LNG Screw Down Non-Return Valve Installation, Operation and Maintenance Manual

Similar documents
Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

2001 SERIES CRYOGENIC BAR STOCK BODY VALVES

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

Danfoss Butterfly Valve

EC4 SERIES CRYOGENIC VALVES 1/4 2 Sizes

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV Page 2. Danfoss VI.IX.A1.02 1

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

Split Body Valves with Bellows Seal Series Globe Valves Series Angle Valves Series Way-Valves

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

½" to 4" (DN15 to DN100) LEA31 and LEA33 ANSI Control Valves Installation and Maintenance Instructions

IMOI 2010 Rev 0

Installation, Operation, and Maintenance Manual

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

Butterfly valves Figure 56 Installation & Maintenance Instructions

Installation, Operation, and Maintenance Manual

3. Installation and Commissioning 4. Maintenance 5. Spares

USER INSTRUCTIONS. Kämmer SmallFlow / / SP Low and Micro Flow Valves. Installation Operation Maintenance

Keystone Figure 85/86 Check valves Installation and Maintenance Instructions

Installation, Operation, and Maintenance Manual

PN9000 Series Pneumatic Actuators Installation and Maintenance Instructions

Operating & Maintenance Manual For Steam Conditioning Valve

IOM Manual. IOM Manual. Series 76/77.

KEYSTONE. Check valves Figure 85/86 Installation & Maintenance Instructions. Figure 85. Figure 86.

MSC Manifolds - DIN for Steam Distribution and Condensate Collection Installation and Maintenance Instructions

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com

Instalation, Operation and Maintenance Manual

SERIES Single seated top guided control valve SERVICE. Preventive maintenance. Overhauling procedure. Note

Types PN5000 and PN6000 Series Pneumatic Actuators Installation and Maintenance Instructions

QLM and QLD Series DN125 to DN200 Three Port Control Valves

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTRUMENT ISOLATION VALVE

Mounting and Operating Instructions EB 8053 EN. Series 250 Type and Type Pneumatic Control Valves

INSTALLATION, OPERATION & MAINTENANCE MANUAL. 0.- Description Handling Installation Actuators Maintenance...

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

Type 3320, Service Manual. Serviceanleitung Service Manuel

USER INSTRUCTIONS. Kämmer SmallFlow - Series / Low and Micro Flow Valves. Installation Operation Maintenance. Experience In Motion


KTM Hindle Series 300 Ultra-Seal two piece metal seated ball valves Installation and Maintenance Instructions

INSTALLATION, OPERATION & MAINTENANCE MANUAL Description Handling Installation Actuators...

Series Single seated top guided control valve. Preventive maintenance. Overhauling procedure. Wörth am Main SERVICE NOTE. Control Valve Division

GT-200 GATE VALVES PN16, Screwed end

MUELLER ECCENTRIC PLUG VALVE

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

CIRCLE SEAL CONTROLS

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

Fisher 657 Diaphragm Actuator Sizes and 87

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Guide

PV4 - Compact Shut Off Style Pig Valve IOM - Installation, Operation & Maintenance

BCV30 DN20 - Blowdown Control Valve Installation and Maintenance Instructions

Svendborg Conveyor Brake Maintenance

USER INSTRUCTIONS. Installation Operation Maintenance. NAF Setball SF Ball Sector Valves. Experience In Motion FCD NFENIM A4 09/16

HIGH PRESSURE CONTROL VALVE R2L ACTUATOR

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

Installation, Operation and Maintenance Manual of Forged Steel Gate, Globe & Check Valves

INSTALLATION, OPERATION, MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

Manually Operated Diaphragm Valves

Series Direct contact and metal-to-metal seating makes the T-pattern globe stop valve ideal for most shut-off applications.

Gas Actuated Valve Supplement

INSTALLATION AND MAINTENANCE INSTRUCTIONS For Chemline EC & EK Series Characterized Control Valves Sizes 1/2 6

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Shut-off valves SVA-DH, SVA-DL

YARWAY HANCOCK Y-PATTERN FORGED STEEL GLOBE STOP VALVES SERIES 4000

USER INSTRUCTIONS. NAF Trunnball DL Ball Valves. Installation Operation Maintenance. Experience In Motion FCD NFENIM A4 01/15

QLM and QLD Series DN15 to DN100 Three Port Control Valves

back to main page Type: Butterfly valves Instructions and Operation Manual Warning! Warning! Danger for life! 1. Intended use Danger for life!

CIRCLE SEAL CONTROLS

50 TONNE HYDRAULIC PRESS MODEL NO: CSA50FP

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com W D0446-A 4/1/05 1

Installation, Operation and Maintenance Manual of Pressure Seal Gate, Globe & Check Valves

Installation, Operation, and Maintenance Manual Full Port Y-Pattern, Bolted Bonnet, Globe and Check Valves

KEYSTONE SERIES GRF RESILIENT SEATED BUTTERFLY VALVES INSTALLATION AND OPERATION MANUAL

UNIFLO Control Valve

Gear pump manual for foam pelton wheel driven pumps

Maintenance Information

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

Newco / OIC / Cooper Forged Valves. Operation & Maintenance. Manual

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

Operating Instructions. Pneumatic Control Valve Low Temperature. Type Series GS3

DA Series Diaphragm Valve

Instruction Manual. Single Acting Hydraulic Aluminium Pull Cylinders RAP Series. Maximum Operating Pressure 700 bar

Flow Control. Before installation or maintenance, these instructions must be fully read and understood.

VSI INDUSTRIAL BALL VALVES SERIES 7100 SERIES 8100 SERIES 7200 SERIES 8300 SERIES 7400 SERIES 8400 SERIES 8000 SERIES 8500

Installation Operation Maintenance

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL

Installation, Operation, and Maintenance Manual GENERAL VALVE GENERAL VALVE TRUSEAL / IOM-GEN-TRUSEAL. Installation, Operation, and Maintenance Manual

Instructions for installation, operation and maintenance of: GATE VALVE

Fisher TBX Hydro Plug Fixture

Operating Instructions. Angle Seat Control Valve. Type 7020

BBV Automatic or Manually Actuated Boiler Blowdown Valves Installation and Maintenance Instructions DN15 - DN65

Fisher CVX Hydro Plug Fixture

ONYX VALVE CO MODEL DAO-PFC Installation & Maintenance

Installation and operating manual

I-795/906. Series 795 and 906 Installation-Ready Knife Gate Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Transcription:

Installation, Operation and Maintenance Manual Date of Issue: 04 August 2010 Page 1 of 27 QF 80: Issue 2

WARNING! BEFORE ANY INSTALLATION AND MAINTENANCE WORK CAN COMMENCE ENSURE THE VALVE AND SURROUNDING SYSTEM IS DRAINED OF PRESSURE AND ISOLATED. Date of Issue: 04 August 2010 Page 2 of 27 QF 80: Issue 2

Contents Disclaimer... 4 Preface... 5 Introduction... 5 Safety... 5 Safety... 7 Installation Overview... 8 Preparation... 9 Hardware Description... 10 Hardware Description... 11 Hardware Description... 12-13 Installation & Maintanence... 14 Maintanence... 15 Service Kit... 16 Replacing the Bonnet Gasket... 17 Bolt Torques... 18 Replacing the Gland Packing... 19-24 Troubleshooting... 25 Contact Details... 26 Service Record... 27 Date of Issue: 04 August 2010 Page 3 of 27 QF 80: Issue 2

Introduction Outline This manual is broken down into separate sections: Introduction This section provides information about important safety requirements as well as highlighting the precautions taken at Bestobell Valves to ensure the cleanliness of our products. Details regarding servicing are also introduced. Installation This details the method of installing the valve on site, and includes information on storage, unpacking and inspection. Preparation of the valve and site is also discussed to allow ease of installation and operation. Hardware Description Introduces the product as well as providing a more detailed description including operating conditions and suitable media. Any further requirements for the effective operation of the valve are also discussed. Maintenance Provides information relating to the on-site maintenance of the supplied valve, as well as discussing common problems and solutions. Safety Read and understand these instructions before installing the valve. Improper installation, operation or maintenance by the owner or operator of this valve can result in personal injury. Only use genuine Bestobell Marine spares to ensure safe and optimum performance. Prior to the installation of the valve into the system and any maintenance work, ensure the system is de-pressurised and isolated for the duration of the installation and during any subsequent maintenance. The valve must be installed within a system that has adequate draining and venting provisions. Date of Issue: 04 August 2010 Page 5 of 27 QF 80: Issue 2

In cryogenic applications the area of pipe-work to receive the valve must be allowed to reach ambient temperature. It is essential that the installers and operators are conversant with all of the safety issues relating to the medium within the system, and are fully trained to an adequate standard. Wear safety glasses and gloves during any installation or operation of the valve. Valves must only be used in a circuit protected by suitable equipment. The valve should be inspected for wear as part of a regular system maintenance programme. Cryogenic burns can occur if the valve is handled during or after the valve has operated. Minor leaks from the outlet side of the valve, if allowed to build up in a confined area, can be hazardous. This can be avoided by dissipating into the atmosphere or a well ventilated area. If valve is to be installed in hazardous climatic conditions or seismic areas, please inform Bestobell Marine. Identify the intended flow direction and match the valve orientation with its flow direction arrow. Ensure that all end connections to the valve are in line and that the pipe work is supported to reduce unwanted stresses, loading and vibration on the valve and system pipe work. Safety Ensure that all joining materials / components used during the installation of the valve are compatible, and will not cause any deterioration to the valve structure. Never use hands to test for leaks! Date of Issue: 04 August 2010 Page 6 of 27 QF 80: Issue 2

Cleanliness Immediately after assembly in a controlled clean room, the valve is sealed in an airtight plastic bag to maintain cleanliness. As such, it is essential to maintain this cleanliness throughout all stages of installation. Particular care should be taken not to contaminate the internals of the valve with grease, moisture, grinding dust, weld/brazing spatter etc. Clean practices will save time later with reduced flushing and maintenance. Service Intervals Bestobell Marine recommends that a major service is carried out on its valves in line with the procedures contained in this manual every 2 years. Regular inspections are suggested on a monthly basis and maintenance work should be carried out in line with this service manual. It is recommended that the Service Record Sheet enclosed be fully completed at every service interval. Installation Personnel carrying out Assembly / Joining / Welding / Inspection must be adequately trained and hold the necessary approvals. Ensure that environmental conditions (atmospheric pollution) are compatible with the valve materials. (NOTE: Ensure there is enough space around the valves installed position to allow the removal and refit of the headwork / valve) Installation Overview The quality of performance in service is a function of the care taken to ensure good installation. A careful study of these instructions is therefore recommended, as properly installed equipment will normally operate for long periods without problems. The most critical point in the lifetime of a valve is the time of installation, therefore, proper care at this stage and during any maintenance will increase the probability of trouble free valve service. Date of Issue: 04 August 2010 Page 7 of 27 QF 80: Issue 2

It is important to maintain cleanliness throughout all stages of the installation, with particular care being taken not to contaminate the internals of the valve with grease, moisture, grinding dust, weld / brazing spatter or other foreign matter. Clean practices will save time later with reduced flushing and maintenance. STORAGE: The equipment packing cases are NOT waterproof and should be stored in a weatherproof location before use. UNPACKING: It is recommended that before any item is unpacked, it should be moved as close as possible to its installed position. This will minimise the possibility of damage during handling. It is further recommended that each item should only be unpacked immediately before it is required. Before installation the engineer should check for: Damaged Packaging Bent or Distorted Items Scratches, Dents or Damage Particular attention should be paid to the sealing faces on the end connection flanges. TOOLS REQUIRED: No special tooling is required for the installation of this valve. Date of Issue: 04 August 2010 Page 8 of 27 QF 80: Issue 2

Preparation WARNING! BEFORE ANY INSTALLATION AND MAINTENANCE WORK CAN COMMENCE ENSURE THE VALVE AND SURROUNDING SYSTEM IS DRAINED OF PRESSURE AND ISOLATED. Remove the headwork before installation and cover the top of the body to protect the internals of the valve from particulate contamination. Also ensure that enough room is left above / around the valve for the headwork once this is replaced after installation. Identify the intended flow direction and match the valve orientation with its flow direction arrow. Ensure that all end connections to the valve are in line and that the pipe work is supported to reduce unwanted stresses, loading and vibration on the valve and system pipe work. Ensure that all joining materials / components used during the installation of the valve are compatible, and will not cause any deterioration to the valve structure. Date of Issue: 04 August 2010 Page 9 of 27 QF 80: Issue 2

Hardware Description All materials used are selected for their suitability to function at cryogenic temperatures. All valves are degreased for oxygen duty, assembled in clean room conditions, and sealed in robust polythene bags prior to despatch. Working Pressures Up to: 50Bar (725psi). Temperature Range: +80 C to 196 C or + 150 F to -320 F Only suitable for operation with media: - LNG Date of Issue: 04 August 2010 Page 10 of 27 QF 80: Issue 2

Hardware Description Manual Globe Valve Stainless steel extended globe valve with bolted bonnet and integral metal seat. Available with butt weld and flanged end connections, the valve has a conical seat design for a fire safe shut off. A Screw down Non-Return version is also available. The bolted bonnet allows for simple site maintenance, with easy access to the serviceable parts of the valve. The valve is operated by a handwheel. The handwheel is turned clockwise to close the valve and anti-clockwise to open it. Handwheel Gland Housing Figure A Manual Globe Valve Extension Tube Cover Loose Flange Valve Body Date of Issue: 04 August 2010 Page 11 of 27 QF 80: Issue 2

ELECTRICAL CONNECTION: LIMIT SWITCH TYPE VALVES Open and Close Limit Switches (ON/OFF) These switches give a position feedback to a control room to indicate the valve open or close. The switch is EX approved to ZONE 0 and are a 24vdc 2 wire type. Below is an example of how the manual limit switch works. Switch Outputs - Manual Valves Closed 2 1 Switch 1 - Continuous ON Switch 2 OFF Partially open Switch 1 Off Switch 2 Off 2 1 Date of Issue: 04 August 2010 Page 12 of 27 QF 80: Issue 2

Fully OPEN 2 1 Switch 1 OFF Switch 2 - Will pulse ON after magnet passes - This pulse can be latched by a PLC to show the valve is fully open Shut Partially Fully open Open Switch 1 ON OFF OFF Switch 2 OFF OFF Pulse signal Date of Issue: 04 August 2010 Page 13 of 27 QF 80: Issue 2

Installation and Maintenance Installation Overview The quality of performance in service is a function of the care taken to ensure good installation. A careful study of these instructions is therefore recommended, as properly installed equipment will normally operate for long periods without problems. It is important to maintain cleanliness throughout all stages of installation, with particular care not to contaminate the internals of the valve with grease, moisture, grinding dust, weld / brazing spatter or other foreign matter. Clean practices will save time later with reduced flushing and maintenance. Preparation Check that there is enough space around the valve installation position to allow removal and refitting of the valve. Ensure that the valve is closed before commencing installation. Identify the intended flow direction and match the valve orientation with its flow direction arrow. Ensure that all end connections to the valve are in line and that the pipework is supported to reduce unwanted stresses, loading and vibration on the valve and system pipework. Ensure that all-joining material / components used with the installation of the valve are compatible, and will not cause any deterioration to the valve structure. Flanged end connections Tighten the flange fasteners progressively in a diametric sequence, at the same time as checking alignment of mating flanges. Butt weld end connections Ensure that the valve is welded to the pipework in accordance with the necessary approvals. Date of Issue: 04 August 2010 Page 14 of 27 QF 80: Issue 2

Maintenance Testing Before introducing pressure to the valve carry out a thorough inspection of all connections: welded and/or threaded. Once pressure is introduced to the valve a method appropriate to the medium being carried by the system should be employed to test for leaks. For further guidance on leaks refer to troubleshooting notes. Check that the valve functions satisfactory by operating it under no load. Check the valve operates freely and smoothly throughout its stroke. Service Intervals Bestobell Marine recommends that a major service is carried out on its valves in line with the procedures contained in this manual every 2 years. In addition to this a regular inspection should take place to ensure correct operational condition. Regular inspections are suggested on a monthly basis and maintenance work should be carried out in line with this service manual. It is recommended that the Service Record Sheet enclosed be completed fully at every service interval. Date of Issue: 04 August 2010 Page 15 of 27 QF 80: Issue 2

Service Kit Spares Kits Standard spares kits consisting of bonnet gaskets and gland packing kits are as follows: It is recommended that only Bestobell LNG approved engineers replace the components in the standard spares kit. Table A Spares Kits VALVE SIZE DN15 DN25 DN40 DN50 DN65 DN80 DN100 DN150 SPARES KIT PART NUMBER CNMR30 CNMR50 CNMR70 CNMR80 CNMR90 CNMRA0 CNMRB0 CNMRD0 Date of Issue: 04 August 2010 Page 16 of 27 QF 80: Issue 2

Replacing the Bonnet Gasket Ensure that the valve is open and the line is depressurised before attempting to remove the headwork. Loosen the bonnet nuts and remove the valve headwork and the actuator. Remember to keep the headwork clean. Remove the old gasket and clean the mating faces on the headwork and valve body to ensure that no debris is remaining that could damage the new gasket. Replace the gasket. Refit the headwork. Tighten the bonnet nuts progressively, in a diametrical sequence the specified torque settings shown in Table B. Check that there are no leaks around the gasket seal. Figure B Remove Bonnet Gasket Date of Issue: 04 August 2010 Page 17 of 27 QF 80: Issue 2

Bolt Torques Table B Bonnet Bolt Load Torques Bolt size Bonnet Bolt Torque M10 32Nm M12 56Nm M16 140Nm M20 270Nm M24 420Nm NOTE: Apply torques progressively and in sequence. Only use Molybdenum based lubricants. Torque specified is for lubricated Stainless Steel fasteners. On Cryogenic applications, ONLY use specified Stainless Steel fasteners. Torques specified for valves with Graphite body / bonnet gaskets. Date of Issue: 04 August 2010 Page 18 of 27 QF 80: Issue 2

Replacing the Gland Packing STEP 1: Whilst the valve is still in the service line, isolate it and drain off pressure. Unscrew the hand wheel retaining nut, lift off the washer and save both parts in a safe place. STEP 2: Lift off the hand wheel taking care not to damage the end of the stem. Store the hand wheel in a safe place. STEP 3: Using the appropriately sized spanner; unscrew the gland nut and locknut. Store the parts in a safe place Date of Issue: 04 August 2010 Page 19 of 27 QF 80: Issue 2

STEP 4: Remove the Gland follower and store in a safe place STEP 5: Remove the securing screws or nuts and washers from the bonnet. Store in a safe place STEP 6: Remove the headwork from the body. Note: Valve disc may remain on the valve seat when headwork is removed. Date of Issue: 04 August 2010 Page 20 of 27 QF 80: Issue 2

STEP 7: Remove the stem from the cover. STEP 8: Remove the gland packing and washer from the inside of the gland area. Take care not to scratch the inside of the gland area. Once removed clean the tube where the packing s are seated removing any of the old packing debris. STEP 9: Replace the stem back into the cover Date of Issue: 04 August 2010 Page 21 of 27 QF 80: Issue 2

STEP 10: Replace the bonnet gasket from the spares kit discarding the old one. Replace the headwork back into the body ensuring stem fits over disc peg. Tighten the bonnet Cap screws/nuts progressively, in a diametrical sequence the specified torque settings shown in Table B. STEP 10: Replace the gland washer and gland packing from the spares kit back into gland area. STEP 11: Replace the gland follower Date of Issue: 04 August 2010 Page 22 of 27 QF 80: Issue 2

STEP 12: Using the appropriately sized spanner; replace the gland lock nut and gland nut. Tighten the gland nut for the appropriate size of valve to the appropriate torque using the figures from table C. Once to torque tighten the locknut to same torque against the gland nut STEP 13: Replace the handwheel STEP 14: Replace the handwheel washer and retaining nut Date of Issue: 04 August 2010 Page 23 of 27 QF 80: Issue 2

Valve Size Gland Nut Torque DN15/25 12NM DN40 30NM DN50 30NM DN80 30NM DN100 20NM X 3 Nuts Table C Gland Nut Torques Testing Check the bonnet and gland housing areas for leaks. For further guidance on leaks refer to troubleshooting notes. Check that the valve functions satisfactory by operating it under no load. Check the valve operates freely and smoothly throughout its stroke. Date of Issue: 04 August 2010 Page 24 of 27 QF 80: Issue 2

Troubleshooting Symptom: Fault: Solution: Missing gasket Fit new gasket Leaking bonnet Leaking flanged end connection Excessively tight valve operation Damaged gasket Loose headwork fasteners Dirt on seal faces Loose end flange fasteners Misaligned flanges Missing or damaged flange gasket Dirt on seal faces Gland packing compressed too tightly Headwork stem and/or stem tube bent or damaged Damaged gland follower Fit new gasket Tighten to correct torque Clean seal faces & replace Tighten to correct torque Align flanges (do not stress misaligned pipe-work with valve) Fit new flange gasket Clean seal face & replace gasket Loosen gland nuts to allow stem to move freely when valve is operated Replace complete headwork assembly Replace the gland follower Leaking gland Worn gland packing Tighten gland nut to specified t Gland continues to leak after tightening Gland packing excessively worn Renew gland packing, retighten gland nut to specified torque Date of Issue: 04 August 2010 Page 25 of 27 QF 80: Issue 2

Contact Details For further maintenance instructions and spares contact: United Kingdom Enquiries: Bestobell Marine President Park, President Way, Sheffield, South Yorkshire, S4 7UR, England. Tel: +44(0)114 2240263 Fax: +44(0)114 2784974 Email: info@bestobell-lng.com / sales@bestobellvalves.com Web: www.bestobell-lng.com / www.bestobellvalves.com Date of Issue: 04 August 2010 Page 26 of 27 QF 80: Issue 2

Service Record Valve Tag Number: Date: Date: Date: Date: Date of Issue: 04 August 2010 Page 27 of 27 QF 80: Issue 2