NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

Permit Holder. Permitted Equipment

ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) AIR QUALITY PROGRAM

Regulatory Impacts of Biogas-fired Internal Combustion Engines

Air Permitting: Municipal Facilities with Emergency Generators

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

New Federal Regulations for Internal Combustion Engines. Doug Parce

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012

Permit Holder. Permitted Equipment

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

Engineering Analysis

Internal Combustion Engines Air Updates 2010

FINAL PERMIT APPLICATION REVIEW SUMMARY

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. January 28, 2013

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

Streamlining Multiple Applicable Requirements

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14

The following emission units and control devices associated with the friction materials process are currently permitted:

STATEMENT OF BASIS. NAICS Description: Motor and Generator Manufacturing NAICS Code:

STATEMENT OF BASIS. University of Arkansas for Medical Sciences (UAMS) 4301 West Markham St. Little Rock, Arkansas 72205

PERMIT APPLICATION REVIEW SUMMARY

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

PERMIT TO INSTALL. Table of Contents

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

Electrical Power Generator Use and Procurement Guidance

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting

PERMIT TO INSTALL. Table of Contents

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 7, 2017 PERMIT TO INSTALL ISSUED TO McLaren Flint Hospital

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

PERMIT APPLICATION REVIEW SUMMARY

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

PERMIT TO INSTALL. Table of Contents

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System

Bureau of Air Quality Technical Support Document General Permit GP-5 January 31, 2013

City of Fort Worth s Natural Gas Air Quality Study Follow-up on Report Recommendations. August 16, 2011

State of New Jersey. Department of Environmental Protection Division of Air Quality

MAJOR SOURCE OPERATING PERMIT THIRD TITLE V RENEWAL DRAFT

1. General Information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Engineering Summary New NGC, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

Air Individual Permit Permit Limits to Avoid NSR

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY FOR FLARE NOS. 1, 5 & 6

Impact of Transportation Emissions on New Jersey s Air Quality

Technical Contact. Steven Klafka Environmental Engineer (608) South Paterson Street Madison, WI 53703

RICE NESHAP Frequently Asked Questions (FAQ)

NATURAL GAS TRANSMISSION

~ SWCAA TECHNICAL SUPPORT DOCUMENT TRISTAR TRANSLOAD PNW, INC. SWCAA ID: Air Discharge Permit Air Discharge Permit Application CL-3039

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Full Compliance Evaluation Report Off-Site Report

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL

TECHNICAL SUPPORT DOCUMENT. Nevada Power Company, dba NV Energy. Walter M. Higgins III Generating Station

~ SWCAA. Southwest Clean Air Agency TECHNICAL SUPPORT DOCUMENT PACIFICORP ENERGY LEWIS RIVER HYDROELECTRIC PROJECTS. SWCAA Identification: 1993

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO

Appendix K. DOC Conditions

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 24, 2014 PERMIT TO INSTALL A. ISSUED TO A & K Finishing, Inc.

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

Appendix K. Final DOC Conditions

OUTOKUMPU STAINLESS USA, LLC CALVERT, AL FACILITY NO.: MAJOR SOURCE OPERATING PERMIT INITIAL TITLE V DRAFT

PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK 201 BEASLEY DRIVE, FREDERICK, MD PART 70 PERMIT NO.

Metro and you, building together.

ICAPCD RULE APPENDIX C

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents

Presented by: Richard M. Cestone, PE, CHMM Senior Project Engineer Remington & Vernick Engineers For New Jersey Water Environment Association

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. July 31, 2013 PERMIT TO INSTALL ISSUED TO Core Energy (Dover 36 CPF)

ALLEGHENY COUNTY HEALTH DEPARTMENT

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION AIR QUALITY PROGRAM PLAN APPROVAL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. August 5, 2016 PERMIT TO INSTALL F. ISSUED TO MAHLE Industries, Inc.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

Transcription:

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO: FROM: Sandra L. Etzel Chief Engineer Melissa Jativa Air Quality Engineer FACILITY DESCRIPTION: Cellco Partnership, dba Verizon Wireless owns and operates its Bridgeville Mobile Switching Center (MSC) located at 18 Abele Road in Bridgeville, PA. The facility is composed of one 600 kw emergency diesel generator, two (2) 750 kw emergency diesel generator, and one 60 kw emergency diesel generator. The facility is a minor source of nitrogen oxides (NO X ), carbon monoxide (CO), particulate matter, particulate matter < 10 microns in diameter (PM-10), sulfur dioxide (SO 2 ), volatile organic Compounds (VOCs) and hazardous air pollutants (HAPs) as defined in section 2101.20 of Article XXI. PERMIT APPLICATION COMPONENTS: 1. Installation Permit application #0867-I001, dated June 13, 2013 (application was for both the installation and operating permit). EMISSION SOURCES: I.D. SOURCE DESCRIPTION CONTROL DEVICE(S) MAXIMUM CAPACITY FUEL/RAW MATERIAL STACK I.D. B001 B002 B003 B004 Emergency Generator #1 Spectrum Detroit 600DS Emergency Generator #2 Katolight D750FRX4 Emergency Generator #3 Katolight D60FGJ4 Emergency Generator #4 MTU 750-XC6DT2 t turbocharger, turbocharger, turbocharger, turbocharger, 600 kw Diesel Fuel S001 750 kw Diesel Fuel S002A & S002B 60 kw Diesel Fuel S003 750 kw Diesel Fuel S004 & S005

Verizon Bridgeville #0867 Page 2 METHOD OF DEMONSTRATING COMPLIANCE: Compliance with the emission standards set in this permit will be demonstrated by recording emergency generator fuel consumption, operating hours, and maintenance activities, and maintaining fuel certifications from fuel suppliers. See Operating Permit No. 0867 for the specific conditions for determining compliance with the applicable requirements. EMISSION CALCULATIONS Potential to emit for generators is based on 500 hours per year of operation as stated in John S. Seitz memo dated September 6, 1995. B001 Emergency Generator #1 Heating Rate: 600 kw 47.9 gal/hr Fuel density: 7.50 lb/gal Sulfur content: 0.05% of all pollutants except PM and SO X are based on the manufacturer s Not to Exceed data. of PM are based on Article XXI emission factor. All PM was assumed to be PM 10 ; all PM 10 was assumed to be PM 2.5. of SO X (as SO 2 ) are based on the following equation which assumes all sulfur in the fuel is converted to SO 2 : SO 2 = 0.01998 Fuel Rate % w S SO2 = 0.01998 47.9 gal/hr 7.50 lb/gal 0.05 = 0.36 lb/hr SO 2 Emergency Generator B001 Factor PM 0.28 lb/mmbtu Article XXI, 2104.02.a.1.B 1.84 0.46 PM10 0.28 lb/mmbtu Article XXI, 2104.02.a.1.B 1.84 0.46 PM2.5 0.28 lb/mmbtu Article XXI, 2104.02.a.1.B 1.84 0.46 NOX 8880 g/hr Manufacturer Guarantee 19.58 4.89 CO 3240 g/hr Manufacturer Guarantee 7.14 1.79 SO X See equation above 0.36 0.09 VOC 166 g/hr Manufacturer Guarantee 0.37 0.09 GHG Mass and CO 2 e : Calculations of greenhouse gases (GHG) and CO2-equivalent (CO 2 e) emissions are based on the methodology found in 40 CFR Part 98, Subpart C, 98.33(a)(1), and factors found in Table C-1 and Table C-2 of that subpart. According to 40 CFR, 98.30, GHG emissions from emergency generators are not included in the mandatory

Verizon Bridgeville #0867 Page 3 greenhouse gas reporting rule, so estimated emissions are included here for informational purposes only. Total rated heat input capacity of the generator = 6.562 MMBtu/hr 500 hr/yr = 3,281 MMBtu/yr CO 2 : 3,281 MMBtu/yr 73.96 kg/mmbtu 1,000 kg/metric ton = 242.66 metric tons/year NO2: 3,281 MMBtu/yr 6 10-4 kg/mmbtu 1,000 kg/metric ton = 0.002 metric tons/year CH4: 3,281 MMBtu/yr 3 10-3 kg/mmbtu 1,000 kg/metric ton = 0.010 metric tons/year CO 2 e = (242.66 1) + (0.002 310) + (0.010 21) = 243.48 metric tons/year of CO 2 e = 268.32 tpy of CO 2e B002 Emergency Generator #2 Heating Rate: 750 kw 51.7 gal/hr Fuel density: 7.50 lb/gal Sulfur content: 0.05% of all pollutants except SO X are based on the manufacturer s Not to Exceed data. of SO X (as SO 2 ) are based on the following equation which assumes all sulfur in the fuel is converted to SO 2 : SO 2 = 0.01998 Fuel Rate % w S SO2 = 0.01998 51.7 gal/hr 7.50 lb/gal 0.05 = 0.39 lb/hr SO 2 Emergency Generator B002 Factor PM 53.9 g/hr Manufacturer Guarantee 0.12 0.03 PM10 53.9 g/hr Manufacturer Guarantee 0.12 0.03 PM2.5 53.9 g/hr Manufacturer Guarantee 0.12 0.03 NOX 6420 g/hr Manufacturer Guarantee 14.15 3.54 CO 1430 g/hr Manufacturer Guarantee 3.15 0.79 SO X See equation above 0.39 0.10 VOC 197 g/hr Manufacturer Guarantee 0.43 0.11 GHG Mass and CO 2 e : GHG emissions from emergency generators are not included in the mandatory greenhouse gas reporting rule, so estimated emissions are included here for informational purposes only. Total rated heat input capacity of the generator = 7.083 MMBtu/hr 500 hr/yr = 3,541 MMBtu/yr CO 2 : 3,541 MMBtu/yr 73.96 kg/mmbtu 1,000 kg/metric ton = 261.89 metric tons/year NO2: 3,541 MMBtu/yr 6 10-4 kg/mmbtu 1,000 kg/metric ton = 0.002 metric tons/year CH4: 3,541 MMBtu/yr 3 10-3 kg/mmbtu 1,000 kg/metric ton = 0.011metric tons/year

Verizon Bridgeville #0867 Page 4 CO 2 e = (261.89 1) + (0.002 310) + (0.011 21) = 262.77 metric tons/year of CO 2 e = 289.58 tpy of CO 2e B003 Emergency Generator #3 Heating Rate: 60 kw 4.9 gal/hr Fuel density: 7.50 lb/gal Sulfur content: 0.05% of all pollutants except SO X are based on the manufacturer s Not to Exceed data. of SO X (as SO 2 ) are based on the following equation which assumes all sulfur in the fuel is converted to SO 2 : SO 2 = 0.01998 Fuel Rate % w S SO2 = 0.01998 4.9 gal/hr 7.50 lb/gal 0.05 = 0.04 lb/hr SO 2 Emergency Generator B003 Factor PM 0.2 g/kw-hr Manufacturer Guarantee 0.03 0.01 PM10 0.2 g/ kw-hr Manufacturer Guarantee 0.03 0.01 PM2.5 0.2 g/ kw-hr Manufacturer Guarantee 0.03 0.01 NOX 8 g/ kw-hr Manufacturer Guarantee 1.31 0.33 CO 0.7 g/ kw-hr Manufacturer Guarantee 0.11 0.03 SO X See equation above 0.04 0.01 VOC 0.4 g/ kw-hr Manufacturer Guarantee 0.07 0.02 GHG Mass and CO 2 e : GHG emissions from emergency generators are not included in the mandatory greenhouse gas reporting rule, so estimated emissions are included here for informational purposes only. Total rated heat input capacity of the generator = 0.671 MMBtu/hr 500 hr/yr = 336 MMBtu/yr CO 2 : 336 MMBtu/yr 73.96 kg/mmbtu 1,000 kg/metric ton = 24.85 metric tons/year NO2: 336 MMBtu/yr 6 10-4 kg/mmbtu 1,000 kg/metric ton = 0.0002 metric tons/year CH4: 336 MMBtu/yr 3 10-3 kg/mmbtu 1,000 kg/metric ton = 0.001metric tons/year CO 2 e = (24.85 1) + (0.0002 310) + (0.001 21) = 24.93 metric tons/year of CO 2 e = 27.48 tpy of CO 2e B004 Emergency Generator #4 Heating Rate: Fuel density: 750 kw 57.8 gal/hr 7.50 lb/gal

Verizon Bridgeville #0867 Page 5 Sulfur content: 0.0015% of all pollutants except SO X are based on the manufacturer s Not to Exceed data. of SO X (as SO 2 ) are based on the following equation which assumes all sulfur in the fuel is converted to SO 2 : SO 2 = 0.01998 Fuel Rate % w S SO2 = 0.01998 57.8 gal/hr 7.50 lb/gal 0.0015 = 0.013 lb/hr SO 2 Emergency Generator B004 Factor PM 0.166 g/kw-hr Manufacturer Guarantee 0.08 0.02 PM10 0.166 g/ kw-hr Manufacturer Guarantee 0.08 0.02 PM2.5 0.166 g/ kw-hr Manufacturer Guarantee 0.08 0.02 NOX 6.233 g/ kw-hr Manufacturer Guarantee 12.23 3.06 CO 0.59 g/ kw-hr Manufacturer Guarantee 1.16 0.29 SO X See equation above 0.013 0.003 VOC 1.29 g/ kw-hr Manufacturer Guarantee 0.25 0.06 GHG Mass and CO 2 e : GHG emissions from emergency generators are not included in the mandatory greenhouse gas reporting rule, so estimated emissions are included here for informational purposes only. Total rated heat input capacity of the generator = 7.919 MMBtu/hr 500 hr/yr = 3,960 MMBtu/yr CO 2 : 3,960 MMBtu/yr 73.96 kg/mmbtu 1,000 kg/metric ton = 292.88 metric tons/year NO2: 3,960 MMBtu/yr 6 10-4 kg/mmbtu 1,000 kg/metric ton = 0.002 metric tons/year CH4: 3,960 MMBtu/yr 3 10-3 kg/mmbtu 1,000 kg/metric ton = 0.012 metric tons/year CO 2 e = (292.88 1) + (0.002 310) + (0.012 21) = 293.87 metric tons/year of CO 2 e = 323.93 tpy of CO 2e REGULATORY APPLICABILITY: 1. Article XXI Requirements for Issuance: See Permit Application No. 0867-I001, Section 5. The requirements of Article XXI, Parts B and C for the issuance of minor modification installation permits have been met for this facility. Article XXI, Part D, Part E & Part H will have the necessary sections addressed individually. 2103.12.a.2.B (Standards for Issuance): Existing sources, where no limits have been established under Article XXI, are subject to Reasonably Available Control Technology (RACT) requirements. In this case, RACT will be consistent with the BACT determination performed at the time of IP 0867-I001 issuance. a. The Department has determined that RACT/BACT shall be:

Verizon Bridgeville #0867 Page 6 a. The use of ultra low sulfur fuel oil with 15 ppm sulfur content for generator B004. 2. Testing Requirements: No testing is required for this installation at this time. However, the Department reserves the right to require testing in the future to assure compliance with the terms and conditions of Operating Permit No. 0867. 3. New Source Performance Standards (NSPS): Generator B004 is subject to 40 CFR Part 60, Subpart IIII Standards of Performance for Stationary Compression Ignition Internal Combustion Engines. This includes, but is not limited to the following sections: 40 CFR 60.4207(b) minimum fuel requirements for sulfur content and cetane index (as given in 80.510(b)). 40 CFR 60.4211(a) minimum emissions standards (as given in 89.112). 40 CFR 60.4211(c) engine certification. 40 CFR 60.4211(e) operation limits for non-emergencies. 40 CFR 60.4214(b) use of a non-resettable hour meter. Generators B001, B002, and B003 are not subject to 40 CFR Part 60, Subpart IIII. The generators commenced construction before July 11, 2005, before the applicability date of the NSPS and were manufactured prior to April 1, 2006. 4. NESHAP and MACT Standards: Generator B004 is subject to 40 CFR Part 63, Subpart ZZZZ National Emission Standards for Hazardous Air s for Stationary Reciprocating Internal Combustion Engines. However, per 63.6595(c), the generator meets the requirements of this subpart by meeting the requirements of 60 CFR Part 60, Subpart IIII, and no further requirements of Part 63, Subpart ZZZZ apply. 5. Risk Management Plan; CAA Section 112(r): The facility is not required to have a risk management plan at this time because none of the regulated chemicals exceed the thresholds in the regulation. 6. Greenhouse Gases (40 CFR Part 98):. The facility is a minor source of greenhouse gas emissions based on estimated potential emissions of 910 tpy of CO2e, which is less than the major source threshold of 100,000 tpy of CO 2 e. There are presently no Title V applicable requirements for greenhouse gases. Should the facility exceed 25,000 metric tons of CO 2 e in any 12-month period, the facility would be required to submit reports in accordance with 40 CFR Part 98. 7. Inventory: This facility is not required to provide annual Emission Inventory reports per 2108.01.e of Article XXI because this facility does not have the potential to emit a total of: a) Ten (10) or more tons of any hazardous air pollutant; b) Twenty-five (25) or more tons of all hazardous air pollutant; or c) Twenty-five (25) or more tons of any other pollutant regulated under Article XXI.

Verizon Bridgeville #0867 Page 7 EMISSIONS SUMMARY: Verizon Bridgeville Emission Limitations POLLUTANT Yearly (tons/year)* Particulate Matter 0.52 Particulate Matter <10μm (PM 10 ) 0.52 Particulate Matter <2.5μm (PM 2.5 ) 0.52 Nitrogen Oxides (NO X ) 11.82 Sulfur Oxides (SO X ) 0.20 Carbon Monoxide (CO) 2.89 Volatile Organic Compounds (VOCs) 0.28 Greenhouse Gases (CO 2 e) 910 * A year is defined as any consecutive 12-month period RECOMMENDATION: All applicable Federal, State, and County regulations have been addressed in the permit application. The facility is not subject to the restrictions of 2102.04.k of Article XXI because there have been no Notices of Violation issued for this or any other Verizon Company facility in Allegheny County during the last 18 months. The Operating Permit for Verizon Bridgeville should be approved with the emission limitations, terms and conditions in Operating Permit No. 0867.