Recommendation: Upgrade capacity of 2.4 miles line in 2008 Expect final decision in early 2006

Champlin Tap to Crooked Lake 115 kv

New Yankee Doodle 115 kv source project-existing Yankee Doodle area Rogers Lake Lone Oak Lemay Lake Yankee Doodle line 0822 Wescott Park Pilot Knob Eagan Wescott Inver Grove Normally open between lines 69 kv facilities 115 kv facilities Lebanon Hills Kegan Lake

Yankee Doodle served by single 115 kv from Lone Oak Rogers Lake Lone Oak Lemay Lake Yankee Doodle line 0822 Wescott Park Pilot Knob Eagan Wescott Inver Grove Normally open between lines 69 kv facilities 115 kv facilities Lebanon Hills Kegan Lake

Twin Cities 345/115 kv Transformers

Twin Cities 345/115 kv Transformers Needs Identified: Under some summer peak conditions Eden Prairie 345/115 kv may overload for parallel transformer outage Parkers Lake 345/115 kv may overload for parallel transformer outage Red Rock 345/115 kv may overload for parallel transformer outage May be aggravated by reduced Twin Cities metro 115 kv generation levels. Twin Cities 10 year planning study expected to be initiated during 2005-2006.

Twin Cities Fault Current Issue Need identified: General fault levels on the system are increasing as we add lines and generation The grounding capability is limited to 50 ka. This is due to grounding equipment limitations The next limiting equipment are the breakers that are nominally rated for 63 ka but have been de-rated to below 60 ka Sectionalizing the system may be needed to decrease the fault current levels Planning study is needed to identify alternatives

Any Questions/ Input?