Network Demand Management Case Study Willows Shopping Centre, Townsville September 2011

Similar documents
Infrastructure planning for Electric Vehicles (EVs): How Queensland is charging ahead. Tim Harrison

Case Study STREAMS SMART MOTORWAYS

Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

For personal use only

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Automated and Electric Vehicles Bill

40KW Solar System for Apple Sauce Co

Commercial Solar Systems

Power Quality and Energy Management

Capabilities Brochure

Electricity Demand Reduction Pilot BSRIA. Charlie Lewis, DECC 25 March 2014

Tune-Ups Policy Overview & Accelerator Program

Street Address. City-Village-Township

PRESENTER PETER NJENGA CHIEF ENGINEER, CUSTOMER SERVICE, KENYA POWER EAST AFRICAN POWER INDUSTRY CONVENTION 2012

WINNIPEG HYDRO QUICK FACTS

Street Address. City-Village-Township

The Electricity Grid Scottish Power Energy Networks Overview

Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

SRP AND THE EVOLVING ENERGY WORLD ANDREA CHALMERS SENIOR SUSTAINABILITY STRATEGIST

SCHEDULE NO. ACG33 NET METERING SERVICE

Rwanda Biofuels Limited. Powering Rwanda s Development

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

A Sustainable Transport Project. Status and Progress

Transportation Electrification: Reducing Emissions, Driving Innovation. July 2017

Power factor correction Don t pay the price for poor power quality

REPOWERING TRANSPORTATION

Purple Line Light Rail P3 Project

Emerald Reactive Support Alternative Solution Expressions of interest

Introducing AusNet Services Regulated Energy Services and the Distribution Business

THE CENTRAL ROAD FUND (AMENDMENT) BILL, 2017

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

MIKOH CORPORATION LIMITED (ASX:MIK) For personal use only

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 27, 2017

Welcome to ICN s accessing resources seminar

Planning for Electric Vehicles (EVs): How Queensland is charging ahead. Dr Michael Kane

WA LABOR Manufacturing Railcars Locally

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

Reliable, economical and safe siemens.com/rail-electrification

Yong Tae (Philip) Yoon Electric Power Network Economics Department of Electrical Engineering Seoul National University

California Energy Commission. December 7, 2015

Your Needs. Our Technology.

Wholesale Developer Services Charges

Feasibility of Establishing an E85 Fuelling Station in Oshawa

A Transformational Approach to Energy Supply. September 2016 Gail Scholes, Jo Gilbert

Phone: Website: CAPABILITY STATEMENT. Energy Efficiency & Sustainability Engineers

6 York Region Transit (YRT/Viva) On-board Security Camera System Upgrade Contract Award

Origin Solar Presentation

Final report. Solar feed-in tariff report

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

24 July Fuel Quality Review Marsden Jacob. Dear Sir or Madam

Monitoring report. Solar feed-in tariff report

BROCHURE. End-to-end microgrid solutions From consulting and advisory services to design and implementation

BMW GROUP DIALOGUE. HANGZHOU 2017 TAKE AWAYS.

FRONIUS SNAPINVERTERS SMARTER, LIGHTER, MORE FLEXIBLE. / Perfect Welding / Solar Energy / Perfect Charging

Taking Innovation on the Road: Increasing Efficiency in Nova Scotia's Beverage Container System. Oct. 16, 2014

Quarterly Report to 30 June 2012

Layered Energy System

DG system integration in distribution networks. The transition from passive to active grids

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Demand Management for Electricity Networks

Medium Voltage Drives. ABB Value Provider Program Partnership for growth and profit

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Initiatives on BMTC. BMTC - Bringing Bangalore to your Door Steps. By MUKKANNA.B Chief Mechanical Engineer BMTC, Bangalore 18/12/2015

The potential for local energy storage in distribution network Summary Report

Submission to Select Committee on Electric Vehicles - inquiry into the use and manufacture of electric vehicles in Australia

BMW Group Investor Relations.

Electric Vehicle Charge Ready Program

ESS Lighting Instruction Pack Original Energy Saver

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

X5 RETAIL GROUP NET RETAIL SALES GROW 24.9% IN Q Total net retail sales growth remained strong at 24.9% y-o-y in Q3 2017, driven by:

ABB n.v PQF LV Active Filters: Bringing energy savings to you

Mississauga Bus Rapid Transit Preliminary Design Project

Efficiency Works Business

A new motorcycle graduated licensing system

BUILDING A LEVEL PLAYING FIELD FOR LOCAL ENERGY WITH LOCAL NETWORK CREDITS AND VIRTUAL NET METERING

Province of North-Brabant ELENA: Zero Emission Buses in the South of the Netherlands

ENERGY STORAGE AS AN EMERGING TOOL FOR UTILITIES TO RESOLVE GRID CONSTRAINTS. June 18, 2015 E2Tech Presentation

City Power Johannesburg: Response to Potential Load Shedding. Presented by : Stuart Webb General Manager : PCM October 2014

Capital Needs Assessment Riders Advisory Council July2, 2008

Ergon Energy s experience in meeting the challenges of increasing peak demand and customer expectation.

THE PUBLIC SERVICE COMMISSION OF WYOMING

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

TORONTO TRANSIT COMMISSION REPORT NO.

Siemens logo. (PRNewsFoto/Siemens Corporation)

MEDIA RELEASE. June 16, 2008 For Immediate Release

Grow your Business with smart home energy solutions

Seattle Building Tune-Ups Overview

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Pangolin Associates case study

Power Supply Cost Recovery

Government of Sierra Leone. Directions in. Energy. Opportunities for Investment and Partnerships

Power Quality. Power Factor Wiring and Service. Background. Introduction. bchydro.com

Metal enclosed capacitor banks: ABBACUS family

ENERGY SOLUTIONS RESIDENTIAL STORAGE BATTERY SYSTEM

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

Transcription:

Network Demand Management Case Study Willows Shopping Centre, Townsville September 2011

Network Demand Management Case Study Willows Shopping Centre, Townsville Key challenge Dexus Property Group was keen to install power factor correction equipment at its Willows Shopping Centre to maximise network utilisation, help protect its existing electrical equipment and extend the service life of that equipment. Coincidentally, it was undertaking a major expansion program and was keen to have power factor correction equipment installed at the time of construction. Willows Shopping Centre, Townsville. Background Willows Shopping Centre, owned by the Dexus Wholesale Property Fund, is in Townsville, one of the fastest growing areas of regional Queensland. On average, 500,000 shoppers pass through the centre s doors every month. At the time, Willows Shopping Centre comprised 23,630 square metres of lettable space accommodating three major and 80 small tenants. Under an $83 million redevelopment plan, it would add 17,000 square metres of lettable space to accommodate six major and 125 small tenants. As well, it would build an $8 million, 500-seat food court and upgraded amenities. Dexus Property Group is a leading manager and developer of shopping centres in Australia and New Zealand, with 15 centres under management. Dexus Property Group is committed to being a market leader in corporate responsibility and sustainability and adopts sustainable practices at Willows Shopping Centre as well as supporting the local community s sustainability initiatives. Energy Management Plan overview Willows Shopping Centre Management was aware of interstate programs that offered financial assistance for power factor correction and approached Ergon Energy to inquire if any assistance was available in Queensland. Ergon Energy was able to offer a financial incentive payment for delivered kva reduction on the shopping centre s business-as-usual scenario under its Townsville Network Demand Management Pilot project. As well, Dexus Property Group needed to install an additional 1500kVA substation to extend the shopping centre as planned. Under the amended Connection Agreement and in accordance with the National Electricity Rules, Ergon Energy required a power factor of at least 0.9.

Business-as-usual scenario The existing power factor at Willows Shopping Centre s six connection points was poor, with five points recording PF 0.75 and one 0.74. The lighting within the centre was predominantly 36-watt fluorescent lamps. Air-conditioning accounted for 50-60 per cent of the shopping centre s power consumption. Demand management solution The demand management solution focussed on fixing the existing electrical installation and extending the life expectancy of that equipment, while protecting from the outset the installation of new electrical equipment in the extended shopping centre. Independently, Dexus Property Group had approached the market for a quote to replace some 700 fluorescent lamps with energy-efficient LED lighting. It also had instigated the installation of power factor correction equipment on two supply points in the existing shopping centre, prior to the start of construction on the planned extensions when an additional four power factor correction units would be installed. After approaching Ergon Energy, an initial site inspection by the electricity utility immediately confirmed the potential demand savings that could be achieved through improved electricity reticulation around the shopping centre if a power factor greater than 0.92 could be achieved. Ergon Energy commissioned a Level 2 audit which confirmed the poor power factor and harmonics across the site. It also identified that power factor correction would: take stress off the main switchboards and transformers feeding them reduce heat load and harmonics improve electrical infrastructure within the complex, i.e., switchboards and sub-mains; and provide a more reliable installation overall. The graph above shows the immediate improvement in power factor following installation of the correction equipment. The dips are the result of explained anomalies in load and did not require further investigation. The graph above shows the kw load in 2009. The load increases from June to after Christmas and is much higher going in to 2010, possibly as a result of the centre extensions.

Results Utilisation of the electricity supplied to Willows Shopping Centre improved immediately after the first installation of power factor correction equipment in July 2009. The power factor correction equipment has maintained power factor at above 0.9, and mostly between 0.95 and 0.98 (that is, more than 90 per cent of the electricity delivered to site is used). Power factor has been maintained at these high levels during times of heavy shopping traffic, such as Christmas Eve, and from 2010 when the extensions to the shopping centre opened. Measurement and Verification (M&V) Results Table Business as usual Post-EMC* implementation Savings / annum Demand (kva) 4062 3384 16.69% * EMC = Energy Management Concept Before the renovations and installation of power factor correction, the maximum kw load was 2596. This occurred at 3216 kva and 0.807 PF. After the renovations and installation of power factor correction, the maximum kw load was 3850. This occurred at 4075 kva and 0.945 PF. Based on the PF of 0.807 at the maximum load before and the maximum load afterwards, an independent auditor confirmed there had been an approximate saving of 700 kva due to the power factor correction installation. Bonus outcome Willows Shopping Centre has achieved optimum utilisation of the energy supplied to it and sees itself as being ahead of the game in the event that a kva billing component is introduced to commercial and industrial connection contracts. Cost Ergon Energy paid Willows Shopping Centre $70,000 for delivering a reduction in demand of about 700 kva. Partners Electroserv Pty Ltd Eco Efficiency Experts Australasia Pty Ltd Energy Correction Options Customer testimonial If it helps to reduce the supplier s need to build further electrical infrastructure and if we all can reduce demand in the longer term we can avoid load-shedding and blackouts. In the short-term it helps the shopping centre regulate voltage, Willows Shopping Centre Operations Manager Tony Armit said. Power-factor correction equipment in the older part of the shopping centre.

Future Initiatives Dexus Property Group has installed power factor correction equipment at its adjacent Sunland Plaza property. It will consider installing power factor correction equipment in all its future commercial building applications. Willows Shopping Centre Management has since upgraded the centre s high-voltage network and is continuing to pursue greater electrical efficiency with its air-conditioning. It also is considering installing LED street-lighting in its car parks.