ZODIAC 601 XL. Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1.

Similar documents
STOL CH 701. STOL CH701 cabin. Top view: Tunnel 7F11-4 between the Seats. STOL CH701 Seats

FUSELAGE CABIN ASSEMBLY

Section 75-ZA-3 Fin & Rudder Cable Fairing Installation

Section 75-FA-4. Forward Fuselage

STOL CH F8-2 Front Floor Stiffener. Cut and position the Front Floor Stiffener to the Floor 7F8-7. Back drill through the Floor 7F8-7.

12/03 EXPLODED VIEW 1) L angles on first rear rib: moved from inboard to outboard side of rib (12/03)

UPDATES to Revision 3, 9/99 Date this document was printed: 12/20/02

AIRCRAFT FINISHING Assembling the Front Seat Frames

ROLL BAR FRAME 2 PLACES F-1231A-FL ROLL BAR FRAME F-1231C INBOARD F-1231B OUTBOARD ROLL BAR STRAP BAGGAGE BULKHEAD

11 - Fairings. Fairings. February XLF Page 11-1

SERVICE KIT thru , 631, 634, 675 R thru R F thru F FR thru FR

4-Bulkheads. Bulkheads. December XLR Page 4-1

Page: MEMO: In Figure 3, "2X 1 3/32 [27.78 mm]" was "2X 1 3/32 [2.75 mm]"

Page REV 1: Added "Step 4: Bend the tabs on the wiring channel to match the slant of the F L & -R Tunnel Sides."

REVISION DESCRIPTION:

36-01 REV 1: Updated figure to depict current F Bellcrank configuration.

2000 SERIES PA-30 / PA-39 STC NO. SA00233SE PA-24 STC NO. SA4150NM

Page: MEMO: In NOTE before Step 5, "Whenever possible, ream using a drill press..." was "Always ream using a drill press...".

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL MOONEY M20 SERIES & M22 STC NO. SA4342NM NOTE: READ THESE DIRECTIONS BEFORE STARTING!

SECTION 22: FWD LOWER FUSELAGE VAN'S AIRCRAFT, INC F-1257 RUDDER PEDAL SUPPORT CHANNEL, 4 PLACES WD-1204 ENGINE MOUNT BRACKET, 2 PLACES

Page: REV 1: In Step 4 "a minimum of 1/16 [1.6 mm] gap" was "an approximately 1/16 [1.6 mm] gap."

WING ASSEMBLY SECTION 13 INSTALLING FUEL TANKS AND RIVETING THE WING SKINS CLOSED

REVISION DESCRIPTION: REV 2: Steps re-written for clarity REV 2: Steps re-written for clarity.

Section 13. Tail Rotor Drive. RotorWay International A600 TALON Construction Manual. Section 13. Page A

SERVICE BULLETIN

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL PA28/PA32 STC # SA00762SE

FUSELAGE ASSEMBLY SECOND SECTION (of three)

EXPRESS ASSEMBLY MANUAL SECTION 3 F5-RG/FT WING ASSEMBLY. Procedure 3.050A INSTALLATION OF AILERON TORQUE TUBE ASSEMBLY

REVISION DESCRIPTION:

FLAP, AILERON, FLAP/FUSELAGE AND STABILATOR GAP SEAL INSTALLATION AND MAINTENANCE MANUAL

F-1202D-L PANEL ATTACH STRIP F L UPPER FWD FUSELAGE SKIN RIB F CABIN EGRESS HANDLE F-1240B COVER PLATE

Page: REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS.

12.0 CONTROLS 3/3/2006. Page 1

REVISION LIST CHAPTER 14: CENTER CONSOLE

53-40 ATTACH FITTINGS

performance S T O L Installation Instructions Manual No. PSTOL-013 Double Slotted Flaps for Piper PA-18 Series Aircraft

1) Page: REV 5: Changed depiction to show added hardware and T-01220

SECTION 26iS/U: FUEL TANK VAN'S AIRCRAFT, INC. T R OUTBOARD RIB IE-00001X MECHANICAL FUEL GAUGE T R INBOARD RIB T R

The engine cowling installation and firewall should be inspected and modified as specified in this Service Bulletin.

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL STC NO. SA2602NM

VAN S AIRCRAFT, INC.

Installation Instructions

Zenair Europe Service Letter

Issue 0/Rev.00-0 Aug Page /

SERVICE INSTRUCTION SI Revision 1

POLY TIP-DOWN WINDSHIELD KIT

NEW PRODUCT RELEASE. PRODUCT/KIT NAME: 12 Stabilator Tip Fairing Kit

Lexus ES Fine Mesh and Adaptive Cruise Control Fine Mesh Grilles Upper and Lower Replacements

REVISION LIST CHAPTER 21: FLAP SYSTEM COMPLETION

APPLICABLE MODELS PA , PA , PA , PA , PA PA-28R-180, PA-28R-200, PA-28S-160, PA-28S-180

Flaps System. 1. General

PPM-5203 TJ/LJ FRONT CAGE KIT Version 1.1

VAN'S AIRCRAFT, INC. SECTION 40: LIGHTING

Airworthiness Directive Schedule

REVISION LIST CHAPTER 15: SEATS AND SEAT BELTS

STEP 1 - APPLYING HINGE BEVELS TO FRONT WING, REAR WING, VERTICAL STABILIZER, AND RUDDER FRONT WING (UNDERSIDE) 45 DOUBLE HINGE BEVEL

FAA approval has been obtained on technical data in this publication that affects airplane type design.

D'Shannon Aviation PANEL INSTALLATION INSTRUCTIONS

GlaStar and Sportsman Service Bulletin 67

Page REV 1: In Step 1, added reference to fluid fitting clocking. Added Figure 2 and Figure 3.

AFT MOUNTED OXYGEN SYSTEM INSTALLATION BEECHCRAFT 33, 35, 36, 55, AND 58

KI (14V) & KI (28V) R44

PPM-5224-A JK 4 DOOR REAR CAGE KIT Version 1.1

A Simplified Index of Mooney M-18 Drawings at the NASM

REVISION LIST CHAPTER 6: AILERON CONTROLS

Ballistic Recovery Systems, Inc. PARACHUTE INSTALLATION MANUAL BRS-1350 LS, AMD 601XL Zodiac

Mustang Classic LightBar Instructions

A Product Line of Sonex Aircraft LLC 511 Aviation Road Oshkosh, WI Tel. (920) Fax. (920)

SD3-60 STRUCTURAL REPAIR MANUAL - STRUCTURAL IDENTIFICATION

Nomad FLIGHT CONTROLS AILERONS INSPECTION AND INCORPORATION OF MOD N634. All spare ailerons with the above part numbers.

PORTA-DOCK, INC. 100A 1284 ALUMINUM CANTILEVER BOAT LIFT

Feb/March-2018 FEB/MARCH. Texas Flying Legends P-47 Update. by Chuck Cravens. The CAD rendering becomes reality in these two images.

10. Lower Fuselage Assembly Undercarriage

Ayres service bulletin Corporation

Assembly Instructions

June 16, 1947 OPTIONAL CHANGE SERVICE BULLETIN NO. 17 INSTALLATION STEERABLE TAIL WHEEL. (Includes Supplement 1 and Supplement 2)

Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit Camaro/Firebird P/N: ,

Cold air in let ple num in stal la tion

Super Dragon Glow Conversion

Detroit Speed, Inc. Subframe Connector Kit Mustang P/N #

SERVICE BULLETIN SB00029 Rev B Page 1 of 19

Installation Instructions

SECTION 47: COWL BAFFLE VAN'S AIRCRAFT, INC. CB RIGHT AFT BAFFLE CB CYLINDER 3 BAFFLE VA-187 4" FLANGED DUCT

MODIFICATION KIT. Serial Numbers 300 (LC40-550FG) thru (LC42-550FG) thru (LC41-550FG) thru

REVISION LIST CHAPTER 24: MISCELLANEOUS SYSTEMS

WARNING! THIS PRODUCT MUST BE INSTALLED BY A TRAINED, AUTHORIZED RICON SERVICE TECHNICIAN.

CHAPTER 15 FURNISHINGS. Section Title Page

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

NC Kit # CE-182PQR-00 Air-conditioning installation manual and ICA for Cessna 182 P, Cessna 182 Q and Cessna 182 R

VAN'S AIRCRAFT, INC. SECTION 19: WING SYSTEMS ROUTING

HRP TOP WING ASSEMBLY INSTRUCTIONS

POLY TIP-DOWN WINDSHIELD KIT

SERVICE BULLETIN. No Compliance mandatory. Inspection/Repair of Main Landing Gear Mounting Attachment

IMPORTANT: PLEASE KEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE! 2015 Nissan Murano. Upper and Lower Overlay Mesh Grilles

Installation Instructions

JUNE/JULY. June/July Dakota Territory Air Museum s P-47 Update

EPP Sheet, 3 mm, 20g/dm³. EPP Sheet, 10 mm, 20g/dm³. 900 mm x 580 mm. 900 mm x 580 mm. EPP Sheet, 6 mm, 20g/dm³. EPP Sheet, 6 mm, 30g/dm³

Cock pit Width Increase

CIRRUS AIRPLANE MAINTENANCE MANUAL

Detroit Speed, Inc. Subframe Connector Kit Mustang P/N #

Transcription:

Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1. Tape the side skins to the cabin floor skin (area in front of the center spar). 6-B-13 - Page 1 of 12

GUSSET 6B10-4 Lay out the 2 aft AN3 bolts using the gusset 6B10-4 as guide for edge distance. Drill pilot holes through the main gear attachment 6B11-4. Slide the gusset underneath the spar flange. Set the side flange flush with the bottom skin. The bend flange is flush with the edge of the cabin floor skin. Look down inside the fuselage; gusset in corner between bottom and side skins. Extend the rivet lines for the spar and gear channel to intersect the rivet line on the lower front longerons 6B10-3: these are the end holes for the inboard rivet line in the gusset. Layout pitch 20. Ref middle right diagram on drawing 6-B-15. Layout the rivet at the end of the spar flange (edge distance 10mm). 6-B-13 - Page 2 of 12

Detail of end hole in spar flange. Note: The end hole in the spar flange is not in line with the outboard rivet line through the gusset. Slide a straight edge underneath the longeron to extend the spar rivet line to the edge of the bottom skin. Layout the measured distance to the end hole in the spar flange. The last (aft) rivet in the outboard rivet line. Approximately 45mm to the aft edge of the cabin floor skin 6B10-1 Looking up at the aft end of lower front longerons 6B10-3 Layout the outboard rivet line and side through the gusset. 6-B-13 - Page 3 of 12

Wait to drill the last hole in the side flange, hole will be drill when the wing attachment uprights 6B13-1 are installed. Reinstall the gusset to overlap on top of the spar flange. Layout and the rivet line the side flange. Drill from outside the fuselage. Ref 6-B-15. Looking down at the left side. 6-B-13 - Page 4 of 12

Re-check that the Longerons 6B11-1 are still level 6-B-13 - Page 5 of 12

Bolt the spar insert through the middle hole in the center wing spar. Install the Wing Jig to the center spar. Level top of jig (check fuselage reference line is also level). Detail of rear channel against fuselage. Front view of left side. Top of jig is level 6-B-13 - Page 6 of 12

Location of the aft wing attachment in corner of side skin with the end of center wing spar. NOTE: The Upright only covers the outboard 5/16 hole in the spar, Ref 6-B-13 WING ATTACHMENT 6B13-1 Trim the top flange to fit underneath the Upper Front Longeron 6B11-1 The 20mm flange overlaps the fuselage side skin. Clamp the wing attachment upright to the spar. IMPORTANT: Place a piece of wood between the clamp and the spar and wing attachment angle (to protect the parts). 6-B-13 - Page 7 of 12

9 DEGREES PLYWOOD SPAR TEMPLATE Ref 6-B-13 & 6-B-15 Use a square along the front of the Gear Channel and the side of the template. Rear view of left side. Position the diagonal side of the template against the Upright 6B13-1. Level the top of the template, the front edge of the template is pushed up against the Upright 6B13-1. Clamp the top of the Upright to the fuselage side skin. The spar is at 81 degrees to the Longerons 6B11-1. Ref 6-B-15 Photo of left side. The Spar is at 9 degrees to the Longerons. IMPORTANT: Keep the template out of the bend radius, the template is on the flat flange portion of the wing attachment. 6-B-13 - Page 8 of 12

The Plywood spar template is square to the gear channel; it is not in line with the fuselage sides. Rear view of right side. Clamp the top of the wing attachment 6B13-1 to the side skin. The wing attachment overlap the side flange of the gusset 6B10-4. The first hole from the bottom (in the fuselage side skin) will also be drilled through the side flange of the Gusset 6B10-4. Note: Board between wing attachment and the clamp to prevent damage to parts. Do not over tighten. 6-B-13 - Page 9 of 12

CHECK: the top flange of the spar does not touch the aft Upright Detail of left side cutout. The Cutouts in the top aft corners of the Spar flange are large enough to make room for the rear Upright 6B13-1. A5 PITCH 20 6B13-1 to 6B11-2 Lay out the rivet line, set the pitch. Drill and Cleco. 6-B-13 - Page 10 of 12

The Gusset overlaps on top of the gear Channel flange and the spar flange 6W4-1 Trim the front and aft end of the gusset to fit between the spar and the gear channel. The I/B rivet line is through the Lower Front Longeron 6B10-3, O/B rivet line is 10mm from the edge of the cabin floor skin, and the third rivet line is through the side flange into the side skin. Rivets along front edge: First layout the holes I/B hole through the Lower Front Longerons 6B10-3. Keep the O/B rivet close to the end of the spar to add a third rivet. NOTE: Keep the spar insert bolted to the wing center section through the middle hole. Install the front wing attachment uprights 6B13-1 on the front side of the spar. 6-B-13 - Page 11 of 12

A5 PITCH 20 Right side. Forward side skins 6B11-2 6-B-13 - Page 12 of 12