33kV Connection up to 90MVA

Similar documents
Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

SUBSTATION INTERLOCKING SCHEMES

6.6kV and 11kV Single Busbar Indoor Switchgear (Cable Connected)

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

SWITCHGEAR FOR SERVICE UP TO 36kV (CABLE AND OVERHEAD CONDUCTOR CONNECTED)

EDS SUBSTATION LVAC SUPPLIES

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

Key features. DESIGNS: - Conservator type - Hermetically sealed

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS

Unified requirements for systems with voltages above 1 kv up to 15 kv

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Guidance for Low Voltage Electrical Installations

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2

NPS/003/016 Technical Specification for 48V and 110V Battery and Charger Systems

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

NPS/003/002 Technical Specification for 30V Distribution Tripping Battery and Charger Systems

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links

Guidelines for connection of generators:

Service Entrance Methods

Approved Meter Sockets and Cabinets

Chapter 6 Generator-Voltage System

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

CP Automatic capacitor bank

045 : 2000 CEB STANDARD

37-SDMS-04 SPECIFICATIONS FOR INTERFACE LOW VOLTAGE MAIN CIRCUIT BREAKERS

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

BHARAT HEAVY ELECTRICALS LIMITED, JHANSI

Substation LV AC Supplies. Document Number: 1-11-FR-04

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

MESP TECHNICAL SPECIFICATION FOR A STATIONARY CONTROL BATTERY AND CHARGER SET FOR USE IN A SUBSTATION

TECHNICAL SPECIFICATION OF 11KV SF6 / VCB METAL ENCLOSED, INDOOR (PANEL TYPE) / OUTDOOR RING MAIN UNIT (RMU). (IEC standard equipment)

Low Voltage Power Supplies in Electrified Areas

شركة كهرباء محافظة القدس المساهمة المحدودة

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

Construction and Connection of Street Light Assets

CHAPTER 4 PROTECTION REQUIREMENTS

STANDARD TECHNIQUE : SD5P/2

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS

Company Directive STANDARD TECHNIQUE : TP4B/2. Relating to 11kV and 6.6kV Transformer Protection

Aurora Energy Limited. Network Connection Requirements (NS5.1)

TRANSMISSION SYSTEMS

On-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011)

33KV INDOOR SWITCHGEAR

Outdoor live tank vacuum circuit breaker Type OVB-VBF for 24/36/40.5 kv applications

Requirements for Secondary Voltage Revenue Metering (750 V and less)

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Construction and Wiring Guidelines for Ergon Energy Substation Panels

B kv Gas-insulated Substations

Electric & Gas Service Requirements (Greenbook) Overview

AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE

Table of Contents 1. SCOPE Toronto Hydro Requirements Enclosed Switchgear Ontario Electrical Safety Code SI Units..

UniGear. Technical Guide

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

MOBILE SUBSTATION DESIGN Brad Bozich & Vitor Vieira 2755 Northwoods Parkway Norcross, Georgia

ZX-Family Gas-insulated medium voltage switchgear

Engineering Recommendation P26

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS

Appendix Item Addendum

Umatilla Electric Cooperative Net Metering Rules

7. SERVICES OVER 600 VOLTS

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

EDS ELECTRIC VEHICLE CONNECTIONS

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

III. Substation Bus Configurations & Substation Design Recommendations

the safe, reliable, and efficient choice for MV switchgear

High Voltage and Extra High Voltage Cables

EMPAC Metal enclosed capacitor bank for wind applications

Underground Distribution Construction Manual

GENERAL INFORMATION 1.01 PURPOSE

University of Houston Master Construction Specifications Insert Project Name

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

ICOMIA Global Conformity Guideline for ISO/ABYC Standards and Canadian TP 1332 requirements. Guideline Number 3 Electrical

SF 6 Gas Insulated Switchgear Type SDH314 / SDHa314 for 72.5 to 145 kv

Appendix 11 RETURN TO APPENDICES LIST. High Voltage Power Supply Upgrade (Welcon Technologies Pty Ltd)

MEDIUM VOLTAGE PRODUCTS. Fault Current Limiters I S. -limiter and FC-Protector The worldʼs fastest switching devices

Medium Voltage Distribution PIX. Air Insulated Switchgear up to 24 kv PARS TABLEAU

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA

(High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT. Enquiry Date:

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Type SIMOPRIME A4, up to 24 kv, Air-Insulated Medium-Voltage Switchgear

Transcription:

Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords Appendix A Approved for issue by the Technical Policy Panel All Rights Reserved The copyright of this document, which contains information of a proprietary nature, is vested in Electricity North West Limited. The contents of this document may not be used for purposes other than that for which it has been supplied and may not be reproduced, either wholly or in part, in any way whatsoever. It may not be used by, or its contents divulged to, any other person whatsoever without the prior written permission of Electricity North West Limited. Electricity North West Limited. Registered in England & Wales. Registered No. 2366949. Registered Office: 304 Bridgewater Place, Birchwood Park, Warrington, WA3 6XG

Amendment No. Date 0 31/03/03 Issue 1 First Issue. Issue and Amendment Summary Brief Description and Amending Action 1 Prepared by: P. Leather. Issue 1 Authorised by: Paul Whittaker Policy & Standards Manager: 27/07/07 Reference to ES366 and the requirement for customer to provide substation LV supply added. Prepared by: Peter Leather 0 19/12/07 Approved by the Technical Policy Panel and signed on its behalf by Simon Rushton: Issue 2 Company name changed to Electricity North West Limited. Requirements for the provision of pilot circuits modified. Prepared by: Peter Leather 1 13/01/10 Approved by the Technical Policy Panel and signed on its behalf by Simon Rushton: Issue 2 Addition of connection arrangement: single circuit via a composite switchboard. Other minor clarifications. Appendix A diagrams redrawn. Prepared by: Peter Leather 2 04/08/11 Approved by the Technical Policy Panel and signed on its behalf by Simon Rushton: Issue 2 New subsection 3.8 inserted; emergency tripping. Also provision of DC supplies expanded - now subsection 3.9. Prepared by: Peter Leather Approved by the Technical Policy Panel and signed on its behalf by Paul Whittaker: ES217.doc Issue 2 19/12/07 PL ES217 Page i of i.

33kV CONNECTION UP TO 90MVA 1. SCOPE This Specification details the requirements of a connection of industrial and large commercial Users with a maximum supply capacity of 90MVA directly connected to the 33kV electricity distribution network (Network) owned and operated by Electricity North West Limited (Electricity North West), that connection being intended to be adopted by Electricity North West. It may be appropriate to provide connections of up to 15MVA capacity in accordance with Electricity Specification (ES)216. This document shall be read in conjunction with ES210. 2. GENERAL Any variation to this specification shall be agreed, in writing, with the Design and Construction Manager, Electricity Connections, Electricity North West prior to any design being accepted. The Owner s Works shall comply with the requirements of ES210. It is a requirement that all work shall be carried out strictly in accordance with the provisions of all relevant legislation and industry best practice. The Owner s Works shall comply in all respects with the provisions of Regulations 3 (1), 6, 7, 8 (1), 8 (3), 9, 10, 12 to 14 and 17 to 22 of the Electricity Safety, Quality and Continuity Regulations 2002 and with the Electricity at Work Regulations 1989. Users shall be supplied and metered at a nominal 33kV, 11kV or 6.6kV. With any single circuit arrangement, the agreed supply capacity shall not be considered to be firm; interruptions caused by faults may not be restorable until repairs have been completed. Users shall be made aware of this. New 33kV underground cables shall have pilot circuits laid with them or provision (eg, ducts and pits) made for the future installation of pilot cables. New and refurbished 33kV overhead lines may require pilot circuits to be installed with them. The specifications for such pilot circuits, which may be required for protection, monitoring, control or other communications, shall be agreed, for each individual cable or overhead line, with Primary Project Management, Electricity Connections, Electricity North West (PPM). The design of the connection shall meet the following system requirements: Maximum Fault Levels on the Network are: 33kV = 1000MVA 11kV and 6.6kV = 250MVA The minimum short circuit ratings shall be: 33kV = 17.5kA for 3 second 11kV = 13.1kA for 3 seconds ES217.doc Issue 2 19/12/07 PL ES217 Page 1 of 8

6.6kV = 21.9kA for 3 seconds The maximum earth fault current is as follows: 33kV = 3500 Amps. The maximum earth fault current for both the 11kV and 6.6kV electricity distribution network is 3300A, based on connection to a primary substation, with three transformers operating in parallel. The minimum impulse withstand levels for new equipment connected to the 33kV Network is 170kV and for the 11kV and 6.6kV Networks 75kV. In particular, the rating of any switchgear and fusegear, forming part of any new connection, must be fully compatible with all the system parameters, as set out in this clause. 3. CONNECTION ARRANGEMENTS 3.1 The connection provided from an Electricity North West Primary 33kV substation may be either direct at 33kV or via a 33/11kV or 33/6.6kV transformer and be one of the following arrangements: 3.1.1. Dedicated User connection at 33kV from a BSP or Primary substation an example of this arrangement is shown in Figure A1 in Appendix A. 3.1.1.1 The maximum load, which is subject to the existing loading on the Network, supplied from a single 33kV feeder shall not exceed 45 MVA. If the Network permits a second 33kV feeder, the capacity may be increased to 90MVA. 3.1.1.2 The exit point shall be the outgoing terminals of the Electricity North West circuit breaker. 3.1.1.3 A User s emergency trip facility shall be provided with this type of connection. The trip facility shall operate the Electricity North West circuit breaker(s). 3.1.2 Dedicated User Tee connection from the 33kV network an example of this arrangement is shown in Figure A2 in Appendix A. 3.1.2.1 The maximum load, which is subject to the existing loading on the Network, supplied from a single 33kV tee arrangement shall not exceed 36 MVA. 3.1.2.2 The exit point shall be the outgoing terminals of the Electricity North West circuit breaker or isolator arrangement. 3.1.2.3 A User s emergency trip facility shall be provided with this type of connection. The trip facility shall operate the Electricity North West owned circuit breaker. ES217.doc Issue 2 19/12/07 PL ES217 Page 2 of 8

3.1.3 Dedicated User Tee connection from the 33kV Network with User s circuit breaker as part of a composite switchboard an example of this arrangement is shown in Figure A3 in Appendix A. 3.1.3.1 The maximum load, which is subject to the existing loading on the Network, supplied from a single 33kV tee arrangement shall not exceed 36 MVA. 3.1.3.2 The exit point shall be the busbar bolted connections between Electricity North West s circuit breaker(s) and the User s circuit breaker(s). 13/01/10 3.1.3.3 A User s emergency trip facility shall be provided with this type of connection. The trip facility shall operate the Electricity North West circuit breaker. 3.1.4 Dedicated User connection at 11kV via a transformer connected to an Electricity North West 33kV primary substation - an example of this arrangement is shown in Figure A4 in Appendix A. 3.1.4.1 The maximum load, which is subject to the existing loading on the Network, supplied from a single 33/11kV transformer shall not exceed 29 MVA. If the Network permits a second 33/11kV transformer then the capacity may be increased to 58MVA. 3.1.4.2 The exit point shall be the outgoing terminals of the final Electricity North West 11kV circuit breaker. 3.1.4.3 A User s emergency trip facility shall be provided with this type of connection. The trip facility shall operate the final Electricity North West circuit breaker(s). 3.1.5 Shared User connection at 11kV or 6.6kV via a transformer connected to an Electricity North West primary substation - an example of this arrangement is shown in Figure A5 in Appendix A. 3.1.5.1 The maximum load, which is subject to the existing loading on the Network, supplied from a single 33/11kV or 6.6kV transformer shall not exceed 20MVA. 3.1.5.2 The exit point shall be the outgoing terminals of the final Electricity North West owned circuit breaker. 3.1.5.3 The substation shall be designed to accommodate a second transformer. 3.1.5.4 Electricity North West may make a financial contribution to this type of connection arrangement. 3.2 Environmental Conditions 3.2.1 The equipment shall be designed and constructed to allow operation in environments defined in Clause 6 of BS EN 60947-1 as follows: 3.2.1.1 Equipment that is housed in a controlled environment shall be suitable for operation in Pollution Degree 2. ES217.doc Issue 2 19/12/07 PL ES217 Page 3 of 8

3.2.1.2 Equipment that is not housed in a controlled environment shall be suitable for operation in Pollution Degree 3. 3.2.2 All equipment shall be protected from the deposit of excessive levels of dust and from the influx of water or other substances liable to have a harmful effect. 3.3 Demarcation of Responsibilities 3.3.1 Every connection agreement shall include a Site Responsibility Schedule. 3.3.2 In completing and agreeing a Site Responsibility Schedule, particular attention shall be given to auxiliary facilities, including LV supplies, and batteries and battery chargers. 13/01/10 3.4 Overhead Lines Overhead lines shall be designed and constructed in accordance with ES400O3 or ES400O2. The conductor cross section selected for any particular installation shall be compatible with the load to be supplied and the system short circuit level. 3.5 Cables 3.5.1 33kV cable to be used shall be single phase, copper conductors with a cross sectional area of 185, 240, 300 or 400 mm², polymeric insulated quasi-dry design with 50 sq mm copper screen wires. Both single core and triplex designs may be used. The cable shall be in accordance with ES400C10. No other type or cross section of cable is permitted. 3.5.2 11/6.6 kv cable to be used shall be 95 or 300 mm² Triplex formation single core quasi dry design polymeric insulated with solid aluminium conductors in accordance with ES400C9. No other types or cross section of cable is permitted. 3.5.3 The conductor cross section selected for any particular installation shall be compatible with the load to be supplied and the system short circuit level. Where the 11/6.6kV point of connection is to a single transformer or two transformer groups, the single core cable earth screen shall, as a minimum, carry the fault current detailed in BS 7870, Section 4.10 without sustaining damage. 3.6 Earthing conditions All installations are to comply with Electricity Policy Document (EPD)333 and shall be discussed and agreed with PPM prior to the formal submission of an Outline Plan of Works as described in ES210. 3.7 Cable installation and jointing 3.7.1 The installation and jointing of underground cables shall comply with the relevant parts of ES400E4 and ES400E5. Jointing systems employed shall be compatible with the cable used and type test evidence shall be available to demonstrate that the performance of the complete system of cable and joints is appropriate for the service duty for which the system is installed. 3.7.2 Core crosses or rolls required for circuit phasing purposes in 3 core cables shall be accommodated within underground cable joints, not in cable boxes. ES217.doc Issue 2 19/12/07 PL ES217 Page 4 of 8

3.7.3 Small wiring shall be ferruled in accordance with ENA TS 50-19. 3.8 Emergency Tripping 3.8.1 Where it is necessary to open an Electricity North West circuit breaker, in order to make the User s equipment dead (or in such other cases as it may be required by the Health and Safety Executive), a suitably protected device to afford the customer with an emergency trip push-button shall be provided and maintained by Electricity North West. This device shall be located on the customer s premises in an accessible position as close as possible to the supply terminals. The device shall be clearly labelled FOR EMERGENCY USE ONLY. 4/8/11 3.8.2 The customer s emergency trip push button shall be of key reset type, with red button and with full guard against inadvertent operation. 3.8.3 Where the customer s emergency trip push-button is to provide DC tripping of more than one circuit breaker, the push-button shall be equipped with an independent pair of normally open contacts for each circuit breaker to be operated. 3.9 & Substation Control 3.9.1 The type of protection and control systems to be applied shall be discussed and agreed with PPM prior to the formal submission of an Outline Plan of Works as described in ES210. 3.9.2 All protection systems shall comply with EPD350 and ES396. 3.9.3 settings and automation and control timings shall be agreed with Electricity North West prior to final commissioning. 3.9.4 Control and relay panels shall comply with ES337. 3.9.5 and control wiring, including the wiring for the emergency trip facility, shall not be run in the same trunking or conduits as User s wiring. 3.9.6 Where both Electricity North West and the customer require a DC supply for protection or control purposes, the parties may agree that only one battery is necessary, for the purposes of both. In that case, Electricity North West will provide the necessary battery and charger and be responsible for their monitoring and maintenance. The low voltage (240V) supply to the charger will be derived from the permanent wiring installation within the substation. It is normally expected that this supply will be provided from the customer s electrical installation. In any particular case, all these responsibilities shall be set out in the Site Responsibility Schedule. Note: Electricity North West may provide a fused supply from the battery at the request of the customer, provided that DC circuits are not extended outside the site boundary, that the drain imposed on the battery by customer s equipment is fixed and specifically agreed, and that the battery charger is fitted with an alarm connected to the Electricity North West s telecontrol system (where connected). However Electricity North West will recover any costs associated with a failure of the battery charger as a result of any failure on the customer s system. 13/01/10 4/8/11 ES217.doc Issue 2 19/12/07 PL ES217 Page 5 of 8

3.10 Cable Entry to Substations Cable entry to substations shall comply with the following criteria: 3.10.1 33/11/6.6kV cable entries to substations shall be made at the laying depth of the cable, using red plastic duct of at least 150 mm diameter complying with ES400D4. Cable joints are not permitted in entry ducts. 3.10.2 Bends in cable ducts shall be of no smaller radius than that permitted for the cable. 3.10.3 All entry ducts including any ducts for earth conductors shall be sealed against the ingress of gas after installation of the cable. Sealing shall be achieved in accordance with Module 38 of CP411 Part 2 - HV Jointing. 3.11 Routeing of cables in buildings The following provisions apply where substations are sited within larger buildings and 33/11/6.6 kv cables, for adoption by Electricity North West, must be routed through those buildings: 3.11.1 Ducts for 33/11/6.6kV cables within buildings shall be at least 150mm in diameter. Where ducted cable routes change direction in buildings, draw pits at least 1.5m square shall be provided, allowing for future repair or replacement of cables. No single run of duct within a building shall exceed 25m between draw pits. 3.11.2 Alternatively, covered trenches may be used to route cables. On completion of cable work, cable trenches shall be filled with sand and covered with a 100mm thick screed. 3.11.3 Where 33/11/6.6 kv cables are fixed to racks or cleated to walls, adequate mechanical protection shall be provided. 3.11.4 All cables shall be securely supported. Particular consideration shall be given to the secure support of cables in vertical runs. 3.12 33/11/6.6 kv Switchgear for adoption by Electricity North West 3.12.1 33kV Switchgear shall comply with ES312. 3.12.2 11/6.6kV switchgear shall comply with ES313. 3.12.3 Approval for the use of specific types of switchgear shall be obtained, in writing, from the Plant Policy Manager, Policy and Implementation, Electricity North West. 3.12.4 Substation, circuit and plant identification shall be as directed by PPM, prior to the commissioning of the equipment. 3.13 Substation Construction 3.13.1 All substation arrangements shall be discussed and agreed with PPM prior to the formal submission of an Outline Plan of Works as described in ES210. 3.13.2 The design of all substations to be adopted shall comply with the requirements of Code of Practice (CP)351. ES217.doc Issue 2 19/12/07 PL ES217 Page 6 of 8

3.13.3 Substation designs shall ensure compliance with all relevant statutory regulations. 3.13.4 Buildings shall be of sufficient dimensions that the switchgear is capable of safe operation, inspection and maintenance. Substation doors and any access doors or gates shall always open outwards and access to substations (including if appropriate access within buildings) shall be such that rapid egress of personnel is facilitated. Locking arrangements shall comply with Electricity North West requirements, to be agreed with PPM. 3.13.5 Substations shall be accessible by personnel authorised by Electricity North West at all times, including out of hours, and during weekends and public holidays. 3.13.6 Notices and nameplates shall comply with ES356. 3.13.7 The substation shall be fitted with a low voltage electrical installation generally conforming with ES366, supply being provided, where necessary, by the User. The actual requirements for those parts of the substation to be occupied by Electricity North West shall be agreed, in any particular case, between the designer of the substation and Electricity North West. 3.14 Metering 3.14.1 Metering for 33kV connection, as shown in Figure.A 1, Appendix A, shall be before the User s point of connection with the metering ct s contained within the Electricity North West 33kV circuit breaker housing. The metering vt shall have a 110V secondary winding. 3.14.2 Metering for 11kV or 6.6kV connection, as shown in Figs. A2 and A3, Appendix A, shall be before the User s point of connection with the metering ct s contained within the Electricity North West 11kV or 6.6kV circuit breaker housing. The metering vt shall have a 110V secondary winding. 3.14.3 Metering cts and vts shall comply with ES501. 3.14.4 In order to ensure the accuracy of metering, the burden of cts shall be restricted by limiting the length of multicore cables connecting the cts to the meter. The maximum permissible length of 2.5 mm 2 multicore cable, measured from the flange mounted cabinet multicore cable gland to the meter panel cable gland, shall not exceed 40m for 1 A and 5 A rated cts. 3.15 Transformers & Ancillary Equipment for adoption by Electricity North West 3.15.1 Transformers shall be in accordance with ES323. 3.15.2 Transformer neutral earthing resistors shall comply with ES350. 3.15.3 The initial utilisation factors shall not be less than 0.6. 3.16 Supplier The Installer shall be responsible for ensuring that a Supplier is appointed on behalf on the User. ES217.doc Issue 2 19/12/07 PL ES217 Page 7 of 8

4. EQUIPMENT RECORDS The Installer shall provide records of all equipment installed, using Form C of ES210 and marked upon the latest available edition of the Ordnance Survey map for the area, at 1/500 scale with any relevant detail shown on 1/250 enlargements. Guidance on the provision of records of underground equipment may be found in ES281 - Part 6. 5. DOCUMENTATION Documentation shall be as described in ES210. 6. DOCUMENTS REFERENCED 6.1 Regulations (Statutory Instruments) Electricity Safety, Quality and Continuity Regulations 2002 Electricity at Work Regulations 1989 6.2 Standards (British Standards and Energy Networks Association) BS 7870 - LV and MV Polymeric Insulated Cables for use by Distribution and Generation Utilities BS EN 60947-1 - Specification for Low Voltage Switchgear and Control Gear ENA TS 50-19 - Standard Numbering for Small Wiring Note: The above standards may be obtained from the British Standards Institute or the Energy Networks Association as appropriate. They cannot be supplied by Electricity North West. 6.3 Electricity North West Documents EPD333 - Supply System Earthing EPD350 - Policy for 132kV, 33kV and 11/6.6kV Systems CP351 - Civil Design Aspects of Primary Substations CP411 Part 2 - HV Jointing ES210 - General Specification for Third Party Constructed New Connections, Extensions and Alterations ES216-11/6.6kV Connections of up to 9MVA (6.6kV) or 15MVA (11kV) Capacity ES312-36kV Single Busbar Indoor Switchgear ES313-6.6kV and 11kV Single Busbar Indoor Switchgear (Cable Connected) ES323-33/11 or 6.6kV System Transformer Technical Clauses & Schedules ES337-19 Rack Control & Relay Panels for use in BSP & Primary Substations ES217.doc Issue 2 19/12/07 PL ES217 Page 8 of 8

ES350 - Neutral Earthing Resistors at BSP & Primary Substations ES356 - Notices & Nameplates ES366 - Heating and Lighting Installations in Primary Substations ES396 - in Primary Substations ES400D4 - Plastic Ducts, Conduit & Accessories ES400C9-11kV Distribution Cables ES400C10-33kV Distribution Cables ES400E4 - Installation, Commissioning and Repair of Solid Type Underground Cables Operating on the LV and 6.6/11kV Systems, and the Restoration of Excavated Areas ES400E5 - Installation, Commissioning and Repair of Underground Cables Operating at 33kV and 132kV, and the Restoration of Excavated Areas ES400O2 - Overhead Lines of Compact Covered Construction for 6.6, 11 and 33kV ES400O3 - Bare-wire Overhead Lines on Wood Poles ES501 - Metering Current & Voltage Transformers Guide for Recording Underground Assets - Electricity 7. KEYWORDS Substation; third party; connection; ES217.doc Issue 2 19/12/07 PL ES217 Page 9 of 8

APPENDIX A Equipment to be adopted by Electricity North West Remote Metering Panel M M vt User s Emergency Remote Trip Facility Exit Point(s) Figure A1 - Example of Connection at 33kV at a Primary Substation Equipment to be Adopted by Electricity North West From Electricity North West Teed Connection or Circuit Breaker User s Emergency Remote Trip Facility Remote Metering Panel M / Intertripping vt Exit Point User s Circuit Figure A2 - Example of Connection at 33kV from Electricity North West Circuit Breaker or Tee ES217.doc Issue 2 19/12/07 PL ES217 Page A1of 4

APPENDIX A (CONTINUED) Equipment to be Adopted by Electricity North West. M Remote Metering Panel Exit Point 13/01/10 User s Circuit(s) Figure A3 - Example of Connection via a Composite Switchboard ES217.doc Issue 2 19/12/07 PL ES217 Page A2of 4

APPENDIX A (CONTINUED) Equipment to be adopted by Electricity North West 33kV Remote Metering Panel M 11 or 6.6kV Exit Point vt User s Emergency Remote Trip Facility User s Circuits Figure A4 - Example of Connection at 11kV via a 33/11kV Transformer (User only Connection at 11kV) ES217.doc Issue 2 19/12/07 PL ES217 Page A3of 4

APPENDIX A (CONTINUED) Equipment to be adopted by Electricity North West 33kV Future Transformer 11 or 6.6kV Remote Metering Panel vt Electricity North West Circuit M M Exit Points User s Circuits Figure A5 - Example of Connection at 11kV via a 33/11kV Transformer (User and Electricity North West Shared Facilities at 11kV) ES217.doc Issue 2 19/12/07 PL ES217 Page A4of 4