INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Similar documents
INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

NEW WAVE 3 INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS. with Quad Spring Tensioners

Installation Guide 50342/ Kargo Master Safari Rancho Cordova, CA

Safety, Operation & Maintenance Manual

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

SERIES A & AA ROLLER DOORS INSTALLATION GUIDE

Siderolling Tarp Systems Under 9 6 Wide

ASSEMBLY INSTRUCTIONS FOR CHARGER AND THE BOSS QUICK ATTACH GRASS BAGGER

ERASER SHD. INSTALLATION GUIDE LIB-CP-SHD Rev. 2. Conveyor Belt Cleaning System

Assembly Instructions. General Information. Installation Instructions. 12, 15 and 20 Series Drill Small Seeds Option. Used with:

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

Mi c r o Er a s e r. Conveyor Belt Cleaning System. INSTALLATION GUIDE LIB-CP-MEA Rev. 5

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

Installation, Maintenance, and Parts Manual. 125 Series Conveyors. Driven By Customers Powered by Proven Products.

TOYOTA HIGHLANDER RUNNING BOARD HIGHLANDER HV Preparation

DuraShield Installation Manual

Installation Instructions

Rear Roller Brush Kit Greensmaster 3150 & 3250

RAM LIFT KIT PART# STOP! READ THIS FIRST!

Designed for the Street Proven on the Track

PFadvantage JD 3300/4400/6600/7700; 4420

SECTION TWO MOUNTING INSTRUCTIONS

Installation Instructions

2001 Mitsubishi Truck Montero LTD 4WD V6-3.5L SOHC Copyright 2006, ALLDATA 8.80 Page 1. Timing Belt: Service and Repair

Chevrolet 3100 IFS Kit

2014+ DODGE RAM LIFT KIT PART# STOP! READ THIS FIRST!

HEIDTS RF-110. INSTALLATION INSTRUCTIONS Fairlane Comet Rear 4-Link

62 Deck Idler Kit High Speed

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE Bolt-On Drag-Race Strut Clip Chevy II

INSTALLATION INSTRUCTIONS

REMOVAL AND REPLACEMENT

2013+ DODGE RAM " Kit PART# STOP! READ THIS FIRST!

63-82 CORVETTE IMPALA KIT INSTRUCTIONS

18SP622 Series 50 Gillig Low Floor Diesel Particulate Filter Installation

ERASERTM. ACCUFLO Conveyor Belt Cleaning System SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

'99-03 CHEVROLET/GMC IFS 4WD 6" SUSPENSION SYSTEM P/N INSTALLATION INSTRUCTIONS

H15P. Toyota Hilux A-DECK Dual Cab

720BAG GM 2 FRONT & 4 REAR LOWERING KIT

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119

JK REAR BUMPER AND TIRE CARRIER

The Importance Of Proper. Maintenance Inspections On Belt Conveyors

N. 15th Street, Middlesboro, KY TARP-N-GO SYSTEMS INSTALLATION INSTRUCTIONS

Installation Instructions BR20 Rear Bumper Replacement Part # 28178T Toyo ta Tundra 2/4WD

ProPass-200 Top Dresser

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

DL650 Odyssey Luggage Installation Guide

ERASER MDP. INSTALLATION GUIDE LIB-CP-MDP Rev. 2. Conveyor Belt Cleaning System

SETUP, PARTS & MAINTENANCE MANUAL 2 BAG CATCHER

Rear Door: Service and Repair REAR DOOR


Q15P. Mitsubishi MQ Triton Dual Cab

2013+ DODGE RAM LIFT KIT PART# STOP! READ THIS FIRST!

7600 Series Center Drive Conveyors

INSTALLATION INSTRUCTIONS

CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL

INSTALLATION GUIDE. JK Rear bumper & tire carrier. AEV30105AC Last Updated: 10/11/16 US PATENT: D642,502 ; D

Instruction Sheet Kit Number:

Belt Tracking Manual. K-Trough Trainer. 1 P age. Issue:

SECTION 5 MAINTENANCE AND SPARE PARTS Inspection Schedule

Installation Manual, Usage Tips, & Warranty Information

MENTOR INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS (800)

INSTALLATION INSTRUCTIONS 97 FORD EXPEDITION

GP1-R FULL EXHAUST SUZUKI GSX-R600 / GSX-R

ATech Timing Belt Tensioner (979756) PSA EW10A 2.0L Engine

MF 9690, 9790, Challenger 660, 670

GROUNDSMASTER. 52 Recycler. for 120 Traction Unit. Model No & UP. Operator s Manual

ERASER HDTM. ACCUFLO Conveyor Belt Cleaning System SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

YOU MUST WEAR SAFETY GLASSES DURING EACH STEP OF THESE INSTRUCTIONS

MOUNTING RAILS ***DO NOT EXCEED VEHICLE MANUFACTURER'S RECOMMENDED TOWING CAPACITY.***

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Ford Super Duty Recoil Traction Bar System. Part#: ,

RIG-I-FLEX 140 SERIES CURTAIN TRACKS

Universal Cam Sync Systems Holley PN

WASHBOX SECONDARY BELT CLEANER SYSTEM

USER'S MANUAL and INSTALLATION GUIDE

2. With the rear door open remove pull-style clip from the passenger side just below the door latch.

LIGHT DUTY ROLL UP DOOR

RED LINE LANDCRUISERS LLC. FJ40-70 series BIG BRAKE KIT INSTRUCTIONS

Instructions for Replacing

ASGCO Mfg., Inc WashBox Secondary Belt Cleaning System

ROSTA Tensioning Motorbases Type MB. self-adjusting maintenance-free overload-proof non-slip dampen harmful vibrations extend belt drive

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

OWNERS MANUAL. Model No LB. PUSH BROADCAST SPREADER. Assembly Operation Maintenance Repair Parts

TAILGATE SPREADER INSTALLATION INSTRUCTIONS

Detroit Speed, Inc. Rear QUADRAlink Suspension Kit with 3 Axle Tube Camaro/Firebird P/N:

Installation Instructions

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

92-00 Civic/ Integra/ Del Sol/ Accord/ CRX

Section 5: Parts Replacement

Phone Fax

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

ROSTA Tensioning Motorbases Type MB. self-adjusting maintenance-free overload-proof non-slip dampen harmful vibrations extend belt drive

Automatic Roof Hatch Opener

BMK-18 U.S. Patent #5,298,158

INSTRUCTIONS FOR INSTALLATION OF THE CH-2 and CH-3 DRIVE UNIT TO AN ENGINE WARNING

ProLine. 44 Mower. for 120 Traction Unit. Model No & Up. Operator s Manual

Transcription:

CHEVRON BELT CLEANERS INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS Check us out at www.asgco.com Customer Service 800-344-4000 800-394-2358 2003 Copyright ASGCO Manufacturing, Inc. 24 Hour Emergency Service and Parts 610-821-0210 ASGCO Mfg., Inc. 301 Gordon Street Allentown, PA 18102 610-821-0216 FAX 610-778-8991

Important Safety Notice Always observe the basic rules of safety when working with any conveyor system. To avoid injury and equipment damage, be sure that all controls to the conveyor are locked out and the power source is disconnected at all times during installation. Installation Tools In addition to the items provided by ASGCO, the following will be needed to install the Chevron Cleaner: 1. Heavy duty file 5. Tape measure 2. Drill with 1 and ½ bits 6. Carpenter s square 3. Cutting or burning equipment 7. Straight edge 4. Adjustable wrench 8. Allen wrench set To ensure the most efficient cleaning operation possible, ASGCO supplies a wide range of Chevron assemblies. ASGCO Chevron Cleaners: SOLID or NOTCHED Solid version could have 6, 8 or 10 diameter discs Notched version is only supplied with 8 diameter discs Custom-made shafts in various lengths and with a varying number of discs Selecting a location for the Chevron The Chevron assembly is designed to remove the fine carryback material. When choosing a mounting location for the Chevron, it is important to consider the space available. The Chevron assembly can be mounted on the arc of a pulley or any section of the belt that is flat and tight. The belt length required is determined by the diameter of the discs and the number of shafts. The following chart provides the distance in inches required to install the various assemblies. Head Pulley Belt Travel Chevron Assembly mounted on arc of pulley or flat section of belt Snub Pulley ASGCO Mfg., Inc. 2 CHEVRON

Disc Four Three Shaft Two Shaft Diameter Assembly Assembly Assembly 10 57 43 29 8 50 38 26 6 43 33 23 NOTE: The center point of the last shaft must be at least 10" away from any pulley or idler that is mounted below the belt. It is also important that the mounting location is adequate to allow the scraped material to fall back into the main discharge chute or a dribble chute. To ensure sufficient flow of the scraped material down the chute, an unlined chute should have at least a 75 angle (to the horizontal); and UHMW plastic lined chute should have at least a 65 angle (to the horizontal). BELT TENSION REQUIREMENTS - Because of the unique design of the Chevron, the shafts must be mounted in a flat, tight area of the belt. The Chevron cannot operate to its maximum effectiveness on a belt that is loose or bowed. ADDING IDLERS OR PULLEYS - If a sufficient mounting location cannot be found between the head and snub pulleys, the Chevron can be located elsewhere, provided that the proper steps have been taken to prevent the belt from loosening or troughing in the contact area. This can be done by mounting standard return idlers or small pulleys above the belt. FABRICATING MOUNTING PLATES - If a chute is not present in the desired mounting location, mounting plates can be fabricated to simulate the sides of the chute and provide a mounting base for the Chevron shafts. These plates are made from 1/4" to 3/8 flat stock steel and should measure 12" to 16" high. Extend the plates the length of the Chevron installation, with an extra 6" on each end. Once a suitable mounting location has been chosen, the initial setup work can begin. Proceed as follows: Initial Setup 1. The first measurement will vary, depending on the disc diameter and the size of the bearings within the pillow blocks: A. IF USING 6" DISCS WITH I " BEARINGS, measure the distance to a point 6" down from (perpendicular to) the belt on the chute wall. Mark this point "X'. B. IF USING 8" DISCS WITH 1 " BEARINGS, measure the distance to a point 61/2" down from (perpendicular to) the belt on the chute wall. Mark this point "X". C. IF USING 8" DISCS WITH 13/8" OR 1 1/2" BEARINGS, measure the distance to a point 7" down from (perpendicular to) the belt on the chute wall. Mark this point "X'. ASGCO Mfg., Inc. 3 CHEVRON

D. IF USING 10" DISCS WITH 1-3/8" OR 1-1/2" BEARINGS, measure the distance to a point 8" down from (perpendicular to) the belt on the chute wall. Mark this point "X'. 2. Transfer point "X' to the other side of the chute wall, making sure that the two marks are in the exact same location on both sides. These marks represent the location points of the mounting bracket bolt of the last Chevron shaft. Keep in mind that they must be at least 10" away from any pulleys or idlers mounted below the returning belt. Head Pulley Belt Travel x 10 Snub Pulley 3. Use the illustration to determine the center to center distance of the remaining Chevron bracket mounting points. The distance between mounting points is determined by the diameter of the Chevron discs. 10 diameter discs require a 14 center to center distance between mounting points. 8" diameter discs require a 12" center to center distance. 6" diameter discs require a 10" center to center distance. While moving towards the head pulley, mark the remaining mounting point locations on both chute walls with "X" marks as was done in Step 1, following the course of the belt for the distance that the Chevron's will be mounted. 4. On both chute walls, scribe a line parallel to the belt and connecting each of the "X" end points. The intersecting points are the mounting points for the Chevron assembly and must be identical on both chute walls. 14 14 14 12 12 12 10 10 10 ASGCO Mfg., Inc. 4 CHEVRON

IMPORTANT For brackets mounted INSIDE the chute wall go to Page 6 For brackets mounted OUTSIDE the chute wall go to Page 7 ASGCO Mfg., Inc. 5 CHEVRON

To adjust the Chevron to its proper cleaning pressure, push both Chevron mounting brackets up until the discs start to compress against the belt. Run your hand across the top of the Chevron where it touches the belt and bend all of the discs in the same direction. Stop adjusting upwards on the brackets when there is a 1/1 6" to 1/8" gap between the discs across the width of the belt. Note: Make sure gap is measured on top of Chevron, NOT on base belt. 1/16 to 1/8 gap between discs when they are compressed against the belt. Note: the 1/8 gap should be measured with solid or notched disc on surface of a Chevron. CAUTION: Over-adjustment of the Chevron against the belt will result in premature wear and under-adjustment will result in poor cleaning action. Do not allow the discs to touch each other when bending them into position. When the Chevron has been properly adjusted, tighten the two nuts with a slugger wrench so that vibration during operation will not cause the adjustment to be altered. Install a bearing cover on each bearing by stretching the 4" X 14" Neoprene sheet over the top and under the pillow block Secure the cover by using the bottom bolt extensions as locating pins. The bolts should protrude through the holes in the Neoprene. 14 Pillow Block Neoprene sheet ASGCO Mfg., Inc. 9 CHEVRON

5. Burn or drill a 1" diameter hole at each of the "X" points on both chute walls. 6. Insert a ¾" x 2" long bolt into each of the 1" diameter holes. Be sure to insert the bolts from the outside of the chute wall, then place a nut and washer on each bolt from the inside. Only hand tighten the nuts at this time. 7. Tack weld the heads of each of the bolts on both sides of the chute wall. Head Pulley Chevron Mounting Brackets Chute Walls Chevron Installation When all of the bolt heads have been welded, the Chevron installation can begin. Start with the last shaft installation and work forward toward the head pulley. 1. Install a Chevron mounting bracket on each of the bolts. To do this, loosen the nut, slide the bracket into position, then snug up the nut by hand tightening. Be sure that the top of the bracket (the part with two notches) is facing up as shown. Pillow Block Conveyor Belt Chevron Mounting Bracket Chute Wall 2. Position a Chevron shaft on top of the facing mounting brackets.(the pillow block and bearing are shipped already mounted on the shaft.) Fasten both pillow blocks to the bracket with 3/8" X 1½" long bolts and hardware (flat washer, locking washer, and nut). [Don't worry about the direction of the discs at this point. GO TO PAGE 9 ASGCO Mfg., Inc. 6 CHEVRON

Vibro Band and Bearing Cover Installation Before installing the remaining Chevron shafts, the Vibro Band must be located and installed on this shaft. Proceed as follows: 1. Position a Vibro Band mounting bracket on each side of the chute wall. The bracket should be located with its top edge approximately 1" below the belt and perpendicular to the ground (not the belt). The notched end of the bracket should face up toward the belt and the center of the chute. IMPORTANT: There should be a 2" distance between the Vibro Band mounting bracket and Chevron discs. Chute Wall Vibro Band Vibro Band Mounting Bracket 2. Weld the Vibro Band mounting brackets into position. 3. Take one of the Vibro Bands and hold it up to but not touching the belt while resting it against the front of the brackets. From the back, mark the two slot locations on the plastic. Drill a ½ diameter hole at the bottom of the slot location on each side. 4. Install the Vibro Band on the side of the mounting bracket facing the head pulley with two 3/8" X I long bolts and hardware. Adjust it so that it just kisses the belt across the full width. CAUTION: The Vibro Bands do not provide cleaning action; their function is to direct the scraped material away from the next Chevron and direct it down into the chute. Adjusting the Vibro Bands too tightly will cause premature wear. ASGCO Mfg., Inc. 10 CHEVRON

5. The next measurement also varies, depending on the outside diameter of the Chevron shaft: A. IF THE OUTSIDE DIAMETER OF THE SHAFT IS 1 ", use a soapstone and straightedge to scribe a vertical line 1½" up from each of the "X" end points. Mark each of these end points "N'. B. IF THE OUTSIDE, DIAMETER OF THE SHAFT IS 1½, use a soapstone and straightedge to scribe a vertical line 1¾ up from each of the "X" end points. Mark each of these end points "A". 6. Scribe a horizontal line 21/2" long, with its center intersecting point "A, on both chute walls. Mark the end points of these lines "Al" and "A2". 7. Scribe vertical lines from points "Al" and "A2" to the top of each chute wall. 8. Repeat this marking procedure on the remaining "X" points on both chute walls. 9. Burn or drill a 1diameter hole at each of the "X points on both chute walls. 10. Burn or cut along the horizontal and vertical lines scribed in Steps 6-8. Remove the chute wall material; the result will be rectangular cutouts above each 1 diameter hole. 11. Insert a ¾" x 2" long bolt into each of the 1 diameter holes. Be sure to insert the bolts from the inside of the chute walls. Place a flat washer, lock washer, and nut on each bolt. Only hand tighten the nuts at this time. 12. Tack weld the heads of each of the bolts on the inside of the chute walls. 6 Disc 1 Bearing 8 Disc 1 Bearing 8 Disc 1-3/8 or 1½ Bearing BELT 10 Disc 1-3/8 or 1½ Bearing 6 6½ 7 8 2½ 2½ 2½ 2½ A1 A A2 1½ X A1 A A2 1½ X A1 A A2 1¾ X A1 A A2 1¾ X ASGCO Mfg., Inc. 7 CHEVRON

Head Pulley Chute Walls Chevron Mounting Brackets Chevron Installation When all of the bolt heads have been welded, the Chevron installation can begin. Start with the last shaft installation and work forward toward the head pulley. 1. Install an Chevron mounting bracket on each of the bolts. To do this, loosen the nut, slide the bracket into position, then snug up the nut by hand tightening. Be sure that the top of the bracket (the part with two notches) is facing up as shown. 2. Flats must be filed at the set screw locations on the end of the Chevron shaft. To do this, position the shaft inside the pillow block and remove the two set screws using an Allen wrench. Insert a punch into the set screw holes and mark their positions on the shaft. Replace the set screws and remove the shaft from the pillow block, and file the flats as indicated by the marks. Chevron Shaft Pillow Block Chute Wall Conveyor Belt Chevron Mounting Bracket 3. Position one end of the shaft, then the other, through the rectangular cutouts in the chute wall. 4. Slide the pillow blocks over the shaft with the flats facing the set screws. Tighten the set screws with an Allen wrench. 5. Fasten both pillow blocks to the bracket with3/8 " x 1 1/2" long bolts and hardware (flatwasher, locking washer and nut). ASGCO Mfg., Inc. 8 CHEVRON

Information Key Description Part Number 1 Shaft Assembly w/o Bearings Call Customer Service w/original part number of cleaner 2 Bearing - 1 Diameter ASG-FOD-BR1 Bearing - 1½ Diameter ASG-FOD-BR2 3 Mounting Bracket for 1 Bearing ASG-FOD-MB1 Mounting Bracket for 1.5 Bearing ASG-FOD-MB2 4 Disc 8 Diameter - Notched 1 Shaft ASG-FOD-8.0D-N Disc 8 Diameter - Notched 1.5 Shaft ASG-FOD-8.5D-N Disc 6 Diameter - Plain 1 Shaft ASG-FOD-6.0D Disc 8 Diameter - Plain 1 Shaft ASG-FOD-8.0D Disc 8 Diameter - Plain 1.5 Shaft ASG-FOD-8.5D Disc 10 Diameter - Plain 1.5 Shaft ASG-FOD-10.5D Call your ASGCO Distributor for any questions or replacement parts Components Diagram 2 1 4 3 1 2 3 Shaft assembly - includes shaft, spacers, discs and collars Bearing - specify 1 diameter specify 1.5 diameter Mounting Bracket - for 1 bearing - for 1.5 bearing 4 8 notched 1 shaft 8 notched 1.5 shaft 6 plain 1 shaft 8 plain 1 shaft 8 plain 1.5 shaft 10 plain 1.5 shaft ASGCO Mfg., Inc. 12 CHEVRON

The second shaft is installed with all of the discs bending in the opposite direction. Continue to alternate the direction of the discs in each subsequent shaft installation. Head Pulley Snub Pulley Move on to the next Chevron shaft installation, using this same step-bystep procedure. Remember that the direction of the discs must be alternated on each subsequent installation. Maintenance When used in a 24-hour operation, the Chevron must be adjusted every four months. Grease hoses should be installed if the Chevron mounting location prevents easy lubrication. Grease the bearing periodically. Operation of the conveyor belt without material should be kept to a minimum. ASGCO Mfg., Inc. 11 CHEVRON