LIFTING LETTER THE BARNHART DELIVERS 400 TON TRANSFORMER PAGE 3 A PUBLICATION OF BARNHART CRANE & RIGGING COMPANY BARNHART CRANE & RIGGING COMPANY

Similar documents
LIFTING LETTER Roll, Roll, Roll Your Boat Page 2

LIFTING LETTER THE BRIDGING THE GAP STORY ON PAGE 4 A PUBLICATION OF BARNHART CRANE & RIGGING COMPANY BARNHART CRANE & RIGGING COMPANY

LIFTING LETTER Engineers at Barnhart Tackle Difficult Feed Water Heater Change Out Page 2

LETTER THE BARNHART S KEY TO FIT ANY LOCK PAGE 3. A Mountain Top Experience Page 2. Barnhart s Modular Lift Tower In The Motor City Page 2

LIFTING LETTER

LETTER LIFTING. VOL. 61 Copyright 2018 A Publication of Barnhart NUCLEAR: COMPONENTS HAUL

Incremental Lifting System

Air time! AMERICAN CRANES & TRANSPORT. Lift planning. Specialized Lifting. Crane inspections. Ranking North America s top tower crane-owning companies

LETTER. 2Barnhart: Providing. 4Project LIFTING POWER. Vol. 48. THE POWER of. 400 Ton Generator. Equipment Profile: Reviews

Incremental Lifting System

Appendix H: Construction Impacts H-3 Air Quality

ALL TERRAIN TRANSPORTERS WORLDWIDE HEAVY TRANSPORTATION AND LIFTING


Welcome to Noor Lifters Suppliers of Forklifts, Cranes Boom-Lifts, Trailers on hiring Basis in India.

Toll-free:

Engineered Transportation For Project Cargo

MULTI AXLE TRAILER, & LIFTING SERVICES HEAVY TRANSPORT HEAVY LIFTING (MOBILE CRANE & SKY LIFT) PRIME MOVER & HAULAGE JACKING & SKIDDING

June 4, Presented by: Tony Niese

ERGONOMIC WORK STATION CRANES

Accelerated Bridge Construction

Winches & Capstans. Air Electric Custom

CAPABILITIES BROCHURE

Pearson Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF) 601/6018/4

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

Terex Quaymate M50 A Great Mate For Small Ports. The New Mobile Harbour Crane From Terex Port Solutions

elearning PLATFORM 2018

2019 elearning Platform

New Queensferry Crossing

Tasmanian Transport, Heavy Lift & Shipping Solutions

CONTENTS ONE YEAR LIMITED WARRANTY

CHAPTER 10 FLOATING WHARVES

Heavy Equipment & Rigging Specialist Training

Spoilt for choice. industrial cranes

View thousands of Crane Specifications on FreeCraneSpecs.com ISL SL MOBILE GANTRY CRANES. Customer inspired lifting solutions

First published June 2007 Copyright China Trend Building Press Limited

Chicago Crane Operator Examination Study Guide

Historic Gymnasium Moved

PRODUCT OVERVIEW.

Bigger and bigger... Innovative heavy duty jib. heavy lift

Underbridge Inspection Units Road Rail Access Technique Tunnel Inspection Units

TEREX CRANES TO SHOWCASE NEW PRODUCTS AND INNOVATIONS AT BAUMA 2016

For Review Only No Copying No Saving No Lending No Posting Online

BUILT WITH INTEGRITY

Cranes. Piggy Backs. Parts. Service. Whatever your needs, give us a call Or Toll Free at

PDF # MANITEX CRANE PARTS MANUAL M1461 DOWNLOAD

INCREASED OPERATIONAL EFFICIENCY

Double Column Vertical Machining Centers

Established in The experts in heavy transportation and logistics. Products & Services.

PRODUCT RANGE OVERVIEW

Material Handling Overview

A PLATFORM WHERE YOU WANT IT. Manufacturers of VRS

Large lifting capacity

BreakBulk Africa 2015

CAPACITIES: SPANS: ROTATION: STYLES: Up to 30' Manual or Motorized Free Standing, Wall Mounted or Gantry

Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

LIFT TRUCKS FOR EVERY APPLICATION

Large lifting capacity

PRIMAAX. - MAAXimize durability - MAAXimize driver comfort - MAAXimize performance. Severe-Duty Vocational Air Suspension

Great things come in small packages MK 140 mobile construction crane

Table of Contents. 1. Boom Dollies Light-Weight Smart Steel Crane Mats Transportation Solutions Additional Solutions

Integrated Solutions. Your Load Under Perfect Control

Product range Presented by the go-to expert For all your needs

CONSISTENT TOP PERFORMANCE DIESEL-ELECTRIC MODEL 8 MOBILE HARBOR CRANES

LOLER REGULATIONS INTRODUCTION

2000 Watt Telescoping Light Mast - 30' 3-Stage Light Tower Rotating Boom - High Mast Lighting

List of references Edited : 27/07/2011

Mounted Crane. A crane mounted on a truck carrier provides the mobility for this type of crane.

A COMBINATION OF POWER AND FUNCTIONALITY DIESEL-ELECTRIC MODEL 6 MOBILE HARBOR CRANES

SAFETY SERVICE QUALITY VALUE RENTAL EQUIPMENT

TELESCOPIC BOOM CRAWLER CRANE 30 TON CAPACITY

Gewalt Hamilton Associates & High-Definition Surveying

RAILCAR MAINTENANCE SOLUTIONS

By Order of Court Reciever. DAY 1: East Riggs Road, Chandler, Arizona DAY 2: 9411 Alpine Drive, Ramsey, Minnesota 55303

Telescopic Crawler Crane. Max. lifting capacity:220 t Max. lifting height:101 m Max. working radius: 88 m

Designing and Manufacturing Modular Spreader Beam Systems for a Cost-Effective, Safe Lift

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River.

EXTRA LARGE VALUE IN CARGO HANDLING DIESEL-ELECTRIC MODEL 5 MOBILE HARBOR CRANES

PRODUCT RANGE OVERVIEW

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES

UNCOMPROMISING HANDLING PERFORMANCE DIESEL-ELECTRIC MODEL 7 MOBILE HARBOR CRANES

PRELIMINARY METHOD OF STATEMENT

TOGGLE DRIVEN BEAM PUNCHES AND PRESSES

Product Overview Festoon-Systems for I-Beams

SPMT. Higher capacity

Valve Lapping Tool Attachment. Valve / Valve Spring Tools / Jacks / Axle Stands. 27-piece Valve Seat Cutter Set, mm

Come across. m o d u l a r s o l u t i o n s

Table of Contents. Chapter 2 Safety Fundamentals for Bridge Inspectors. Methods of Access Introduction

Qualification structure for the Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF)

SH GROUP FACILITIES. Kuopiovej Svendborg. Denmark

Optimising overall functionality of your ships integrated anchor handling, towing, mooring and subsea load handling solutions

A FLEXIBLE ALL-ROUNDER DIESEL-ELECTRIC MODEL 4 MOBILE HARBOR CRANES

PRODUCT GUIDE INDUSTRIAL AUTOMATION ROBOTS / DRIVE PRODUCTS / SAFETY PRODUCTS / ELECTRICAL PRODUCTS INDUSTRIAL GROUP

BRIDGES RAIL WATER WIND BUILDING

Chicago Crane Operators Examination Study Guide

Enerpac Integrated Solutions

is to take out your own personal subscription The only way to guarantee that you receive every copy of The Lifting Professional s Magazine

TR SERIES LŌDRIL LAD SERIES AERA. Foundation Drilling Equipment Manufacturing

FROM BRAIN WAVE TO HEAVY LIFT TERMINAL IN ONE YEAR

PILING RIGS DRILLING RIGS

Transcription:

BARNHART CRANE & RIGGING COMPANY THE LIFTING LETTER 2 0 0 2 F O U R T H E D I T I O N Heavy Cargo Storage Facilities and Services Expand Page 2 A PUBLICATION OF BARNHART CRANE & RIGGING COMPANY Equipment Module Setting Page 2 MRI Unit Installed With Cantilever Beam Page 3 Barnhart Delivers 400 Ton Transformer Page 3 Reactor Pressure Vessel Removal At A Northeastern Nuclear Facility Page 4 BARNHART DELIVERS 400 TON TRANSFORMER PAGE 3 BC&R Engineering & Specialty Tools Page 4 Barnhart Completes Time Critical Exchanger Project Page 5 You Say Problem - Barnhart Says Challenge Page 5

Heavy Cargo Storage Facilities and Services Expand Barnhart has been awarded contracts to store heavy cargo from various industries including medical, HVAC, air separation, electric power generation and manufacturing. Barnhart s Heavy Lift Terminal at the Port of Memphis and its 150 plus acre facilities at branches throughout the United States well suit Barnhart to provide heavy lift and storage services. At the request of our customers, Barnhart now provides preservation initiatives to prepare electric power plant cargoes for long term storage. Providing this service requires Barnhart to interface between equipment OEMs and service specialists to ensure that appropriate procedures are followed. The condition of the equipment is monitored throughout the storage term. Numerous power plant projects have been deferred or cancelled creating an increased demand for storage facilities. Barnhart is constructing a new indoor storage facility engineered to accept heavy cargo. The facility will be located at the Heavy Lift Terminal in Memphis adjacent to Ichabod, the 1250 ton derrick crane located on the Mississippi River. This storage location will facilitate discharging heavy cargo directly from rail or barge to inside storage. EQUIPMENT MODULE SETTING Barnhart Crane supplied two cranes and rigging crews to lift and place two modular equipment skids and one stair tower at a rubber plant in West Tennessee. The 500 ton crane had to be placed in an existing elevated driveway with half the crane placed off the driveway ramp, to keep the radius of the lift within the crane s capacity. The equipment skids (96 high and 90,000 lbs. each) were lifted off transporters, stood vertical with a 110 ton assist crane, lifted over existing equipment and set within inches of the existing structures. A difficult crane and rigging project made easy by experienced crews and good engineering.

MRI UNIT INSTALLED WITH CANTILEVER BEAM Photo courtesy of State Gazette Recently, a hospital in Western Tennessee purchased a new Magnetic Resonant Imaging (MRI) unit. Installing an MRI unit is usually straight forward with the MRI room built at ground level. In this case, the MRI room was built on the second floor with additional obstacles in front of the wall opening and restricted head room. The Barnhart team called on it s engineering department and top rigging superintendent to come up with a solution for this complicated job. A special forked cantilever beam and a 60 ton crane with two load lines was utilized to make this difficult job go safely and smoothly. BARNHART DELIVERS 400 TON TRANSFORMER COVER STORY COVER STORY COVER STORY COVER STORY COVER STORY Barnhart Crane and Rigging s Chicago Branch was entrusted with the movement of an Illinois nuclear facility s spare main power transformer for its Power Station. The 833,000 pound transformer was transported inland by barge from New Orleans to BC&R headquarters in Memphis, TN. After being transloaded to another barge by Barnhart s 1250-ton derrick crane, Ichabod, the transformer was then transported up the Mississippi River to the Illinois River, rolled off, transported, and set on a temporary base at the customer s facility. The transformer measured 11 feet wide by 33 feet long by 17 feet tall and was the largest transformer ever handled by Barnhart. Our coustomer s senior project manager, said, There was a high degree of confidence in Barnhart Crane & Rigging from the start because of the depth and breadth of BC&R s equipment and expertise. Their management had a real professional knowledge of how to work on a nuclear site, preventing the logistics and technical aspects of moving the transformer from becoming a problem.

REACTOR PRESSURE VESSEL REMOVAL AT A NORTHEASTERN NUCLEAR FACILITY The final phase of Barnhart Crane s scope for this project was completed in September. Barnhart removed the Reactor Pressure Vessel (RPV) from the reactor cavity in the containment building and placed it on a transportation saddle. The RPV removal was part of site decommissioning. The RPV lift was accomplished with a specially configured twin strand jack system mounted on an existing overhead crane in the containment building. The strand jack system incorporated a tandem Barnhart slide system to move the RPV laterally for insertion into the shipping container. The tandem slide system was mounted on each of two girders on the existing overhead crane. Following the lateral move with the slide system, the RPV was carefully lowered in to the shipping container with the strand jack system. The final set of the shipping container package was done with Barnhart s Modular Lift Tower (MLT) and strand jacks augmented by a pair of 800 ton gantries. The saddle was maneuvered with nine lines of Barnhart self-propelled Goldhofer trailer. BC&R Engineering & Specialty Tools Barnhart crews traveled to Kansas to set a cement ball mill. The ball mill was 55 L x 18 W and weighed 320,000 lbs. Existing foundation piers and limited area around the saddle foundations proved to be a great place to show off some of BC&R s specialty tools. Barnhart engineers decided to use 60 L x 5 H box girders along with 500 ton hydraulic gantries and ten lines of self propelled Goldhofer trailer. Rigging crews lifted the ball mill with gantries and placed it on the Goldhofer trailer for on site transport. Then crews repositioned the gantries and track system next to the ball mill bearing foundations. Crews then moved the ball mill into position for lifting and movement across the top of the trailer for final placement on top of saddle piers.

Barnhart Completes Time Critical Exchanger Project At a Alabama refinery, Barnhart s customer needed to maintain a tight schedule during a revamp project. One dilemma involved removing multiple heat exchanger units to dispose of some while retaining others. Additionally, the exchangers were housed in the lower bay of a multiple level structure without crane access. Even more problematic was the need to remove the tube bundles from the disposable units while leaving the bundles in the keepers. One of the keepers was perched atop two empty shells making for a high center of gravity. The challenge was to remove the exchangers without damaging the units scheduled for reinstallation. Barnhart decided to remove the exchangers as two large units. The solution required turning eleven individual heat exchangers into a six pack and a five pack. The individual units were configured to units weighing up to 180,000 lbs. By tying the exchangers together the top heavy keeper became part of a larger more stable unit. Barnhart provided the engineered plan to tie the units together. Using a hydraulic slide system, the five and six pack units were removed safely and ahead of schedule. Once in the open, a crane removed the disposable units and prepared the keepers for reinstallation. YOU SAY PROBLEM BARNHART SAYS CHALLENGE What do you do when you purchase equipment you can t get delivered? Call Barnhart Crane & Rigging and make your problem become our challenge. After waiting months for a solution to get two Amine Drums from a fabricator s shop in St. Louis to the Mississippi River, the refinery decided to send out a call for assistance. Barnhart coordinated with local and state authorities to make the haul of two Amine Drums (64 L x 18 W x 20 H) weighing 110 tons each. Two Goldhofer trailers with BC&R designed inserts made bridge crossings and narrow streets seem like a typical Sunday drive on the way to a Rams football game.

TELESCOPIC BOOM CRANES MODEL NO. BOOM 500 Ton Liebherr All-Terrain (2)...LTM 1400...440 440 Ton Demag Truck Crane (2)...HC 1010...348 300 Ton Demag All-Terrain...AC 665...389 225 Ton Liebherr All-Terrain...LTM 1160...364 210 Ton Krupp All-Terrain...GMK 5210...322 180 Ton Demag All-Terrain (3)...AC 435...262 165 Ton Demag All-Terrain (3)...AC 335...302 150 Ton Demag All-Terrain (2)...AC 395...253 150 Ton Krupp All-Terrain (2)...KMK 5100...227 120 Ton Demag All-Terrain...AC 265...204 110 Ton Liebherr (3)...LTM 1090...243 110 Ton Krupp All-Terrain...KMK 5110...214 100 Ton Demag All-Terrain (4)...AC 205...219 80 Ton Krupp All-Terrain (4)...KMK 4070...175 80 Ton Grove RT (2)...RT 990...206 70 60 Ton Truck Crane (5)...186 50 30 Ton Grove Truck Crane (14)...142 22 Ton Grove All-Terrain/Truck (4)...113 27 12 Ton Boom Truck (6)...149 17.5 8 Ton Carry Deck (7)...37 CRAWLER/RINGER CRANES MODEL NO. BOOM 1800 Ton Demag with Ringlift...CC 4000...595 880 Ton Demag Crawler with Superlift...CC 4000...550 600 Ton Demag Crawler with Superlift...CC 2600...295 500 Ton Demag Crawler...CC 2600...295 440 Ton Demag Crawler with Superlift...CC 2000...435 386 Ton Demag Crawler with Superlift...CC 1200...433 360 Ton Link-Belt Heavy Lift...LS 718 HL...480 330 Ton Demag Crawler...CC 2000...433 275 Ton Demag Crawler...CC 1200...433 250 Ton Link-Belt Crawler Tower Crane (2)...LS 718...550 250 Ton Link-Belt Crawler Crane (2)...LS 718...450 LATTICE BOOM TRUCK CRANES MODEL NO. BOOM 800 Ton Demag Truck Crane with Superlift...TC 3000SL...496 550 Ton Demag Truck Crane...TC 3000...496 440 Ton Demag Truck Crane with Superlift...TC 1200 SL...472 308 Ton Demag Truck Crane...TC 1200...472 200 Ton Link-Belt Truck Crane...HC 258...370 125 Ton Link-Belt Truck Crane (2)...HC 238...300 HEAVY LIFTING, MOVING & SLIDING 500 Ton Hydraulic Gantries (20) Lift Towers to 1200 Tons 1000 Ton Sliding Systems (8) 2400 Ton Jacking System Forklifts to 120,000 lbs. with hydraulic booms Air Casters to 500 Tons 1800 Ton Strand Lift MARINE SERVICES Memphis,TN - Heavy Lift Terminal with 1250 Ton Derrick Crane, Rail Service, Heavy Storage Mobile, AL - Heavy Cargo discharge and storage, RO-RO, Barge/Rail Loading Heavy Lift Services Decatur, AL - Barge Dock, Cranes to 500 Tons, RO-RO Pascagoula, MS - Heavy Cargo discharge and storage, Barge/Rail Loading, Heavy Lift Services TRANSPORTATION SERVICES Over 2000 Tons of Hydraulic Platform Trailer Capacity including SPMT Barge and Rail Loading and Securement Dolly Transporters to 1000 Tons 48 State Heavy Haul, Stretch Trailers, Tank Trailer to 16 diameter Temporary Bridges to 152 Jumper Ramps 30-152 INTERNATIONAL SERVICES The following can be shipped in standard containers: Lift Towers, Dolly Transporters, Gantries, Goldhofer Trailers, Sliding Systems, Barge Ramps, Temporary Bridges, Strand -Lift Systems STORAGE CAPABILITIES 500,000 Square Feet of Indoor Warehousing Over 100 Acres of Outdoor Storage 6 lines/201 tons 12 lines/403 tons 24 lines/806 tons 1701 Dunn Ave Memphis,TN 38106 901-775-3000 800-727-0149 fax 901-775-2992 731 Finley Island Road Decatur, AL 35601 256-355-5531 800-830-4260 fax 256-355-2091 8216 Arch Street Pike Little Rock, AR 72206 501-570-0700 800-543-2318 fax 501-570-0304 246 N. Pearson Road Pearl, MS 39208 601-664-3005 800-394-8652 fax 601-664-3077 5700 Ironworks Theodore, AL 36582 251-654-0541 800-587-3249 fax 251-654-0547 10529 Lexington Drive Knoxville,TN 37932 865-966-9786 fax 865-966-9705 938 E 4th Street Richmond,VA 23224 804-233-9221 fax 804-232-9141 190 Smith Street West Monroe, LA 71292 318-322-LIFT (5438) fax 318-388-3808 1202 Columbus Street, PMB 221 Ottawa, IL 61350-2107 815-431-0078 fax 815-431-0776 6429 Harney Road Tampa, FL 33680 813-383-5106 fax 813-626-0336 web page: www.barnhartcrane.com e-mail: sales@barnhartcrane.com PRSRT STD US POSTAGE PAID MEMPHIS,TN PERMIT 465