victron energy B L U E P O W E R

Similar documents
victron energy B L U E P O W E R

Manual. Lynx Ion 24V/180Ah Lithium Ion Batteries

USER MANUAL GEBRUIKSAANWIJZING. Phoenix 12/150 Phoenix 24/150 Phoenix 48/150

Victron Energy USER MANUAL GEBRUIKSAANWIJZING GEBRAUCHSANWEISUNG PALLAS-TG 12/50 SKYLLA-TG 24/30 SKYLLA-TG 24/50 SKYLLA-TG 24/30 110V TITAN 48/25

DC Master 24/ A

c-go 24V/6A 24V/8A 24V/12A

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

USB Charge Port Installation Instructions

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A

Installation and Operation Guide

SBC V In-Car Charger Dual Input (Solar MPPT & DC)

TIC 300 PRO. Users Manual Mode d emploi Bedienungshandbuch Manual d uso Manual de uso. Non Contact AC Voltage Detector. High Energy Tic Tracer

MODUL-CONNECT 1.2. Owner s Manual. Modular, digital wiring and control system. Document Part Number MSMC Rev 9 (04/18)

Dimensions 12/800N 12/1200N D. DC to AC Power Inverters. OWNERS MANUAL for Models: OWNERS MANUAL April ISO 9001:2000 Certified Company

Pure Sine Wave Inverter 600W-24V User Manual

A/C PRESSURE MONITOR INSTALLATION INSTRUCTIONS SYSTEM OPERATION GREEN INDICATOR LIGHT

IMPORTANT. Always connect the batteries first. Use for 12V battery system only 12V (36 cells) solar panel array.

DC Distribution Panel User Guide # S

MIL-24/2600Q MIL-24/3200DQ

Mass Sine 24/10000 Mass Sine 24/15000

USER S MANUAL GPC SERIES LOW VOLTAGE DISCONNECT. Galley Power LLC.

CM100. Carbon Monoxide Meter. 99 Washington Street Melrose, MA Phone Toll Free

Installation and Operation Guide

OPERATING MANUAL Digital Diesel Control Remote control panel for WhisperPower generator sets

TOYOTA VENZA w/smart 2009 TVIP V4 PREPARATION

P30L User Manual Revision 2.0. P30L LCD 30A Solar Charge Controller CHC-LCD-30. User s Manual

S150,S300 Series Pure Sine Wave Inverter User s Manual

Sprayer Control. Manual for SprayLink Cable Installations. Tank. Jet Agitator. Agitator Valve. Diaphragm Pump. Pressure Transducer.

WARNING. This product uses High Brightness LEDs. Direct viewing of the SMD LEDs at close range should be avoided. Keep product away from children.

MASTERsine Inverter PXA Series Installation Guide

Submersible Pond Pump with UV 800 Gallons Per Hour

Dash Logger Extension Cable PART# - RS11850-MD60-EC-11. APPLICATION(S): RIVA/Athena Dash Logger with 2011 & Newer Sea Doo 4-TEC Models

Battery Back-up BBM Owner's Manual. Please read this manual BEFORE installing your inverter

TOYOTA HIGHLANDER w/smart Key TVIP V4 REMOTE ENGINE STARTER (RES) Part Number: PT

GP-1000 Inverter. Go Power! Electric Inc. PO Box 6033 Victoria, BC V8P 5L4 Tel: Fax:

INSTALLATION INSTRUCTIONS TRAILER HITCH MAIN HARNESS KIT

OWNERS MANUAL JANUARY 2007 ISO

Hawkeye Plus Reverse Assistance System Installation Instructions

Compass 45º - Transducer -

D&D Motor Systems, Inc.

TOYOTA RAV4 w/smart 2009 TVIP V4 PREPARATION

TOYOTA PRIUS 2010 TVIP V4 PREPARATION

P5000 Series Owners Manual 12/16/04 5:16 PM Page 1. Owners Manual

Go Power! Manual. GP-Smart Charger

AC POWER SOURCE PURE SINE WAVE DC-AC INVERTERS OWNER S MANUAL

TOYOTA TUNDRA TVIP V4 REMOTE ENGINE STARTER (RES)

Plus SABRE LIGHTBARS

Remote Vehicle Control System. Keyless Entry and Convenience System

General Precautions. Personnel Precautions

The function of this Dynamic Active Probe has divided into three preferences on the screen main Menus:

DC to AC Power Inverters

Compact System NRGS 11-2 NRGS Original Installation Instructions English

DC to AC Power Inverters

TOYOTA SEQUOIA TVIP V4 REMOTE ENGINE STARTER (RES)

Power Distribution System User s Manual. Model: PDS-100

TOYOTA COROLLA 2009 TVIP V4 PREPARATION

The Ultimate Smart Grid Solution INSTRUCTION MANUAL

User Manual. Solar Charge Controller 3KW

Case IH Puma and New Holland T70X0/T7.XXX - Steering Ready SmarTrax Installation Manual. P/N Rev B 09/15 E20796

Wind display type WSDI-2

Compass 35º - Transducer -

BRAVO Inverter/Battery Charger. Table of Contents

part three electrical installations

MANUAL D250SA SMARTPASS 120. Input Solar panel Earth Connection

Installation & Calibration

800 WATT POWER INVERTER

RS-3 PRO RS-1007 PRO. CAT IV Analog Clamp meter Series. Users Manual. For detailed specifications and ordering info go to

XPower Inverter 450. Owner s Manual

Freedom egen System End-of- Line Functional Checklist

Infinitybox Express Road Race Car Kit Installation Guide

TX900. Microwave Leakage Detector. 99 Washington Street Melrose, MA Phone Toll Free

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

TRAILER WINCH MODELS ST315 AND ST712. General Safety (Continued) Description. Unpacking. General Safety Information.

REC-11+ REMOTE RECEIVER UNIT

Table of Contents 文管中心 發行章

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

Go Power! Manual. GP-1750HD Inverter GP-2500 Inverter

INSTALLATION INSTRUCTIONS

RK Standby Battery Operator s Manual

MAINFRAME HOT RUNNER TEMPERATURE CONTROL SYSTEMS. Instruction Manual

DC TO AC POWER INVERTER PWRIC150012W INSTRUCTION MANUAL

HQ-INV300WU-12 HQ-INV300WU WATT DC TO AC MODIFIED SINEWAVE INVERTER WITH USB OUTPUT

Instruction Book for. ContouR ElECtRol

Smart 110 with built-in flashlight for 6 240Ah lead-acid batteries

Phocos CML-V2. Solar charge controller. User Manual (English) Dear customer,

SENTRY ISOBUS Tip Flow Monitor. Software Version 1.00

PRM-4. Phase Sequence and Motor Rotation Tester. Users Manual. For detailed specifications and ordering info go to

800 WATT POWER INVERTER

XPower Inverter 1000 Plus and 1750 Plus. Owner s Guide

User Manual / Manuel utilisateur

BC-1230P/ 1240P/ 1260P Multi-Stage Battery Chargers User Manual

LEXUS RX 450h 2010 TVIP V4 PREPARATION

Installation Instructions

POWER TILT ACCESSORY FUZE T50 STELLAR GL STELLAR LEAP OWNER S OPERATION AND MAINTENANCE MANUAL

TOYOTA COROLLA 2010 TVIP V4 PREPARATION

Portable Power Solutions USER MANUAL

Model Series. PumpAgents.com - buy pumps and parts online ELECTRIC BILGE PUMPS. Model Series FEATURES SPECIFICATIONS STANDARD MODELS

Operating instructions

Quick-Kill Installation Manual V1.0 (Universal Motorcycle Application)

RollSeal 1733 County Road 68 Bremen, Alabama Part No Rev Owner s Manual RS-Divider Curtain

Transcription:

victron energy Bus-based power distribution system Installation & Operation manual VE.NET DC

victr on ener gy Installation & operation manual Copyrights 2006 Victron Energy B.V. All Rights Reserved This publication or parts thereof, may not be reproduced in any form, by any method, for anypurpose. For conditions of use and permission to use this manual for publication in other than the English language, contact Victron Energy B.V. VICTRON ENERGY B.V. MAKES NO WARRANTY, EITHER EXPESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, REGARDING THESE VICTRON ENERGY PRODUCTS AND MAKES SUCH VICTRON ENERGY PRODUCTS AVAILABLE SOLELY ON AN AS IS BASIS. IN NO EVENT SHALL VICTRON ENERGY B.V. BE LIABLE TO ANYONE FOR SPECIAL, COLLATERAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES IN CONNECTION WITH OR ARISING OUT OF PURCHASE OR USE OF THESE VICTRON ENERGY PRODUCTS. THE SOLE AND EXCLUSIVE LIABILITY TO VICTRON ENERGY B.V., REGARDLESS OF THE FORM OF ACTION, SHALL NOT EXCEED THE PURCHASE PRICE OF THE VICTRON ENERGY PRODUCTS DESCRIBED HERE IN. Victron Energy B.V. reserves the right to revise and improve its products as it sees fit. This publication describes the state of this product at the time of its publication and may not reflect the product at all times in the future. 2

Installation & operation manual Table of contents 1 Introduction...4 1.1 General 4 VE.Net DC...4 Features...4 About this manual...4 1.2 Safety 4 General...4 Modifications...4 Service and technical support...4 1.3 Overview 5 Overview of components...5 2 Installation...6 2.1 Install the system...6 Precautions...6 Calculate the needed power...7 Select the nodes...8 Routing from the appliance(s) to the node...9 Routing of the bus cable and main fuse box...10 Install the main fuse box...11 Connect to the battery...12 Connect the direct power nodes (DPN)...13 Install the switch panel...14 Install the node...16 2.2 Configure the system...19 Priority...19 Switch mode...19 Navigation lights...19 Bilge-pump...19 Feedback defective lamp/cable...19 Reconfigure...19 Store the configuration...19 2.3 Start the system the first time...20 Configure one switch to one node...21 Configure one switch to more than one node...21 Configure more than one switch to one node...22 Change priority...22 Change feedback of defective lamp/wire...23 Delete connection between switch and node...24 victr on ener gy 3 Operation... 25 Push button panel overview... 25 Switch on the system... 26 Background light... 26 Warning lights... 27 Indications of the appliances... 27 Detection of doors and hatches... 28 Direct Power Node (DPN)... 29 Switch off the system... 30 4 Maintenance... 31 4.1 Troubleshooting... 31 4.2 Replace the node... 32 If no new nodes are available:... 32 4.3 Technical specifications... 33 4.4 Spare parts 34 5 Appendix... 36 Configuration table (3x)... 36 3

victr on ener gy 1 Introduction 1.1 General VE.Net DC Congratulations on purchasing a VE.Net DC bus power distribution system for your vessel. The system is delivered as a set and can be assembled according to CE standard. It is essential therefore to follow the installation instructions carefully. VE.Net DC is a modern electronically controlled bus system. Special built in features reduce the risk of a cable fire or a low-voltage situation. 1.2 Safety General Observe all safety instructions. Use this product only for the purpose it is intended for. Please contact your dealer immediately if a potential danger arises during the use of this product. Features Built in features include: An electronic fuse for each load. The fuse can be reset with the switch push button. All warnings are both visual and audible. A warning for broken (navigation) light or wire. A warning for overloads. The appliance turns off automatically. A warning for low voltage. The appliance turns off automatically. An adjustable background light in the switch panel. Modifications Modifications to the product are not permitted. Service and technical support For information concerning specific settings, maintenance or repair work, contact your local dealer. About this manual Installation & operation manual This user manual describes the installation and operation of the VE.Net DC system. Read this manual carefully before use or operation of the product. In case you have any doubt about a procedure contact your dealer. 4

Installation & operation manual 1.3 Overview Overview of components A. Cable harness including: 10 A fuse 50 A fuse 10 A. direct power node 20 A. direct power node 2 15 m. bus cable 8 m cable for push button panel 8 m cable for bilge-pump 8 m cable for instruments B. Push button panel C. 3 A. power nodes D. 10 A. power nodes E. 16 A. power nodes F. Sensor node for bilge-pump G. Cable cutter H. DC 4 compound (tube) I. CD labels A(1x) B(1x) C(5x) D(8x) E(2x) 3 10 16 F(1x) G(1x) H(1x) I(1x) victr on ener gy S 5

victr on ener gy 2 Installation 2.1 Install the system Precautions Observe the following when you wire the system: 1. Never install any components above batteries or fuel tanks. 2. Never install components or cables near heat sources that may melt the insulation. 3. Never expose components or cables to oil or grease. 4. Never install components when there is a risk of exposure to water. 5. Never use twist-on connectors. Always use insulation barriers to prevent a short circuit of exposed terminal connectors. Always use the correct tool. Always take the necessary precautions to protect the components and cables from damage. Always clamp the wires at least every 30 cm (12 ). Protect cables that pass bulkheads or structural members against damage by grummets or equivalent means. Installation & operation manual Protect components and wires with sheets, conduits or equivalent means when there is a risk of physical damage. All wires must be fire resistant, finestranded and tinned. Always use the correct cable diameter and colour. This is indicated on the node. Wires outside the motor compartment must be rated at minimum 60 C / 140 F. Wires inside the motor compartment must be rated at minimum 70 C / 158 F. 6

Installation & operation manual Calculate the needed power Calculate the total power and the amount of nodes for each bus-cable before you start installation. 1. Calculate for each single appliance or groups of appliances the power needed. 1 A per 10 W for a 12 V system 0,5 A per 10 W for a 24 V system 2. Divide the appliances as evenly as possible between the two bus cables. Each bus cable can have a maximum load of 50 A. 3. Select the node with the correct amperage. Refer to Select the nodes. 4. Write down the configuration of the nodes in the Configuration tables. Refer to the Error! Not a valid bookmark self-reference.. victr on ener gy Warning! Do not install nodes in a petrol engine compartment or a gas locker. There is a risk of ignition and explosion. Note: Appliances connected to the Direct Power Nodes do not influence the total power on a bus cable. 7

victr on ener gy Select the nodes We recommend the following set-up: Node Appliance Cable Diameter (mm 2 ) (AWG) 3 A Navigation light 1,5 16 Interior light 10 A Deck light 1,5 16 Instruments Interior light Power outlet Refrigerator 16 A Fresh water pump 2,5 14 Bilge-pump Sensor node on/off Automatic switch bilge-pump 1,5 16 Installation & operation manual Note: Connect the delivered sensor node to the automatic switch of the bilgepump. Caution! The node triggers when there is more power applied than specified. Caution! Connect the radar, compass GPS and bilge-pump to a direct power node. The direct power nodes are located in the main fuse box. 8

Installation & operation manual Routing from the appliance(s) to the node victr on ener gy Node Node 1. Lay-out the wires from the appliance to where the node will be placed. 2. Cut the wires to the correct length. Allow extra length to tighten up the cables with tie-wraps. Refer to the drawing. 3. Attach the connectors on the end of the wires. 4. Lay-out single appliances directly to the node. 5. Lay-out group appliances parallel to the node. 9

victr on ener gy Routing of the bus cable and main fuse box Installation & operation manual 1. Lay-out the bus-, instrument-, switchboard- and bilge-pump cables and the main fuse box to where they will be placed. Note: Make sure the main fuse box is easy to access. Warning! Do not install nodes in a petrol engine compartment or a gas locker. There is a risk of ignition and explosion. max. 200 cm 80" Note: Make sure that the cable between the fuse box and the battery has a maximum length of 200 cm (80 ). Warning! If the +cable (red) between the main fuse box and the battery is longer than 200 cm (80 ), it needs a fuse of 80 A at the battery. 10

Installation & operation manual Install the main fuse box victr on ener gy 1. Remove the cover of the main fuse box. Note: Make sure the main fuse box is easy to access. 2. Install the main fuse box on a suitable surface. 3. Set the fuses in the OFF position. 4. Replace the front cover. Warning! Make sure all fuses are set in the OFF position. 11

victr on ener gy Connect to the battery Installation & operation manual 20 mm 6/8" 1. If necessary, adjust the length of the bus wires at the main fuse box. 2. Remove the cover of the main fuse box. 3. Loosen the screw to remove the wire on the fuse. Note: Do the procedure for one wire at a time. 15 mm 5/8" 4. Cut the wire. 5. Remove 15 mm (5/8 ) of the insulation at the end of the wire. Use the cable cutter to cut the insulation. 6. Place the wire back on its place. 7. Tighten the screw to secure the wire. Warning! Follow the instructions properly to reduce the risk of future shortcut with possible fire. 8. Clamp the bundles of + (red) and (black) battery wires with at least 20 mm (6/8") distance in between. 9. Connect the red cable to the + terminal on the battery. 10. Connect the black cable to the - terminal on the battery. Warning! Make sure there is no risk of physical damage for the cables. In case there is a risk, protect the cables with grummets or equivalent. 12

Installation & operation manual Connect the direct power nodes (DPN) victr on ener gy 12 11 12 11 30 cm 12" Fusebox Max 10 A DPN 1. Start from the main fuse box. 2. Clamp the 10 A Direct Power Node (DPN) wires to the instruments. If necessary, install a multiple fuse box with a total of 10 A between the different instruments and the node. Refer to the illustration. 3. Clamp the 20 A DPN wires to the bilge-pump. Note: Do not connect the wires to the appliances mentioned. 4. Attach the wires for the push button panel. Leave 30 40 cm (12 16 ) extra length for easy connection of the switch panel. 5. Attach the wires with a clamp every 30 cm (12 ). Note: Clamp the wires of the instruments, bilge-pump and switch board separated from the bus cable. Caution! The instruments and VHF may need a separate fuse. Refer to the instrument user manual. 13

victr on ener gy Install the switch panel Installation & operation manual O 20 mm 6/8" 1. Remove the cover of the switch panel. Note: Handle the cover with the electronics with care. Do not touch the electronics. Place the cover with the electronics in the box during installation. 2. Feed the wires through a 20 mm (6/8 ) hole. 3. Feed the wires through the back panel. 3. Install the back panel on a suitable surface. 14

Installation & operation manual victr on ener gy Bus GND VBAT Violet Black Red 4. Insert the labels in the cover. Note: Switch 1 and 4 are reserved for the bilge-pump. If necessary, make new labels with the delivered CD. Use an overhead sheet to print the labels. 5. Connect the wires to the electronics. 6. Replace the front cover. 15

victr on ener gy Install the node Installation & operation manual Note: Start with the node closed to the main fuse box. 1. Install the node base onto a suitable surface. Note: Align the side of the node marked with + with the red bus cable Align the side of the node marked with with the black bus cable. 2. Push the wires into the base. 3. Mark the places of the clips on the wires. Warning! Do not use the node base and the clips more than one time. Mounting deforms the clips and base. 2 mm 1/16" 4. Cut the insulation with the cable cutter. 5. Bend the wire several times until 2 mm (1/10 ) of the conductors are exposed. 16

Installation & operation manual victr on ener gy 6. Push the clips onto the wire. Make sure the clips make contact with the exposed wires. 7. Put some DC4 compound around the clips. 8. Push the clips into place to secure. 9. Repeat these steps for the other wire. 10. Put some DC4 compound around the violet wire. Put the compound on the place of the single clip. 11. Push the wire into its position. 12. Use a hammer to secure the clip in the base. 17

victr on ener gy Installation & operation manual 30 cm 12" 13. Place the middle cover 14. Attach the proper node. 15. Attach the connectors to the wires and clamp them accordingly. Caution! Do not connect the wires to the node. This will be done during the configuration of the system. 16. Attach the wires with a clamp every 30 cm (12 ). Allow some space for additional nodes to install. 17. On the end of the bus cable: Cut the bus cables to the proper length and insulate them with insulating tape. 18

Installation & operation manual 2.2 Configure the system Priority The node priority is used when there is an overload or low voltage situation. The nodes with a low priority turn off first to make sure important systems remain in operation. Therefore it is important to set the priority of each node correctly. The priority is automatically set in the order of configuring the nodes. The first configured nodes are set to the highest priority. Bilge-pump The bilge-pump and its sensor node do not need to be configured. They are set in the factory on switch 1 (automatic) and switch 4 (manual) with the highest priority. It is enough to connect the Direct Power Node (DPN) wires to the pump and the automatic switch to the sensor node. Switch mode The switch buttons can be set to two different switch modes: Toggle mode: When the switch is pushed, the appliance functions until the switch is pushed again. Use this mode for the refrigerator, lights etc. Direct mode: The appliance functions as long as the switch is pushed. Use this mode for the horn, winch etc. Feedback defective lamp/cable The system indicates whether a lamp/wire is defective or when a motor is not running. It is possible to configure the appliance not to include this indication. This is recommended for appliances such as 12 V outlet, refrigerator, automatic pumps etc. Navigation lights victr on ener gy There are three options: 1. Configure each lamp to a separate node, but to the same switch. The switch indicates malfunction, but not which light is defective. 2. Configure each lamp to a separate switch and a separate node. The indication shows which light is defective. 3. Configure each lamp to a separate node, but to the same switch. Combined with a VE.Net DC Navigation light board it is easy to see which light is defective. Reconfigure 1. Disconnect the appliance from the node. 2. Follow the procedure as for normal configuration. Caution! The reconfigured appliance is set to the lowest priority. Store the configuration It is necessary to store each configuration separately. To do this, turn the push button panel off and on after you finished the specific configuration. 19

victr on ener gy 2.3 Start the system the first time Installation & operation manual 1. Switch on all main fuses. 2. Switch on the push button panel. 3. Proceed with configuration. Warning: In case of immediate alarm (buzzer and lightening of the polarity warning led): 1. Turn of the system through the main fuses immediately. 2. Check the polarity at the batteries. Change if necessary. 3. Turn on the system again. See chapter Maintenance. 20

Installation & operation manual Configure one switch to one node victr on ener gy Toggle 2 sec C1 C2 Direct 5 sec C3 1. Push the + and for two seconds. The display shows C1. 2. Connect the appliance to the node. The display shows C2. The buzzer gives a signal. 3. Push the desired push button. Push shortly to select toggle mode. The display turns off and the buzzer stops. Push for 5 seconds to select direct mode. The display shows C3 and the buzzer stops. Configure one switch to more than one node Use the above procedure. Repeat the procedure for each node that you want to connect to the switch. 21

victr on ener gy Configure more than one switch to one node Installation & operation manual 2 sec C1 1 C4 # 1. Do the procedure as in Configure one switch to one node. 2. Push the + and for two seconds. The display shows C1. 3. Push the first configured switch button shortly. 4. Push the desired switch shortly. The switch is configured automatically to the same mode as the first switch. The display turns off. Change priority 2 sec P0 C1 1. Push the + and for two seconds. The display shows C1. x 2 P1 2. Push the + 2 times shortly. The display shows P0. 3. Push the to set the priority. The display shows P1, P2 or P3. P1 is high priority. 4. Push the switch button that corresponds to the node. The display turns off. # Caution! Do not set all appliances to the same priority. 22

Installation & operation manual Change feedback of defective lamp/wire victr on ener gy 2 sec C1 3x Fb F1 F0 # 1. Push the + and for two seconds. The display shows C1. Note: Be aware that an automatic motor and appliances with separate conventional switches, when not activated, will indicate defective lamp/wire. 2. Push the + 3 times shortly. The display shows Fb (Feedback). 3. Push the to set the feedback: F1: Feedback on; F0: Feedback off (recommended for refrigerator, automatic running motor, and groups of separately switched appliances. 4. Push the switch button that corresponds with the node. The display turns off. 23

victr on ener gy Delete connection between switch and node Installation & operation manual 2 sec rs 4x C1 # 1. Push the + and for two seconds. The display shows C1. 2. Push the + 4 times shortly. The display shows rs (Reset). 3. Push switch to delete shortly: The switch illuminates green and the appliance switches on. 4. Turn off and on the push button panel to store the deleted function. The green light and the appliance turn off. The connection between the switch and the node is deleted. 24

Installation & operation manual victr on ener gy 3 Operation Push button panel overview A. On/off B. Push button C. Label D. Warning light Over current E. Warning light Polarity F. Display G. - Button (background light / configuration) H. + Button (background light / configuration) A B C D E F G over current polarity 1 2 4 5 7 8 C3 3 6 9 H 10 11 12 13 14 15 16 17 18 19 20 21 25

victr on ener gy Switch on the system Installation & operation manual # 1. Switch on all fuses. 2. Push the ON/OFF button. The indication lights in the ON/OFF switch and the + and buttons turn on (green). The switch panel is ready for use. Background light 3. Push the switch button of the node to turn on the corresponding appliance. A green light in the switch button indicates that the corresponding node is turned on. When the switch panel is turned on, the background light is illuminated in the medium level (level 4). 1. Push + to increase the level of the background light. The maximum level is 6. A beep signals that this level is reached. 2. Push to decrease the level of the background light. The minimum level is 1. A beep signals that this level is reached. 26

Installation & operation manual Warning lights The two warning light on the push-button panel warn you for the following failures: Wrong polarity Overload of the system / low voltage Indications of the appliances Each appliance is automatically tested during its operation. In that case, the light in the switch button is green. Other indications in the push-buttons are explained in the table. In case of a failure, turn off the appliance with the push-button. The buzzer, indication led and automatic fuse are reset. Repair the appliance. Switch on the appliance to test. victr on ener gy Light Buzzer Meaning Action Polarity Continuous Battery connected wrong, the + and connectors have been mismatched Turn off all fuses in the fuse box. Check the polarity of battery and change it correctly. Devices may be overheated and damaged if the polarity was wrong for over a minute. Overload Interrupted The system is overloaded or the battery voltage is too low (battery is discharged). Light Buzzer Meaning Action Green No Appliance is turned on and functions normally. Blinking green Yes No appliance. Light defective or wire between node and appliance defective. Circuit is nearly overloaded or node is nearly overheated. Blinking Yes green / red Blinking red Yes Circuit is overloaded or overheated and turned off automatically Turn off appliances that are not absolutely necessary. If the situation continues, the system switches off appliances automatically in order of priority. Check lights or wires. Press the button to reset the buzzer. Turn off the node. Push the switch button to reset. Check the wires from the node to the appliance for short circuits. 27

victr on ener gy Detection of doors and hatches The buttons on the switch panel can be used for detection if a door or a hatch is opened. For this purpose, a special sensor node is necessary. Light Red Meaning Door / hatch / switch closed Door / hatch / switch open Installation & operation manual 28

Installation & operation manual Direct Power Node (DPN) victr on ener gy Digital power on Direct power on power off Digital power on Direct power on power off Digital power on Direct power on power off Appliances that are connected to a direct power node are normally switched on by the switch board. In case of malfunction of the switch board: 1. Push the bypass fuse on the direct power node to switch on the appliance. In case the appliance cannot be turned off with the switch board: 2. Release the power fuse of the direct power node. 29

victr on ener gy Switch off the system Installation & operation manual over current polarity 1 2 1. Push the ON/OFF switch. The indication lights and appliances turn off. Note: In case the bilge-pump operates while you turn off the system, it stays in operation. Warning! Always Turn off all fuses in the main fuse box before you start working on the electrical system! Note: In case it is preferred to leave some appliances (e.g. refrigerator, alarm installation) in operation, it is necessary to leave the system on. To minimize the power consumption of the system, decrease the background light. Refer to Background light 30

Installation & operation manual 4 Maintenance 4.1 Troubleshooting victr on ener gy Problem Possible cause Possible solution Polarity light is illuminated, a continuous Battery is connected wrong. Turn off the main power immediately. beep is heard. Check the polarity of the battery No action when the ON/OFF button is pushed. After a button is pushed, no warnings and no power at the appliance. Overload light is illuminated, a interrupted beep is heard. The 10 A fuse in the main fuse box is released. Push button panel is connected wrong. The 50 A fuse in the main fuse box is released. Bus cable and node are connected wrong. The voltage is low. The circuit is overloaded. Switch blinks red, a beep is heard. Short circuit between node and appliance. Switch blinks green, a beep is heard. Wire between node and appliance is defective. Light is defective. Bilge-pump or instruments connected via a direct power node cannot be turned off. The bypass fuse of the direct power node is switched on. DPN is defective. connection. Check the voilet bus wire. Reset the fuse Check the connections of the switch panel. Reconnect if necessary. Check the red plus wire. Reset the fuse. Check the connections between bus cable an the node. Reconnect if necessary. Turn off appliances. If not, the system turns off appliances automatically by order of priority. Check the wires between the appliance and node. In case of a built-in safety device in the appliance: turn off the warning. Refer to Feedback defective lamp/cable. Replace the lamp of the light. Turn off the bypass fuse of the DPN. Turn off the power of the DPN. 31

victr on ener gy 4.2 Replace the node Installation & operation manual Red/Violet Black 1. Switch off all fuses. 2. Unplug the connectors on the node. Make sure which connector is connected to + and. 3. Push a screwdriver into the node for approximately 5 mm. 4. Turn the screwdriver; you may need to apply some force because of possible corrosion. 5. Push in the new node. Note: Make sure to replace the node with a new one of the same type. 6. Configure the node. Refer to Configure the system. If no new nodes are available: Warning! Use this procedure only in case of an emergency and when no spare parts are available. Warning! Make sure the + and cables cannot make contact with each other. Possible risk of short circuit! For appliances connected via a power node: 1. Disconnect the node. Follow steps 1 to 4 of the procedure on the left. 2. Place a wire between the black cable of the bus and the black cable of the appliance. 3. Take a fuse with the same rating as the corresponding node. 4. Place the fuse with a wire between the red cable of the bus and the red cable of the appliance. 32

Installation & operation manual 4.3 Technical specifications System voltage : 12 V Voltage range : 10-16 V Standby power consumption : <10 ma Active power consumption : Approximately 100 ma Storage temperature : -20 ºC to +70 ºC (-4 F to 158 F) Operational temperature : -4 ºC to +50 ºC (24 F to 122 F) Maximum bus cable length : 100 m / 328 ft Maximum number of nodes : 255 Maximum length of bus cables (for boats) : 15 m / 50 ft Maximum load with 15 m of bus cable : 50 A Maximum number of bus cables : Indefinite Weight of a 130 A system with 20 nodes : 20 kg / 44 lbs Complies to : 94/25/EC and 89/336/EEC International standards : ISO 10133 CE approval : Yes EMC approvals : EN 61000-6-2 (2001) and EN 61000-6-3 (2001) victr on ener gy 33

victr on ener gy 4.4 Spare parts Installation & operation manual 8 5 7 6 2 1 15m 9 3 4 10 11 12 13-14-15-16-17-18-19 20 34

Installation & operation manual victr on ener gy Number Article description Article number 1 Main Fuse 10 A MF10A-0 2 Direct power node 10 A DPN10A-0 3 Fuse 10 A DPNF 10A-0 4 Main Fuse 50 A MF50A-0 5 Direct power node 20 A DPN20A-0 6 Fuse 20 A DPNF20A-0 7 Cabling bus 50 A (complete) CB50A-0 8 Cable cutter CC16-0 9 Dielectric gel DC4-0 10 Frame 21 keys / Navigation light FPB21NL-0 11 Push-button plate PBP21K12V-0 12 Node base single NB1-0 13 Power node 16 A PN16A-0 14 Power node 10 A PN10A-0 15 Power node 3 A PN3A-0 16 Branch node BN-0 17 Sensor node switch 12 V SNS12V-0 18 Sensor node open/close 12 V SNOC12V-0 19 Sensor node level 12 V SNL12V-0 20 Slides node base single SNB1-0 35

victr on ener gy 5 Appendix Installation & operation manual The following sections can be used and (when necessary) removed from this manual: Configuration table (3x) 36

Installation & operation manual victr on ener gy Configuration table Bus cable number:................. Type node Serial nr. Priority Switch nr. Type of appliance Amperage Total amperage for the bus cable 37

victr on ener gy Installation & operation manual Configuration table Bus cable number:................. Type node Serial nr. Priority Switch nr. Type of appliance Amperage Total amperage for the bus cable 38

Installation & operation manual victr on ener gy Configuration table Bus cable number:................. Type node Serial nr. Priority Switch nr. Type of appliance Amperage Total amperage for the bus cable 39

victr on ener gy Victron Energy B.V. De Paal 35 1351 JG ALMERE The Netherlands www.victronenergy.com info@victronenergy.com