VALVE CLEARANCE ADJUSTMENT EM 7

Similar documents
VALVE CLEARANCE ADJUSTMENT EM 8

EM 112 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSPECTION. Intake Air Surge Tank Side

VALVE CLEARANCE (3MZ-FE)

a. Turn the crankshaft pulley, and align its groove with the timing mark "0" of the timing chain cover.

VALVE CLEARANCE (K3-VE)

VALVE CLEARANCE INSPECTION

TIMING CHAIN COMPONENTS

REMOVAL EM SEPARATE COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) (a) Remove the bolt shown in the illustration.

VALVE CLEARANCE INSPECTION

EM 97 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSTALLATION

OIL PUMP (for 4WD and Pre-Runner)

CYLINDER HEAD (for Bank 2 4WD and Pre-Runner)

VALVE CLEARANCE (1NZ-FXE)

EM 92 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY REMOVAL

IG 1 2GR-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM ENGINE ROOM R/B - IG2 FUSE - ST/AM FUSE IGNITION COIL NOISE FILTER NOISE FILTER A137458E01

VALVE CLEARANCE (3ZZ FE/4ZZ FE)

EM 6 VALVE CLEARANCE ENGINE MECHANICAL EM11I 01 ADJUSTMENT HINT:


Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

EM 128 2UZ-FE ENGINE MECHANICAL ENGINE UNIT INSPECTION

TIMING CHAIN COMPONENTS

ENGINE TUNE UP. (See steps 1 and 2 on page CO 5)

REMOVAL EM SEPARATE COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) (a) Remove the bolt shown in the illustration.

VALVE CLEARANCE (1ZZ FE)

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

Mazda3 - Workshop Manual - Engine

1GR-FE ENGINE MECHANICAL: TIMING CHAIN: INSTALLATION (2007 4Runner) Model Year: 2007 Model: 4Runner Doc ID: RM WS002X

IG 1 1NZ-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM IGNITION COIL NO. 1 CAMSHAFT POSITION SENSOR SPARK PLUG CRANKSHAFT POSITION SENSOR A116185E01

IGNITION SYSTEM IG 1 2GR-FE IGNITION IGNITION SYSTEM INSTRUMENT PANEL JUNCTION BLOCK - IG2 FUSE ECM

1ZZ-FE ENGINE MECHANICAL ENGINE UNIT DISASSEMBLY. If you paid for the content in this manual you were screwed!

ENGINE ASSEMBLY COMPONENTS EM 170 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY V-BANK COVER VACUUM HOSE AIR CLEANER ASSEMBLY NO. 2 VENTILATION HOSE

EM 38 2TR-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

CHARGING SYSTEM PRECAUTION CH 1

Before performing any on-vehicle adjustments to fuel or ignition systems, ensure engine mechanical condition is okay.

REPLACEMENT HINT: 11. REMOVE V RIBBED BELT TENSIONER ASSY (a) Remove the 5 bolts and V ribbed belt tensioner.

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

DISTRIBUTOR DISTRIBUTOR REMOVAL

TIMING BELT COMPONENTS EM 15

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

3/15/2015 1:10 PM TIMING CHAIN REMOVAL/INSTALLATION [L3 WITH TC]

TUNE UP EG2 12 ENGINE MECHANICAL

ALLDATA Online Toyota Camry Wagon L4-2.0L (3S-FE) - Timing Belt Installat... Page 1 of 15. Timing Belt Installation. Timing Belt (3S-FE)

IN-VEHICLE REPAIR. Timing Drive Components Camshaft Drive Cassette, LH. Special Tool(s) Holding Tool, Camshaft Sprocket (T97T-6256)

2003 Toyota Truck Highlander 2WD V6-3.0L (1MZ-FE) Copyright 2013, ALLDATA Page 1

EM 27 2UZ-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

TIMING BELT COMPONENTS

FUEL SYSTEM PRECAUTION FU 1

TIMING BELT REPLACEMENT. Tools Required. J A (KM-421-A) Timing Belt Adjuster J Angle Meter KM-470-B Angular Torque Gage

10. SEPARATE COMPRESSOR (a) Remove the nut, 3 bolts compressor stay and compressor. HINT: Hang up the hoses instead of detaching.

INTEGRATED IGNITION ASSEMBLY (IIA) (4A FE)

3/13/ :32 AM. NOTICE: Do not disconnect the hose.

Page 1 of 25. Service and Repair REMOVAL SIZED FOR PRINT. Related Components

2001 Chevrolet Metro LSi ENGINES 1.3L 4-Cylinder - Metro & Firefly (Canadian) Fig. 3: Exploded View Of Timing Belt & Components (Typical)

TIMING BELT (1MZ FE Jan., 2003)

CAMSHAFT (LH BANK) (2GR FE) ENGINE MECHANICAL 1424N 01 REPLACEMENT

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

REMOVAL AC 67. Using a clip remover, disengage the 6 clips and remove the front fender apron seal upper. (2WD)

2001 Toyota MR ENGINES' '1.8L 4-Cylinder

ENGINE MECHANICAL (4A FE)

D - ADJUSTMENTS - 4-CYL

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

REMOVAL FU 11 2TR-FE FUEL FUEL INJECTOR. Pinch. Checker. Detaching Switch Pull Out. Retainer. Fuel Hose Connector. Pipe. O-ring. Pinch.

25. REMOVE OIL PIPE NO.1 (a) Remove the 2 oil pipe unions, and oil pipe No.1. (b) Remove the oil control valve filter LH and gaskets.

TIMING BELT (3S FE) COMPONENTS

REMOVAL & INSTALLATION

2/17/2017 Timing Belt Service and Repair, Removal and Replacement

Timing Drive Components Camshaft Timing

TIMING BELT (5S FE) COMPONENTS

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

CHARGING SYSTEM PRECAUTION CH 1

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

Timing Belt: Service and Repair. Toyota Truck Sienna LE V6-3.0L (1MZ-FE) 2002

2003 Nissan-Datsun Truck Frontier 4WD V6-3.3L (VG33E)

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

Service and Repair CAMSHAFT

DTC P0300 Random / Multiple Cylinder Misfire Detected. DTC P0301 Cylinder 1 Misfire Detected. DTC P0302 Cylinder 2 Misfire Detected

ON-VEHICLE INSPECTION

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

GENERAL SPECIFICATIONS

DISTRIBUTOR (5S FE) REMOVAL OF DISTRIBUTOR IG 30

2012 Kia Soul L4 2.0L

Tech Talk. Timing Belt 6VD1/6VE1

SECTION C Engine 5.4L (4V)

COMPONENT LOCATOR > DISASSEMBLED VIEWS

EG-34 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION

Toyota Camry CE Sedan L4-2.2L DOHC (5S-FE) MFI Timing Belt: Service and Repair

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

STARTER (for 2WD and Pre-Runner)

INSTALLATION EM 21. Inward. Sensor. Plate Washer. 10 mm Hexagon Wrench SST. Fulcrum Length SST TIMING BELT ENGINE MECHANICAL 2002 AVALON (RM872U)

TORQUE SPECIFICATIONS

FUEL PRESSURE REGULATOR

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION

REMOVAL. 16. LOOSEN CRANKSHAFT PULLEY BOLT Using SST, loosen the pulley bolt. SST ( ), EM 20 SST TIMING BELT

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

EG1 485 OIL PUMP COMPONENTS FOR REMOVAL AND INSTALLATION

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

Fastener Tightening Specifications Specification

EG1 361 THROTTLE BODY

REMOVAL & INSTALLATION

2004 Nissan/Datsun Truck Quest Mini Van 3.5L SFI DOHC 6cyl Repair Guides Engin...

Transcription:

GR-FE ENGE MECHANICAL VALVE CLEARANCE VALVE CLEARANCE ADJUSTMENT 7. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMAL 2. DRA ENGE COOLANT (See page CO-3) 3. ROVE V-BANK COVER (See page ES-44) 4. ROVE AIR CLEANER ASSBLY (See page ES- 45) 5. ROVE TAKE AIR SURGE TANK (See page - 57). ROVE IGNITION COIL ASSBLY (See page IG-7) 7. ROVE CYLDER HEAD COVER SUB-ASSBLY (See page -59) 8. ROVE CYLDER HEAD COVER SUB-ASSBLY LH (See page -59) 9. SET NO. CYLDER TO TDC/COMPRESSION (a) Turn the crankshaft pulley until its groove and the timing mark "0" of the timing chain cover are aligned. Groove A07530E02 RH Bank (b) Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration. If not, turn the crankshaft complete revolution (30 ) and align the timing marks above. LH Bank G03289E0

8 GR-FE ENGE MECHANICAL VALVE CLEARANCE RH Bank: LH Bank: Front 3 3 0. SPECT VALVE CLEARANCE (a) Check the valves indicated in the illustration. () Using a feeler gauge, measure the clearance between the valve lifter and camshaft. Valve clearance (Cold): Intake 0.5 to 0.25 mm (0.00 to 0.00 in.) Exhaust 0.29 to 0.39 mm (0.0 to 0.05 in.) (2) Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter. 2 2 A07343E0 RH Bank: LH Bank: Front 2 2 3 3 5 5 (b) Turn the crankshaft 240 clockwise, and check the valves indicated in the illustration. () Using a feeler gauge, measure the clearance between the valve lifter and camshaft. Valve clearance (Cold): Intake 0.5 to 0.25 mm (0.00 to 0.00 in.) Exhaust 0.29 to 0.39 mm (0.0 to 0.05 in.) (2) Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter. 4 4 A07344E0

GR-FE ENGE MECHANICAL VALVE CLEARANCE 9 RH Bank: LH Bank: Front 4 4 5 5 (c) Turn the crankshaft 240 clockwise, and check the valves indicated in the illustration. () Using a feeler gauge, measure the clearance between the valve lifter and camshaft. (2) Valve clearance (Cold): Intake 0.5 to 0.25 mm (0.00 to 0.00 in.) Exhaust 0.29 to 0.39 mm (0.0 to 0.05 in.) Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter. A07345E02. ADJUST VALVE CLEARANCE (a) Set No. cylinder to TDC/compression. () Turn the crankshaft pulley until its groove and the timing mark "0" of the timing chain cover are aligned. Groove A07530E02 RH Bank (2) Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration. If not, turn the crankshaft complete revolution (30 ) and align the timing marks as above. LH Bank G03289E0

0 GR-FE ENGE MECHANICAL VALVE CLEARANCE Paint Marks G0327E0 A00082E0 (3) Place paint marks on the No. chain links corresponding to the timing marks of the camshaft timing gears. (b) Remove the chain tensioner assembly No.. (c) Remove the No. 2 camshaft. (d) Remove the chain tensioner assembly No. 2. (e) Remove the camshaft. (f) Remove the No. 4 camshaft sub-assembly. (g) Remove the chain tensioner assembly No. 3. (h) Remove the No. 3 camshaft sub-assembly. (i) Remove the valve lifters. (j) Determine the replacement valve lifter size according to the following formulas and charts: () Using a micrometer, measure the thickness of the removed lifter. (2) Calculate the thickness of a new lifter so that the valve clearance comes within the specified value. T: Thickness of removed lifter A: Measured valve clearance N: Thickness of new lifter Intake: N = T + (A - 0.20 mm (0.008 in.)) Exhaust: N = T + (A - 0.30 mm (0.02 in.)) (3) Select a new lifter with a thickness as close as possible to the calculated value. HT: Lifters are available in 35 sizes in increments of 0.020 mm (0.0008 in.), from 5.00 mm (0.992 in.) to 5.740 mm (0.220 in.).

GR-FE ENGE MECHANICAL VALVE CLEARANCE A0734

2 GR-FE ENGE MECHANICAL VALVE CLEARANCE A07342

GR-FE ENGE MECHANICAL VALVE CLEARANCE 3 (k) Install the No. 3 camshaft sub-assembly. (l) Install the chain tensioner assembly No. 3. (m) Install the No. 4 camshaft sub-assembly. (n) Install the camshaft. (o) Install the chain tensioner assembly No. 2. (p) Install the No. 2 camshaft. RH Bank (q) Install the chain tensioner assembly No.. () Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration. 2. STALL CYLDER HEAD COVER SUB-ASSBLY LH (See page -8) 3. STALL CYLDER HEAD COVER SUB-ASSBLY (See page -8) LH Bank 4. STALL IGNITION COIL ASSBLY Torque: 0 N*m (02 kgf*cm, 7.4 ft.*lbf) 5. STALL TAKE AIR SURGE TANK (See page - 9). STALL AIR CLEANER ASSBLY (See page ES- 4) 7. ADD ENGE COOLANT (See page CO-3) 8. CONNECT CABLE TO NEGATIVE BATTERY TERMAL G03288E0 9. CHECK FOR ENGE COOLANT LEAKAGE (See page CO-4) 20. STALL V-BANK COVER (a) Install the V-bank cover with the 2 nuts. Torque: 7.5 N*m (7 kgf*cm, in.*lbf) 2. SPECT IGNITION TIMG (See page -)