Schedule of Electrical Permit Fees. Contractor

Similar documents
City of St. Anthony Village Silver Lake Road St. Anthony, Minnesota FEE SCHEDULE

Fee Schedule for Whitehall Township

CHAPTER V RESIDENTIAL WIRING

PUBLIC NOTICE. Borough of Tenafly ORDINANCE NO

Keycodes Inspection Agency PO Box 391 Bethlehem, Pennsylvania

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

TABLE II Electrical Permit Fees

See NT POWERCOS , Classification Based On Service Size.

BUILDING PERMIT FEES BUILDING VALUATION DATA

Approved Meter Sockets and Cabinets

Schedule 'B' Bylaw #635-DA-18 The Inspections Group Inc. Building Permit Fee Schedule

Standard retail electricity supply

BUILDING PERMIT FEES

M A N I T O B A Order No. 48/13. Régis Gosselin, BA, CGA, MBA, Chair Before: Raymond Lafond, BA, CMA, FCA, Member Larry Soldier, Member

MASTER FEE SCHEDULE. $50 initial minimum charge plus $20 per hour if minimum is exceeded COMMERCIAL RATES. Once per week collection

ONTARIO AMENDMENTS TO THE CANADIAN ELECTRICAL CODE PART 1, C22.1. As amended

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

ELECTRICAL INSPECTION ACT ELECTRICAL INSPECTION AND CODE REGULATIONS

ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE

Spring Test 10 due 05/11/2013

MASTER FEE SCHEDULE. SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec )

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Requirements for Secondary Voltage Revenue Metering (750 V and less)

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B;

ORDINANCE NO. WHEREAS, The City of Georgetown established its current electric rates in 2007;

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

$ homes in a subdivision. The Fee includes an S-1 Pedestal. $ homes in a subdivision. The Fee includes an S-2 Pedestal.

Application for Service Residential Subdivision / Development

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Chapter 1 Electrical Theory...1

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

SECTION VII METERING INSTALLATIONS

10. METERING General Requirements

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

2014 NEC Analysis Part 2

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

INCREASE YOUR POWER FACTOR Manufactured By XZERES Corp.

Section 6 Electric Metering: Residential

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

Fee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours

PLANNING AND DEVELOPMENT DIVISION OF BUILDING & INFRASTRUCTURE HAMILTON COUNTY,OHIO. SCHEDULE OF FEES January 1, 2019, EDITION

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

Volume 2 Charts, Formulas, and Other Useful Information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

PASCO COUNTY UTILITIES SERVICE CONNECTION APPLICATION Single Residential or Commercial

Page Number Schedule Rate Class Description 1 R

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast

GENESEO MUNICIPAL UTILITIES 115 S OAKWOOD AVE GENESEO IL 61254

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Spring Test 7 due 05/03/2013

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011

ORDINANCE NO THE CITY COUNCIL OF THE CITY OF OTHELLO, WASHINGTON DOES ORDAINS AS FOLLOWS:

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

POPLAR BLUFF MUNICIPAL UTILITIES AND CITY CABLE

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Western Section IAEI Code Panel Questions

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

TECHNICAL TERMS AND ABBREVIATIONS. Alternating Current An electric current that reverses its direction at regularly recurring intervals.

UNS Electric, Inc. Rules and Regulations

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

SINGLE PHASE WIRING SPECIFICATIONS

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

CARTHAGE WATER & ELECTRIC PLANT ELECTRIC RATES RESIDENTIAL SERVICE

THREE PHASE WIRING SPECIFICATIONS

Schedule SP SOLAR PURCHASE (Experimental)

2011 NEC Changes Part 2 (Homestudy) (Homestudy)

Proposed Zoning Bylaw Text Amendments Pertaining to Electric Vehicle Charging Infrastructure Requirements (Bylaw No. 4905,2018)

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

APUA TARIFFS ELECTRICITY TARIFFS

Metering and Service Installation:

RESOLUTION #84 LICENSE AND FEE SCHEDULE

Customer Metering and Services Guide Revised: May 2017

Table Fire Prevention Code Permit Requirements

Electric Rate Schedules

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

Electric Service Requirements

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

CONTINUING EDUCATION FOR OREGON ELECTRICIANS NEC Code Change Part 1 8 Hours

Photovoltaic Solar Plan Review

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

Electric Service Guide. Residential

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

Security Requirements for Contents

UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49

A Look at the 2017 NEC Significant Changes

N.H.P.U.C. No ELECTRICITY GRANITE STATE ELECTRIC COMPANY DBA LIBERTY UTILITIES. SUPERSEDING N.H.P.U.C. No. 17 TEMPORARY RATES

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Managing Electric Vehicle Supply Equipment (EVSE) Installations

A guide to rate information & requirements for the interconnection of a solar distributed generating system

Residential Application for New Electric Service

Transcription:

Schedule of Electrical Permit Fees Contractor Effective: August 1, 2018 Issued By: Manitoba Hydro Customer Metering & Electrical Codes c2018-05-02 Available in accessible formats upon request

Table of Contents Schedule 2 Flat Rate Permit Fees RESIDENTIAL Contractors 1 Single Dwellings/Mobile Homes 4 2 Trench or Overhead Conductors 4 3 Alterations, Additions, Rec Rooms, Sun Rooms, etc. 4 4 Devices Not Over 20 Amperes 4 5 Devices Over 20 Amperes 5 6 Motors, Transformers, Refrigeration, Heating, Cooking or Similar Equipment HP/kW/kVA/Ton 5 Schedule 2 Flat Rate Permit Fees COMMERCIAL Contractors 1 Hotels, Motels, Personal Care Homes and Dormitories 6 2 Schools 6 3 Apartment Buildings and Senior Citizens Residences 6 4 Multi-Unit Residential Complexes 6 5 Relocatable Structures 6 6 Trench or Overhead Conductors 6 7 Temporary Services 6 Schedule 3 Itemized Permit Fees LOW VOLTAGE Installations 1 Consumer Services 7 2 Distribution 7 3 Devices Not Over 20 Amperes 7 4 Devices Over 20 Amperes 7 5 Electric Signs 7 6 Lamp Standards 7 7 Mobile Home and Recreational Vehicle Parks 8 8 Motors, Transformers, Refrigeration, Heating, Cooking or Similar Equipment HP/kW/kVA/Ton 8 9 Fuel Burning Space Heating Equipment 8 10 Fuel Dispensing Devices (Gas, Propane, Natural Gas) 8 11 Voice Data Video (VDV) and Alarm Installations 8 12 Renewable Energy (for the installation of solar photovoltaic, wind and hydropower systems) 8 Schedule 4 Itemized Permit Fees HIGH VOLTAGE Installations 1 Services 9 2 Distribution 9 3 Motors and Transformers 9 All prices are subject to GST 2

Schedule 5 General 1 Hourly Inspection Rates 10 2 Safety Inspection 10 3 Travelling Expenses 10 4 Extra Inspections 10 5 Annual Permit 10 6 Special Acceptance of Electrical Equipment 10 7 Penalty 10 8 Special Inspection Prior to the Reconnection of Existing Residential Services / Dwelling Units 10 9 Special Inspection Prior to the Reconnection of Existing Commercial Services / Installations 10 10 Plans Examination and Manitoba Electrical Code Deviation Request 10 All prices are subject to GST 3

Schedule 2 Flat Rate Permit Fees RESIDENTIAL Contractors Registered Non-Registered Minimum Permit Fee (Non-Refundable) $110.00 $165.00 1 Single Dwellings/Mobile Homes a) New single dwellings, 200 Amps or less (service included). $250.00 $350.00 b) New single dwelling, over 200A, not exceeding 400 Amps (does not include service see NOTE 1). $300.00 $400.00 c) New single dwellings, over 400 Amps (does not include service see NOTE 1). $350.00 $450.00 d) Ready-To-Move Homes (RTM) Separate permits are required for: i) Wiring at the building site. $96.25 $192.50 ii) Wiring at the permanent site. $96.25 $192.50 e) Mobile Homes Connection of a mobile home. $96.25 $137.50 f) Additions and Alterations to Service, Meter Socket or Distribution Panels, Temporary Services or Reconnection of Existing Services. $96.25 $137.50 g) Central Heating, Cooling, Air Conditioning Units and Heat Pumps $82.50 $110.00 h) Residential Garages, or similar outbuildings i) Sub-panel 100 Amps and less, including 20 devices maximum $82.50 $110.00 ii) Sub-panel exceeding 100 Amps, including 20 devices maximum $82.50 $110.00 iii) Devices in excess of 20, as per Items 4, 5 & 6 i) Hot Tubs $82.50 $110.00 j) Swimming Pools $82.50 $151.25 k) Extra Trip $82.50 $110.00 l) Additional Permit $82.50 $110.00 2 Trench or Overhead Conductors i) Trench or Overhead Conductor Inspection $82.50 $110.00 ii) Trench Approval $41.25 $55.00 3 Alterations, Additions, Rec Rooms, Sun Rooms, etc. Maximum 20 devices (Heating & additional devices as per Items 4,5 &6) $110.00 $220.00 4 Devices Not Over 20 Amperes Switches, receptacles, lighting fixtures, fire and intrusion alarm devices and similar equipment rated not over 20 amperes: i) For the first 100 units, each: $2.50 $2.50 ii) For the remaining units, each: $1.75 $1.75 All prices are subject to GST 4

5 Devices Over 20 Amperes Switches, receptacles, lighting fixtures and similar equipment rated over 20 amperes i) For the first 4 units, each device: $12.50 $12.50 ii) For the remaining units, each device: $5.00 $5.00 6 Motors, Transformers, Refrigeration, Heating, Cooking or Similar Equipment - HP/kW/kVA/Ton Each unit, including controls on the load side of the branch circuit overcurrent device: i) Fractional, each unit $6.00 $6.00 ii) 1, but not over 4 $15.00 $15.00 iii) Larger than 4, but not over 25 $28.50 $28.50 NOTE 1: For additions, alterations, or new services exceeding 200Amps, an additional permit will be required as per Schedule 3 NOTE 2: For the reconnection of existing Consumer s Services which have been disconnected for 6 months or longer, or for buildings located within National Parks boundaries, See Schedule 5. All prices are subject to GST 5

Schedule 2 Flat Rate Permit Fees COMMERCIAL Contractors Minimum Permit Fee (Non-Refundable) $165.00 1 Hotels, Motels, Personal Care Homes and Dormitories a) Each unit $110.00 b) For areas such as lounges, recreation areas, conference rooms, kitchens, dining rooms, restaurants and other commercial premises, for each 10 m 2 of the floor area based on the outside dimensions $16.50 2 Schools For each 10 m 2 of useable floor area, based on the outside dimensions. (Does not include re-locatable structures.) $16.50 3 Apartment Buildings and Senior Citizens Residences Apartment buildings and senior citizens residences, (three or more dwelling units with shared entrances and a single consumer service): a) Each unit (address) $165.00 b) For areas such as lounges, recreation areas, conference rooms, kitchens, dining rooms, restaurants and other commercial premises, for each 10 m2 of the floor area based on the outside dimensions $16.50 c) For commercial premises located in the building based on applicable fees as listed in Schedule 3. 4 Multi-Unit Residential Complexes For garden apartments, row housing, condominiums, and other such buildings: (Separate entrances, no shared hallway) a) For each unit $220.00 b) For commercial premises located in the building based on applicable fees as listed in Schedule 3. 5 Relocatable Structures i) Wiring at the building site. $220.00 ii) Wiring at the permanent site. $220.00 6 Trench or Overhead Conductors i) Trench or Overhead Inspection $165.00 ii) Trench Approval $55.00 7 Temporary Services i) Up to 200 Amperes Single phase $165.00 ii) Over 200 Amperes Single phase $220.00 iii) 3-Phase, as per Schedule 3. All prices are subject to GST 6

Schedule 3 Itemized Permit Fees LOW VOLTAGE Installations 1 Consumer Services For the installation or reconnection of each service box, meter socket, metering transformer enclosure, Customer Service Termination Enclosures (C.S.T.E. s), or similar apparatus, the fee shall be determined by the ampacity of the equipment: i) Not over 200 amperes $55.00 ii) Over 200 but not over 1 000 amperes $110.00 iii) Over 1 000 amperes $165.00 2 Distribution For each panelboard, switchboard, splitter, alarm panel, control panel, enclosed switch or similar apparatus, the fee shall be determined by the ampacity of the equipment: i) Not over 200 amperes each unit $55.00 ii) Over 200 but not over 1000 amperes each unit $110.00 iii) Over1000 amperes each unit $165.00 NOTE: A combination service box and panelboard shall be deemed as a separate service box and panelboard. 3 Devices Not Over 20 Amperes For switches, receptacles, lighting fixtures, fire and intrusion alarm devices and similar equipment rated not over 20 amperes: i) For the first 100 units, each device $2.50 ii) For the remaining units, each device $1.75 *Power Smart Lighting (for each address) i) For the first 100 units, each device $2.50 ii) For the remaining units, each device $1.75 4 Devices Over 20 Amperes For switches, receptacles, lighting fixtures and similar equipment rated over 20 amperes: i) For the first 4 devices, each device $12.50 ii) For the remaining devices, each device $5.00 5 Electric Signs i) For the first sign $165.00 ii) For the first sign retrofit, with approved retrofit kit $110.00 iii) For each additional sign, and/or sign retrofit with approved retrofit kit on the same premises and under the same permit $40.00 6 Lamp Standards For each lamp standard $20.00 All prices are subject to GST 7

7 Mobile Home and Recreational Vehicle Parks For power pedestals: i) First 10 units, each unit $31.00 ii) Remaining units, each unit $15.50 8 Motors, Transformers, Refrigeration, Heating, Cooking or Similar Equipment-HP/kW/kVA/Ton* For each unit including controls on the load side of the branch circuit overcurrent device: i) Fractional each unit $6.00 ii) 1, but not over 4 $15.00 iii) Over 4, but not over 25 $28.50 iv) Over 25, but not over 100 $61.50 v) Over 100, but not over 500 $132.00 vi) Over 500 $264.00 *NOTE: For air conditioning 1 ton = 1 kw 9 Fuel Burning Space Heating Equipment For fuel burning equipment: i) For each unit not over 200 000 BTU $46.50 ii) For each unit over 200 000 BTU $96.50 iii) For each fuel fired unit heater $15.50 iv) For field wired associated equipment, such as valves, pumps or dampers, the fee shall be determined by the rating of each device 10 Fuel Dispensing Devices (Gas, Propane, Natural Gas) For each unit $55.00 11 Voice/Data/Video (VDV) and Alarm Installations i) For the main control panel, including up to 50 devices $165.00 ii) For each device in excess of 50, $1.75 iii) For each additional rack; including all components installed in each rack, such as; hubs, patch panels, modems, router, etc. Each $55.00 12 Renewable Energy (for the installation of solar photovoltaic, wind, and hydropower systems) a) Not over 2 kw i) For the first 500 w $100.00 ii) For each additional 500 w or portion $100.00 b) Over 2 kw i) For the first 2 kw $400.00 ii) Each additional kw $40.00 All prices are subject to GST 8

Schedule 4 Itemized Permit Fees HIGH VOLTAGE Installations 1 Services For each service including metering and grounding. $1,500.00 2 Distribution For each unit or cell of protective or switching equipment $200.00 3 Motors and Transformers For each motor, transformer and similar equipment: i) Up to 500 hp/kva $250.00 ii) Over 500 but not over 1 000 hp/kva $350.00 iii) Over 1 000 hp/kva $500.00 All prices are subject to GST 9

Schedule 5 General 1 Hourly Inspection Rates For the inspection of an installation where the fees in Schedules 1, 2, 3 and 4 are not applicable: a) Normal Office Hours i) For the first ½ hour or part thereof the fee shall be $85.00 ii) For each additional 15 minutes $40.00 b) Outside Normal Office Hours For inspections outside normal office hours, the fee shall be double the hourly fee. 2 Safety Inspection The fee for Safety Inspection shall be at the hourly rate. 3 Travelling Expenses When a special trip is required a minimum 3 hours will be billed, or when the installation is not accessible by road, traveling expenses may be charged in addition to the regular inspection fees. 4 Extra Inspections When extra inspections are required, the permit fee shall be at the hourly rate. Minimum one hour. $165.00 5 Annual Permit The fee for an annual permit shall be at the hourly rate and based on the total hours of inspection performed over a 12 month period. The minimum permit fee for an annual permit, which is payable upon application, shall be $440.00 6 Special Acceptance of Electrical Equipment a) Special acceptance of electrical equipment shall be charged at a minimum of 3 hours and additional time at the hourly rate b) For each special acceptance label. $25.00 7 Penalty i) When an electrical permit is not requested prior to commencement of the work, a penalty in addition to the normal permit fee will be levied to the Permit Applicant $500.00 ii) Reinstatement of permit privileges after privileges have been revoked $250.00 8 Special Inspection Prior to the Reconnection of Existing Residential Services or Dwelling Units, or Residential Dwellings Located Within National Parks Boundaries, Fee per unit shall be $220.00 9 Special Inspection Prior to the Reconnection of Commercial Services or Installations The fee will based on the hourly rate 10 Plans Examination and Manitoba Electrical Code Deviation Request (for the initial review/code deviation request, and each additional review/ code deviation request) i) The fee will based on the hourly rate $165.00 All prices are subject to GST 10