Need Assessment Document (NAD) DDUGJY

Similar documents
NOTIFICATION RURAL ELECTRIFICATION PLAN

Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

Anil Agarwal Dialogue 2014

Tackling Power Theft through Meter Data Management and Quality Analysis. Results from NPCL s AMR roll out and AMI trial

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018

ANNEXURE: TARIFF SCHEDULE

AT&C Loss Reduction in Electrical Distribution System by Implementation of HVDS

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

PRESS NOTE. Distribution Tariff for Maharashtra State Electricity Distribution Company Limited (MSEDCL) applicable with effect from 1 June, 2015

Annexure 1: Category-wise Tariff for BEST's consumers for FY (effective from 1 September, 2018)

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Maharashtra Electricity Regulatory Commission

EXPRESSION OF INTEREST INVITING FROM

PRESS RELEASE ON 19March, 2018

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

T&D EQUIPMENT MARKET IN INDIA 2017

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Estimating the cost of electrification technology options to aid electricity access scale up: The case of Ghana

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

ANNEXURE: TARIFF SCHEDULE

BHUTAN POWER CORPORATION LIMITED AN OVERVIEW

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2016

Details of concern person for future communication/clarification. Mobile No. Address

Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid. Praveer Sinha Tata Power Delhi Distribution Limited

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015

24X7 POWER FOR ALL MEGHALAYA. A Joint Initiative of Government of India and Government of Meghalaya

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************

Joint Inspection Report

KANPUR ELECTRICITY COMPANY LIMITED

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Uttar Gujarat Vij Company Limited APR for FY & ARR for FY TARIFF SCHEDULE

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

A JOINT INITAITVE OF. Government of India. Government of Jharkhand. Power for All. Jharkhand

THE ANDHRA PRADESH GAZETTE PART IV-B EXTRAORDINARY PUBLISHED BY AUTHORITY [No.1] HYDERABAD, THURSDAY, JANUARY 24, 2013

Building Collaboration Between East African Nations via Transmission Interconnectors

Government of Pakistan Ministry of Water and Power ****************** NOTIFICATION

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

Study on. Business. Forum of Regulators (FOR) New Delhi

I. Meter Hire/Rental Charges

System Improvement Scheme(R&M) : FY

Power Sector Trends: Focus on States

Ministry of Power ACHIEVEMENTS UNDER MAJOR SCHEMES OF MINISTRY OF POWER. Capacity Addition during the last 3 years has been 55,078.

Regional Meeting on Sustainable Energy for Asia -Pacific Least Developed Countries Kathmandu, Nepal. Surendra Rajbhandari

Before the. Case No. 106 of 2009

REGIONAL MEETING ON SUSTAINABLE ENERGY

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Guidelines for Solar Grid Power Projects

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

India: the Power Sector; what you also need to know

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

24X7 POWER FOR ALL TRIPURA A JOINT INITIATIVE OF GOVERNMENT OF INDIA AND GOVERNMENT OF TRIPURA

CASE NOS. 79, 80, 81 & 82 of 2017/363 Date

Western Electricity Supply Company of Orissa Ltd., Burla, Sambalpur , Orissa

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

BRIEF ACHIEVEMENTS AND INITIATIVES OF SIKKIM NATIONALISED TRANSPORT (SNT) (TILL DECEMEBR 2015)

MYT Petition citing various reasons and uncertainties in the electricity market.

Multi-Tier Framework Survey Kenya

MANAGING NEW CONNECTIONS FOR YOUR BUSINESS

Analysis of Indian electricity distribution systems for integration of high shares of rooftop PV By Joerg Gaebler, IGEN Solar, GIZ India

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

PRESENTER PETER NJENGA CHIEF ENGINEER, CUSTOMER SERVICE, KENYA POWER EAST AFRICAN POWER INDUSTRY CONVENTION 2012

SCE's Experience Distribution Volt/VAR Control:

Uttar Pradesh Electricity Regulatory Commission, Lucknow

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Rural Electrification Workshop International Best Practices and Options for Policy Makers 4 5 April 2013, Yangoon, Union of Myanmar

24 X 7 POWER FOR ALL GOA. A Joint Initiative of Government of India and Government of Goa

UTTARAKHAND POWER CORPORATION LIMITED

Government of Sierra Leone. Directions in. Energy. Opportunities for Investment and Partnerships

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Construction and Practices of Strong & Smart Grid. State Grid Corporation of China 5-6 April 2011, Hongyu LIN, France

Dakshin Gujarat Vij Company Limited

Tariff Circular & Tariff Schedules

IEEE-PES Chicago Chapter Presentation November 11, Smart Grid. Mike Born. Principal Engineer, Capacity Planning

Reactive Power Compensation using 12 MVA Capacitor Bank in 132/33 KV Distribution Substation

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Smart Grid System from Japan to India

(1) Current State and Issues of the Electricity Sector in Indonesia

B. E. S. & T. UNDERTAKING

ROBERTO BERNACCHI, GLOBAL PRODUCT MANAGER, 16 JUNE 2018 New power infrastructure concept for greener container terminals Creating Stronger, Smarter

The Role of Electricity Storage on the Grid each location requires different requirements

Prospects for Rural Electrification in Africa

EUCL AMI Project Experience Share

DISTRICT PROFILE ERODE

Prospects for Rural Electrification in Africa

Lighting Up Bihar. Robin Burgess, LSE and IGC Michael Greenstone, MIT Nicholas Ryan, Harvard Anant Sudarshan, Harvard and JPAL

Smart Grid Vision and Roadmap for India

A PROJECT PROFILE ON ROLLING SHUTTERS

About Landis + Gyr manage energy better

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

Transcription:

Need Assessment Document (NAD) DDUGJY

Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing infrastructure 13 6.0 Cost data/ schedule of rates 15 7.0 Proposed infrastructure 16 8.0 Objective based cost segregation 19 2

1.0) General Instruction Need Assessment Document : DDUGJY The utilities shall prepare a consolidated Need Assessment Document (NAD) withrelevant information of their licensee area along with justifications (preferably by way of load flow studies) to substantiate the proposed scope of work and cost estimates based on recent schedule of rates. The utilities will identify need for feeder separation and critical gaps in sub-transmission and distribution network considering all relevant parameters such as: 1) Consumer mix, 2) Consumption pattern, 3) Voltage regulation, 4) AT&C loss level, 5) HT & LT ratio, 6) Loading of power & distribution transformers, 7) Loading of feeders / lines, 8) Reactive power, 9) Power factor, 10) Improvement in standard of performance 11) On-going works under other schemes for efficient management of distribution system. The NAD will be examined by the nodal agency to arrive at broad scope of work to be covered under the scheme and the total cost in consultation with the concerned utilities. The utility / state shall ensure availability of power to achieve the target of 24x7 power supply for non-agricultural consumers, progressively in rural areas. Based on the broad scope of work validated by nodal agency, the utilities will formulate district/circle/zone wise bankable Detailed Project Reports (DPRs) in line with the approved NAD. DPRs should bebased on detailed field survey and latest approved schedule of rates for various items of work. The Nodal Agency will separately provide comparable costs sourced from CPSUs for major equipment for reference of the utility. These reference rates shall be used as ceiling rates for 3

sanctioning of the projects. Grant shall be extended on the sanctioned cost or award cost of the project, whichever is lower. The works in Gram Panchayat selected under SaansadAdarsh Gram Yojana (SAGY) shall necessary be included in the DPR. While formulating DPRs, utility shall necessarily consult the public representatives including Member of Parliament. Utility shall furnish a certificate to this effect while submitting DPRs to Nodal Agency. --------------x--------------- 4

2.0) Objectives of DDUGJY: The Broad monitorable Objectives for prioritizing the works under the scheme shall be: (i) 24x7 power supply for non-agricultural consumers and adequate power supply for agricultural consumers, (ii) Reduction of AT&C losses as per trajectory (discom-wise) finalized by the Ministry of Power in consultation with States and (iii) Providing access to all rural households. The utility to prepare the NAD/ DPR categorized under the broad head of objectives: SNo. Objective Broad Scope 1 24X7 power supply for non- Feeder Ag consumer and adequate Separation(Physical supply for Ag consumer / Virtual) i. Physical separation of Reorientation of HT feeders for feeders Agricultural and non- Associated Agricultural consumers infrastructure ii. Virtual separation of feeders 2 AT&C loss reduction i. Strengthening of subtransmission and distribution system ii. Metering 3 Access of Power i. Creation of new infrastructure Sub-stations HT/ LT lines Distribution Transformers Meters ABC Cables HT/ LT lines Distribution Transformers Meters ABC Cables Micro grid BPL service connections 5

The NAD document shall consist of following format for submission of structured information: SNo. Details Information Sought 1 General Information under 4.0 2 Details of existing Infrastructure under 5.0 General Details of project area Power supply details Details of on-going schemes Details of consumers Details of households Details of villages Substations Feeders Distribution Transformers LT line Meters 3 Costing under 6.0 Cost data and schedule of rates to be provided as attachments (utility wise) 4 Proposed Infrastructure Under 7.0 5 Objective based cost segregation Under 8.0 New Substations Augmentation of Feeders Distribution Transformers LT line Capacitor Banks Meters Objective based costing 6

3.0) Scope of Works Need Assessment Document : DDUGJY A. The projects under the scheme shall be formulated for rural areas only and will cover works relating to: i. Feeder Separation (i) Physical separation of HT feeders for Agricultural and non- Agricultural consumers: a. Erection of HT lines for drawing new feeders and reorientation/re-alignment of existing lines. b. Installation of new distribution transformers and augmentation of existing distribution transformers. c. Re-location of distribution transformers and associated LT lines for re-grouping of consumers (Agricultural and Non- Agricultural). (ii) Virtual separation of feeders : a. Installation of new distribution transformers and augmentation of existing distribution transformers. b. Re-location of distribution transformers and associated LT lines for re-grouping of consumers (Agricultural and Non- Agricultural). c. Installation of rotary switch and associated hardware at substations. Feeders already segregated by the utilities shall not be eligible to be covered under this scheme. However, the feeders segregated by virtual means could be considered for undertaking physical separation under the scheme. ii. Strengthening of sub-transmission and distribution system (i) Creation of new sub stations along with associated 66 KV / 33 KV/ 22 KV/ 11 KV lines. (ii) Augmentation of existing sub-stations capacity by installation of higher capacity/additional power transformer along with associated equipment/ switchgear etc. (iii) Erection of HT lines for reorientation/re-alignment including augmentation of existing lines. 7

(iv) Installation of new distribution transformers and augmentation of existing distribution transformers along with associated LT lines. (v) Installation of capacitors. (vi) Renovation and Modernization of existing sub-stations and lines. (vii) High Voltage Distribution System (HVDS). (viii) Arial Bunched Cable for theft prone areas. iii. Micro-grid and off-grid distribution network. iv. Metering The installation of meters at sub-stations, feeders, distribution transformers and consumers is important to ensure seamless accounting and auditing of energy at all levels in the distribution system. Accordingly, metering of all feeders and distribution transformers including metering at all input points to the utility shall be ensured under this scheme. The metering component under the scheme shall cover the following: (i) Installation of suitable static meters for feeders, distribution transformers and all categories of consumers for un-metered connections, replacement of faulty meters & electro-mechanical meters. (ii) Installation of Pillar Box for relocation of meters outside the premises of consumers including associated service cables and accessories v. NOFN: The scheme envisages connecting all 33 KV or 66 KV grid sub stations/ billing offices / Regional / Circle / Zonal offices of utilities by extending optic fiber network being established under NOFN. A separate and consolidated DPR shall be prepared by the respective utility in consultation with BBNL or any designated agency like BSNL, RailTel, PGCIL etc. for the NOFN programme in the state. 8

B. Works not eligible under the scheme The following works/ items shall not be eligible for coverage under DDUGJY scheme: (i) Works already sanctioned under other schemes of Government of India (RGGVY, NEF, R-APDRP etc.).the projects for which any other grant / subsidy from Government of India has already been received / proposed to be received shall not be eligible under this scheme. (ii) Service lines to APL consumers. (iii) Under-ground cable works. (iv) Cost of land for sub-stations. (v) Civil works other than sub-stations. (vi) Compensation towards right of way. (vii) Distribution automation and IT applications. (viii) Office equipment / fixtures. (ix) Spares (other than mandatory spares). (x) Tools and Plants (T&P). (xi) Vehicles. (xii) AMR / AMI, Prepaid meters and Smart Meters. (xiii) Salaries and Establishment Expenditure. 9

4.0) General information of project area a) Name of Utility: b) No. of districts: c) Profile of utility (i) General Information Sl. Particular No. Information 1 Total Project Area (sq Km) 2 Total Number of rural consumers 3 Total Population of Project Area (as per 2011 census) 4 Nodal Officer 5 Energy Input (MU) in last FY 6 AT&C loss in last FY 7 HT/LT Ratio (ii) Power Supply Details Sl. No. Details of Substation Details of Feeder Peak Demand (MVA) met Name Capacity & Voltage Ratio Name Loading %ge Length 1 2 3 10

d) Project Area Details (District wise): Details of on-going GOI scheme like Old RGGVY, NEF, etc S. No. 1 2 3 4 Name of District On-going GOI scheme like Old RGGVY, NEF, etc e) Details of consumers (category-wise) Type of Consumer Domestic Agriculture Industrial Commercial Others Total Total Energy Consumed in preceding year Revenue in Rs. Lakhs No. of Metered consumer No. of Unmetered consumer Total No. of Metered + unmetered consumer f) Availability of average hours of supply to rural households in the project area: g) Details of household electrification Name of District District A DistrictB Total No of household No. of Electrified household No. of Un- Electrified household No. of unelectrified household proposed under ongoing RGGVY No. of Un- Electrified household proposed for electrification under the scheme Balance Un- Electrified household (if any & reasons there of) 11

Total h) Roadmap for providing access to 100% rural households: Balance Electrified household Un- Year 1 Year 2 Year i) Details of village electrification Name of District DistrictA DistrictB Total No of Villages No. of Electrified Villages No. of Un- Electrified Villages No. of unelectrified villages proposed under ongoing RGGVY No. of Un- Electrified villages proposed for electrification under the scheme Balance Un- Electrified villages (if any & reasons there of) Total j) Details of work covered (QUANTITY) under RGGVY (District wise) District Works Xth Plan XI plan XII plan HT line KM Dist. Trans. (NO/KVA) LT line Substation NO /MVA) Service connection to BPL in NO. Sanctioned Executed Sanctioned Executed Sanctioned Executed k) Details of cost(in Rupees) covered under RGGVY (District wise) District Works Xth Plan XI plan XII plan 12

HT line KM Dist. Trans. (NO/KVA) LT line Substation NO /MVA) Service connection to BPL in NO. Sanctioned Executed Sanctioned Executed Sanctioned Executed 13

5.0) Details of existing infrastructure (District wise): S. No. Item Unit District A District B 1 33/11 KV or 66/11 KV SUB-STATION MVA Name of S/S: A Name of S/S: B Name of S/S: C Capacity : MVA Capacity : MVA Capacity : MVA 2 33 KV feeders Km Source S/S: (EHV) Fed S/S (33/11 kv). Length: km 3 11 KV feeders Km Source S/S: Voltage Regulation Length: km 4 Distribution Transformer KVA No.. Total kva. 5 LT Line : Km 6 Capacitor Bank MVAR & No. 7 Aerial Bunched Cables Km 8 Metering- Feeder Nos Total Metered: Un metered:

9 Metering -DT Nos Total Metered: Un metered: 10 Metering -Consumer Nos Total Metered: Un metered: 15

6.0) Cost data/ schedule of rates Latest cost schedule may be attached 16

7.0) Proposed infrastructure Utility wise details of proposed infrastructure in following format (with district wise break up). The following are the Broad items and the utilities may include/ exclude the items as per their priority S.No Item Unit Unit Rate Total Amount in Rs. lakhs Objective of work (1, 2 or 3)# A. Feeder Separation 1 33 KV Feeder Kms 2 11 KV Feeder Kms 3 LT Line Kms 4 Distribution Transformer MVA/No Total B. Strengthening of Sub-Transmission and Distribution Network 1 33/11 KV or 66/11 KV SS : MVA New substation Additional Transformer 17

Augmentation Enhancement Need Assessment Document : DDUGJY 2 Brief Scope of R&M works in existing 33/11 KV or 66/11 KV substations (details of Substations & works to be provided in DPR) 3 33 KV feeders Km New Augmentation 4 New 11 KV feeders- Km New Augmentation 5 6 Distribution Transformer- New Distribution Transformer- R&M MVA/No Nos. 7 LT Line Km 18

New Augmentation 8 Capacitor Bank MVAR 9 Aerial Bunched Cables Km C. Metering Total 1 Feeder Nos 2 Distribution Transformer Nos 3 Consumer Nos Total Grand Total # Note: Objectives: 1) 24x7 power supply for non-agricultural consumers and adequate power supply for agricultural consumers, 2) reduction of AT&C losses as per trajectory (discom-wise) finalized by the Ministry of Power in consultation with States and 3) providing access to all rural households. 19

8.0) Objective based cost segregation: Need Assessment Document : DDUGJY SNo. Objective Part cost of the project attributing to this objective (Rs. in lakhs) 1 24x7 power supply for non-agricultural consumers and adequate power supply for agricultural consumers, 2 Reduction of AT&C losses as per trajectory (discom-wise) finalized by the Ministry of Power in consultation with States and 3 Providing access to all rural households. TOTAL -----------x----------- 20