BOLTIGHT Ltd Hydraulic Closure System

Similar documents
BOLTIGHT Ltd Hydraulic Bolt Tensioning

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

UT ASSEMBLY REQUIREMENTS. *Torque all T-bolt nuts to foot pounds.

UT ASSEMBLY REQUIREMENTS. *Torque all T-bolt nuts to foot pounds.

MSC Manifolds - DIN for Steam Distribution and Condensate Collection Installation and Maintenance Instructions

Parts and Accessories Installation Instructions

Ram Cushions and Pressure Parallels Dynamic Solutions For A Global Market

SUT-450-I ASSEMBLY REQUIREMENTS

Model 4360 Teardown and Reassembly Instructions

PARTS CATALOGUE / TECHNICAL GUIDE

Mercedes-Benz Citan Price List. Valid from June 2013

Quick Fix Guide PROCESSINTERLOCKING

TOYOTA COROLLA LOWERING SPRINGS Preparation

Hydro-Flow Model 2200 Installation and Operation Guide B

Sub Section Title Page No. 1 Introduction 3. 2 Significant Equipment Detail 3. 3 Installation Guidelines 4. 4 Routine Maintenance 4

INSTALLATION MANUAL. For: LAMBORGHINI URUS

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

off-grid Solutions Security of supply Basics: Off-grid energy supply

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

Transmission Overhaul Procedures-Bench Service

Sub Section Title Page No.

Tire & Wheel Fundamentals

GENERATOR SEAL OIL SYSTEM

DRIVE AXLE - INTEGRAL HOUSING

Zenith ZBTS/ ZBTSD/ZBTSCT

TOYOTA FJ CRUISER OFF-ROAD SHOCKS Installation Preparation

e fix Power add-on drive

Fitting Instructions: Rocket III / Classic / Roadster A and A Heated Grips Kit

Keep your trucks moving

FUNCTIONAL SKILLS COMMUNICATION READING LEVEL 1. Practice Exam 1 (for example script A) Exam date. Source Booklet

THE DIFFERENCE IS ELECTRIFYING. SANDVIK DD422iE

P5510. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

SCION tc LOWERING SPRINGS Preparation

COMPONENTS ILLUSTRATION

JETORQUE. Hydraulic Bolt Tensioner

GT-R Alpha 10/12 Turbo Kit

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

Engine Dismantle and Assemble ( )

INSTALLATION INSTRUCTIONS

SUT-250-S (These instructions are used for SUT-250-SCLC also)

Installation Instructions :AUDI 8V RS3 : Page 1

ABB life cycle services Uninterruptible power supplies

GENERAL VEHICLE INFORMATION FRONT LOWER STRUCTURE CENTRE LOWER STRUCTURE UPPER FRONT STRUCTURE NON-SIDE OPENING ELEMENTS

INSTALLATION INSTRUCTIONS

Triple Offset Valves

8JCW8J08. 'S.j.S!OLI'SLj.j.Oq JO J8!1ddns.j.S!ID!88dS. speq puo sessej.uow J8!18J ejnssejd S3:>1A~3S

Coil Spring Conversion Kit

INSTALLATION & MAINTENANCE MANUAL

REACTOR DISCHARGE VALVES S & DIGESTER BLOW VALVES SB & 5300SB B FLANGED BALL VALVES

CUSTOMIZED SERVICE & REPAIR SOLUTIONS

MODEL NUMBER AND IDENTIFICATION. Pag. 5 CHARACTERISTICS CHARACTERISTIC POWER, TORQUE AND SPECIFIC CONSUMPTION CURVES

Z1 Motorsports 300zx Akebono Brake Kit Installation Manual (Front)

REAR AXLE Click on the applicable bookmark to selected the required model year

Operation and Maintenance Instructions

Simple, fast, efficient.

Transair: Advanced Pipe Systems Pocket Installation Guide [1/2"] [1"] [1 1/2"] [2"] [2 1/2"] [3"] [4"] [6"]

Installation Instructions and Suggestions For Jeep YJ Fiberglass Replacement Bodies

PARTS LIST / TECHNICAL GUIDE

Paint/Solvent/Dump Valve and Flow-Through Valve

Tailcone Alignment Work aid, Using T (Laser Fixture), T (Target)

Solar PV General Introduction Guide for Electricians

THE AUTOWELD SYSTEM. Automated Pipe Welding System. High Productivity

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power

PARTS CATALOGUE / TECHNICAL GUIDE

COMPLETE FITTING INSTRUCTIONS FOR THE CASA PERFORMANCE SINGLE DISC HYDRAULIC BRAKE KITS

Bumble Bee. Please read and understand all instructions before building!

Electric wiring kit for towbars / 13-pin / 12 Volt / ISO 11446

ON-VEHICLE INSPECTION

WHEEL FITMENT EXPLAINED

Company Profile. Saudi Emarati Electric Power Generators Co. (L.L.C)

Bora showers Inline valve cartridge removal instructions. Inline Valve Cartridge Removal Instructions

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

SEries 41 check valve installation, operation & maintenance manual

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Installation Instructions

Increased Performance for Turbo Gears BHS AeroMaXX

SERIES G3DB/AG3DB ELEVATOR

TOYOTA COROLLA/MATRIX LOWERING SPRINGS Preparation

Mobil DTE 10 Excel Series

FORD. SuperRail Mounting Kit #3520. #3600 SuperGlide (24K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight)

FORD SuperRail Mounting Kit #3113. #3100 SuperGlide (12K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) SPECIFICATIONS

Brochure. Synchronous generators for diesel and gas engines Proven generators reliable power

Chain and Belt Tensioning Systems

Installation Instructions

More than just a solenoid interlock AZM300

Table of Contents. Chapter 2 Safety Fundamentals for Bridge Inspectors. Methods of Access Introduction

A Practical Guide to Free Energy Devices

Biasing the Vintage Series (Nomad, BelAir, VT50, Vintage 33)

Roller Camshaft Installation

Generating Electricity

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations

Patient Trolley System

TwinTech & SingleTech Combi Overview

Installation, Operation and Maintenance Manual

Front Suspension. Front Suspension Component Layout. NOTE: Without Dynamic Response version shown

Goulds High Pressure, Multistage Ring Section Pump

Ampco ZP3 Series (Addendum) Positive Displacement Pumps Installation and Maintenance Manual

Injector Solenoid - Test

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

CONTACT: Rasto Brezny Executive Director Manufacturers of Emission Controls Association 2200 Wilson Boulevard Suite 310 Arlington, VA Tel.

Transcription:

BOLTIGHT Ltd Hydraulic Closure System

Introduction Following a major overhaul on a conventional steam turbine or a combined cycle steam turbine, the turbine casing is temporarily reassembled to check alignment and clearances between rotating and static components Referred to as tops-on / topsoff work, it involves tightening bolts using a variety of methods This sequence of work is vitally important yet time-consuming

The System The Hydraulic Closure System is a replacement for bolt heating during the tops on / tops off clearance checks The system uses hydraulic nuts on the casing s existing bolts The Hydraulic Closure System is a fast, accurate and reliable method for Tops on: Tops off The pressure of the system is directly proportional to the force applied to the casing Gap measurement can be performed at known casing loads It is a cold system Bolt heating is eliminated so no safety hazards or waiting time Eliminates sub-contract bolting services and standby time costs Minimal training required

System Operation The Hydraulic Closure System is direct retrofit for the turbine casing The hydraulic nuts are installed instead of standard nuts The hydraulic nuts are connected together with high pressure hoses When pressurised, the hydraulic nut system stretches the bolts and quickly, evenly and accurately compresses the turbine casing While the nuts are under pressure, checks can take place When complete simply release the pressure for disassembly No more bolt heating means no more stand by time while the studs cool

Benefits The hydraulic closure system is fast, efficient and reliable It gives accurate and repeatable results Since it is a cold system no safety issues with regards to bolt heating Eliminates stand by time from the cooling of the bolts Uses the existing casing bolts The nuts are designed to fit on the casing s existing spot-faces allowing the system to fit all turbine geometries The Hydraulic Closure System is extremely cost effective, and achieves an even quicker pay back if used on operating plants with identical or similar turbines that have the same bolt sizes and thread forms

Benefits Best Practise Process COST savings BOLTIGHT Hydraulic Closure System Safety Critical path time savings

Time Saving Comparison: Existing method Planned duration 2 x 12 hour shifts comprising: bolt installation; bolt heating: bolt cooling (checks) - bolt heating; bolt cooling; bolt removal. Closure system 1 x 5 hour shift comprising: bolt installation; bolt tightening; - (checks) - bolt removal. Analysis detail: Standard time for hydraulic equipment installation. Fitting hydraulic hoses - 3 hoses per minute Pressurise sequence - 3 minutes Depressurise sequence - 10 seconds Disconnect hoses - 5 hoses per minute

Complete Package At BOLTIGHT we can provide you with the complete system, which includes our hydraulic nuts and all the ancillaries and spares required. The package usually includes hydraulic nuts of varying sizes to suit the turbine casing, an air or electric driven pump, hoses and fittings to harness the system together, spare parts and seals and a comprehensive Health Safety Operating Instruction and Maintenance Manual. We also offer on-site training in use of the system and advice on how best to use the system for complete and accurate casing closure. Rental options are also available on the system.

Product Innovation Size Identification Dots Allows fast and easy recognition of the size of the nut Our engineers can provide you with a colour coded bolting layout diagram to aid nut placement

Product Innovation Lifting Lugs Aids in fitting the nuts to the underside of a turbine case Fast, easy installation Fitted with matching identification dots to the tool size

BOLTIGHT will be pleased to provide a technical and financial proposal for the Hydraulic Closure System. Please don t hesitate to contact us for further details.