Design of the Fort Sill Microgrid

Similar documents
The hierarchical three layer protection of photovoltaic generators in microgrid with co-ordinated droop control for hybrid energy storage system

Small Electrical Systems (Microgrids)

Control System for a Diesel Generator and UPS

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

Future of the Power System? Presented by : Yazhou (Joel) Liu, Ph.D., PE Schneider Electric Engineering Services electric.

Control Strategies for Supply Reliability of Microgrid

GUIDE TO BACK UP POWER

Laboratory Scale Microgrid Test-Bed Hardware Implementation

Presented By: Bob Uluski Electric Power Research Institute. July, 2011

Use of Microgrids and DERs for black start and islanding operation

Advanced controls of PV for microgrid applications

UNC-Charlotte's Power Engineering Teaching lab

STABILIZATION OF ISLANDING PEA MICRO GRID BY PEVS CHARGING CONTROL

Reactive Power Sharing Droop Control Strategy for DG Units in an Islanded Microgrid

Laboratory Tests, Modeling and the Study of a Small Doubly-Fed Induction Generator (DFIG) in Autonomous and Grid-Connected Scenarios

Performance Analysis of 3-Ø Self-Excited Induction Generator with Rectifier Load

Energy Security Electrical Islanding Approach and Assessment Tools. Dr. Bill Kramer Senior Research Engineer Distributed Energy Systems Integration

Use of Import Underpower as a Means of Protecting Against Loss of Parallel Operation in DG Interconnection Applications

2017 Southeastern Tri Regional SAME Training Symposium Microgrids What are they, lessons learned 8/30/2017 Dan Dorn Eaton Corp

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience

Welcome to the IDEA Webinar Series

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor

Effect of prime mover speed on power factor of Grid Connected low capacity Induction Generator (GCIG)

Integration of Large Wind Farms into Electric Grids

INDUCTION motors are widely used in various industries

Adaptive Fault-Tolerant Control for Smart Grid Applications

Tieline Controls in Microgrid Applications

RESEARCH PROJECT VERBUNDNETZSTABIL

Smart Integrated Adaptive Centralized Controller for Islanded Microgrids under Minimized Load Shedding

DER Portfolio Optimization and Dispatch, Tertiary Control/Monitoring Strategies

ENGINE GOVERNING SYSTEMS LSM672 LOAD SHARING MODULE. GOVERNORS AMERICA CORP. 720 Silver Street Agawam, MA , USA MEMBER

MODELING OF A MICROTURBINE WITH PMSM GENERATOR USING MATRIX CONVERTER TECHNIQUE FOR GRID INTERCONNECTION SYSTEM

Soft Start for 3-Phase-Induction Motor

International Journal of Advanced Research in Electrical, Electronics and Instrumentation Engineering. (An ISO 3297: 2007 Certified Organization)

Power Solutions Manager Generac Power Systems, Inc.

Statcom Operation for Wind Power Generator with Improved Transient Stability

EE6351 ELECTRIC DRIVES AND CONTROL UNIT-1 INTRODUTION

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

IEEE Workshop Microgrids

Accidental Islanding of Distribution Systems with Multiple Distributed Generation Units of Various Technologies

Abstract. Benefits and challenges of a grid coupled wound rotor synchronous generator in a wind turbine application

CIGRE US National Committee 2013 Grid of the Future Symposium. Facilitating Bulk Wind Power Integration Using LCC HVDC

Design and Implementation of Reactive Power with Multi Mode Control for Solar Photovoltaic Inverter in Low Voltage Distribution System

Pumped storage for balancing wind power fluctuations in an isolated grid

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

PESC 2004 ABSTRACT. Tel Fax

Advanced Active And Reactive Power Control For Mini Grids

Use of STATCOM for Improving Dynamic Performance of Wind Farms Connected in Power Grid

Journal of American Science 2015;11(11) Integration of wind Power Plant on Electrical grid based on PSS/E

Design of Active and Reactive Power Control of Grid Tied Photovoltaics

Dynamic Behaviour of Asynchronous Generator In Stand-Alone Mode Under Load Perturbation Using MATLAB/SIMULINK

INTERCONNECT CHALLENGES IN THE DEVELOPING WORLD S DISTRIBUTED GENERATION INFANCY. David C. Oehl, P.E. President MAVEN POWER

Comparative Analysis of Integrating WECS with PMSG and DFIG Models connected to Power Grid Pertaining to Different Faults

Robust Control Technique for Grid-connected Power Conditioner

Unit Protection System for Pumped-Storage Power Stations

PSNH INTERCONNECTION REQUEST

Autonomous Voltage and Frequency Control by Smart Inverters of Photovoltaic Generation and Electric Vehicle

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Breakout Session 1 Report-out presentations

Abstract- A system designed for use as an integrated starter- alternator unit in an automobile is presented in this paper. The

Microgrid solutions Delivering resilient power anywhere at any time

COMPARISON BETWEEN ISOLATED AND GRID CONNECTED DFIG WIND TURBINE

Frequency Control of Isolated Network with Wind and Diesel Generators by Using Frequency Regulator

Islanding of 24-bus IEEE Reliability Test System

Magellan Utility Scale Energy Storage

Electric Power Research Institute, USA 2 ABB, USA

NETSSWorks Software: An Extended AC Optimal Power Flow (AC XOPF) For Managing Available System Resources

Fault Rid Through Protection of DFIG Based Wind Generation System

Power System Stability Analysis on System Connected to Wind Power Generation with Solid State Fault Current Limiter

Workshop on Grid Integration of Variable Renewable Energy: Part 1

ADHERING TO UTILITY INTERCONNECTION STANDARDS MAY NOT GUARANTEE DG SECURITY Wayne G. Hartmann Beckwith Electric Co., Inc. Product Manager, Protection

Application Note: Protection of Medium-Power Motors With SIPROTEC Compact 7SK80

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

Exercise 6. Three-Phase AC Power Control EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Introduction to three-phase ac power control

Copyright 2003 Advanced Power Technologies, Inc.

RESILIENT SOLAR CASE STUDY: SUNY New Paltz NYPA Integrated Grid Pilot

Combined Input Voltage and Slip Power Control of low power Wind-Driven WoundRotor Induction Generators

THE YOUNICOS SOFTWARE PLATFORM

EXPERIMENTAL VERIFICATION OF INDUCED VOLTAGE SELF- EXCITATION OF A SWITCHED RELUCTANCE GENERATOR

Load Frequency Control of a Two Area Power System with Electric Vehicle and PI Controller

Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008

Experimental Resultsofa Wind Energy Conversion Systemwith STATCOM Using Fuzzy Logic Controller

Configuration Diagrams

PV inverters in a High PV Penetration scenario Challenges and opportunities for smart technologies

Modelling and Simulation of DFIG with Fault Rid Through Protection

LESSONS LEARNED IN IMPLEMENTING BATTERY INVERTER SYSTEM CONTROLS IN LOW-INERTIA SYSTEMS

DP INNOVATION. A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

Pika Energy Island Made in America

Power Management with Solar PV in Grid-connected and Stand-alone Modes

Basics of Power Delivery Systems

FREQUENCY REGULATION AND MICROGRID INVESTIGATIONS WITH A 1 MW BATTERY ENERGY STORAGE SYSTEM

Development of Novel Connection Control Method for Small Scale Solar - Wind Hybrid Power Plant

Net Metering Interconnection Requirements

ENHANCEMENT OF MICRO-GRID DYNAMIC PERFORMANCE SUBSEQUENT TO ISLANDING PROCESS USING STORAGE BATTERIES * RASHAD M. KAMEL AND B.

Up gradation of Overhead Crane using VFD

APPLICATION OF VARIABLE FREQUENCY TRANSFORMER (VFT) FOR INTEGRATION OF WIND ENERGY SYSTEM

ANALYSIS OF WIND AND PV SYSTEMS 4.1 Wind Energy Conversion Systems (WECS)

Dead bus synchronizing. Applications

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Transcription:

Design of the Fort Sill Microgrid ndrew Paquette, Ronald Harley School of Electrical and omputer Engineering Georgia Institute of Technology tlanta, G, US adpaquet@gatech.edu, rharley@ece.gatech.edu bstract This paper describes the design and operation of the microgrid installed for the US Department of Defense at Fort Sill, Oklahoma. The microgrid is composed of two natural gas generators, a battery energy storage inverter, renewables, and a static switch. Design considerations for this retrofit application with a high penetration of dynamic loads are given. The integration of the energy storage inverter with a commercial isochronous generator control system is described. comparison of droop control vs. isochronous control is provided, and the benefits of using an existing isochronous generator control system for microgrid applications are described. System performance is validated by simulation results. I. INTRODUTION The Department of Defense (DoD) is interested in microgrids for improving energy security, reducing fuel cost and resupply convoy casualties, and increasing alternative and renewable energy use. Energy security is of significant concern for the DoD. The DoD needs to be able to continue operating in case of outages caused by a deliberate attack on U.S. power grid, Katrina-type natural disasters, or aging grid infrastructure and equipment failure. Microgrids are seen as a coordinated approach to maximize energy security and minimize cost and environmental impact. Microgrids allow islanded or grid-parallel operation and can include features such as seamless transfer between gridconnected and islanded operation, priority based load shedding, extended islanded operation, and power export. There has been a great deal of research on microgrids, but there is a shortage of demonstrations of large-scale microgrids for DoD applications. The Fort Sill Microgrid demonstrates a full-scale DoD microgrid with features including seamless transfer between islanded and gridconnected operation, energy storage, renewables integration, load shedding, and power export. The maturity of microgrid technologies for DoD deployment are a concern. This project takes the state-of-the-art microgrid controls as a starting point, specifically ERTS microgrid controls [1, 2], and builds on them to improve the level of maturity and to demonstrate a full-scale DoD microgrid. One significant innovation in this project from the perspective of microgrid cknowledgment: This material is based upon work supported by the US rmy Engineer Research and Development enter, onstruction Engineering Research Laboratory and sponsored by the merican Recovery and Reinvestment ct (RR) of 29 under ontract No. W9132T-1--18. Disclaimer: ny opinions, findings and conclusions or recommendations expressed in this material are those of the author(s) and do not necessarily reflect the views of the US rmy. Vijay havaraju, Slobodan Krstic, Peter Theisen Eaton orporation Menomonee Falls, WI, US maturity is adapting a conventional generator control system for monitoring and control of a microgrid with generators and inverters, as opposed to developing the system-level controls and monitoring software from scratch. This microgrid is unique from existing microgrid test beds in that all of the loads are dynamic loads with nonlinear or high-inrush characteristics, which are significantly more demanding than the linear loads typically used in test beds. This mix of high-inrush and non-linear loads is representative of what the authors anticipate to be common for practical microgrid installations. The experience gained from this project is useful for outlining challenges and design considerations for future DoD and industrial microgrids. Retrofit applications will typically have added costs, because of limited control over the type of loads present, and potentially limited control over the loads themselves. It is anticipated that almost all DoD microgrid applications will be retrofits. The remainder of this paper is organized as follows: system description is given in Section II, the microgrid operating modes and design considerations are described in Section III, the integration of the energy storage inverter into the isochronous generator control system is described in Section IV, simulations of starting the large induction motor are shown in Section V, protection is described in Section VI, and conclusions are given in Section VII. II. SYSTEM DESRIPTION The microgrid described in this paper is located on Fort Sill, Oklahoma. It is composed of two 24 kw natural gas generators; a 5 kv inverter with a 4 kw, 56 kwh lithium ion (Li-ion) battery; a 12, 48 V static switch; 2 kw of PV; a 2.5 kw wind turbine; and local loads. The loads are composed of a 36 hp induction motor (IM) with a wye-delta starter, a 2 hp rectifier-fed variable-frequency drive, and miscellaneous small induction motors and lighting loads. one-line diagram is shown in Fig. 1. commercial isochronous generator control system has been used for system control, monitoring, and display, and has been adapted to incorporate the energy storage inverter. One isochronous controller is attached to each generator, the inverter, and the static switch. The controllers communicate via a dual-redundant Ethernet network. n interface to the building management system has been included to allow 978-1-4799-5776-7/14/$31. 214 IEEE

Utility 13.2 kv 13.2 kv / 48 V 75 kv Y IM IM IM 1 hp (3x) 3 hp 4 hp VFD IM 2 hp Static Switch 12 Y- Starter Fig. 1. Fort Sill Microgrid one-line diagram. control of the load levels for the motor drive and 36 hp IM, and to momentarily inhibit starting of the IM if necessary. III. MIROGRID FETURES ND DESIGN ONSIDERTIONS. Operating Modes and Transitions Islanded operation is initiated in two difference ways: islanded operation can be initiated intentionally, or in response to a grid disturbance. With intentional islanding, the generators are brought online and ramped up to assume the entire microgrid load. When the static switch current is near zero, the static switch is opened and a smooth transition occurs with no voltage or frequency transient. In the case of unintentional islanding, the generators are typically offline, and the load is immediately picked up by the inverter once the static switch opens. When a grid fault or some other type of grid disturbance occurs, the static switch opens suddenly, and the microgrid load must be supported by the inverter. The inverter is always online and ready to pick up the load, assuming sufficient battery state of charge. Once the static switch is opened, the inverter supports the entire load until the generators are started. The generators synchronize to the inverter and ramp up their output power to assume the entire load. If there is sufficient capacity, the inverter can begin charging. The isochronous control system can allow for various grid-connected operating modes, including peak shaving and power import/export. renewables leveling mode of operation has been proposed in which the energy storage can be used to maintain the combined output of PV + wind + energy storage output at a specified level, subject to battery state of charge constraints. The battery can also be used for peak shaving mode, where the battery is used to maintain the microgrid power import at or below a specified level. Use of the synchronous generators for peak shaving or base loading is possible, but has not been exercised in this project. Due to local emissions constraints, the generators are restricted to operation only when the grid is unavailable. IM 36 hp G1 24 kw Nat. Gas G2 24 kw Nat. Gas Wind 4 kw 56 kwh Li-ion att INV PV 2.5 kw 2 kw 5 kv Power export from the microgrid is a desired feature of this microgrid. In this case, the microgrid owner also owns the local distribution system, and thus will allow power export. Load shedding is enabled, and is facilitated by changing the % load operation point of the 36 hp induction motor. ll of the other loads are considered critical and will only be shed in case of a severe under frequency, in which case all loads would be shed. This is a very interesting point, because shedding of non-critical loads is often touted as an important feature of microgrids for improving reliability. However, in real-world microgrids, there may not be many sheddable loads because customers will consider all of their loads to be critical. Including non-critical loads in the microgrid will increase cost, and hence customers will not want to include non-critical loads inside the microgrid.. Design onsiderations for Retrofit pplications Retrofit applications have some unique differences from new installations that may have significant impacts on microgrid design and cost. The main difference is limited control over loads, and limited ability to modify the system. In this application, there is a single IM that represents 7% of the normal operating load, which caused significant concerns about tripping off the sources during IM starting and the islanding transition. It would have been preferable to add a variable frequency drive to the IM to reduce inrush, but that was not an option due to the project being a retrofit. It would also have been preferable to overrate the sources due to the large starting inrush, but cost constraints prohibited this. Instead, generation overhead margin was reduced in favor of cost, necessitating a special procedure for starting the IM. While the total load rating is above the generator capacity, the typical maximum load is slightly below the generator capacity, which allows the use of the selected generator ratings. onsiderations such as high penetration of dynamic loads, limited control over loads, and retrofit applications are likely to increase the required peak ratings of sources, thus increasing the cost of microgrids and impacting their economic viability. IV. INTEGRTION OF INVERTER INTO ISOHRONOUS GENERTOR ONTROL SYSTEM. asics of Modern Isochronous ontrol Synchronous generators have only two control inputs: governor speed reference, and VR terminal voltage reference. Isochronous control systems use the speed and voltage bias inputs on the governor and VR to control the generator. Increasing the speed reference causes the governor to increase the speed by increasing mechanical input power. If connected to a stiff grid, the speed is fixed by the grid and increasing mechanical input power will increase electrical output power. Increasing the voltage reference causes the VR to increase the terminal voltage by increasing the field excitation. If connected to a stiff grid, the terminal voltage is (mostly) fixed and increasing the

Fig. 2. High-level diagram of isochronous controller with synchronous generator. field excitation will increase reactive power output. When in an island with multiple generators, increasing the speed (or voltage) reference of one generator will have the effect of both increasing its real (or reactive) power output (and thus changing the relative load sharing between the generators), and increasing the system speed (or voltage). With knowledge of the power output, voltage, and frequency of each source (via communication), an isochronous control system can adjust the voltage and frequency bias of each source to simultaneously regulate the dispatch of each source and system voltage and frequency. basic diagram of an isochronous controller applied to a synchronous generator is shown in Fig. 2. Various control modes and control objectives are possible. In grid connected mode the total grid power import/export can be controlled, and the generators can be used for base load or load following. In islanded mode the generators can share load proportionally, or some used for base load and others for load following.. enefits & Drawbacks of Droop vs. Isochronous ontrol Droop control provides stable load sharing without communication. However, communication is required for system wide monitoring, control, & optimization. Without communication, only stable, proportional load sharing is possible. With droop control, the system voltage and frequency may deviate significantly from rated values, potentially causing problems for certain types of loads. Operation at rated voltage and frequency is possible with communication and a system control that adjusts droop parameters to restore voltage and frequency to nominal values. Isochronous control allows a great deal of flexibility in the control of each source, and allows operation at rated voltage and frequency. Isochronous control systems allow control of the real and reactive power set points of each source, enabling a wide variety of control modes including proportional load sharing, operation of one or more sources in base loading mode, power import/export, and peak shaving. Isochronous control inherently provides continuous supervisory control. Existing isochronous control systems can provide system-wide monitoring, control, optimization, and display. The primary drawback is that communication is required for control. Droop control allows for stable operation in the event of communication failure. However, isochronous control systems are widely used for critical power systems such as hospitals and data centers, despite relying on communication. The isochronous control product line used for this project utilizes dual-redundant Ethernet networks, and has never experienced a single communication failure (of either of the redundant Ethernet networks, let alone a dual failure) in years of service in numerous applications. Therefore, contrary to the consensus of the microgrid literature, relying on communication for control is not necessarily a problem it has been done for years with few (or zero) problems. However, isochronous control systems are typically configured such that if a controller does detect a communication failure, then it reverts to droop control. Using an existing control system minimizes development costs because the existing isochronous control system already has nearly all of the desired monitoring & control functionality. The existing control system also has secure interface options that incorporate information security concerns and allow addition of advanced optimization techniques.. Integration of Inverter with Isochronous ontrol System The isochronous controller generates real and reactive power references that are implemented by the voltage and frequency bias controllers. When grid connected, or when islanded with synchronous generators online, the inverter can operate in power control mode with the power references given by the isochronous controller. For the islanding transition, the inverter should be able to support the grid immediately after the P switch is opened. The inverter must be able to operate in standalone mode if no generators are online. DQ current control is typically used for power control. However, dq current control uses a phase-locked loop (PLL) and requires that another source be present to regulate voltage and frequency [3]. nother way to regulate power is by adjusting the inverter s phase angle to control real power and adjusting the voltage magnitude to control reactive power. Standalone operation can be achieved by regulating voltage magnitude instead of reactive power and operating at a constant frequency, i.e. keeping the angle constant. The inverter control used in this work is shown in Fig. 3. When grid-connected, reactive power is regulated by a PI controller, the output of which is the inverter voltage magnitude command. When islanded, the voltage magnitude command is obtained from regulating the output voltage magnitude. In standalone mode, i.e. when islanded and the generators are offline, the inverter angle is held constant.

angle. trl = 1 P 1 + Pref - angle w st trl I P_filt standalone islanded. + V - V_meas trl = 1 Qref - Q_meas trl standalone islanded I P wt_ref 2 Pi / 3 wt_ref - 2 Pi / 3 wt_ref + Fig. 3. Diagram of inverter control. ngle Resolver Sin * wt_ref When grid-connected or when islanded with the generators online the real power is regulated by changing the angle. Note that with the control mode selections in Fig. 3, standalone is true (equal to 1) when the inverter operates by itself in islanded operation, and islanded is true when the static switch is open. Different sets of PI gains are used for grid-connected and islanded operation. The integration of this voltage controlled inverter with the isochronous control system allows various methods of dispatching the inverter and generators, as well as seamless transitions between grid-connected and islanded operation. D. Simulation Results Simulations have been performed to demonstrate the basic functionality of the proposed inverter control method and its integration with the isochronous control system. The mode transitions from grid-connected to islanded (standalone), and islanded to parallel with generators are also demonstrated. Simulation models of the generators were based on a proprietary model of a large, turbocharged diesel generator, and the inverter model is based on the inverter used in the project with the control shown in Fig. 3. The simulations were performed in PSD and included a detailed model of the isochronous control system. The first simulation demonstrates the effectiveness of the real power control by adjusting the angle, and reactive power control by adjusting the voltage command. simulation of real and reactive power reference steps when grid-connected is shown in Fig. 4. The real and reactive power controllers track the references with minimal overshoot. During normal operation, the inverter is grid connected and is ready to support the microgrid in case of a grid outage or disturbance. In the simulation in Fig. 5, the inverter is initially grid connected and is trickle charging the battery, i.e. the angle controller is regulating power and the Vmag controller is regulating reactive power. The VFD load and small IM loads are online, but the 36 hp IM is offline. t 4 seconds, islanding is initiated suddenly by opening the static switch, and the inverter transitions to standalone mode 1 ms later, triggered by status information about the static switch sent via the isochronous control system. In islanded mode the angle is held constant and the Vmag controller Sin Sin * * vrefa vrefb vrefc Real Power (pu) Reactive Power (pu) Voltage (pu) ngle (rad/s).4.2. -.2.4.2. -.2 1.1 1.5 1..95.75.5.25. -.25 -.5 -.75 P_measured Q_measured Inverter ang Time, s 1.5 2. 2.5 3. 3.5 4. RMS Voltage (pu) Power (kw) Reactive Power (kvr) Frequency (Hz) Fig. 4. Simulation of power reference step changes when grid-connected. 1.6 1.4 1.2 1..98.96.94.92.9 2 15 1 5-5 1 75 5 25-25 6.5 6.25 6. 59.75 Fig. 5. Simulation of islanding transient. regulates voltage magnitude. Once the inverter is islanded and is in standalone mode, the generators start up and synchronize to the microgrid. simulation of this procedure is shown in Fig. 6. The isochronous controller slowly ramps up the generators until they have assumed the entire load. The capability to slowly ramp the generators is a convenient feature of isochronous control. fter the generators have synchronized and assumed the load, the inverter transitions P_ref Q_ref V_measured V_Static-Switch V_MISS V_Inverter1 V_G1 Vrms_G2 P_Static-Switch P_MISS P_Inverter1 P_Load P_G1 P_G2 Q_Static-Switch Q_MISS Q_Inverter1 Q_Load Q_G1 Q_G2 Freq_Inverter1 Freq_G1 Freq_G2 59.5 Time, s 3.8 3.9 4. 4.1 4.2 4.3 4.4 4.5

RMS Voltage (pu) Power (kw) Reactive Power (kvr) 1.6 1.4 1.2 1..98.96.94.92.9 2 15 1 5-5 1 75 5 25-25 6.5 V_Static-Switch V_MISS V_Inverter1 V_G1 Vrms_G2 P_Static-Switch P_MISS P_Inverter1 P_Load P_G1 P_G2 Q_Static-Switch Q_MISS Q_Inverter1 Q_Load Q_G1 Q_G2 Freq_Inverter1 Freq_G1 Freq_G2 W StoT T_shaft W S TL I M Input T1 T4 T2 T5 T3 T6 M1 Fig. 7. PSD model of the 36 hp IM with wye-delta starter and 6- terminal IM model. S2 M2.86.86.86 S1 S1 Frequency (Hz) 6.25 6. 59.75 59.5 Time, s 6. 8. 1. 12. 14. 16. 18. 2. Fig. 6. Simulation of generator synchronization and transition back to power control mode. out of standalone mode. The behavior of the inverter in power control mode while islanded with the generators online will be explored in the next section. The isochronous control system provides a completely seamless transition from islanded to grid-connected mode. The isochronous controller connected to the static switch monitors the microgrid and grid voltages and adjusts the references for the inverter and generators to synchronize the microgrid voltage, frequency, and phase to the grid prior to closing the static switch. fter the static switch closes, the output power of each source does not change, and the static switch current is nearly zero because the microgrid voltage, frequency, and phase were matched to the grid prior to closing the static switch. Isochronous control provides a completely seamless transition from grid-connected to islanded mode, whereas simple droop control does not. With simple droop control, synchronization is achieved by operating the microgrid at a different frequency from the grid, and waiting until the voltage across the breaker passes through zero [4]. fter the breaker closes, the frequency, and thus the power output of each source, changes. Under ideal conditions this transient may be small, but isochronous control can provide a completely seamless transition. V. HIGH PENETRTION OF DYNMI LODS Real-world microgrids will typically have dynamic loads such as high inrush motors and non-linear rectifier loads, with different requirements than the linear loads normally used in microgrid test beds. The loads in the microgrid described in this paper consist of induction motors (IMs) and a large variable frequency drive fed by a diode rectifier. The 36 hp IM represents a large percentage of the total load, and the inrush characteristics are very important to ensure that the microgrid is capable of starting it during islanded operation.. Inrush haracteristics of the 36 hp IM. The 36 hp IM has a wye-delta reduced voltage starter [5], which configures the stator windings in wye during startup, and transitions to delta once the machine reaches near rated speed. The wye-delta starter results in starting current and torque of 1/3 that of starting across-the-line in delta. When the stator windings are transitioned from wye to delta, a large inrush occurs that can have a peak current nearly as high as the delta locked rotor current. The PSD model of the 36 hp IM is shown in Fig. 7, and utilizes a 6- terminal IM model and contactors and transition resistors to transition between wye and delta connection. ontactors M1, M2, S1, and S2 are sequenced as in [5] to transition the connection from wye to delta. The input StoT is used for initialization to transition from user specified (fixed) speed W to user specified (calculated) load torque T_shaft. The inrush characteristics of the 36 hp IM were measured prior to the installation of the microgrid, and were used to validate the simulation model. comparison of simulation and measurement results is shown in Fig. 8. Fig. 8(a) shows the RMS inrush current, which starts at 75 RMS,. Fig. 8(b) shows a close-up of the wye-delta transition, where the peak current exceeds 2,7 peak, or 22% of the combined rated currents of the generators and inverter. The inrush measurements were used to validate a simulation model, and simulations were performed to ensure that the inverter and generators would be able to start the IM without suffering from an overcurrent trip.

urrent () hiller Starting Validation. Time, s 2. 3. 4. 5. 6. 7. 8. 9. 1. urrent () 1.6k 1.4k 1.2k 1.k.8k.6k.4k.2k 3.k 2.k 1.k. -1.k -2.k Simulated RMS urrent Starting in Wye configuration Simulated urrent Wye -Delta transition hiller Starting Validation hiller Validation Fig. 8. omparison of measured and simulated starting of 36 hp IM in grid-connected operation: (top) RMS current, and (bottom) wye-delta transition.. Simulation of IM Starting Due to the large inrush of the 36 hp IM, a special procedure is required for starting the motor. oth generators and the inverter must be online, because neither the generators nor the inverter are capable of starting the motor by themselves. The other microgrid loads, specifically the 2 hp VFD, must be throttled back using the building management system. The building management system makes it possible to inhibit starting of the large IM if the conditions are not suitable. In this simulation, the inverter and generators are controlled to share real and reactive power in proportion to their ratings. The inverter adjusts its angle to control its real power to share load with the generators, and regulates the voltage to rated value. The IM starting simulation is shown in Fig. 9 and Fig. 1. Initially, the smaller IM loads are online, and the VFD is set to a reduced load level. The 36 hp IM starts at 5. seconds, and the inverter initially supplies most of the reactive power, until the generators increase their reactive power output. t 1.27 seconds the IM transitions from wye to delta, and draws a large current surge. The inverter and generator currents are shown in Fig. 1, and it can be seen that the inverter current reaches nearly 1.8 per-unit. This simulation has shown that the microgrid is able to handle the large, high-inrush motor load. VI. PROTETION Measured RMS urrent Wye -Delta transition Measured urrent -3.k Time, s 8.2 8.22 8.24 8.26 8.28 8.3 8.32 8.34 8.36 Protection is a significant concern in microgrids due to the unique challenges encountered in microgrid environments [6-9]. The protection scheme employed in the RMS Voltage (pu) Power (kw) Reactive Power (kvr) Frequency (Hz) 1.5 1.25 1..975.95.925.9 5 4 3 2 1-1 V_MISS V_Inverter1 V_G1 Vrms_G2 Time, s 4. 5. 6. 7. 8. 9. 1. 11. 12....... urrent () urrent () 6 4 2 61. 6.5 6. 59.5 59. 1.5k 1.k.5k. -.5k -1.k -1.5k 5 25-25 P_MISS P_Inverter1 P_Load P_G1 P_G2 Q_MISS Q_Inverter1 Q_Load Q_G1 Q_G2 Freq_Inverter1 Freq_G1 Freq_G2 I_Inverter1 I_G1 Fig. 9. Simulation of starting the 36 hp IM. -5 Time, s 1.2 1.225 1.25 1.275 1.3 1.325 1.35 1.375 1.4 Fig. 1. Simulated Inverter and Generator urrent during wye-delta transition. Ft. Sill Microgrid is described here to provide a record for microgrid designers of protection systems employed in pilot microgrids. The microgrid uses a static switch as the main protective device, with backup trip function provided by two utility-grade relays, one of which becomes the primary protection when the static switch is bypassed. Overcurrent protection is provided by each source s breaker (G1, G2, INV, Wind, PV), as well as the inverse time overcurrent protection in the load breakers. Each breaker has inverse time and instantaneous overcurrent protection. The static switch also has over/under voltage and over/under frequency relay to meet IEEE 1547 requirements, as well as a more sensitive over/under voltage settings to provide rapid islanding in case of a utility disturbance. protection coordination study was performed to choose the overcurrent relay settings for each of the breakers to provide coordination during faults between upstream and downstream devices. The coordination study

considered faults in grid-connected and islanded modes and with different combinations of sources online to consider maximum and minimum fault currents. The same settings for overcurrent protection are used for all operating modes. The coordination study identified that due to limited fault current capability of the inverter, the downstream breakers may not trip in islanded mode when only the inverter is present. The inverter only operates by itself in islanded mode for a short period, since the generators normally run during islanded operation. The generators are able to provide sufficient fault current to trip downstream breakers. nother concern is that the calculated worst case fault current is very close to the short circuit rating of the static switch. VII. ONLUSION The Fort Sill microgrid provides valuable experience in microgrids designed for seamless transitions between gridconnected and islanded operation, and experience with a high concentration of dynamic and nonlinear loads. It is anticipated that many real-world microgrid installations will be retrofit applications with a high penetration of dynamic loads. This is particularly the case in DOD installations, which will almost all be retrofit. This microgrid improves energy security for the DoD by providing operation during grid outages, seamless transition between grid-connected and islanded operation, and integration of renewables. The integration of a battery energy storage inverter into a commercial isochronous control system has been described. This isochronous control system provides all of the desired microgrid operation, control and monitoring features, with minimal new software development, and includes the ability for integration of advanced optimization methods. REFERENES [1] R. Lasseter and M. Erickson, "Integration of battery-based energy storage element in the ERTS microgrid " University of Wisconsin- Madison, Oct. 29, [Online], vailable: http://certs.lbl.gov/certsder-pubs.html. [2] H. Nikkhajoei and R. H. Lasseter, "Distributed generation interface to the ERTS microgrid," IEEE Transactions on Power Delivery, vol. 24, pp. 1598-168, 29. [3] J. Rocabert,. Luna, F. laabjerg, and P. Rodriguez, "ontrol of power converters in microgrids," IEEE Transactions on Power Electronics, vol. 27, pp. 4734-4749, 212. [4]. Kroposki, R. Lasseter, T. Ise, S. Morozumi, S. Papatlianassiou, and N. Hatziargyriou, "Making microgrids work," IEEE Power and Energy Magazine, vol. 6, pp. 4-53, 28. [5] F. M. ruce, R. J. Graefe,. Lutz, and M. D. Panlener, "Reducedvoltage starting of squirrel-cage induction motors," IEEE Transactions on Industry pplications, vol. I-2, pp. 46-55, 1984. [6] H. J. Laaksonen, "Protection principles for future microgrids," IEEE Transactions on Power Electronics, vol. 25, pp. 291-2918, 21. [7] T. Loix, T. Wijnhoven, and G. Deconinck, "Protection of microgrids with a high penetration of inverter-coupled energy sources," in Integration of Wide-Scale Renewable Resources Into the Power Delivery System, 29 IGRE/IEEE PES Joint Symposium, 29, pp. 1-6. [8] H. Nikkhajoei and R. H. Lasseter, "Microgrid protection," in Proc. Power Eng. Soc. General Meeting, Tampa, FL, 24-28 June 27. [9] E. Sortomme, S. S. Venkata, and J. Mitra, "Microgrid protection using communication-assisted digital relays," IEEE Transactions on Power Delivery, vol. 25, pp. 2789-2796, 21.