Sub Base Fuel Tank With Walk-in Type Enclosure. Installation Instructions

Similar documents
BLACKBIRD INSTALLATION SUPPLEMENT

INSTALLATION INSTRUCTIONS FOR COZY CAB A-1 AIR CONDITIONING KIT

1996 Aerostar/Ranger/Explorer

INSTALLATION INSTRUCTIONS

Bellows. GT Exhaust Accessories Installation and Operation Manual. Rev. B. (c) Copyright 2012, GT Exhaust, Inc. All Rights Reserved

SECTION AXIAL HVAC FANS

DewEze Clutch Pump Kit Ford 6.2L Gas, A Pump, Side Port, 2011+

Air Conditioner for M915 A0/A1 Truck

Installation Instructions

Installation Instructions

DewEze Clutch Pump Kit Ford 6.2L Gas, A Pump, Side Port, INSTALLATION INSTRUCTIONS 1. The installation of this kit requires trained decis

GB-250. Submittal Specifications Installation Application Specific Details

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems

HORD INSTALLATION & SERVICE MANUAL. Hospital Operating Room Diffusers INSTALLATION & SERVICE MANUAL. Date: 06 / 12 Reference # : E-10 1

Vibrator Kit. Stainless Steel & Poly Hopper Spreaders with FLEET FLEX Electrical System

600 SERIES STANDARD DUTY STRAIGHT TRACK INSTALLATION INSTRUCTIONS

Installation Instructions Factory Style Bow Kit

Cylindrical Silencers

NSGV EVE-ER I, O, & M MANUAL

LE MODELS: SHIPPING, RIGGING, LIFTING, ASSEMBLY MANUAL

SOUND GUARD SST-E INSTALLATION INSTRUCTIONS & PARTS LIST

Lifting height 5.5" - 72" with adapters " Height overall 165" Width between columns 122" Drive through 109" Width overall 151.

DORMA INTERIOR. DORMA PURE FAMELESS SLIDING Glass Wall Systems

forward curved inline duct blowers

INSTALLATION INSTRUCTIONS PART NUMBER:21-729

This information covers the proper procedure for replacing the Volvo D16F engine in a VT or VNL chassis.

EXTERNAL OIL FILTER SYSTEM WITH COOLANT FILTER KIT

The Chameleon Trac II Patent Pending M-Series User s Manual

MFH-5399 Block & Manifold Fresh Water Cooling Kit Instructions

UltraSlim Mechanical Install & Owner s Manual

General Manager/Service Manager/Warranty Administrator. 2015FL-005 Attachment #2 1KD Diesel Turbo Replacement Campaign Repair Instructions

PN: 6410T0022 Rev. 8/18/2014 Revision D Albany RR300 Stainless Mechanical Install & Owner s Manual

OFFICE PARTITIONS. Data Port Openings. Use cable tie bracket to dress data cables under panels. STEP 1

Fuel Tank Fitment Instructions Tusk/Rally Raid Products/Seat Concepts kit Husqvarna 701 Enduro

KJ Jeep TJ/LJ Rock Krusher 3 Coil Spring Spacer Lift Kit with shocks DO NOT COMBINE WITH ANY OTHER SUSPENSION KIT

Owner smanual. Banks Ram-Air Intake System Chevrolet 6.6L Duramax Turbo-Diesel Pickups. with Installation Instructions

Thermal Wraps. GT Exhaust Accessories Installation and Operation Manual. Rev. A. Copyright 2012 GT Exhaust, Inc. All Rights Reserved

INSTALLATION INSTRUCTIONS

This information covers the proper replacement procedure for the EGR valve on the Volvo D16F engine.

3 Turbo Downpipe Installation Audi A3 / Volkswagen GTI / Volkswagen Jetta 2.0L FSI/TSI Turbo CD100013

(W) INSTALLATION INSTRUCTIONS GRILLE GUARD 2014 GMC SIERRA 1500 EXCLUDES DENALI PART # /

Page 1 of 5. Project : CATERPILLAR CM GENSETS PROJECT (RADIATOR COOLING) 2 x 16CM32, 6.3 kv, 50 Hz. TUS(S)PL Supply. Customer Supply DESCRIPTION

Magnum Mobile Generator MMG235 Specifications

35-kV Safefront SuperWell Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current Limiting Fuses

Thirteen (13) UL listed fluorescent fixtures per booth will supply illumination.

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

SNO-PRO Ford Super Duty F-250, F-350 & F Ford Super Duty F-250, F-350 (With Snow Plow Prep. Package ONLY)

MFH-5398 Block Only Fresh Water Cooling Kit Instructions

STANDBY EMERGENCY CNG/LPG GENERATOR

INSTALLATION INSTRUCTIONS

-- Installation Instructions --

05-08 GT. Hellion Power Systems Mustang Kit Instructions

Side Rocker Installation Instructions

Strobe Light Kit. Poly Hopper Spreaders w/fleet FLEX System

A B C D E F. Tools Required (supplied by others)

Centrifugal Cabinet Fans Model BCF. Belt Drive Low-Profile

Solar & Roller Shades

Installation Instructions In-bottom/Out-back Cooling Kit for E4h Drives VLT FC Series FC 102, FC 103, FC 202, and FC 302

INSTALLATION & OWNER S MANUAL

07-11 GM 1500 Pickup, Avalanche, Yukon, Tahoe, Suburban Front 2.5 Kit

Assembly Instructions

Installation Manual v1.0: MST Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

INSTALLATION INSTRUCTIONS GRILLE GUARD GMC SIERRA 1500 EXCLUDES DENALI PART # 4084/

Specifications. Standard MMG100D** MMG130D** MDG150DF4

MM184 Rev. 12 (9 94)

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

INSTALLATION & OWNER S MANUAL

INSTALLATION & OWNER S MANUAL

LAGUNA SERIES SLIDING DOOR KITS

MECHANICAL INSTALLATION PROCEDURES for Custom Grids and Support Framing

Installation Instructions Supertop for Truck

TJ/LJ Bowless Top. Components. 1. Soft Top (1) 2. Foam Supports (2) 3. Whisper Bars (2)

ELECTRIC SHOCK HAZARD/FIRE AND/OR EXPLOSION HAZARD. ELECTRIC SHOCK HAZARD/FIRE AND/OR EXPLOSION HAZARD.

INSTALLATION OF OFF-THE-FLOOR FIXTURES

Jeep Wrangler TJ 4.0 LITER Installation instructions

MFH-5320 Fresh Water Cooling Kit Instructions

Owner smanual. Banks Ram-Air Intake System Chevrolet/GMC 8.1L Workhorse Class-A Motorhome. with Installation Instructions

Jeep Wrangler 4.0 Liter TJ Jeep Wrangler 2.5 Liter TJ Installation instructions

Mobile Generator MMG25FHI Specifications

Conflicts NOTE: XLE, LE, AND SE MODELS

MMG45IF4. Mobile Generator. Engine. Generators. System Output. System Controls MMG45IF4

Installation Instructions Vanishing Lid Bracket

Required Tools: Phillips screw driver to remove original soft top. Torx sockets are required to completely remove the original soft top hardware.

Equipped with AEM Dryflow Filter No Oil Required! INSTALLATION INSTRUCTIONS PART NUMBER DS (GUN METAL GRAY FINISH)

INSTALLATION & OWNER S MANUAL

Mobile Generator MMG75D Specifications

Parts List & Mounting Instructions Kubota F2260, F2560, F3060

Upper Class Grille Main grille INSERT - #54127 / #54131 / #54133 / #51127 / #51131 / 51133

MODELS STXD & STXDe DIRECT DRIVE CENTRIFUGAL ROOF EXHAUSTERS

INSTALLATION & OWNER S MANUAL

INSTALLATION MANUAL. Melink Corporation (513) Revision

ASSEMBLY MANUAL. Keep With Operator s Manual

Side Dump Tarp System Driver or Passenger Stowing Non-Sealed applications

FAX

Installation Instructions Supertop for Truck

Opening Quality Doors Around The World. Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual)

SECTION PIPE HANGERS AND SUPPORTS

03-04 Cobra. Hellion Power Systems Mustang Cobra Kit Instructions

Installation Instructions

Crane Utility Vehicle

Transcription:

Sub Base Fuel Tank With Walk-in Type Enclosure Installation Instructions CONTRACTOR: INSTALLATION INSTRUCTIONS Phoenix Products, LLC 1727 Bennett St. Jacksonville, FL 32206-3197 Phone: (904) 354-1858 Fax: (904) 354-7929 Page 1 of 8

INSTALLATION INSTRUCTIONS Installation Instructions for Neoprene Pads Each generator package fuel Tank is provided with neoprene pads for each support rail. These pads are provided in an effort to compensate for any variations that may occur in the concrete slab on which the package shall rest. The pads are typically 6 wide by 3/8 thick by the full length of the support rails. Following are instructions for the placement of the neoprene pads. 1. It is recommended that the Contractor draw a layout of the fuel tank at the precise location desired on the concrete slab. The Submittal Drawings that were provided the contractor can be used to determine the approximate location of the fuel tank support and mark the concrete slab accordingly. 2. Once the support locations have been marked on the concrete slab, the contractor can then take the neoprene pads and place them loosely on the concrete slab. 3. As the fuel tank is being lowered to the desired location, but prior to the final setting of the tank, some minor adjustment may be required to align the pads accurately with the fuel tank. 4. Once the pads have been aligned with the fuel tank, the fuel tank may be lowered to its final location and the fuel tank secured to the concrete slab using an epoxy insert anchoring system. Fuel Tank Off-Loading & Installation Procedures 1. Protective Plastic Wrapping: If delivered to the site in plastic wrapping, the wrapping must be removed after the fuel tank is unloaded. 2. Equipment to Off-Load the Unit. a. Crane 1. When the weight of your unit requires it. 2. When berms restrict the use of a forklift. Page 2 of 8

b. Lifting Cables & Straps Sufficient cables with hooks on each end fastened to a centering ring or spreader bar. NOTE: Wire cables can damage the paint finish and/or enclosure (if applicable). Lifting Straps of sufficient capacity should be used whenever possible. Spreader Bars are required with either cables or straps to prevent damage. 3. Procedures for off-loading: Lifting lugs are provided for offloading of the tank. All lugs shall be used during the process. Lifting and rigging to be completed by qualified contractor. 4. Fuel Tank Installation: Fuel tank should be installed on a level concrete pad which extends a minimum of 12 beyond the edge of the tank in all directions. The fuel tank should be centered on the concrete and then secured by drilling holes in the slab at the tank tie-down hole locations. Secure the tank with customer supplied stainless steel expansion anchors and associated hardware. The holes in the tank support feet are 1 diameter. 5. Tank Paint Touch-up Procedures: Note: Tank Touch-up kit is normally shipped loose inside of the Overfill Box or the Equipment Box, if applicable; this kit must be removed and stored in a cool dry location to avoid the paint hardener from hardening. a. Sand the area immediately surrounding the damaged spot to allow the touch-up paint to be feathered out to the undamaged portion of the tank. This will allow for an even appearance after the repair has been completed. b. Apply one coat of the provided Glass Flake Epoxy using a roller with medium to fine porosity or a fine bristled brush. The Glass Flake Epoxy should be mixed with the provided hardener in a four to one ratio of paint to hardener. (4 paint to one hardener) c. Allow Glass Flake to set for a minimum period of one (1) hour prior to application of Polyurethane. Glass Flake must not feel soft to the touch or the Polyurethane will not adhere. d. After Glass Flake has sufficiently dried, apply one coat of the provided Polyurethane using a roller of similar porosity as Page 3 of 8

described above. The Polyurethane should be mixed with the provided hardener in a four to one ratio. (4 Polyurethane to one Hardener) The Polyurethane requires approximately sixteen hours to fully cure. Note: drying time may vary somewhat due to temperature and/or humidity. The above times are determined by the manufacturer and are based on ideal conditions. Engine/Generator Setting 1. Vibration isolators will arrive attached to the tank top. 2. Generator to be lifted using manufacturers recommended method 3. Set generator on vibration isolators and replace bolts to finger tight. (bolt torque process to be completed by certified CAT Technician) Exhaust and Emissions 1. Using the manufactures lifting lugs, set the Clean Emissions Module (CEM) on the fuel tank. Secure the unit using the supplied hardware to the prewelded studs on the tank. 2. Attach the two cylindrical silencers to the CEM using the provided hardware. Check the mounting brackets to ensure they are secure. 3. Align and attach the exhaust to the CEM using the supplied hardware. 4. Reconnect the stainless steel urea lines to the CEM. 5. Reconnect the electrical/control wiring to the CEM. 6. Once the enclosure is set, remove the shipping covers and lower the exhaust elbows (qty 2) through the roof of the enclosure and connect them to the cylindrical silencers using the supplied hardware. Page 4 of 8

Enclosure Installation Instructions: Enclosure Off-Loading & Installation Procedures It is recommended that the enclosure be off-loaded using a crane sufficiently sized to handle the weight of the enclosure. The weight of the enclosure is indicated on the Submittal Drawings Cover Sheet. This weight is an approximation and the crane should be selected accordingly. 1. Procedures for Enclosure Off-Loading: a. The enclosure is provided with a minimum of four lifting lugs located on the roof channels along the length of the enclosure. b. It is recommended that a spreader bar with four cables with hooks be used for lifting the enclosure. 2. Enclosure Installation: a. Enclosure should be centered on the fuel tank and then secured by installing the appropriate hardware & mounting clips. Mounting clips have 5/8 diameter holes. Each Phoenix Enclosure is provided with self-adhering foam gasket material for the enclosure base channels. This material is provided in an effort to compensate for any variations that may occur in the concrete slab or fuel tank / load frame on which the enclosure shall rest. Following are instructions for the placement of the gasket material. 1. Once the enclosure base channels have been identified on the fuel tank, the contractor can then place the gasket material on the outboard bottom of the base channels. 2. As the enclosure is being lowered to the desired location, but prior to the final setting of the enclosure, some minor adjustment may be required to align the enclosure accurately with the layout on the fuel tank and the radiator shroud. Page 5 of 8

Enclosure Auxiliary Re-assembly Procedures The enclosure has been pre-assembled, wired and plumbed at Phoenix Products. Prior to shipping, some auxiliary power / electrical wiring or fuel related piping & controls may have been disconnected to allow for shipping. Any roof penetrations will be covered with Aluminum panels or other means that will need to be removed prior to installation. 1. The following list is an example of, but not limited to items that may require reconnection / re-assembly by Contractor: a. Caterpillar 3516C-HD, 2500 kw Tier 4 Generator Set (Engine, Generator, Radiator & Clean Emission Module (After Treatment) b. Discharge plenum extension - Using the provided lifting lugs set the plenum over the air discharge. (see fig. 1 ) - Apply sealant (provided) (see fig 2) - Anchor discharge plenum to enclosure with provided hardware. c. Bolt-on side air intake hoods - Using the provided lifting lugs set the hoods into the channel pre-mounted on the sidewall of the enclosure. - Anchor side air intake hoods with provided hardware. - Apply sealant to all contact points, where the hood meets the enclosure. (see fig. 3) d. Wiring from electrical panel to be reconnected to generator and peripherals. e. Electrical interconnects as required for project specifics f. Grounding g. Air Compressor (separate 480v feed) h. 150 Gallon DEF Day Tank, Pumps & Controls. i. Fuel Tank piping & fuel alarm wiring j. Fuel Polishing System Page 6 of 8

Figure 1 Figure 2 Page 7 of 8

Figure 3 Fig. 4 Page 8 of 8