Vacuum Circuit Breakers (Vehicle)

Similar documents
Vacuum Circuit Breaker (Vehicle)

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle) Type HKR 7.5kV to 15kV. Instructions Installation Operation Maintenance SGIM-9928C

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle) Type MSV 5kV. Instructions Installation Operation Maintenance SGIM-9988

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle) Type FSV 5kV to 15kV. Instructions Installation Operation Maintenance SGIM-9968

Type 2 Arc Resistant WL Low Voltage Metal-Enclosed Switchgear

Type 38-3AH3 38 kv vacuum circuit breaker instruction manual. Installation operation maintenance E50001-F710-A238-V1-4A00. Answers for energy.

Installation Instructions For Motor Control Center (MCC) Units

SIEMENS. XJ-L Busway Systems. Storage, Installation and Maintenance Instructions for... Piece No. 32-J Rev 3

Instruction manual. Types GMSG and GMSG-GCB 5 kv to 15 kv vacuum circuit breakers.

SecoVac * Ground & Test Device

IB PowlVac ITE-HK Remote Racking Device

Instruction manual. Type 3AH35-MA vacuum circuit breaker magnetic-actuator operator module.

Instruction and Installation Guide

Instruction manual. Type 3AH35-MA vacuum circuit breaker magnetic-actuator operator module.

GE CONSUMER & INDUSTRIAL

RGZESDI Inverter Duty AC Induction Motors

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

SIGNAL WORDS QUALIFIED PERSON

Hubbell has a policy of continuous product improvement. Please visit hubbellpowersystems.com to confirm current design specifications.

COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

Test Cabinet (Inspection Box) Instructions. for Testing Accessories on Manually and Electrically Operated EntelliGuard G Low Voltage Circuit Breakers

Type 3AH kv to 38 kv vacuum circuit breaker operator module instruction manual

COOPER POWER SERIES. Screened Separable Connectors MN650024EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

5/15/27 kv, 25/31.5/50/63 ka Manual Ground & Test Devices Installation, Operations and Maintenance Manual

Cradle Mounted Key Interlock Guide Frame Accessory

COOPER POWER SERIES. QD5 Quik-Drive tap-changer reversing neutral stationary contact asssembly kit A26 installation instructions

COOPER POWER SERIES. Dielectric grease application to recloser cable instructions. Reclosers MN280070EN

Power Break Circuit Breakers

GE Industrial Solutions. User/Installation Manual for 4.76kV -15kV SecoBloc

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

COOPER POWER SERIES. 600 A 15/25 kv class T-OP II connector assembly installation instructions. Deadbreak Apparatus Connectors MN650048EN

Instructions for VCP-W Simple Electrical Ground & Test Device (SEG&TD) with simplified interlock scheme - bottom terminal set version

Effective June 2016 New Issue

COOPER POWER SERIES. K-Limiter back-up current-limiting fuse installation instructions. Fusing Equipment MN132010EN

COOPER POWER SERIES. Pad-mounted Switchgear MN285019EN. Effective March 2017 Supersedes February 2007 (S )

TYPE AST. Grounding Switch. ALL Ratings INSTALLATION & INSTRUCTION MANUAL

ibusway for Data Center

GE Industrial Solutions. DEH Installation and Maintenance Manual AKD-20 AR / Entellisys AR Exhaust Plenum System

COOPER POWER SERIES. KA716L7001 adjustable control valve kit for Types L, E, 4E, V4E, and V4L reclosers installation and adjustment instructions

Effective November 2016 Supersedes February 2012 (S )

COOPER POWER SERIES. High-voltage primary bushings installation instructions. OEM Equipment MN800008EN

February 28 th, 2018 UPDATE: Important Product Safety Bulletin Immediate Action Required INSTRUCTIONS FOR FIELD RISK MITIGATION

Factory Authorized Mechanism Enhancement (FAME)

COOPER POWER SERIES. Edison Modular Fuse (EMF) Installation Instructions. Fusing Equipment MN132031EN

High-voltage primary bushings installation instructions

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S )

COOPER POWER SERIES. HX-CB loadbreak fuse cutout installation instructions. Fusing Equipment MN132011EN

ProTrip Conversion Kits. For GE Types AK-15, AK-25, and AKU- 25 Low-Voltage Power Circuit Breakers INTRODUCTION. DEH Installation Instructions

Instruction Manual 15kV KVAN-1125M 1200/2000A Maxi-Vac Medium-Voltage Vacuum Circuit Breaker

TIASTAR Motor Control Center Installation And Maintenance Instructions For Units Only

O & M Manual for the EATON Generator Ready Loadcenter

Vacuum Circuit Breaker Type VAD-3

CR193 Vacuum Limitamp* Contactors

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage.

COOPER POWER SERIES. ELSG Full-Range Current-Limiting Fuse Re-Fusing Instructions. Fusing Equipment MN132017EN

COOPER POWER SERIES. S.T.A.R. type LVR faulted circuit indicator installation instructions. Fault Indicators MN320005EN

S Voltage Regulators GENERAL. PRODUCT INFORMATION Introduction. Contents. Acceptance and Initial Inspection. Handling and Storage.

Vacuum Circuit-Breakers, Type HVX kv, of cassette design, cassette with motor drive

Effective March 2015 Supersedes S August 2012

S Voltage Regulators GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage. Standards

NorthStar. brand. Instruction Manual. SLIM Tach SL Thru-Shaft Diameter. Magnetoresistive Encoder Designed for GE Wind Energy

Type NR oil switch installation and operation instructions

User manual W-VACi. W-VACi 12 / 17.5 / 24 kv IEC Vacuum Circuit Breakers

Effective November 2016 Supersedes September 1998 (S )

1. Safety practices General Introduction Standards...3

S Fault Indicators. S.T.A.R. Type TPR Faulted Circuit Indicator Installation Instructions. Contents INSTALLATION PROCEDURES

Specification Guide. for RMVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers

Type GM38 38 kv metal-clad switchgear instruction manual. Installation operation maintenance E50001-F710-A236-V1-4A00. Answers for energy.

INSTRUCTION MANUAL. HCV-5HA 7.2kV, 400A-7.0kA HCV-5HAL 7.2kV, 400A-7.0kA INSTALLATION - OPERATION - MAINTENANCE

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage

GWI Rev. 1 October 2007 Supersedes Rev. 0 Dated February 2004

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV)

SUBSTATION VACUUM CIRCUIT BREAKER (38KV)

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV)

Effective May 2017 Supersedes December 2004 (S )

COOPER POWER SERIES. Surge arrester interchangeable fuse cutout combination installation instructions. Surge Arresters MN235004EN

Type GM-SG 5 kv and 15 kv non-arc-resistant metal-clad switchgear instruction manual

Transformer Installation, Operation, and Maintenance Manual

www. ElectricalPartManuals. com SIEMENS Vacuum Circuit Breaker Operator Module Type 3AH 4.16kV to 38kV Medium-Voltage Equipment

COOPER POWER SERIES. RTE EL-BAY-O-NET FUSE Re-Fusing Instructions. Fusing Equipment MN132024EN

COOPER POWER SERIES. UltraSIL polymer-insulated D-73P disconnect switches installation instructions. Switches MN008004EN

COOPER POWER SERIES. Testing a motor capacitor on a voltage regulator procedure instructions. Voltage Regulators MN225064EN

HCV-5HA 7.2kV, 400A-7.0kA HCV-5HAL 7.2kV, 400A-7.0kA

Figure 1. Kearney Type HX cutout.

50 / 75 / 150 DHP [Cable or Hard Bus Application] Ground and Test Device

COOPER POWER SERIES. KA1169R Closing Coil Transfer-Switch Accessory Operation. Reclosers MN280069EN

Installation and Operation

COOPER POWER SERIES. Quick Connect Assembly (QCA) Retrofit Kit, General Electric Installation Instructions. Voltage Regulators MN225075EN

SIEMENS. Combination Starter Enclosure Kit Classes 49EC17 & 49EC18 Instruction Guide E87010-A0151-T003-A1-49EC. August, 2012

Transcription:

Vacuum Circuit Breakers (Vehicle) Type 5 HVR 4.16kV Instructions Installation Operation Maintenance SGIM-9948D

Hazardous voltages and high-speed moving parts. Will cause death, serious injury or equipment damage. De-energize and ground the equipment before maintenance. Maintenance should be performed only by qualified personnel. The use of unauthorized parts should not be used in the repair of the equipment. Follow all safety instructions contained herein. IMPORTANT The information contained herein is general in nature and not intended for specific application purposes. It does not relieve the user of responsibility to use sound practices in application, installation, operation, and maintenance of the equipment purchased. Siemens reserves the right to make changes in the specifications shown herein or to make improvements at any time without notice or obligations. Should a conflict arise between the general information contained in this publication and the contents of drawings or supplementary material or both, the latter shall take precedence. QUALIFIED PERSON For the purpose of this manual a qualified person is one who is familiar with the installation, construction or operation of the equipment and the hazards involved. In addition, this person has the following qualifications: (a) is trained and authorized to de-energize, clear, ground, and tag circuits and equipment in accordance with established safety practices. (b) is trained in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses or face shields, flash clothing, etc., in accordance with established safety practices. (c) is trained in rendering first aid. SUMMARY These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser s purposes, the matter should be referred to the local sales office. The contents of this instruction manual shall not become part of or modify any prior or existing agreement, commitment or relationship. The sales contract contains the entire obligation of Siemens Energy, Inc. The warranty contained in the contract between the parties is the sole warranty of Siemens Energy, Inc. Any statements contained herein do not create new warranties or modify the existing warranty.

Vacuum Circuit Breakers (Vehicle) Table of Contents Introduction and Safety... 2 Introduction... 2 Qualified Person... 2 Signal Words... 2 Dangerous Procedures... 2 Field Service Operation... 2 Receiving, Handling and Storage... 3 Introduction... 3 Receiving Procedure... 3 Shipping Damage Claims (when applicable)... 3 Handling Procedure... 3 Storage Procedure... 3 Space Heating... 3 Vehicle Description... 4 Vehicle Function and Operational Interlock... 4 Alignment... 4 Recommended Tools... 4 Installing Circuit Breaker Module Into Compartment... 4 Maintenance... 5 Introduction and Maintenance Intervals... 5 Recommended Maintenance and Lubrication... 5 Removing the Circuit Breaker... 6 Interphase Barrier... 6 Checks of the Primary Power Path... 6 Inspection of Primary Disconnects and Cleanliness Check... 6 Fastener Check... 6 Racking Mechanism... 7 Electrical Control Checks... 7 Check of the Wiring and Terminals... 7 Electrical Close and Trip Check (Control Power Required)... 7 Checks of the Spring Charging Motors... 7 1

Introduction and Safety Introduction The 5HVR family of vacuum circuit breakers is designed to meet all the applicable ANSI, NEMA and IEEE standards. Successful application and operation of this equipment depends as much upon proper installation and maintenance by the user as it does upon the careful design and fabrication by Siemens. The purpose of this Instruction Manual is to assist the user in developing safe and efficient procedures for the installation, maintenance and use of the equipment. Contact the nearest Siemens representative if any additional information is desired. Signal Words The signal words Danger, Warning and Caution used in this manual indicate the degree of hazard that may be encountered by the user. These words are defined as: Danger - Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. Warning - Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Caution - indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. Hazardous voltages and high-speed moving parts. Will cause death, serious injury or property damage. Only qualified persons thoroughly familiar with the equipment, instruction manuals and drawings should install, operate and/or maintain this equipment. Qualified Person For the purpose of this manual a Qualified Person is one who is familiar with the installation, construction or operation of the equipment and the hazards involved. In addition, this person has the following qualifications: Training and authorization to energize, de-energize, clear, ground and tag circuits and equipment in accordance with established safety practices. Training in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses, face shields, flash clothing, etc., in accordance with established safety procedures. Dangerous Procedures In addition to other procedures described in this manual as dangerous, user personnel must adhere to the following: 1. Always work on de-energized equipment. Always deenergize a breaker, and remove it from the switchgear before performing any tests, maintenance or repair. 2. Always perform maintenance on the breaker after the spring-charged mechanisms are discharged. 3. Always let an interlock device or safety mechanism perform its function without forcing or defeating the device. Field Service Operation Siemens can provide competent, well-trained Field Service Representatives to provide technical guidance and advisory assistance for the installation, overhaul, repair and maintenance of Siemens equipment, processes and systems. Contact regional service centers, sales offices or the factory for details, or telephone Siemens Field Service at 1-800-241-4453. Training in rendering first aid. 2

Receiving, Handling and Storage Introduction This manual covers the Receiving, Handling and Storage instructions for vacuum circuit breakers shipped separately from the switchgear. This section of the manual is intended to help the user identify, inspect and protect the circuit breaker prior to its installation. Receiving Procedure Make a physical inspection of the shipping container before removing or unpacking the circuit breaker. Check for shipment damage or indications of rough handling by the carrier. Check each item against the manifest to identify any shortages. Accessories such as the manual charging crank, the racking crank and the split plug jumper (optional) are shipped separately. Shipping Damage Claims (when applicable) - Follow normal shipment damage procedures, which should include: 1. Check for visible damage upon arrival. 2. Visible damage must be noted on delivery receipt, and acknowledged with driver s signature. Notation, Possible internal damage, subject to inspection must be on delivery receipt. 3. Notify the Siemens Sales office immediately of any shipment damage. 4. Arrange for carrier s inspection. Do not move the unit from its unloading point. Handling Procedure Heavy weight. Can cause death, serious injury, or property damage. Use of a qualified rigger to hoist the circuit breaker. 4. The palleted circuit breaker can also be moved using a properly rated fork-lift vehicle. The pallets are designed for movement by a standard fork-lift vehicle. Storage Procedure 1. When the breaker will be placed on its pallet for storage, be sure the unit is securely bolted to the pallet and covered with polyethylene film at least 10 mils thick. Indoor Storage - Whenever possible, store the circuit breaker indoors. The storage environment must be clean, dry and free of such items as construction dust, corrosive atmosphere, mechanical abuse and rapid temperature variations. Outdoor Storage - Outdoor storage is not recommended. When no other option is available, the circuit breaker must be completely covered and protected from rain, snow, dirt and all other contaminants. Space Heating - Space heating must be used for both indoor and outdoor storage to prevent condensation and corrosion. When stored outdoors, 250 watts per breaker of space heating is recommended. 1. Carefully remove the shipping carton from the circuit breaker. Keep the shipping pallet for later use if the breaker is to be stored prior to its installation. 2. Inspect for concealed damage. Notification to carrier must take place within 15 days to assure prompt resolution of claims. 3. Each circuit breaker should be appropriately lifted, using lifting sling rated for at least 2,000 lbs. Breaker shall be lifted by Upper B phase post insulator. 3

Vehicle Description Vehicle Function and Operational Interlocks Type 5HVR vacuum circuit breakers are comprised of the interrupter/operator module fitted to a vehicle. This interrupter/operator module is an integral arrangement of operating mechanism, dielectric system, vacuum interrupters, and means of connecting the primary circuit. The vehicle supports the interrupter/operator module, providing mobility and fully coordinated application in ITE type HV switchgear. This manual should be used jointly with the Circuit Breaker Operator manual, SGIM-9918. Alignment All aspects of the circuit breaker structure which impact alignment and interchangeability are checked at the factory. Field adjustment will not normally be required, but variations in existing switchgear may require field adjustment. Hazardous voltages and high-speed moving parts. Will cause death, serious injury, and property damage. De-energize before working on this equipment. Do not by-pass interlocks or otherwise make interlocks inoperative. Recommended Tools Racking Crank: Original circuit breaker racking crank may be used. Handle Extension Lever 18-763-151-501 Figure 1. Vehicle Front View. Installing Circuit Breaker Module Into Compartment The following procedure should be followed when inserting the circuit breaker into the switchboard. 1. Insert extension handle, then push down to expose racking shaft end. Remove extension handle. 2. Move locking lever to unlock position. 3. Push breaker to test position. 4. Move locking lever to lock position. 5. To test breaker, pull interlock racking release knob. 6. Insert extension handle, then push down to expose racking shaft. Remove extension handle. 7. Rack to connect position. 8. Pull interlock racking release knob. 9. Circuit breaker may now be closed and tripped. Figure 2. Vehicle Side View 4

Maintenance Introduction and Maintenance Intervals Periodic inspections and maintenance are essential to obtain safe and reliable operation of the circuit breaker as well as the switchgear. Hazardous voltages and high-speed moving parts. Will cause death, personal injury, and property damage. De-energize before working on this equipment. Read instruction manuals, observe safety instructions, and limit use to qualified personnel. When circuit breakers and/or the switchgear are operated under Usual Service Conditions, maintenance and lubrication is recommended at five year intervals or at the number of operations indicated in Table 2. Usual and Unusual service conditions for Medium Voltage Metal-Clad Switchgear are defined in ANSI C37.20.2, section 8.1. Generally, usual service conditions are defined as an environment in which the equipment is not exposed to excessive dust, acid fumes, damaging chemicals, salt air, rapid or frequent changes in temperature, vibration, high humidity, and extremes of temperature. The definition of usual service conditions is subject to a variety of interpretations. Because of this, you are best served by adjusting maintenance and lubrication intervals based on your experience with the equipment in the actual service environment. Regardless of the length of the maintenance and lubrication interval, Siemens recommends that circuit breakers and switchgear should be inspected and exercised annually. Table 1: Maintenance Tasks Checks of the primary power path Cleanliness check Inspection of primary disconnects Electrical control checks Wiring and terminals check Secondary disconnect check Automatic spring charging check Electrical close and trip check High potential test Insulation test Inspection and cleaning of insulation Functional tests Primary disconnect contact cleanliness and lubrication Racking mechanism cleanliness and lubrication Circuit Breaker Operator tasks as detailed in manual SGIM-9918 The list of tasks in Table 1 does not represent an exhaustive survey of maintenance steps necessary to ensure safe operation of the equipment. Particular applications may require further procedures. Should further information be desired or should particular problems arise which are not covered sufficiently for the Purchaser s purposes, the matter should be referred to the local Siemens sales office. The use of unauthorized parts in the repair of the equipment, or tampering by unqualified personnel will result in dangerous conditions which will cause death, serious injury or equipment damage. Follow all safety instructions contained herein. Recommended Maintenance and Lubrication Periodic maintenance and lubrication should include all the tasks shown in Table 1. Recommended procedures for each of the listed tasks are provided in this section of the manual. Failure to properly maintain the equipment could result in death, serious injury or product failure, and can prevent successful functioning of connected apparatus. Instructions should be carefully reviewed, understood, and followed. The maintenance tasks in Table 1 must be performed regularly. 5

Maintenance Removing the Circuit Breaker The following procedure should be followed when removing the circuit breaker from the switchboard. 1. Trip the circuit breaker by means of the control switch on the front of the switchboard. 2. Insert extension handle, then push down to expose racking shaft. Remove extension handle. 3. Rack circuit breaker to test position. 4. Pull racking release knob, circuit breaker may now be closed and tripped. 5. To remove breaker from cubicle, insert extension handle, then push down to expose racking shaft. Remove extension handle, now move locking lever to the unlock position. 6. Circuit breaker may now be removed from cubicle. Interphase Barrier To remove the interphase barrier, loosen two screws enough to allow them to be pushed down and out of engagement with the front of the interphase barrier. Then, lift the front and rear of the barrier slightly and slide it upward until the barrier is free of the circuit breaker. The interphase barrier must be removed before making adjustments or tests. To remove the interphase barrier, proceed as described under Interphase Barrier in section Maintenance. Checks of the Primary Power Path The primary power path consists of the three vacuum interrupters, the three upper and the three lower primary disconnects. These components are checked for cleanliness and condition (Figure 3). The vacuum interrupters are discussed in the Circuit breaker Operator Manual SGIM-9918. Note: Maximum Contact Resistance is read from primary bus stab to primary bus stab. A value of 13 micro-ohms should be added to the maximum contact resistance specified in Circuit Breaker Operator Manual SGIM-9918. Inspection of Primary Disconnects and Cleanliness Check Figure 3 is a side view of the HVR Circuit Breaker with the insulating barriers removed to show the vacuum interrupter, and the upper and lower primary disconnects. All of these components must be clean and free of dirt or any foreign objects. Use a dry lint-free cloth. For stubborn dirt, use a clean cloth saturated with denatured alcohol. The phase barriers are plates of glass polyester insulating material and attached to the circuit breaker to provide Figure 3. Primary Power Path suitable electrical insulation between the vacuum interrupter primary circuits and the housing. Always re-install the phase barriers carefully to the original location prior to inserting the circuit breaker in the housing. When the contacts are mated with the switchgear s primary stud assembly, there is forceful contact distributed over a wide area. This maintains low current flow per individual contact finger. Inspect the contact fingers for any evidence of burning or pitting that would indicate weakness of the contact finger springs. Inspect the primary disconnect arms for physical integrity and absence of mechanical damage. Inspect the flexible connectors that connect the bottom movable contacts of the vacuum interrupters to the lower primary disconnect arms for tightness and absence of mechanical damage, burning, or pitting. Using a clean cloth saturated with denatured alcohol, clean old lubricant from primary disconnects, and apply Siemens contact lubricant (reference 15-172-791-214) in a very thin layer. Fastener Check Inspect all fasteners for tightness. Both lock-nuts and retaining rings are used. Replace any fasteners that appear to have been frequently removed and replaced. 6

Maintenance Racking Mechanism Racking mechanism is to be wiped clean, and a film of Klueber Isoflex Topas L32 (part # 3AX11333H), Anderol 732 aerosol synthetic fluid grease (reference part number 15-172- 816-058) or Beacon #325 (part # 15-337-131-001) applied on the shaft surfaces, threads and nuts. Electrical Control Checks Check of the Wiring and Terminals 1. Physically check all of the switchgear wiring for evidence of abrasion, cuts, burning or mechanical damage. 2. Check all terminals to be certain they are solidly attached to their respective device. Electrical Close and Trip Check (Control Power Required) A check of the breaker control circuits is performed while the unit is still connected to the switchgear (Test position or optional plug jumper). This check is made with the breaker energized by control power from the switchgear. 1. Once the breaker springs are charged, move the switchgear Close/Trip switch to the Close position. There should be both the sound of the breaker closing and indication that the breaker contacts are closed by the main contact status indicator. 2. As soon as the breaker has closed, the automatic spring charging process is repeated. 3. After a satisfactory close operation is verified, move the switchgear Close/Trip switch to the Trip position. Verify by both sound and contact position that the contacts are open. Completion of these checks demonstrates satisfactory operation of auxiliary switches, internal relays and solenoids. Checks of the Spring Charging Motors of the spring charging motor are necessary. Table 2. Periodic Maintenance and Lubrication Tasks Sub-Assembly Primary Power Path Item Primary Disconnects Inspect For 1. Burnt or damaged fingers 2. Lubrication of contact surfaces. 3. Tightness of nuts and other locking devices Electrical Controls Wiring 1. Mechanical damage or abrasion High Potential Test Terminals and Connectors Close and Trip Solenoids, Anti- Pump Relay, Auxiliary Switches, Secondary Disconnect Primary Circuit to Groundand between Primary Disconnects Control Circuit to Ground 1. Tightness and absence of mechanical damage 1. Automatic charging 2. Close and trip with control power 1. 60 second withstand, refer to Circuit Breaker Operator Manual SGIM-9918 for ratings. 1. 60 second withstand, refer to Circuit Breaker Operator Manual SGIM-9918 for ratings. Insulation Interrupter Operator Mechanism Racking Mechanism Barriers and all Insulating Components 1. Cleanliness Refer to Circuit Breaker Operator Manual. 2. Cracking, crazing, tracking, or other sign of deterioration 1. Cleanliness 2. Lubrication of shaft surfaces. 7

Siemens Energy, Inc. 7000 Siemens Rd. Wendell, NC 27591 SGIM-9948D (2-2009) Printed in U.S.A. 2001 Siemens Energy, Inc. SIEMENS is a registered trademark of Siemens AG.