DIESEL EGT GAUGE INSTALLATION INSTRUCTIONS P14D AA

Similar documents
DT-466 JTG DYNAMIC LIQUID PROPANE INJECTION DIESEL INSTALLATION MANUAL P11X AB

CANADIAN UPS 6.0L MONO FUEL ENGINE SYSTEM INSTALLATION MANUAL P13C AA

E L MONOFUEL ENGINE SYSTEM INSTALLATION MANUAL (UTILIMASTER WALK-IN BODY) P13X AE

IGNITION SYSTEM SERVICE MANUAL NUMBER

CCD-493 KIT SERIES INSTRUCTION SHEET

CC-410 KIT SERIES INSTRUCTION SHEET

FUEL SYSTEM. Table of Contents. Specifications. Section 3A Electric Fuel Pump FUEL SYSTEM. Fuel Recommended Gasoline Recommended Oil

CCS-810 KIT SERIES INSTRUCTION SHEET

FUEL SYSTEM. Table of Contents. Section 3C Oil Injection

Spark Plug Fouling 3.0 Liter OptiMax

330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT TYPICAL ACCESS TO LEVELING 15

UPS Pure Sinewave UPS

DIEBOLD 5550 CASH DISPENSER THROUGH 330mm (13") MAXIMUM WALL PLAN VIEW FRONT ELEVATION SIDE ELEVATION CONSUMER ACCESS DIMENSIONS

CS 7780 FULL FUNCTION DRIVE-UP TERMINAL

POWER BUTTON: 25mm (1") CONDUIT X 3048mm (10'-0") LONG TO HOUSE POWER AND CONTROL CABLES (SUPPLIED BY DIEBOLD)

DIEBOLD 3750 CASH RECYCLER TERMINAL. 13mm ( 2") UL SAFE - 15" OR 19" DISPLAY THROUGH THE WALL 330mm (13") PLAN VIEW FRONT ELEVATION SECTION

KING COBRA/KING COBRA-2 NARROW STILE SERIES KC9357/KC9357-2

ELECTRICAL SYSTEM 4 D INSTRUMENTATION

* * * DIEBOLD 3700 LOBBY CASH RECYCLER- FRONT LOAD 15" DISPLAY OR 19" DISPLAY CONSUMER ACCESS DIMENSIONS PLAN VIEW 19" DISPLAY FRONT ELEVATION

Model 1001/1001HPS Drinking Fountain

FUEL SYSTEM. Section 3A Pulse Crankcase Driven Fuel Pump. Model 200/225 DFI. 1. Fuel Pressure/Vacuum Gauge (0-15 psi) (Obtain Locally)

9900 IN LOBBY TELLER - (ILT) PORTRAIT AND LANDSCAPE DISPLAY PLAN FRONT VIEW SIDE VIEW PAGE 1 OF 6 CALL

ELECTRICAL. Table of Contents. Section 2A - Ignition

Optional: Wiring a Relay for Gauge Controlled Output

DIEBOLD 3700 LOBBY CASH RECYCLER- FRONT LOAD 15" DISPLAY OR 19" DISPLAY CEN I, CEN III GAS, CEN IV GAS or CEN IV GAS EX SAFES

GM FUEL PRESSURE SENSOR BY-PASS INSTALLATION INSTRUCTIONS P11X AF

OPTIONAL 178mm (7") SPACER AVAILABLE FOR WALL THICKNESSES UP TO 152mm (6") 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT

330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT (2) EACH SIDE OF SAFE CEN I SAFE ONLY

203mm (8") MAXIMUM WALL THICKNESS IN AREA OF UNIT NOTE: 203mm (8") MAXIMUM WALL THICKNESS IN AREA OF UNIT (2) EACH SIDE OF SAFE CEN I SAFE ONLY

COIN DISPENSER SIDE CAR FOR INSTALLATION NEXT TO DIEBOLD IN LOBBY TELLER (ILT) PLAN FRONT VIEW SIDE VIEW PAGE 1 OF 7 CALL

CS 7750 FULL FUNCTION TERMINAL 15" OR 19" DISPLAY - THROUGH THE WALL 330mm (13")

JET PUMP. Table of Contents. Section 5 - Jet Pump

DIEBOLD IN LOBBY TELLER (ILT) PORTRAIT OR LANDSCAPE INSTALLED WITH A COIN RECYCLER SIDE CAR PLAN FRONT VIEW SIDE VIEW PAGE 1 OF 7

Lincoln Under-cabinet Light Installation Instructions

SEE PAGES 3 AND 4 OF 7 FOR 3700 CASH RECYCLER THROUGH THE WALL WITH VESTIBULE TRIM KIT REFERENCE FRONT EDGE OF BEZEL FOR DEPTH DIMENSIONS

POWERHEAD. Section 4A - Cylinder Head. Rocker Shaft and Rocker Arm... 4A-21 Camshaft... 4A-22 Cylinder Head... 4A-24

VB-7000 Series. Selection Guide. Applications. Applicable Literature. Selection Guide Contents

REPLACEMENT. 4. REMOVE WINDSHIELD MOULDING OUTSIDE (a) Using a knife, cut off the moulding, as shown in the illustration.

FRONT SIDE FIX WINDOW

* * * 3700 LOBBY CASH RECYCLER. REAR LOAD 13mm ( 2") UL SAFE - 15" DISPLAY OR 19" DISPLAY WITH DETAILS FOR OPTIONAL VESTIBULE INSTALLATION

GUARDIAN VERTICAL MOUNTING

FUEL SYSTEM. Table of Contents. Section 3B - Carburetors. Attenuator And Carb Throttle Levers... 3B-2 Fuel Lines... 3B-4

Suspension Control Module

Conversion to 235/45 R 17 tyres and 8 J x 17 H 2 ET 28 disk wheel 40.01

STANDARD AND FULL HEIGHT - REAR LOAD - WITH 40mm (1 16") CEN I, CEN III GAS or CEN IV GAS SAFES

Transmission and Driveline. Section 2A - Transmission and Driveline

ELECTRICAL AND IGNITION 2 A IGNITION SYSTEM

3700 LOBBY CASH RECYCLER. REAR LOAD 13mm ( 2") UL SAFE - 15" DISPLAY OR 19" DISPLAY WITH DETAILS FOR OPTIONAL VESTIBULE INSTALLATION

CORPORATION SERVICE MANUAL FOR MOTORIZED VEHICLES 200 SERIES HYDRAULIC LEVELING SYSTEM SPACEMAKER ROOM EXTENSION SYSTEMS

Teile und Zubehör- Einbauanleitung

152mm (6") DIA. POINT TO POINT SYSTEM PVC OR STEEL TUBE SYSTEM TYPE I AND TYPE II OVERHEAD UNITS TYPE I OVERHEAD UNIT TYPE II OVERHEAD UNIT NOTES:

C DEN HARTOG INDUSTRIES, INC.

X3-40/X3-45/X3-55/X Mercury Marine. Operation Maintenance Installation Warranty Manual

ELECTRICAL AND IGNITION

GASOLINE ENGINES SKI MODELS

AIRCRAFT ENGINES SERVICE INSTRUCTION ENGINE START AT LOW TEMPERATURES AT ROTAX SI R1

FUEL SYSTEM. Table of Contents. Section 3B - Carburetors

Appendix E D791 and T791 Head and Valve Holddown Assembly Details

CORPORATION CORPORATION SERVICE MANUAL FOR MOTORIZED VEHICLES 200/210 SERIES HYDRAULIC LEVELING SYSTEM SPACEMAKER ROOM EXTENSION SYSTEMS

Carl Nielsen Music is Life. SET UP MANUAL Travelling Exhibition from Odense City Museums DK-5000 Denmark

Electrical. Section 2A - Ignition

FUEL SYSTEM. Table of Contents. Section 5C - Injection Pump

ABB industrial drives. Mechanical installation instructions ACS880 multidrive cabinets

POWER TRIM. Table of Contents. Section 5D - Auto Trim II

HEADLIGHT 10A HEAD 20A HEAD 10A HEAD 20A HEAD (RH UPR) (LH UPR) (RH LWR) (LH LWR) 4 1J 5 1J 8 1J R W R G R B R L R L R B E 1 R Y R Y E 1 R W R B

EXTERIOR GROUP CONTENTS FRONT BUMPER ASSEMBLY AND RADIATOR GRILLE REAR WIPER AND WASHER REAR BUMPER ASSEMBLY...

HEADLIGHT 10A HEAD 20A HEAD 20A HEAD 10A HEAD (RH- LWR) (LH- LWR) (RH- UPR) (LH- UPR) 4 1J 5 1J 8 1J 7 1J R- W R- G R- B R- L R- B E 1 R- Y R- Y E 1

TECHNICAL INSIGHT INTERNAL CLEARANCE - TYPES AND NORMS

EXTERIOR GROUP CONTENTS FRONT BUMPER ASSEMBLY REAR WIPER AND WASHER REAR BUMPER ASSEMBLY

AMP AIR SUSPENSION KITS. HP10193: Ford F-250/350 4WD* Ford F-450* HP10194: Ford F-250/350 2WD* Ford F-450*

FUEL SYSTEM & CARBURETION 3 A CARBURETOR R1 JUNE 1996 FUEL SYSTEM AND CARBURETION

MNPV6 REV A DISCO 4X FINAL ASSY

SERVICE MANUAL HWH TOUCH PANEL-CONTROLLED 625 SERIES HYDRAULIC LEVELING SYSTEM. FEATURING: Touch Panel Leveling Control

ELECTRICAL. Table of Contents. Specifications. Section 2B - Battery Charging System and Starting System. Starter Draw (Under Load)

GROUP 51 CONTENTS WARNINGS REGARDING SERVICING OF SUPPLEMENTAL RESTRAINT SYSTEM (SRS) EQUIPPED VEHICLES

Energy Recovery Ventilator

SERVICE MANUAL ELECTRICAL TROUBLESHOOTING

JUMO MIDAS C18 SW. OEM seawater pressure transmitter. Applications. Brief description. Customer benefits. Special features. Approvals/approval marks

Two-Position Electric Duplex Room Thermostats

POWER TRIM. Table of Contents. Section 5D - Auto Trim II

CONTROL VALVES FOR GRINDER. Installation, Maintenance and Operating Instructions 5 GA 71 en Issue 5/02

2190DF / 2575DF / 2700DF / 2702DF FIRE THEFT SAFE WITH DIGITAL LOCK. Operation and Installation Guide. MANUAL # M

DRIVE SHAFTS INDEX

Assembly instructions

SERVICE MANUAL HWH TOUCH PANEL-CONTROLLED 325 SERIES HYDRAULIC LEVELING SYSTEM. FEATURING: Touch Panel Leveling Control


All the work described in sections A, B, C, D, and E must be carried out in full before the wheel/tyre combination may be used.

INSTALLATION GUIDE INSTALLATION GUIDE

FORD EXPLORER. (2010 Production Onwards) INTEGRATED SIDE STEP INSTALLATION INSTRUCTION. 60 Minutes. 13mm and 17mm Socket

CRUISE CONTROL (VACUUM TYPE)

864293A02 4.3L (262 CID) MANIFOLD CONVERSION

Before repairs, remove the airbag sensor if shocks are likely to be applied to the sensor during repairs.

SHEET 1 OF 6

PC-6 PILATUS AIRCRAFT LTD. CH-6371 STANS, SWITZERLAND SERVICE BULLETIN SERVICE BULLETIN NO: REF NO: 190

MODEL 1200 WATER WHEEL TRANSPLANTER OPERATING MANUAL

JUMO MIDAS S05 OEM pressure transmitter - universal

GENUINE PARTS INSTALLATION INSTRUCTIONS

Job Sheet 3. Pump Installation OBJECTIVE PROCEDURE. Installation of the Motor and Centrifugal Pump on the Pump Universal Base

MSR SERIES MSR RACK MOUNTING ENCLOSURE FEATURE. Technical data Protection class IP40. CAD data is downloadable from our website.

WINDSHIELD / WINDOWGLASS

Transcription:

DIESEL EGT GUGE INSTLLTION INSTRUCTIONS P4D4-9235- Revision: - Dated 3/9/4 Replaces: None

DIESEL EGT GUGE INSTLLTION HRDWRE CONTENTS P4D4-44- - DIESEL EGT GUGE KIT COMPONENT - DIESEL EGT GUGE SSY (PRT # P4D4-4800-) B - RELY (PRT # 43000) C - RELY SOCKET (PRT # 450003) D - TERMINL - RELY SOCKET (PI TO PRT # 450003) E - -MP FUSE (PRT # 420004) F - FUSE HOLDER W/WIRE LED (PRT # 4000) G- 5-MP FUSE (PRT # 420003) H - FUSE HOLDER (PRT # 40000) J - /4" RING TERMINL (PRT # 480000) K - #0 RING TERMINL (PRT # 48000) L - SELF TP SCREW (PRT # 950000) M - 8" TIE STRP (PRT # 50000) N - 8 G. RED WIRE (L=5') (PRT # 49002) P - /4" SPLIT CORRUGTE (L=20') (PRT # 350047) QTY 5 2 2 3 5 B E G C D F H J M N P K L

CRITICL PROCESS OPERTION 0 MKE SURE THE ENGINE IS COOL BEFORE STRTING THIS PROCEDURE 0) BEGIN BY INSTLLING THE THERMOCOUPLE INTO THE EXHUST, THEN WORK BCK TO THE GUGE. INSTLLING THE PROBE IN THE PROPER LOCTION WILL INSURE OPTIML TEMPERTURE REDINGS. 20) FOR NON-TURBO ENGINES INSTLL THE PROBE -2 INCHES FROM THE CYLINDER HED 30 20) FOR TURBO ENGINES REMOVE THE EXHUST MNIFOLD ND INSTLL THE PROBE -2 INCHES FROM THE CYLINDER HED; IF THE EXHUST MNIFOLD CNNOT BE REMOVED, INSTLL THE PROBE -2 INCHES FTER THE TURBO EXHUST OUTLET (EXHUST GS TEMPS COULD DROP OVER 200 WHEN INSTLLING FTER THE TURBO); CLEN LL METL FILINGS OUT OF THE EXHUST MNIFOLD. METL FILINGS WILL DMGE THE TURBO IMPELLOR IF THEY GO THROUGH THE TURBO. THE PROBE CN BE MOUNTED IN TWO DIFFERENT WYS, SO PLESE USE THE METHOD BEST SUITED FOR YOUR NEEDS 30) PRE-EXISTING /8" NPT THREDED HOLE SIMPLY SCREW THE THREDED INTO THE HOLE, INSERT THE PROBE ND TIGHTEN THE SET SCREW SNUGLY ONTO THE PROBE CUTION: DO NOT OVERTIGHTEN THE SET SCREW OR DMGE TO THE PROBE MY OCCUR MKE SURE THE PROBE IS ORIENTED SO THE WIRES DO NOT COME IN CONTCT WITH, OR BECOME TOO CLOSE TO THE MNIFOLD OR OTHER HOT ENGINE PRTS. PRT NUMBER QTY P4D4-4800- DESCRIPTION DIESEL EGT GUGE SSY TOOLS PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE OF 8

CRITICL PROCESS OPERTION STINLESS CLMP METHOD 30) THIS METHOD IS FOR PPLICTIONS THT REQUIRE FREQUENT REMOVL OF THE MNIFOLD OR HEDER FOR SERVICE, OR JUST FSTER ND ESIER INSTLLTION. 30 DRILL 7/6" DIMETER HOLE BOUNT 6" DOWN FROM THE JUNCTION OF THE EXHUST PIPE TO MNIFOLD JUNCTION. UNDO THE CLMP ND SLIDE THE PROBE INTO THE HOLE IN THE CLMP. SLIDE THE SET SCREW COLLR ONTO THE PROBE. BEFORE TIGHTENING THE COLLR IN POSITION, MKE SURE THT WHEN INSERTED, THE PROBE WILL HVE ITS TIP IN THE MIDDLE TWO-THIRDS OF THE EXHUST STREM. TIGHTEN SCREW COLLR IN POSITION. CUTION: DO NOT OVERTIGHTEN SET SCREW OR DMGE TO PROBE MY OCCUR HOLD THE CLMP OPEN WHEN INSERTING THE PROBE INTO THE 3/32" HOLE. RE-JOIN THE CLMP ENDS ND TIGHTEN IN POSITION. MKE SURE THE PROBE IS ORIENTED SO THE WIRES DO NOT COME IN CONTCT WITH, OR BECOME TOO CLOSE TO THE MNIFOLD OR OTHER HOT ENGINE PRTS. 40) WITH THE PROBE INSTLLED, ROUTE THE WIRE HRNESS TOWRD THE DSH PNEL OF THE VEHICLE 50) DISCONNECT THE NEGTIVE (-) BTTERY CBLE PRT NUMBER QTY DESCRIPTION TOOLS P4D4-4800- DIESEL EGT GUGE SSY 7/6" DRILL BIT DRILL PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 2 OF 8

CRITICL PROCESS OPERTION 60) LOCTE EXISTING HOLE IN THE DSH PNEL, OR DRILL " DIMETER HOLE. P 70) 80) OBTIN THE /4" CORRUGTE (P) FROM THE KIT; STRTING FROM CONNECTOR END OF THE WIRE HRNESS, INSTLL PRROXIMTELY -2 FT. OF CORRUGTE ONTO THE WIRE HRNESS. OBTIN THE RUBBER GROMMET; CUT SLIT INTO THE GROMMET ND INSTLL THE GROMMET ONTO THE WIRE HRNESS WITH THE CORRUGTE INSTLLED; INSERT THE CONNECTOR END OF THE WIRE HRNESS INTO DSH PNEL HOLE; LIGN ND SET GROMMET INTO HOLE 90) FROM INSIDE THE VEHICLE, DETERMINE SUITBLE LOCTION FOR THE GUGE IN CLOSE PROXIMITY TO THE WIRE HRNESS (THE GUGE MOUNTS IN 2-/6" DIMETER HOLE - DRILL IS NECESSRY) NOTE - THE WIRE HRNESS IS N INTEGRL PRT OF THE GUGE CLIBRTION ND CN NOT BE SHORTENED OR LENGTHENED WITHOUT FFECTING THE GUGE CLIBRTION. 00) USING THE SUPPLIED BRCKETS ND NUTS, SECURE THE GUGE TO THE DSH PNEL 60 70 80 90 00 PRT NUMBER QTY DESCRIPTION TOOLS P 350047 /4" SPLIT CORRUGTE (L=20') 2-/6" HOLE SW " HOLE SW DRILL PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 3 OF 8

CRITICL PROCESS OPERTION 0 20 30 0) FROM UNDERNETH THE INSTRUMENT PNEL, LOCTE ND GRSP THE DIESEL EGT GUGE WIRE HRNESS ND CONNECTOR; LIGN ND SET THE WIRE HRNESS ND CONNECTOR INTO THE BCKSIDE OF THE GUGE (PUSH/PULL CONNECTOR TO VERIFY FULLY SETED) 20) CONNECT THE WHITE WIRE ON THE DIESEL EGT GUGE WIRE HRNESS TO THE DSH LIGHTING OR SWITCHBLE 2V LIGHT SOURCE 40 30) LOCTE THE RED WIRE ON THE DIESEL EGT GUGE WIRE HRNESS; OBTIN THE FUSE HOLDER W/WIRE LED (F) ND MP FUSE (E); TTCH THE RED WIRE TO THE WIRE ON THE FUSE HOLDER 45 40) LOCTE THE 'KEY-ON' FUSE INSIDE THE FUSE BOX; REMOVE THE FUSE ND INSTLL INTO THE FUSE HOLDER S SHOWN 45) INSERT THE FUSE HOLDER INTO THE 'KEY-ON' FUSE LOCTION S SHOWN PRT NUMBER QTY DESCRIPTION TOOLS E 420004 -MP FUSE WIRE CRIMPERS F 4000 FUSE HOLDER W/WIRE LED PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 4 OF 8

CRITICL PROCESS OPERTION 70 50 J K 50) CONNECT BOTH BLCK WIRES ON THE DIESEL EGT GUGE WIRE HRNESS TO GOOD ENGINE GROUND (USE PROVIDED RING TERMINLS IF NEEDED) B 60) OBTIN THE RELY (B), RELY SOCKET (C), RELY SOCKET TERMINLS (D), ND 8 G. RED WIRE (N), FUSE HOLDER (H) ND 5-MP FUSE (G) FROM THE KIT C D N 70) INSTLL () RELY SOCKET TERMINL (D) ONTO THE END OF THE BLUE WIRE ON THE DIESEL EGT GUGE WIRE HRNESS G 80) INSTLL () RELY SOCKET TERMINL (D) ONTO ONE END OF THE 8 G. RED WIRE (N) H 90 90) INSTLL THE FUSE HOLDER W/5 MP FUSE ONTO THE 8 G. RED WIRE PER ICOM INSTRUCTION PX-9208- PRT NUMBER QTY DESCRIPTION TOOLS B 43000 RELY WIRE STRIPPERS C 450003 RELY SOCKET WIRE CRIMPERS D PI 5 TERMINL - RELY SOCKET G 420003 5-MP FUSE H 40000 FUSE HOLDER J 480000 2 /4" RING TERMINL PROCESS NME K 48000 2 #0 RING TERMINL N 49002 8 G. RED WIRE (L=5') DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 5 OF 8

CRITICL PROCESS OPERTION 200) LOCTE THE PGS WIRE COMING FROM PIN #26 ON THE ICOM DIESEL ECU MODULE (WIRE GOES TO PIN #7 ON THE 8-PIN CONNECTOR) 200 20) USING PIR OF WIRE CUTTERS, CUT THE PGS WIRE T THE DESIRED LOCTION 20 220) INSTLL () RELY SOCKET TERMINL (D) ONTO ECH END OF THE CUT PGS WIRE 220 D D PRT NUMBER QTY DESCRIPTION TOOLS PI TERMINL - RELY SOCKET WIRE CUTTERS WIRE CRIMPERS PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 6 OF 8

CRITICL PROCESS OPERTION B 230) SSEMBLE THE RELY CONNECTOR (C) S SHOWN BELOW C 240) INSTLL RELY (B) INTO SSEMBLED RELY CONNECTOR (C); SECURE RELY SSEMBLY TO DSH PNEL USING PROVIDED SELF TP SCREW (L) 250) CONNECT THE NEGTIVE (-) BTTERY CBLE L PIN #26 WIRE ON ICOM JTG-D ECU MODULE CONNECTOR 230 BLUE WIRE ON DIESEL EGT GUGE WIRE HRNESS 87 87 8 G. RED WIRE (W/5 MP FUSE) TO BTTERY 2V POSITIVE 86 30 85 PIN #26 WIRE TO PIN #7 ON 8-PIN CONNECTOR PRT NUMBER QTY DESCRIPTION TOOLS B 43000 RELY C 450003 RELY SOCKET L 480000 SELF TP SCREW PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 7 OF 8

CRITICL PROCESS OPERTION 260 260) OBTIN THE /4" SPLIT CORRUGTE (P) FROM THE KIT; INSTLL CORRUGTE ONTO EXPOSED WIRES P 270) CREFULLY COIL EXCESS WIRE ND LOOSELY TIE WITH PROVIDED 8" ZIP TIE (M) (LOOSELY TYING THE EXCESS COIL PENTS EMBRITLEMENT CSUED BY VIBRTION) M 270 POWER UP 280) THE POINTER WILL MOVE COUNTER CLOCKWISE TO THE STOP ND THEN MOVES TO THE CURRENT GUGE REDING. THIS PROCEDURE IS N UTO-CLIBRTION FUNCTION ND IS PERFORMED ON EVERY POWER-UP. WHILE THIS TEST IS BEING PERFORMED, THE GUGE MY MKE 'CLICKING' SOUND (THIS IS NORML). PRT NUMBER QTY DESCRIPTION TOOLS M 50000 5 8" TIE STRP P 350047 /4" SPLIT CORRUGTE (L=20') PROCESS NME DIESEL EGT GUGE INSTLLTION P4D4-9235- PGE 8 OF 8

Title: DIESEL EGT GUGE INSTLLTION Document I.D.: P4D4-9235 Page Rev ISIONS OPERTION NUMBER ISION LEVEL DESCRIPTION OF CHNGE DTE PPROVED BY INITIL RELESE 8/5/203 M. STEPPEY uthor: Marc Steppey pproval: Date: 3/25/204 Title: Technical Manager Title: Initials