CALIFORNIA SIDECAR TRIKE CONVERSION KIT INSTALLATION INSTRUCTIONS VALKYRIE INTERSTATE

Similar documents
Installation Instructions

Current. Installation Instructions

Installation Instructions

Trike Conversion Kit GL1500 Goldwing

CALIFORNIA SIDECAR TRIKE CONVERSION KIT INSTALLATION INSTRUCTIONS MODEL YEARS. For installation assistance, call Parts & Technical iii PAGE

Trike Conversion Kit GL1800 Goldwing Current. Installation Instructions

Victory CrossRoads CrossCountry CrossCountry Tour HardBall

Trike Conversion Kit ROADLINER, STRATOLINER, & STRATOLINER DELUXE

2018 UP GL1800 Gold Wing & Gold Wing Tour. Trike Kit Installation Instructions. California Sidecar Parts & Technical Support

Trike Conversion Kit. KAWASAKI 1700 Vulcan Voyager Vulcan Vaquero Vulcan Nomad. Installation Instructions

Cobra & Cobra XL. Trike Conversion Kit GL1800 Goldwing. Installation Instructions. California Sidecar Parts & Technical Support

2018 UP GL1800 Gold Wing & Gold Wing Tour. Power Trak Installation Instructions. California Sidecar Parts & Technical Support

Cobra & Cobra XL. Power Trak Current GL1800 Goldwing. Installation Instructions. California Sidecar Parts & Technical Support

ELECTRIC REVERSE Installation Instructions

Trike Conversion Installation Guide Kawasaki Vulcan 900 Classic, Classic LT, and Custom Models 2007 and Up Solid Axle Suspension

2018 UP GL1800 Gold Wing & Gold Wing Tour. Auxiliary Fuel Tank. Installation Instructions

Installation Instructions

ELECTRIC REVERSE Current. Harley-Davidson Sportster. Installation Instructions

Installation Instructions

Trike Conversion Installation Manual. All Models

Trike Conversion Installation Guide for Indian Scout Motorcycles 2016 & Up Revision 2

RAIDER to 2016 XL MODELS *Will not fit XR1200 models *Nightster, Forty-Eight and Iron 883 models may require additional modifications

Installation Instructions

Trike Conversion Installation Guide for Harley-Davidson Sportster Motorcycles 2004 & Up Revision 7

-Failure to make the proper adjustments will potentially lead to serious personal injury and/or property damage and may void the warranty.

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

2010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

Trike Conversion Installation Guide for Zero Flex Solid Axle Wide Body Harley-Davidson FLH Series Motorcycles Revision 1

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

INSTALLATION INSTRUCTION 88094

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

INSTALLATION INSTRUCTION 88581

Suspension System RS6582B

INSTALLATION INSTRUCTION 88146

'99-03 CHEVROLET/GMC IFS 4WD 6" SUSPENSION SYSTEM P/N INSTALLATION INSTRUCTIONS

Installation Notes: #86000-R Race Series +3.5 L/T Kit

INSTALLATION INSTRUCTION Rev A

INSTALLATION INSTRUCTION 88088

FORD F-250/350 SUPER DUTY 4 WHEEL DRIVE FORD EXCURSION 4 WHEEL DRIVE FTS & 8 LIFT BOX KIT

Tools Needed: Class 8.8 Class MM 55ft/lbs 75ft/lbs 14MM 85ft/lbs 120ft/lbs 16MM 130ft/lbs 165ft/lbs 18MM 170ft/lbs 240ft/lbs

INSTALLATION INSTRUCTION 89400

PLEASE READ THIS INSTRUCTIONS CAREFULLY, BEFORE YOU START INSTALLATION

AEV30308AA Last Updated: 05/31/18. 4 DUALSPORT sc SUSPENSION system for RAM 1500 air ride standard and rebel INSTALLATION GUIDE

Installation Instructions

FRONT & 4 REAR GM WD LOWERING KIT

INSTALLATION INSTRUCTIONS FOR THE TOMAHAWK ELECTRIC REVERSE

04-08 FORD F150 4 KIT

INSTALLATION INSTRUCTION 88581

Slave Cylinder Weep Hole Drilling Procedure

CHEVY C WHEEL DRIVE STANDARD CAB ONLY (EXCEPT 454SS) FTS1588-7BC 4" LIFT SPINDLES

BEFORE BEGINNING INSTALLATION

Universal Mounting Kit #0520

DODGE RAM WHEEL DRIVE DODGE RAM WHEEL DRIVE FTS /2 LIFT BOX KIT

FORD FAIRLANE Booster Conversion Kit ( TORINO, RANCHERO )

INSTALLATION INSTRUCTION 88073

SUT-250-S (These instructions are used for SUT-250-SCLC also)

Jeep Wrangler (JK) Present

04-08 FORD F150 6 KIT

RHINO SUSPENSION SYSTEM INSTALLATION INSTRUCTIONS

'88-'00 CHEVROLET/GMC IFS 4WD(8LUG) OLD BODY STYLE 6" SUSPENSION SYSTEM P/N

4331 EUCALYPTUS AVE. ~~ CHINO, CA Fax FORD F-250/350 SUPER DUTY 4 WHEEL DRIVE FTS

*1576BAG9* 1576BAG FORD F KIT C THANK YOU FOR CHOOSING ROUGH COUNTRY FOR YOUR SUSPENSION NEEDS.

INSTALLATION INSTRUCTIONS

***THE OWNER'S MANUAL MUST BE GIVEN TO THE END USE CUSTOMER AFTER COMPLETING THE INSTALLATION.***

Current Softail FLST Harley-Davidson. Ground Effects Installation Instructions

DISC BRAKE/DUAL MASTER CYLINDER CONVERSION. Tools, Equipment and Supplies Needed:

INSTALLATION INSTRUCTIONS

BRK JL CC5 K Hydraulic Front Brake Kit For Club Car DS Model Installation Instructions

INSTALLATION INSTRUCTION 88267

CAUTIONS AND WARNINGS

INSTALLATION INSTRUCTION 88148

6 S-10 Pickup/Jimmy/Blazer Torsion Bar Drop Kit

PRODUCT NOTES: These components are designed for suspension height adjustment lower than stock height.

TOYOTA TUNDRA BIG BRAKE KIT Section I - Installation Preparation

INSTALLATION INSTRUCTIONS 88518

JEEP JK 4 LONGARM. Tools Needed: Thank you for choosing Rough Country for your suspension needs.

Tools, Equipment and Supplies Needed:

P/N Instr Rev Page 1 of 11

INSTALLATION INSTRUCTIONS

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

1998 Plymouth Breeze SUSPENSION' 'Rear - Cirrus, Stratus, Breeze & Sebring Convertible SUSPENSION

FTS & 8 RADIUS ARM BOX KIT

BAKER CRUISE DRIVE TOP COVER BAKER 1.5 OIL PAN

DODGE DAKOTA 3 KIT INSTALLATION INSTRUCTIONS KIT# 60043

INSTALLATION INSTRUCTIONS

Sachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport

I. Before starting installation

INSTALLATION INSTRUCTIONS

Suzuki Samurai Coated Stainless Steel Braided Brake Lines (SKU# SB-BL) Installation Instructions

FORD F-250/350 SUPER DUTY 4WD FTS RADIUS ARM BOX KIT

Eibach Pro-Damper Shocks & Struts (05-09 All):

INSTALLATION INSTRUCTION 88045

INSTALLATION INSTRUCTIONS 8827

4331 EUCALYPTUS AVE. CHINO, CA

Installation Guide for the TeraFlex Elite LCG JK 4 Long Arm Suspension System

8" 4-LINK SUSPENSION SYSTEM. Ford Super Duty 4WD Part#:

Transcription:

CALIFORNIA SIDECAR TRIKE CONVERSION KIT INSTALLATION INSTRUCTIONS VALKYRIE INTERSTATE FOR INSTALLATION ASSISTANCE, CALL PARTS & TECHNICAL SUPPORT @ (434) 263-8866

TABLE OF CONTENTS SECTION PAGE Table of Contents 2 Introduction 3 Parts List 4 Accessory Parts List 6 Step 1. Preparing the Motorcycle 7 Step 2. Removing the Rear Wheel and Swing Arm 7 Step 3. Installing the New Swing Arm 7 Step 4. Installing the Rear End 8 Step 5. Installing the Air Shock Mounting Bracket 8 Step 6. Installing the Body Frame 9 Step 7. Installing the Progressive Shocks to the Motorcycle Frame 9 Step 8. Installing the Shocks to the Swing Arm 9 Step 9. Modifying the Exhaust System 9 Step 10. Installing the Air Shock Hose Tubing 10 Step 11. Installing the Body 10 Step 12. Installing the Wheels 11 Step 13. Installing the Passenger Foot Rests 11 Step 14. Installing the Wiring 11 Step 15. Completing Installation 11 2

INTRODUCTION DISCLAIMER - These instructions assume a level of understanding of motorcycle repair and maintenance beyond that of a beginner or novice, and California Sidecar cannot be liable for an installer s failure to understand or follow these instructions as written. Likewise, California Sidecar cannot be responsible if any of the steps are omitted or shortcuts are taken, or parts other than those supplied by CSC, are used in installing this trike conversion kit. WARNINGS are printed in bold type. PLEASE USE EXTREME CARE so as not to damage the part, the motorcycle, or yourself!! ALWAYS wear safety glasses when working with hand and power tools, and when working with or around any harmful or hazardous materials! Additionally, when working in and around the fuel system, ALWAYS work in a well ventilated area free from sparks and open flames! DIRECTIONAL REFERENCES - All references to right and left side are as if one is seated on the motorcycle. - All references to forward mean toward the front of the motorcycle while back means toward the rear of the motorcycle unless otherwise stated. SAVING AND DISCARDING PARTS - During installation, if parts are intended to be saved for later use, they are marked SAVE in italics. If removed parts are not marked SAVE, they may be discarded. LIST OF TOOLS AND EQUIPMENT - This list contains only those items that might be construed as out of the ordinary for someone repairing a motorcycle. A COPY OF THE O.E.M SERVICE MANUAL IS ESSENTIAL TO THIS INSTALLATION. Trike Installation Trailer Hitch Installation 5/16 drill bit 1/8 X 8 or 3/16 X 8 drill bit Flat Black Spray Paint Floor Jack Ring Pliers Silicone Sealer Super Glue Teflon Sealing Tape IMPORTANT Note to Installing Dealer: Please forward the Owner Info Pack to the purchaser of this product. It contains valuable information for the end-user of this product. 02/01 1.) BODY FRAME 4-5/16-18 X 3 HHCS 8-5/16 USS Flat Washer CALIFORNIA SIDECAR VALKYRIE INTERSTATE TRIKE KIT PARTS LIST 3

6-5/16-18 Nyloc Nut 2-5/16-18 x 1 HHCS 2-5/16 Fender Washer 1 - Rear Tour Box Bracket 1 - With CB 1 - Without CB 2 - Air Shock Front Mounting Bracket 2 - Air Shock Rear Mount Bracket 2-3/8-16 x 1-1/4 HHCS 2-3/8-16 x 1-1/4 HHCS 4-3/8 SAE Flat Washer 4-3/8 SAE Flat Washer 2-3/8-16 Nyloc Nut 2-3/8-16 Nyloc Nut 4 - M10 x 1.25 x 35 SHCS 4 - M10 Flat Washer 4 - M8 X 1.25 Nyloc Nut 4 - M8 Flat Washer 3 - M6 Nyloc Nut 2.) AIR SHOCK MOUNT 2-A.) AIR SHOCK FILLER LINE KIT 1 - Valkyrie air shock mount 1 - Black air tubing (3 X 1/8 ) 1 - Honda O.E.M. air shock 1 - Adapter shock to air tube with O ring 1 - Air shock filler line kit (see 2-A) 1 - Bag consisting of: 1-5/8-18 x 2-1/2 HHCS 1 - Ferrel Nut 1-5/8-18 Nyloc Nut 1 - Ferrel 1 - M14 x 1.50 x 55 HHCS 2 - O-ring 1 - M14 x 1.50 Nyloc Nut 1 - Air filler assembly 2 - M10 x 1.25 x 80 HHCS 1 - Needle valve S/S with cap 4 - M10 x 1.25 Nyloc Nut 2-5/16 Flat Washer S/S 2 - M10 x 1.25 x 100 HHCS 1 - Needle valve jam nut 16 - M10 Flat Washer 1 - Brass adapter needle valve to air tube 1 - Brass compression sleeve 1 - Brass compression nut 3.) SPRING SHOCKS 1 - Spanner wrench 2 - Progressive shock 2-5/8-18 x 2-1/4 HHCS 2-5/8-18 Nyloc Nut 4.) SWING ARM ASSEMBLY 2 - Swing arm pivot bolts (left + right) 5.) FINAL DRIVE UNIT 8 - ½-20 Nyloc Nut for Ford Rear Drive 1 - Drive shaft, fitted with: 1 - Yoke 1 - U-joint 1 - O.E.M front U-joint and yoke (modified) 1 - Box of Neapco #1-0189, 2 U-bolts, 4 Nuts and 4 Lock Washers 6.) EXHAUST SYSTEM - STANDARD EXHAUST SYSTEM - OPTIONAL 2 - Hanger mounts, chrome fitted with: See Accessory List 2-5/16-18 X 1-3/4 HHCS 4-5/16 SAE Flat Washer S/S 2-5/16-18 Nyloc Nut 4

2-3/8-24 x 1 HHCS 2-3/8-24 Nyloc Nut 7.) BRAKE LINE SYSTEM 1-2-piece steel braided brake line 1-2 lb. Residual valve 1 - M10 X 1.0 banjo bolt with two crush washers 8.) WHEELS & TIRES 8 - ½-20 Tapered Lug Nut 9.) PASSENGER FOOT REST 2 - Foot rest mount plate 4-3/8-16 x 1-1/2 BHSCS S/S 4-3/8-16 Nyloc Nut 2 - M10 x 1.25 x 40 HHCS 2 - M10 Lock Washer 10.) MISCELLANEOUS Instructions Core Parts List 5

ACCESSORY PARTS LIST 1.) TRAILER HITCH 1 - Receiver hitch plate 6-5/16-18 x 1 HHCS 6-5/16-18 Nyloc Nut 12-5/16 SAE Flat Washer S/S 1 - Receiver tongue, chrome 1 - Receiver pin 1 - Receiver pin clip 1-1-7/8 Chrome ball with Lock Washer and Nut 2.) CHROME EXHAUST PIPE EXTENSIONS 2 - Turn down extensions, chrome 2 - ¼-20 x 1 HHCS 2 - ¼-20 Nyloc Nuts 2-3/8-24 x 1 HHCS 2-3/8-24 Nyloc Nut California Sidecar Parts & Technical Support 100 Motorcycle Run Arrington, VA 22922 PHONE: (434) 263-8866 FAX: (434) 263-8877 6

CALIFORNIA SIDECAR VALKYRIE INTERSTATE TRIKE CONVERSION KIT INSTALLATION INSTRUCTIONS STEP 1: PREPARING THE MOTORCYCLE Remove the following items IN ACCORDANCE WITH THE SERVICE MANUAL: 1. Rider seat (save) 9. Right and left rider foot rests (save) 2. Side covers (save) 10. Right and left passenger foot rests (save) 3. Saddle bag guards (if installed) 11. Passenger foot rests support brackets 4. Saddle Bags 12. Exhaust system (save) 5. Saddle bag mounting brackets 13. Side stand 6. Tour Box (save) 14. Back half of rear fender 7. Antenna & mount (save). Note: Disconnect antenna cable before removing. 8. Tour Box mounting brackets (save). Note: a new rear mount bracket is supplied with the installation kit. STEP 2: REMOVING REAR WHEEL & SWING ARM 15. Leaving wires as long as possible, cut off and save electrical plug from rear section of fender. Remove the following items IN ACCORDANCE WITH THE SERVICE MANUAL: 1. Drain brake fluid 8. Remove U-joint boot from engine case 2. Remove rear wheel 9. Remove Swing arm 3. Remove both shocks. 10. Remove U-joint boot from swing arm (save) 4. Remove final drive unit 11. Remove drive shaft from final drive unit 5. Remove rear brake caliper and brake line to rear master cylinder 12. Remove C-clip, spring and cup washer from drive shaft (save) 6. Remove swing arm pivot lock nut (save) 13. Save front U-joint and yoke. RETURN TO CALIFORNIA SIDECAR as core parts 7. Remove both swing arm pivot bolts STEP 3: INSTALLING THE NEW SWING ARM FRAME 1. Install C-clip, spring and cup washer to new drive shaft. 2. Lightly grease spring and splines of new drive shaft. 3. Place drive shaft through swing arm and install new front yoke. BE CERTAIN THAT ALIGNMENT MARKS LINE UP PROPERLY. 4. Lightly compress and tie both U-joints together with wire through new swing arm frame. 5. Install U-joint boot on swing arm. 6. Install swing arm onto bike frame using new swing arm pivot bolts. (Refer to the service manual for proper procedure). Note: Do not loosen or cut wire (Step 3.4 above) holding drive shaft. 7. Torque to Honda specs listed below: Right Left Lock 7

103 NM 19 NM 113 NM 76 ft. lbs 14 ft. lbs. 83 ft. lbs. STEP 4: INSTALLING THE REAR END 1. Move the rear end into position with the swing arm. 2. Install eight (8) 1/2 x 20 nyloc nuts and torque to 55 lbs. 3. Cut and remove wire (installed in Step 3.4). Install U-bolts to rear drive yoke and torque to 20 lbs. Be certain that the bearing offsets in the yoke and the U-joint are properly aligned. 4. Route braided brake line forward from T fitting around to right side of frame and attach to master cylinder using OEM banjo bolt. It is necessary to bend brake line at master cylinder to allow enough clearance to reinstall master cylinder cover. 5. Using 12 wire ties, tie brake line to swing arm in at least 4 places and make sure it is clear of all obstructions and/or areas where it could be damaged or pinched. 6. Using DOT 4 brake fluid bleed all air from brake lines. 7. Add 3 pints or1½ quarts of 80-90 wt. gear oil to final drive unit. 8. Grease rear U-joint. 9. Push front yoke dust boot back over output shaft and on to engine case. STEP 5: INSTALLING THE AIR SHOCK MOUNT 1. Drill out with 25/64 drill bit all the way through frame on both sides at the front and rear hole where passenger back rest was mounted. 2. Install air shock to mounting bracket with filler pipe pointing forward to front of bike. Be certain the clevis on the air shock mount points to front of bike. 3. Install air line adapter with air tube to air shock. 4. Place air shock and mount into position, (be certain the air line opening on shock is facing front of bike). 5. Install FRONT air shock mount bolts in the following sequence: M10 x 1.25 x 80 bolt, 1 M10 washer, body hanger, 3 M10 washers, then position bolt through motorcycle frame and air shock mount and fasten with M10 x 1.25 nyloc nut. 6. Repeat step 5 for the other side of bike. 7. Install REAR air shock mount bolts in the following sequences: M10 X 1.25 X 100, 1 washer, through the chrome fender rail, then through fender, hanger bracket, and air shock mount, then add 3 washers and a 1 nyloc nut. 8. Repeat step 7 for the other side of bike. STEP 6: INSTALLING THE BODY FRAME 8

1. Place body frame into position. 2. Install four (4) chrome M10 x 1.25 x 35 socket head bolts with four (4) M10 washers, through holes (2 on each side) and fasten where the passenger footrest brackets were mounted. Torque to 55 lbs. 3. Install all eight (8) 3/8 x 24 x 1¼ Gr.8 bolts, each with two (2)? SAE flat washers and one (1)? x 24 nyloc nut, connecting the body hanger brackets front and rear to body frame. Torque to 40 lbs. STEP 7: INSTALLING THE PROGRESSIVE SHOCKS TO THE MOTORCYCLE FRAME Before installing the Progressive shocks it necessary to set the preload. These shocks come from the factory set at their lowest rebound setting and can be adjusted higher from the lowest setting to the highest. This is performed by placing the bottom of the shock in a vise and, using the spanner wrench provided with the kit, rotating the adjusting can on the bottom of the shock. Rotating clockwise increases the preload, and rotating counter-clockwise decreases the preload. These may need to be adjusted several times to suit rider preferences. STEP 8: INSTALLING SHOCKS TO SWING ARM 1. Place a jack under final drive unit and raise the final drive unit so bottom of shocks align with the holes in the clevis brackets of swing arm. 2. Place the two (2)? x 18 x 2-¼ Gr.8 bolts through clevis and shock, and fasten with two (2)? X 18 nyloc nuts and torque to 55 lbs. 3. Fasten air shock to swing arm with M14 x 1.50 x 55 bolt and M14 x 1.50 nyloc nut and torque to 55 lbs. STEP 9: MODIFYING THE EXHAUST SYSTEM 1. Remove chrome covers from each side of the exhaust pipes to expose the individual exhaust tubes where they fit into the muffler. 2. Leaving the jack in place under the final drive unit, raise the jack higher so exhaust system can be reinstalled. Tighten all exhaust bolts at cylinder head and torque to 16 lbs. 3. Using an oxy / acetylene torch with a rose bud tip, carefully heat all three pipes equally until they are red hot. When they are sufficiently hot insert a long metal pipe into the muffler to bend mufflers down 2 on both right and left sides. Be careful not to burn a hole through the exhaust pipe. It will be necessary to tie the motorcycle down and elevate the final drive unit enough for the mufflers to fit into their proper position. 4. On right side, re-heat same three exhaust tubes and again using metal pipe bend muffler out away from center of bike about 2. Again, be careful not to burn a hole in the exhaust pipe. 5. If exhaust extensions are not being used, install muffler hanger brackets now. a) Slide hanger mounts on from back and join to trike body frame mount with two 3 / 8 x 24 x 1 ¼ long + nyloc nuts. Do not tighten. 9

b) Tighten all clamps and rear hanger brackets 6. If exhaust extensions are to be used remove left and right tail pieces and install extensions to mufflers. 7. If mufflers do not clear final drive unit or do not align to body frame muffler mount tabs, repeat STEP 10: steps 9.3 and 9.4. INSTALLING THE AIR SHOCK AIR HOSE TUBING 1. Route air shock inlet tube to left side of front panel where the seat key release is and drill 5/16 hole next to the seat key release. 2. Insert air shock inlet valve and secure with nut supplied. STEP 11: INSTALLING THE BODY 1. Be sure all previous steps are complete. 2. Place body on frame in a downward motion from above bike. 3. Using a 2 X 4 or block hold the front of body up so that you can re-install all 4 pieces of the tour box mounting frame. Note: The rear bracket is now supplied with the kit. 4. Align the body to the bike frame and wheels. Lift carpet up in areas where you will be drilling. 5. Drill six (6) 5/16 holes through body using holes in body frame as guide. Be certain to pull inside trunk carpet out of the way of the holes to be drilled. 6. Fasten body using the following bolts: Rear - four (4) 5/16 x 18 x 3 bolts with eight (8) 5/16 USS flat washers + four (4) 5/16 x 18 nyloc nuts. Front - two (2) 5/16 x 18 x 1 bolts with two (2) 5/16 x 1-1/2 fender washers + two (2) 5/16 x 18 nyloc nuts. 7. Re-install Tour Box and antenna to new rear mount. Run coaxial cable between tour box and trike STEP 12: body to the plug under the seat. INSTALLING THE WHEELS 1. Install wheels with lug nuts provided and torque to 70 lbs. Re-check after 25 miles. 2. Install center caps with CSC logo. 3. Inflate tires to 20-25 lbs. of air pressure. STEP 13: INSTALLING PASSENGER FOOT RESTS NOTE: The footrest can be placed in two positions, whichever is more comfortable for the passenger. 10

1. Position footrest plates on body frame just in front of fender with top of plate flush with top of body frame. 2. Mark the two holes and drill out with 3/8 drill bit. 3. Install two (2) 3/8 x 16 x 1-1/2 button socket head bolts through foot rest plate and body frame. Next, install 3/8 x 16 nyloc nuts and torque to 20 lbs. 4. Repeat the above procedure for the opposite side. 5. Fasten footrest to plate with M10 x 1.25 x 35 bolt and M10 lock washer and tighten. STEP 14: INSTALLING THE WIRING 1. Cut to length and crimp an appropriate terminal end to wire and connect to battery, red/black to + (positive) and white to - (negative). 2. Route small black antenna wire to the body frame (anywhere) and wrap around metal frame several times. 3. Connect wires from trike body to OEM plug removed in Step 2-3 as follows: Motorcycle Light Blue Brown Green Orange Green w/red (brake) Trike Kit Light Blue Brown Green Orange Green/Red STEP 15: COMPLETING INSTALLATION 1. Re-install antenna and Tour Box to new rear mount. Run coaxial cable between tour box and new trike body then plug under the seat. 2. Check all lighting on the motorcycle and trike body for proper operation. California Sidecar Parts & Technical Support 100 Motorcycle Run Arrington, VA 22922 PHONE: (434) 263-8866 FAX: (434) 263-8877 11