Installation Guide Contigo 6150 & 6151

Similar documents
Installation Guide Contigo 6100

Nero 6600H/6601H. Installation Guide. Commercial Vehicle Productivity and Security. Antenna Configuration

DriveCam Unit Installation Instructions

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS SECURITY SYSTEM KIT CONTENTS SHOCK SENSOR F-D15 WINDOW DECAL (QTY 2) F-D16

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves)

Mini H1 Twin Kit - Installation Instructions

EnergyBar 6. Setup Guide

EDBRO TRAILER INCLINOMETER

EDBRO RIGID INCLINOMETER

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

Installation instructions: 13 Pin Electrical system for towing hitch

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar)

Audi 8L A3 and B5 A4 ColorMFA Install Guide ColorMFA from AutoPilot. Instructions from Clusters by Litke and pinout from Drive2

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...

72 Mustang Mach 1 tachometer cluster and gauge conversion

Parts Checklist: ZJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Grand Cherokee ZJ

A L L Diagnostic Trouble Codes ( DTC ): P Code Charts P0302

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS

Advanced 3 Million Wireless USB Limousine Underbody Kit

XJ 4-Link Rear Long Arm Instructions

Headsight HHC HH 14 series. Combine Manual

INVERTER/CHARGERS EVOLUTION SERIES. Off-Grid Power Solutions. How an Inverter/ Charger. Works... ORDER NOW

INSTALLATION INSTRUCTIONS

Parts Checklist: WJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* (1) *BOX 2* (1) Jeep Grand Cherokee WJ

Tips & Technology For Bosch business partners

/2017. Flexline rapid clamping systems with drive chain clamping element, T-slot and adjustment track

VEHICLE ACTIVATED SPEED LIMIT SIGNS

General Faucet Installation Instructions

TCS and TCS-200-1H Tension Controls

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ

Car & Key Memory functions for series E38, E39 (from 09/98), E46, E52, E53, R50 and R53 from start of series production

DTC P0401 Exhaust Gas Recirculation Flow Insufficient Detected

INSTALLATION INSTRUCTIONS FOR PART #20001 FORCED INDUCTION BOOST COOLER WATER / METHANOL INJECTION SYSTEMS

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

CAUTION: Do not install damaged parts!!!

INSTALLATION INSTRUCTIONS

Open Street Cam User Manual

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR PART #50015 DIESEL MPG-MAX WATER / METHANOL INJECTION SYSTEM 6.0L/6.4L/6.7L POWERSTROKE DIESEL

2-CHANNEL WIRELESS REMOTE CONTROL SYSTEM EWC-2

Installation Instructions

WELCOME. WEB LOCATION Los Angeles, CA

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

D-Sub adaptor Cable clamps for metric cable entries Cable clamps for PG cable entries Further Accessories

ALL components will be installed on the top of the board with the exception of the OPTIONAL dual battery holder.

EP12M248 7 Stage Automatic Smart Battery Charger, Desulphuration& Maintainer 12V, 2 / 4 / 8A FOR AGM, GEL AND WET BATTERIES USER MANUAL

INSTALLATION INSTRUCTIONS FOR PART #47002 WATER / METHANOL INJECTION SYSTEM UNIVERSAL TURBO DIESEL

LN products. Contents. LN Cabinets for LAN applications. LN Enclosures. LN Open Racks

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change

Headsight HHC JD xx20 series. Combine Manual

Installation Instructions AQ-5100, AQ-5200 & AQ-5300 Under Counter Water Filter Single Stage (5100), Two Stage (5200) and Three Stage (5300) systems

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

AMERICAN IRON HORSE IGNITER TEST BOX

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

;THI~~Sf\-FEJY _.:.. ;'..»...

The MODUM Fire Escape Ladder

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-30 TRACK TORCH/BURNER MACHINE. by BLUEROCK Tools

BIG-VUE Series Meter

Quark Brushless Systems

INSTALLATION INSTRUCTIONS

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator

P/N Water/Methanol Injection Kit V2 Standard Controller - Internal MAP 1-Gallon Tank STOP!

E+ Battery Care Guide

PSS INSTALLATION INSTRUCTIONS

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

Machine Safeguarding

NEXT UPS Systems MANTIS II Tower 750/1000/1500 Installation and user manual English

The MODUM Fire Escape Ladder

ABTQ-103 rev 01 Last review:

Refer to the description for DTC P0C Refer to DESCRIPTION.

Generator/Loadbank Quick Connection Switchboard

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION!

Signature Series Vehicles C6 A6 Installation Guidelines

P/N Water/Methanol Injection Kit V2 HD Controller - Internal MAP 5-Gallon Tank STOP!

Uninterruptible Current Supply USV V / 1.2 Ah

PRE-PLANNING & DELIVERY GUIDE

03-06 TJ Long Arm Upgrade Instructions

WELCOME. WEB LOCATION Los Angeles, CA

Hydraulic pumps and hydraulic power packs type Z (gear pumps)

Electric Bicycle Owner Manual

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

SWP200 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING

Adobe Connect Web Conferencing

Iveco New Daily Crew Van. perfect combination between people and cargo

USER`s Manual. Swivelling semi-automatic press. Swivelling manual press TECHNICAL DATA. - works without compressor

Motor pumps and hydraulic units type R and RG

Gearbox Installation Manual

Hub/Remote Operations in version 3.0

GLOBAL LIFT CORP Owner s Manual

Thank you for purchasing a SledLites.com HID system for your snowmobile. Please read all warnings and complete manual prior to installing.

Operator s Manual with Maintenance Information. Second Edition Fourth Printing Part No

REMOTE GREASING KIT FOR MORGANS SERIES 2

CS369-R51I Thank you very much for purchasing our air conditioner.

Transcription:

Installatin Guide Cntig 6150 & 6151 Cmmercial Vehicle Prductivity and Security The Cntig 6150 & 6151* (cllectively knwn as the Cntig 615X) are highperfrmance beacns designed fr cmmercial prductivity and security. They are ideally suited t installatins in delivery and service fleets as well as public safety, mass transprtatin, utility, and ff-rad r cnstructin vehicles. Security features include unauthrized vehicle mvement and relcatin alerts, as well as a means f cnnecting ptinal auxiliary sensrs anywhere within the vehicle. Fr additinal installatin infrmatin please refer t the Installatin Best Practices dcument available thrugh the Resurce Center in yur Dealer Prtal. 1. Install Antenna The Cntig 615X cmes with a cmbined GPS/GSM antenna mdule. It is t be installed in a lcatin where the GPS perfrmance will be ptimum. There is a chice f three antenna types (see belw) which are available in either adhesive munt (fr internal applicatins), magnetic r screw/pst munt (fr external applicatins). Kit Cntents GPS Beacn device with SIM Cmbined GPS/GSM antenna Wiring harness Tls and Supplies Required Wire cutters, wire strippers Vltmeter (multimeter) Sldering irn, slder Electrical tape Plastic cable ties Screw drivers, munting screws Wrenches, sckets Caulking/Sealant fr external munting Drill fr thrugh-hle munting Determine the best lcatin fr the GPS Antenna The tp side f the antenna mdule shuld have a clear signal path t as much f the sky as pssible. Supprted antenna types include: Wedge Antenna Part #: 6150-ANT-WEDGE-A Size: 5.4 inch (138mm) length; 1.25 in (32mm) width; 0.44 in (11.2mm) depth; Black plastic husing, munted with peel-and-stick adhesive patches. Magnetic Weatherprf Antenna Part #: 6150-ANT-WP-M Size: 2.54 in (64.5mm) Diameter; 0.54 in (13.6mm) depth; Black plastic with silver magnetic metal base. Drill-thrugh Weatherprf Antenna Part #: 6150-ANT-WP-DT Size: 2.54 in (64.5mm) Diameter; 0.77 in (19.5mm) depth (excluding screw pst); Black plastic with silver metal base and rubber weather-seal gasket; Screw pst munt fr drill-thrugh applicatins. Cpyright 2011 Cntig Systems Inc. All rights reserved. www.cntig.cm * The Cntig 6151 superseded the Cntig 6150 in late Summer 2011.

Installatin Guide Cntig 6150/6151 If the installatin is nt required t be cvert, an ideal lcatin is underneath the frnt windshield glass. Fr cvert installatins, an ideal lcatin is under the dashbard, as high and clse t the frnt windshield as pssible. If installing in a car, the antenna can usually be munted under the rear windw r in the trunk, under the rear deck, as clse t the rear windw as pssible. Fr best perfrmance, the tp f the antenna shuld face the sky thrugh the area f least signal blckage (see diagrams belw). Signals will penetrate uphlstery, carpet, plastic dashbards, etc., but nt metal panels r brackets. Signals will penetrate windw glass but nt metallic tinted windws r painted edges f windws. Radi antenna r defrst wires embedded in glass may degrade signals. 2 f 6 Cpyright 2011 Cntig Systems Inc. All rights reserved. www.cntig.cm

Installatin Guide Cntig 6150/6151 2. Beacn Installatin Psitin Determine beacn installatin psitin but d nt fasten it in place until all wiring is cmplete. Determine the best lcatin fr the beacn a strng flat surface that can be drilled t accmmdate the munting hles is ideal. Any spt where the beacn can be fastened in place with plastic cable ties is suitable. Under a seat is ften a suitable lcatin fr beacn installatin. Be sure it is nt clse t any heat surces r areas that experience misture r vibratin. The beacn is nt waterprf r weatherprf and shuld always be installed in the passenger cmpartment f the vehicle. Visibility f the indicatr LEDs will be useful fr testing and trubleshting. 3. Cnnect Pwer and Ignitin Sense The 615X pwer harness has ne wire bundle cntaining 6 wires. The bundle cntains the 9-30V cnstant Pwer (red), Grund (black), and Ignitin Sense (yellw) wires. The input/utput (I/O) wires are as fllws: Input 1 (gray), Input 2 (purple) and Output (blue). Ntes: Cnnect the wiring harness t all the vehicle s cnnectin pints befre attaching the harness t the beacn. If wiring harness wires need t be extended, use the same gauge wire and slder the extensin wire n, then insulate with heat shrink tubing r electrical tape. Ensure that n wires are ruted near heat surces. Pwer Cnnectin Instructins Cnnect the black (grund) wire t battery negative r the vehicle chassis this wire MUST be cnnected first, befre the pwer r ignitin sense wires. Be sure the grunding screw is nt painted r cated with an insulating material. With the vehicle s ignitin turned ff, use a vltmeter t assist in finding a suitable, cnstant 9-30V pwer cnnectin pint directly t the vehicle s battery may be best. Ensure that any wires in the wiring harness that are nt t be cnnected d nt cme in cntact with pwer, grund, r any ther vltage. Insulate them with electrical tape. Ignitin Sense Cnnectin The ignitin sense cnnectin is mandatry. Failure t install the ignitin sense crrectly will result in errneus data being reprted frm the beacn. Find a surce f 9-30V that is switched n and ff with the ignitin key in the run psitin (accessry psitin is nt acceptable). This cnnectin shuld prduce 9-30V when the vehicle ignitin is ON and 0 Vlts when the vehicle ignitin is OFF. Cnnect the yellw (ignitin sense) wire t this pint. Vltage transitins must ccur instantly. Gradual r stepped transitins frm ne vltage t anther may nt be detected. 3 f 6 Cpyright 2011 Cntig Systems Inc. All rights reserved. www.cntig.cm

Installatin Guide Cntig 6150/6151 Functin Pin # Wire Clr Specificatin Grund 4 Black 0V 9-30V Pwer 5 Red +9VDC t +30VDC Ignitin Sense 1 Yellw +9VDC t +30VDC Aux Input 1 (ptinal) 6 Gray Opened: 9-30VDC r pen circuit Clsed: Grunded Aux Input 2 (ptinal) 7 Purple Opened: 9-30VDC r pen circuit Clsed: Grunded Output (ptinal) 8 Blue Open Cllectr Sinks 250mA t 1.5A max Imprtant Ntices The 615X is designated t perate frm 9 t 30 Vlts DC. The user is respnsible fr ensuring the vltage supplied t the 615X remains in this vltage range t include transient vltage spikes and lad dump vltages. Failure t cmply may damage the 615X. Failure t install the ignitin sense crrectly will result in errneus data being reprted frm the beacn. This may result in false r incrrect reprting f vehicle starts, stps, ignitin n and ff. 4 f 6 Cpyright 2011 Cntig Systems Inc. All rights reserved. www.cntig.cm

Installatin Guide Cntig 6150/6151 4. Auxiliary Input and Output Auxiliary Input The auxiliary input can be used t detect and reprt the pening and/r clsing f a circuit. An auxiliary input circuit is cnsidered t be clsed when either the Input 1 (grey wire) r Input 2 (purple wire) is cnnected t a vehicle grund surce. The auxiliary input circuit is cnsidered t be pen when either Input 1 r Input 2 is cnnected t an pen circuit r a 9-30V pwer surce. When using auxiliary inputs t measure the state f vehicle circuits, it is recmmended that yu use a relay t cntrl the input signal t the device. Output Output can be used t remtely cntrl vehicle functins such as dr lck/unlck and starter disable/enable. There is ne utput available. This utput can be cnfigured via the web prtal t interactively tggle an external circuit between pen and clsed states, r t pulse the circuit t the clsed state fr either ne r five secnds, then autmatically pen the circuit. T clse an external circuit, the 615X utput acts as a grund surce (r what is referred t as a current sink) t the external circuit. T pen an external circuit, the 615X utput will be pen. Since the 615X utput can draw a maximum current f 1.5A, it is recmmended that yu use the utput t cntrl a relay and use the relay t manage the external circuit. IMPORTANT NOTE: The 615X beacn perfrms a pwer reset cycle when vehicle ignitin n is detected r when pwer is cut t the beacn. During this reset cycle, the utput state f the beacn will change. This means that the utput setting may be changed upn ignitin. Fr installatins requiring supprt fr starter mtr disable, it is recmmended that yu install a latching relay, cmbined with an utput pulse, in rder t disable a starter mtr. 5. Cnnect and Munt Beacn Cnnect the tw antenna cables t the beacn using the crrespnding caxial cnnectrs. Attach the wiring harness t the beacn and ensure that the retaining clip snaps in place. Affix the beacn securely t the vehicle using the munting hles fund in the tabs at either end f the beacn. If a suitable panel fr affixing the beacn is nt available, fastening the beacn t a bracket r wire bundle with plastic cable ties is als adequate. Secure any lse r extra lengths f wire. Ensure that the SIM latch cvering the SIM scket is in the lcked psitin. 5 f 6 Cpyright 2011 Cntig Systems Inc. All rights reserved. www.cntig.cm

Installatin Guide Cntig 6150/6151 6. Test Fr the first test, the vehicle shuld be utdrs in an pen area where GPS signals can be readily received. Watch the indicatr LED n the beacn fr the first few minutes after all pwer and antennas have been cnnected. It indicates the fllwing status: Clr LED 6150 6151 USR1 Green Green Functins Steady: Cnnected t GSM/GPRS netwrk. Flashing: Attempting t cnnect t GSM/GPRS netwrk. Off: Cannt cnnect t GSM/GPRS netwrk. NOTE It may take 15 t 20 minutes, usually much less, fr the wireless netwrk and the GPS receiver t synchrnize the first time the beacn is pwered up. PWR/ GPS Red Red Steady: Unit is pwered n. Off: Unit is pwered ff r in Standby mde. USR2 Red Blue Steady: GPS acquired. Off: Attempting t acquire GPS. Perfrm an end-t-end system test by lcating the beacn and testing ignitin sense via the user prtal. It is strngly recmmended that a rad test be perfrmed t verify the ignitin wiring and t ensure that the cnfigured scenaris are perfrming crrectly. 6150 6151 USR 1 PWR / GPS USR 2 USR 1 PWR / GPS USR 2 6 f 6 Cpyright 2011 Cntig Systems Inc. All rights reserved. www.cntig.cm