Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Similar documents
Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

OVERHEAD & GANTRY CRANE / RIGGING

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Ryko Solutions, Inc. Crane and Jib Safety Program

Chapter 22 Mobile Cranes

ESSENTIAL SAFETY RESOURCES

CRANE & HOIST SAFETY PROGRAM

Cranes. OSHA Office of Training & Education 1

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

MOBILE CRANES ONSHORE PROGRAM

Crane Safety Resource Guide P AGE 1

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

Crane & Hoist Safety Guidelines

UNIVERSITY OF TOLEDO

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

CRANE, HOIST AND SLING SAFETY PROGRAM

HEALTH AND SAFETY MANUAL

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

HOISTING APPARATUS Inspection Guidelines

MOBILE CRANES AND HOIST

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

29 CFR Ch. XVII ( Edition)

Provided by: Operating, Maintenance & Parts Manual

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Crane & Derrick Operation Procedures for Construction

CRANES & MOBILE LIFTING EQUIPMENT COMPANY POLICY AND PROCEDURE

Safe Operating Practices & Maintenance Manual

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana.

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion.

LOAD CHART & RIGGING PRACTICE EXERCISES

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Health, Safety, Security and Environment

STEEL ADJUSTABLE-HEIGHT GANTRY CRANE INSTRUCTION MANUAL

UC Santa Barbara Crane Safety Program

Technical Manual. Inspection Record For: Hoist Model No.: Hoist Serial No.: Hoist Inspection and Maintenance Guide

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

Crane and Hoist Safety Program

SAFETY GUIDANCE MATERIAL

WOC LP. Manual. Standards WOC HSE. WO Executive. Section L003 - Lifting Operations DOCUMENT NO: WOC-HSE-ST & EP Department

Moving materials: Crane and hoist safety

Chicago Crane Operators Examination Study Guide

FHS-Series Steel Fixed Height Gantry Cranes Instruction Manual

UC DAVIS CRANE, HOIST, AND SLING SAFETY PROGRAM

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

SAFETYFIRSTTRAINING.CA

40' ' POWERED BOOM: MODE 1 40' - 126' POWERED BOOM: MODE 2

Equipment Log Book. Unit #

SECTION 14: AERIAL LIFT PROGRAM

Provide a safe working environment, Govern operator use of heavy equipment, and Ensure proper care and maintenance of heavy equipment.

Liftcrane Boom Capacities 999 SERIES 2. Manitowoc Cranes, Inc.

Table of Contents Rev. 10/31/2018 FHA MANUAL. FHA-series Fixed Height Aluminum Gantry Crane Instruction Manual

JIB-FM Series Floor Mounted Jib Cranes Instruction Manual

Distributed by Tri-State Equipment Company Inc. Web: PH: FAX:

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Appendix D Glossary of Common Crane Terms

Crane, Hoist, and Sling Safety Program October 24, 2017

LOAD CHART & RIGGING LEARNING GUIDE

Health, Safety, Security and Environment

Occupational Safety and Health Admin., Labor

Glossary of Crane and Rigging Terms

For Review Only No Copying No Saving No Lending No Posting Online

Responsible Unit: Facilities Management

LOAD CHARTS MANTIS 6010LP 30 TON TELE-BOOM CRAWLER CRANE 1 V FT MAIN BOOM, 20 FT EXTENSION & 20 FT JIB

Heavy Equipment & Rigging Specialist Training

While handling materials, employees must abide by the following requirements:

OPERATOR S MANUAL CHAIN HOIST 0.25 TON 0.5 TON 1 TON 2 TON. These Hand Chain Hoists meet or exceed the following standards: CE ANSI B30.

Capacity (tonnes) 0.25t. No. of Falls 1. Load Chain (mm) Load Chain Grade 80

truck crane 140 tons link-belt htc-3140lb BOOM LENGTHS: 42 to 195 ft JIB LENGTHS: 38 to 109 ft JIB OFFSETS:

Title: Crane Operation Effective Date: 12/3/2014 Control Number: THG_0033 Revision Number: 2 Date: 10/22/2015 Annual Review Completed: 5/13/2015

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

Grade 80 & 100 Alloy Chain

INSPECTION AND MAINTENANCE CHECKLIST

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

"CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS"

OPERATOR S MANUAL LEVER HOIST 0.75 TON 1.5 TON 3 TON. These Lever Hoists meet or exceed the following standards: CE ANSI B30.21

Hand Chain Hoists. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Title: Crane Operation Effective Date: 12/3/2014 Control Number: THG_0033 Revision Number: 2 Date: 10/22/2015 Annual Review Completed: 5/13/2015

LS 278H. 250 ton (227 metric ton) Hydraulic Lattice Boom Crawler Crane. Tube Boom Capacities ft. ( m)

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

MANITOWOC (Crawler Mount) LOAD CHART

LEVEL 1 MOBILE CRANE THEORY EXAM PRACTICE QUESTIONS

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains

Liftcrane Boom Capacities 2250 SERIES 3

Chicago Crane Operator Examination Study Guide

Transcription:

Clearheart Construction Co., Inc. Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily injury or property damage. Care must be taken in all facets of crane operation. As with all items of machinery, only trained, qualified, and authorized persons may operate cranes. Qualified Crane Operator: Training: A person who has appropriate offshore experience and training may be designated by our Safety Director as a Qualified Crane Operator. Appropriate offshore experience and training would include classroom-type sessions and hands-on field training on cranes to be operated by the qualifying crane operator. Classroom-type training would included a full review of the American Petroleum Institute Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, which must be readily available for reference and use. Classroom topics will include: Types of Cranes Used Offshore: 1. Mechanical cranes. 2. Non-mechanical cranes. 3. Electric powered cranes. 4. Other crane types. Crane Components and Lifting Capacities: 1. Components of a stationary mounted crane. 2. Boom Angle and Load Radius, reading a range diagram or load rating chart. 3. Number of parts of line and relationship to rated load. 4. Limitations of the size and type of wire ropes used in boom hoist lines, pendants, and load hoist line. 5. Lifting capacity of the auxiliary hook. 1 Clearheart Construction Co., Inc.

6. Lifting capacity of load and boom hoist drums. 7. Consideration of sea state on operating conditions. Wire Rope Construction and Use: 1. Mechanics of wire rope. 2. Classes, designation and characteristics of wire rope. 3. Handling of wire rope. 4. Guidelines for replacement of wire rope. 6 Wire rope slings. Mounting features of the Revolving Superstructure: 1. Hookrollers. 2. Ball ring. 3. King post. 4. Others. Boom Structure: 1. Types of boom construction (lattices, box, etc.). 2. Wire rope guides. 3. Boom bolts. 4. Pin connections. Limit Devices: 1. Boom-hoist limit. 2. Load hoist limit. 3. Boom stops. 4. All locking devices. 5. Anti-two block devices. Additional Items: 1. Sheaves. 2. Hand signals. 3. Control markings. 4. Engine emergency stop. 5. Gauges and indicators. 2 Clearheart Construction Co., Inc.

Hands-on training will include: 1. Lubricating points. 2. Adjustments. 3. Principles of crane operations. 4. Load charts. 5. Hand signals. 6. Inspections. Refresher training is required every four (4) years. Fire extinguisher training will be included in both the hands on training as well as the classroom training and in the refresher training. Having completed the above training the operator should be qualified to operate both non-mechanical cranes and/or mechanical cranes (those with free-fall capability). Physical Qualifications: Crane operators must: 1. Have vision of at least 20/30 Snellen in one eye and 20/50 in the other with or without glasses, and have depth perception as demonstrated by record of a recognized test administered by an authorized person. 2. Be able to distinguish red, green, and yellow, regardless of the position of colors, if color differentiation is required for crane operations. 3. Have hearing, with or without a hearing aid, adequate for the specific operation. 4. Have no history of a disabling medical condition which may be sufficient reason for disqualification. Note: Follow-up qualification is required every four (4) years. Additionally, prior to authorization to operate a crane, operators of cranes with a boom length of 25 feet or more and a maximum rated load capacity of 15,000 pounds or more must: a. have a valid certificate of competency issued by an Accredited Certifying Entity for the type or cane being used. b. pass a physical examination that meets the requirements of either ASME B30.5-2000 or US DOT standard 49 CFR 392.41 through 391.49. 3 Clearheart Construction Co., Inc.

c. pass a written examination that covers, at least: 1. operational characterizes and controls for the crane type for which qualification is being sought. 2. emergency control skills such as a response to fire, power line contact, loss of stability, and control malfunction. 3. demonstration of basic arithmetic skills necessary for crane operation and the ability to read and comprehend the crane manufacturer s operation and maintenance instruction manuals, including load capacity information (load charts) for the crane for which certification is sought. 4. pass a hands-on examination to demonstrate proficiency in operating the specific crane including pre-start and post-start inspection, maneuvering skills, shutdown, and securing procedures. The above operator certificates are valid for five (5) years after which recertification is required. All crawler, truck, or locomotive cranes will meet the applicable requirements for design, inspection, construction, testing, maintenance and operations as prescribed in ANSI B30.5-1968. A crane inspection certification record will be maintained which shows the date, the items inspected, the serial number of the crane and the signature of the inspector. The operator will ensure that a 5BC (or greater) fire extinguisher is readily accessible during operation. Qualified Rigger A rigger is anyone who attaches or detaches lifting equipment to loads of lifting devices. Crane load rigging will only be performed by a qualified rigger, a qualified crane operator, and/or a qualified inspector who has completed the requirements to be a qualified crane operator. Training for Qualified Riggers: Training includes classroom-type, hands-on training, and examination. Hand-on training should include proper inspection, use. selection, and maintenance of rigging gear (slings, shackles, hooks, etc.). Rigger qualifications should be maintained at a minimum every 4 years through requalification. Additionally, the individual should have no history of a disabling medical condition which may be sufficient reason for disqualifications. 4 Clearheart Construction Co., Inc.

A training outline for riggers in found in Appendix A3 API Recommended Practice 2D, Rigger Training, which includes: a. Rigging Hardware: 1. Sheaves, blocks. 2. Hooks, latches. 3. Rings, links, swivels. 4. Shackles. 5. Turnbuckles. 6. Spreader and equalizer beams. 7. Cable clips. 8. Pad eyes, eyebolts, and other attachment points. b. Slings: 1. Sling configuration. 2. Sling angle. 3. Rated Load. 4. Sling types (synthetic, wire, chain, etc.) 5. Cargo nets, personnel baskets, and other basket types. c. Procedures and Precautions: 1. Load control/taglines. 2. Lift planning (load weight, center of gravity, etc.). 3. Sling Inspection/rejection criteria. 4. Unbinding loads. 5. Personnel transfer. 6. Sling handling and storage. d. Rigging Basics: 1. Pinch points/body position. 2. Personal Protective Equipment (PPE). 3. Signals/communications. 4. Load stability. 5 Clearheart Construction Co., Inc.

Crane Usage Categories and Inspections: Infrequent usage (10 hours or less per month based on average use over a quarter: Requires pre-use inspection performed by the operator; Annual Inspection performed by a qualified crane inspector. Moderate usage (more than 10, less that 50 hours per month): Requires pre-use inspection performed by the operator; quarterly and annual inspections performed by a qualified crane inspector. Heavy usage (50 hours or more per month) Required pre-use inspection perform by the operator; monthly, quarterly, and annual inspections performed by a qualified crane inspector., Note: While the pre-use inspection is performed by the operator, it may also be performed by a qualified inspector. Note: A pre-use inspection form is found in our project manual. Minimum crane inspection guidelines are found in Appendix C to API RP 2D, Usage, Inspection, Testing, and Maintenance. All rated load capacities, recommended operating speeds, special hazard warnings or instructions must be readily visible to the operator while operating the crane. At all times, the manufacturer s specifications and limitations will be adhered to. Attachments will not exceed the capacity, rating, or scope recommended by the manufacturer. Any modifications to crane equipment which might affect safety may only be done with written approval from the manufacturer. While cranes easily have the lifting ability to hoist employees on a personnel platform, this is absolutely prohibited except in cases when the erection, use, and dismantling of conventional means of reaching the worksite would be more hazardous or is not possible because of structural design or worksite conditions. A conventional means would include: a personnel hoist, ladder, stairway, aerial lift, elevating work platform or scaffold. Dangers associated with cranes include numerous moving parts. These dangers can be minimized or eliminated by ensuring that all guards are in place and not tampered with. Care must be taken to ensure that areas within the swing radius of the rear of the rotating superstructure of the crane are barricaded to prevent a person from being struck or crushed. All employees must keep clear of loads that are about to be lifted as well as suspended loads. 6 Clearheart Construction Co., Inc.

Slings: Minimum inspection requirements for wire rope and slings are found in Appendix G to API RP 2D, Wire Rope and Sling Inspection, Replacement and Maintenance. When using slings made from alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope (conventional three strand construction), and synthetic web (nylon, polyester, and polypropylene), the following safe operating practices will be observed: a. All slings will be inspected prior to use by the crane operator. Additionally, the frequency for documenting crane inspections will be determined by the crane owner based on: 1.) frequency of use; 2) severity of service conditions; 3) nature or type of lifts being made; and, 4) experience based on service life of slings used in similar applications. b. Slings shall not be shortened with knots or bolts or other makeshift devices. c. Sling legs shall not be kinked. d. Slings used in a basket hitch shall have the loads balanced to prevent slippage. e. Slings shall be padded or protected from the sharp edges of their loads. f. Hands or fingers shall not be placed between the sling and its load while the sling is being tightened around the load. Hand Signals: Hand signals used to guide the crane operator will be consistent with the ANSI standard for the type of crane in use and an illustration of the signals must be posted at the job site. A copy of these hand signals is in our Project Manual. Load Test Records: Load test records will be furnished showing procedures outlined in Appendix E to API RP 2D, Load Testing. Load testing should be done by a qualified inspector following the specific procedures listed on pages 1 through 3 of Appendix E to API RP 2D. 7 Clearheart Construction Co., Inc.

U.S. Department of Labor Mine Safety and Health Administration Hand Signals for Lifting Equipment. 8 Clearheart Construction Co., Inc. PROJECT MANUAL Job Site Forms

Certification of Crane Pre-Use Inspection & Checklist CRANE MODEL: DATE: CRANE SERIAL NUMBER: FREQUENT Mon. Tues. Wed. Thurs. Fri. Sat. Sun. Observation of defects as used Continual Functional Operating Mechanisms Deterioration or leakage in: Lines Tanks Valves Drain Pumps Any Part of Air or Hydraulic System Hooks Deformation Cracks Note: Repair or replace if more than 15 percent of normal throat opening or more than 10º twist from plane of unbent hook Hoists, Chains & End Connections Excessive Wear Twisted Distorted Stretched Rope reeving (See Mfg s Specifications) All operating mechanisms for excessive wear Rope reeving (See Mfg s Specifications) Operator s Initials: Code: = OK X = Deficiency NA = Not Applicable PERIODIC All THE ABOVE ITEMS Deformed, Cracked or Corroded Members Loose Bolts or rivets Cracked or worn sheaves and drums Excessive Wear on: Brake System Parts Linings Pauls Ratchets Improper indicators Chains & Sprockets excessive wear Power Plant Safety Issues Distorted, worn, cracked pins, bearing, shafts, gears, rollers, locking and clamping devices Certified Completion: All Items inspected in the Pre-Use Inspection must be certified as having been completed. I certify the items noted in the Pre-Inspection have been inspected. Safety Program Administrator Clearheart Construction Co., Inc. (Date) 9 Clearheart Construction Co., Inc. PROJECT MANUAL Job Site Forms