. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Similar documents
Blue Quick Seal Connection

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

22. TenarisHydril Blue Thermal Liner Connection

Wedge 533 / 503 / 553

Wedge TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD

ER Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

3SB Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

SEC Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

MS & MS XT/XC Connections

2. The power tong snub line should be attached to a back up post, leveled and positioned at a 90 angle to the power tongs.

Blue Series and Legacy Series Make up Acceptance

Handling / Lift Plugs

1. Use slip type elevators for flush, near flush, integral, special clearance and special bevel coupled connections.

Initial Running Guidelines

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

JFEBEAR RUNNING MANUAL

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

OCTG Mill RUNNING AND PULLING PROCEDURE FOR TPS-MULTISEAL (ALL TYPES & GRADES) QP 05-16E Revision No. 7 Page 1 of 11

RECOMMENDED PRACTICE TKC FJ-150

RECOMMENDED PRACTICE SEAL-LOCK FLUSH/SEMI FLUSH CONNECTIONS

Running Procedure. Rev.:2 VAGT.

Running Procedure. VAsuperior. Rev.:2.

RECOMMENDED PRACTICE SEAL-LOCK HT

SEAL-LOCK APEX ANCILLARY

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I

Running Procedure. VAroughneck. voestalpine Tubulars GmbH & Co KG Rev.: 0

Running Procedure. VAxplorer. Rev.:1.

Drill Pipe Connection Care and Handling

TKC CONVERTIBLE: 8 RD / NUE / EUE / BUTTRESS 4040 / 4040 HO / 4040 HO-B FS-150 ANCILLARY SPECIFICATION

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

Running Procedure for Casing with GB Drilling with Casing Connections

Wedge /8" TO 13 5/8"

SEAL-LOCK HT ANCILLARY SPECIFICATION

SEAL-LOCK HT-S (TIMED) ANCILLARY SPECIFICATION

Blue 2 3/8" TO 13 5/8"

Blue 2 3/8" TO 13 5/8"

Fishing Bumper Sub. Manual D450

FIELD INSPECTION OF JFETIGER THREAD. Downloaded From JFETC.COM Fri, 16 Nov :49: * valid at time of download * JFETIGER.

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Lubrication. Extend the life of Circuit breakers and Switches. Presented by Phillip Serna

SAFE USE AND HANDLING OF HOSES AND FLEXIBLE CONNECTIONS IN THE SOLVENTS INDUSTRY

Low Profile Service Jack

Statoil Multi Dope Yellow

Contents. RE PS Revision 5

TenarisXP Buttress 4 1/2" TO 16"

CHAPTER 9 : TYPE II TEST ON SI ENGINES (VERIFYING CARBON MONOXIDE EMISSION AT IDLING)

INSTALLATION AND MAINTENANCE MANUAL Rev. 12/2015 Deda Elementi. seat post. seat post

CLAMPS. A Cascade clamp for every application.

RIDGID Wrenches 1.1. Page. Wrench Type

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

INSTRUCTION MANUAL IM-422 For HTC/COUPLING ASSEMBLY HC-8088

BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B

AC Electric Capstan Owner s Manual Installation and Operating Instructions

Hollister-Whitney Elevator Corporation

GOOD CONDITION GUIDE SHOGUN

Operating Procedures for 2 SCH 160 through 10 SCH 120 GripTight Long Radius Elbow Test Plug

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

15. Bearing Handling Storage Fitting A-97

JANUS OILFIELD TECHNOLOGY

Operating Procedures for GripTight High Pressure Test Plug

GM G-BODY LSD INSTALLATION

OIL COUNTRYTUBULAR GOODS

Guide for the use of HANS in motor sport

Provided by: Operating, Maintenance & Parts Manual

Casing & Tubing Running Services

DA Series Diaphragm Valve

for ½" thru 2" 800 lb. Piston Lift Check Valves with Resilient Seat Option

Reliance Industries, LLC. Installation, Operation, Inspection and Maintenance Instructions for the Slider Traveling Beam Anchor Clamp

AMPSEAL 16* Connector System 24 JUN 13 Rev C

CAUTION: The first section of the guide deals with the UP SECTION, while the second deals with the DOWN SECTION.

3.5" Oval Bull Bar. Part No. B1519S/B. PARTS LIST: Qty Part Description Qty Part Description

Baumann Way Control Valve

DM-TRSL (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Shifting lever DEORE XT SL-T8000 DEORE SL-T6000

Installation Guide Suzuki GSXR 600/750

Explanatory Information (NOT PART OF ANSI STANDARD)

Planning Advisory Notice

SERVICE BULLETIN FLIGHT CONTROLS - INSTALL FLAP INSPECTION ACCESS PANELS ON CERTAIN AERO CENTER PRODUCTS

INSTRUCTION MANUAL. CAT Place Table Top Centrifuge

Application Tooling Specification Sheet

Small Block Chevy. S-Drive Pulley Kit INSTALLATION INSTRUCTIONS

How it s done Fitting instructions for replacing brakes

Installation Guide Suzuki GSXR 1000

Сontents. RE PS Revision 5

PARTS LIST: PROCEDURE:

PAPER ROLL DAMAGE REDUCTION. Deliver a perfect roll every time

CHEVROLET TAHOE/DENALI/AVALANCHE/YUKON/ SILVERADO/SIERRA 2007+

Stuck Draft Gear Procedure Manual Derived from AAR Manual of Standards and Recommended Practices Book B-II, RP , Pages 57 98

Application Tooling Specification Sheet

3M Overhaul Service Kit

GOOD CONDITION GUIDE. Suzuki Financial Services

Shifting Lever. RAPIDFIRE Plus

START HERE FRONT BUMPER REMOVAL. 1) Turn off engine and chalk tires with stop block. Open Hood. Disconnect Battery.

BOSS ZONE 1 GRP MOBILE WORKING TOWER INSPECTION PROCEDURE. Youngman Group Ltd Issue B Date 23/03/09 Page 1 of 8 Pages

Table of Contents Visual Inspection and Neutralizing... 3 Disassembly

Installation Guide 2016 Kawasaki ZX10-R Exhaust Kit

Fluid-O-Tech ROTOFLOW ROTARY VANE PUMP REBUILD MANUAL

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

Transcription:

IDM Code GDL23370/1 / March 2018 TenarisHydril MACII Connection Scope These guidelines apply specifically to the use of TenarisHydril MACII connections. This document should be used in conjunction with the TenarisHydril Running Manual, which is the main document applicable to the running of all TenarisHydril Premium Connections. References. TenarisHydril Running Manual.. Premium Connection Approved Thread Compounds TSH-MD-00.0002.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG 13-005.. MACII Handling Plugs TN 9804. Equipment, Material & Documents 1. Verify the appropriate thread compound is available. 2. Refer to document TSH-MD-00.0002 for a list of compounds approved by Tenaris. 3. Latest version of the specific Product Data Sheet can be obtained from Tenaris website. In case this is unavailable, request the data sheet from the local Technical Sales representative or contact-tenarishydril@tenaris.com. TenarisHydril RUNNING MANUAL 1

TenarisHydril RUNNING MANUAL Pre-Running 1. Never move or handle pipe without the correct thread protectors securely in place. 2. Ensure connections are cleaned and free of all debris and / or contaminants, cleaning methods employed should conform to the recommendations contained within the TenarisHydril Running Manual. 3. Visually inspect threads and seal areas prior to running, ensuring no damage is evident. 4. Verify the connections to be assembled are genuine TenarisHydril manufactured connections. 5. Verify compatibility of the MACII connection with any accessories such as pup joints, cross overs, cement heads, etc. 6. Verify material grade of all accessories ensuring compatibility with main string. 7. On Dopeless connections check condition of pin and box coating ensuring no peel off or degradation has occurred. 8. Check availability of handling plugs, minimum of 3 to ensure efficiency of running process. 9. Check the handling plugs are in good condition and fit correctly onto pipe. 10. Check single joint elevators have sufficient clearance to slide over box expanded area and seat against the handling plug. 2

IDM Code GDL23370/1 / March 2018 11. Check the handling plugs are genuine TenarisHydril threads. 12. Verify handling plug number and maximum lift capacity. 13. Never exceed the maximum lift capacity. 14. Ensure handling plug OD / weight is compatible with pipe connections, MACII has limited same OD / weight interchange capability. 15. Refer to the TenarisHydril running manual for the care and use of handling / lift plugs. Inspection 1. Inspection criteria for all TenarisHydril connections is as outlined in the Field Service Operative Guideline FSOG 13-005. 2. Pay particular attention to seal areas. 3. Ensure the area from pin nose to seal has no tears, gouges or raised metal. TenarisHydril RUNNING MANUAL 4. Ensure the pin and box torque shoulders have no dents, tears or raised material which could interfere with correct assembly. 5. Check box connections for mashes or ovality caused by transportation, handling or storage. 3

TenarisHydril RUNNING MANUAL MAC II Configuration Hooked Thread 4

IDM Code GDL23370/1 / March 2018 External Seal Torque Shoulder TenarisHydril RUNNING MANUAL Internal Seal 5

TenarisHydril RUNNING MANUAL 6 Thread Compound Application Carbon Steel For Carbon steel pipe Chrome Material 1. Apply a thin coating of thread compound on the full pin end only, threads, seals and pin nose, the thread form should be clearly visible. 2. Do not apply running compound to the box end. 3. Thread compound should be cleaned from the box of carbon steel if received 'rig ready'. For Chrome material pipe 1. Apply a thin coating of thread compound on both pin and box ensuring all threads, seals and pin nose are completely covered. 2. Do not over dope the connections, a thin even layer covering all surfaces is adequate. The thread form should be clearly visible. 3. Use approximately 50% of the quantity applied to the pin when doping the box. 4. Do not apply the thread compound manufacturer s friction factor.

IDM Code GDL23370/1 / March 2018 Thread Lock Application Connections must be clean and dry when applying thread lock. 1. Apply a thin coating of thread lock on the threads of the large step of the pin connection. 2. Do not apply thread lock on the seals or torque shoulder. 3. Apply thread compound to the box internal seal, torque shoulder and the threads of the small step of the connection. 4. Apply thread compound to the pin external seal. RUNNING MANUAL TenarisHydril 5. Do not apply the thread lock manufacturer s friction factor. 6. If the thread lock has a friction factor greater than 1, use maximum make up torque value indicated on the data sheet. 7

TenarisHydril RUNNING MANUAL MAC II Dopeless 1. Minor rust or discolouring of the pin connection can be removed with the use of a clean, dry rag ensuring the Dopeless coating remains intact. 2. Minor rust or discolouring of the box connection can be removed with the use of a non abrasive plastic scouring pad and a clean dry rag ensuring the Dopeless coating remains intact. 3. Dopeless connections do not require the application of thread compound for make up. 4. If for whatever reason thread compound has to be applied to MACII Dopeless connections, whether both pin and box are Dopeless or when mixing a doped connection with Dopeless, apply thread compound as indicated below. 8

IDM Code GDL23370/1 / March 2018 Non Dopeless pin into Dopeless box. Apply a thin coating of thread compound on all pin threads, seals and pin nose.. Apply a thin coat of thread compound to box internal seal and torque shoulder. Dopeless pin into standard box. Apply a very thin coating of thread compound on all pin threads only.. Do not dope pin seals or box connection. Dopeless pin into Dopeless box. Apply a very thin layer of thread compound on all pin threads only.. Do not dope pin seal or box connection. Dopeless Pin Standard Pin Standard Box Dopeless Box Dope Pin Threads Only Dope Pin Threads Only RUNNING MANUAL TenarisHydril See page 6 Dope Pin Threads, Seals & Shoulder. Dope Box Seals. If applying thread compound to Dopeless connections use the doped variant torque values. 9

TenarisHydril RUNNING MANUAL MAC II Dopeless Thread Lock 1. Ideally when running a Dopeless string the connections to be thread locked should be the non Dopeless variant with the connections cleaned of thread compound and completely dried, then thread lock and dope applied as per the diagram on page 7. 2. When thread locking Dopeless connections remove the Dopeless coating from the threads on the pin connection where the thread lock is to be applied prior to the application of thread lock. 3. Leave the Dopeless coating on the pin seals, torque shoulder and threads where no thread lock is to be applied. 4. Dopeless boxes should be washed with hot water then dried prior to thread locking. 5. Thread lock should be applied to the threads of the large step on the pin, as per the diagram on page 7. 6. The application of thread dope is not required. 7. When assembling Dopeless connections with thread lock, apply the non Dopeless torque values taken from the standard product data sheet. 8. Do not apply the thread lock manufacturers friction factor. 9. If the thread lock has a friction factor greater than 1 use maximum make up torque value indicated on the data sheet. 10

IDM Code GDL23370/1 / March 2018 Torque Application 1. The use of computer make up analysis equipment is strongly recommended when assembling MACII connections. 2. There are no defined shoulder points for MACII connections, however a shoulder point must be in evidence. 3. Shoulder point must be lower than minimum make up torque and higher than reference torque. 4. Reference torque should initially be set at 5% of optimum torque. 5. The dump valve should be set at optimum torque, verify correct operation on the pipe body prior to first make up. 6. Set the computer turns to 1 initially then adjust as necessary to attain good graph depiction. 7. Refer to the TenarisHydril running manual make up acceptance section for further explanation. 8. The computer make up profile for MACII connections should be similar to the ones below. TORQUE * 1000 ft-lbs MAX. 46000 4.4 OPT 42000 MIN. 38000 3.3 2.2 1.1 0 0 0.40 0.80 1.20 1.60 TURNS RUNNING MANUAL TenarisHydril 11

TenarisHydril RUNNING MANUAL TORQUE * 1000 ft-lbs 4.4 3.3 2.2 1.1 0 0 OPT 42000 MAX. 46000 MIN. 38000 0.40 0.80 1.20 1.60 TURNS 9. MACII connections have limited same size different weight interchangeability, refer to TenarisHydril premium connections catalogue for interchange capability. 10. If different weight or grade of connections are to be mixed apply the lower of the indicated make up torques. 11. When assembling Dopeless connections the torques applied must be taken from the Dopeless variant product data sheet. 12. When mixing standard doped and Dopeless connections apply doped variant torque values. 12

IDM Code GDL23370/1 / March 2018 Running 1. The use of a stabbing guide is strongly recommended. 2. The use of slip type elevators are recommended. 3. The use of a safety clamp is strongly recommended when running MACII connections. 4. The use of a weight compensator is strongly recommended for chrome, large OD or heavy pipe. 5. To avoid cross threading stab pipe in a smooth controlled fashion ensuring the pipe is vertical when doing so, continue to support and stabilise the pipe throughout the stabbing and make up operation. 6. Upon commencement of initial rotation use low RPM (5 RPM or below) in order to ensure the pipe has not cross threaded during stabbing. 7. If cross threading is evident, immediately reverse rotate the pipe, completely disassemble, clean and inspect both connections. 8. Maximum spin in speed should not exceed 15 RPM. TenarisHydril RUNNING MANUAL 9. Apply power tong at low RPM (do not exceed 5 RPM) for final make up. 10. Walk chrome pipe all the way in to hand tight then apply tong only for final make up. 13

TenarisHydril RUNNING MANUAL 14 Pulling 1. Automatic stabbing system or stabber is strongly recommended to stabilise the pipe vertically. 2. The use of a stabbing guide is recommended to prevent hang up. 3. The use of a safety clamp is strongly recommended. 4. The use of a weight compensator is strongly recommended for chrome, large OD and heavy pipe. 5. Apply the back up tong jaw on the pipe body, never grip the box connection. 6. Apply power tong in low rpm (3-5 rpm) to break the connection, ensuring the pipe is stabilised during the break and spin out process. 7. Walk chrome pipe all the way out after initial break out. 8. Visual inspection is recommended to classify the thread condition. Any rejected connections should be clearly marked and segregated for further investigation. 9. Apply clean, dry thread protectors after applying storage compound on clean, dry connections. 10. Storage / thread compound should always be applied to connections post job, even rejects. 11. Do not apply storage compound to Dopeless connections. 12. For long term storage of Dopeless connections, refurbishment by qualified personnel prior to applying Dopeless specific protectors is recommended. 13. Ensure clean, dry, Dopeless protectors with seal rings correctly in place are installed.