congestion management program

Similar documents
congestion management program

ACTION: ESTABLISH LIFE-OF-PROJECT BUDGET FOR UP TO 100 NEW COMPO BUSES

ORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report

Washington Metropolitan Area Transit Authority

Peninsula Corridor Electrification Project (PCEP)

Transit Project Delivery Status Report. Significant Issues

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

Board of Directors authorization is required for all goods and services contracts obligating TriMet to pay in excess of $500,000.

RFP No. P3010 New l.i ght Rail Vehicles

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

MEETING DATE: October 9, 2015 ITEM 7. Authorize Expenditure of Funds and Contract Actions to Support Locomotive Lease from BNSF Railway Company

TORONTO TRANSIT COMMISSION REPORT NO.

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

Purple Line Light Rail P3 Project

MOTION No. M Purchase of Five 40-foot Buses PROPOSED ACTION

TORONTO TRANSIT COMMISSION REPORT NO.

7000 Series Railcar Program Overview

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA EXECUTE CONTRACT MODIFICATIONS FOR BUS INSPECTION SERVICES

Peninsula Corridor Electrification Project Cost / Schedule Update

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

STAFF REPORT ACTION REQUIRED

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

35 One Gateway Plaza Los Angeles, CA

Project Budget and Schedule Status

APPROVE VANPOOL VEHICLE SUPPLIER BENCH CONTRACTS

Mobility Corridor Updates. Transit & Active Transportation Projects

Too Good to Throw Away Implementation Strategy

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Board 8/24/2017 Final Action Bonnie Todd, Executive Director of Operations Martin Young, Commuter Rail Manager

SUBJECT: CONTRACT C080S, HOIST REPLACEMENT AT BUS MAINTENANCE DIVISIONS 3, 5, 9, 10, AND 18, PETERSON HYDRAULICS AND ROTARY LIFT, A JOINT VENTURE

Los Angeles County One Gateway Plaza q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA metro.4 I

v Deborah Flint - Chief ecutive e, ficer

P2000 RAIL CAR AUXILIARY INVERTERS

Program Evaluation and Audit Metro Transit Bus Tire Lease Contract Review

Mobility Corridor Updates. Transit & Active Transportation Projects

Vehicle Replacement Policy - Toronto Police Service

AWARD CONTRACT FOR LINE BREAKERS

Exhibit 1. Background. Authorizing Legislation

Washington Metropolitan Area Transit Authority Recommended Contracting Actions For Up To 217 Hybrid Electric & Clean Diesel Buses

Tel metro. net

City of Palo Alto (ID # 6416) City Council Staff Report

MOTION NO. M Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade PROPOSED ACTION

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014 PURCHASE OF HYBRID SEDANS APPROVE CONTRACT AWARD ACTION: RECOMMENDATION

Late Starter. Tuesday, November 6, 2018

3.17 Energy Resources

STAFF REPORT ACTION REQUIRED

Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY. PARTIAL STREET LIGHTING SERVICE RATE 117 Page 1 of 5

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

THE PUBLIC UTILITIES BOARD ACT April 22, Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B.

TOTAL PROPOSED CONTRACT PRICE Ring Power Corporation $4,875,951

DART Priorities Overview

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION

Metropolitan Domestic Water Improvement District Board of Directors Meeting. August 8, July 2011 Report

SAN FERNANDO CITY COUNCIL SPECIAL MEETING NOTICE & AGENDA FEBRUARY 3, :30 PM COMMUNITY MEETING ROOM 117 MACNEIL STREET SAN FERNANDO, CA 91340

Balancing the Transportation Needs of a Growing City

AGENDA ITEM 1 F Consent Item

Solano County Transit

Los Angeles County Metropolitan Transportation Authority. Paid Parking Pilot Program Parking Management

City Council Report. Mayor and City Council

4 COSTS AND OPERATIONS

Pomona Rotary December 19, 2017

Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle

Peninsula Corridor Electrification Project (PCEP)

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases. Sean H. Turner October 18, 2017

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Greater Cleveland Regional Transit Authority

Neighborhood Fire Stations

The Regional Municipality of York. Purchase of Six Battery Electric Buses

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

Starting and Growing Rural Vanpool Programs: From Financing to Vehicle Procurement

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

TORONTO TRANSIT COMMISSION REPORT NO.

Minnesota Avenue Station Parking Garage Repair Project

Department of Legislative Services

The Case for. Business. investment. in Public Transportation

Martha s Vineyard Regional Transit Authority

Metro OPERATIONS COMMITTEE JANUARY 20,201 1 SUBJECT: CNG ENGINE OIL AWARD CONTRACT FOR CNG ENGINE OIL RECOMMENDATION

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

MEMORANDUM. TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit. Date: May 24, Summary

APPROVE CONTRACT MODIFICATION AWARD

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

The Funding of Pupil Transportation In North Carolina March, 2001

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Vehicle and Equipment Services (4760P)

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

Presentation to the Board of Directors on Rail Fleet Rehabilitation and Restoration Programs SAN FRANCISCO, CALIFORNIA

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

FTA Low Speed Magnetic Levitation Program

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CITY OF LOS ANGELES DEPARTMENT OF AIRPORTS

Transcription:

congestion management program 2550 Rail Vehicle Program March 2012 11-0319tr 2010 lacmta Q U A R T E R LY P R O J E C T S TAT U S R E P O R T

255O RAIL VEHICLE PROGRAM QUARTERLY PROJECT STATUS REPORT THE PREPARATION OF THIS DOCUMENT HAS BEEN FINANCED IN PART THROUGH A GRANT FROM THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL TRANSIT ADMINISTRATION (FTA), UNDER THE FEDERAL TRANSIT ACT OF 1964, AS AMENDED AND WITH FUNDS FROM THE STATE OF CALIFORNIA March 2012

TABLE OF CONTENTS Page No. Project Overview...... 1 Management Issues...... 2 Project Status Schedules P2550 Vehicle Contract & Proposed Delivery Schedule.... 3 Schedule Issues as of March 30, 2012........ 4 Project Budget Status....... 5 Financial/Grant Status... 6 Current Photos..... 7 Appendices... 8-9

PROJECT OVERVIEW The 2550 Light Rail Vehicle Base Contract for a Base order of 50 LRVs was awarded to Ansaldobreda, S.p.A. of Pistoia and Naples, Italy (A.B.). The 2550 Contract also includes two 50-LRV pre-priced options for future growth, expansions, and new lines. Per MTA Board Action in September 2009, staff was tasked to extend the expiration dates of both options to October 31, 2009, and finalize exercise of the options by that date. Ansaldobreda, however, declined to accept Metro conditions for the options and the options expired. As of March 30, 2012, forty-eight (48) vehicles have been Final Accepted for operation on the Metro Gold Line. Project accomplishments for this period: 1. Accepted vehicles have been operating in revenue service since March 2008. During this period vehicle operational issues have been discovered as a result of experience gained in actual revenue operation. AB has addressed and continues to support resolution of operational issues as encountered and continue to support the warranty program. To date the P2550 fleet has accumulated approximately 6.8 million miles of revenue service with average Mean Miles Between Failure (MMBF) of 21,546 for February 2012. 2. As of March 30, 2012, two (2) cars remain at the Pittsburg, CA Final Assembly Plant. They are awaiting parts from Italy to complete the assembly work and then ship to Los Angeles for commissioning and acceptance. 3. Numerous meetings (daily, weekly and monthly) have been held with AB engineers during the period to determine the status, to close engineering open items and improve revenue operational issues. The work is ongoing. 4. Liquidated Damages. Under the Contract, AB is obligated to reimburse MTA for delivery delays up to a maximum of $14,677,487 (10% of the total contract price). To date, over $14.56M has been withheld from AB progress payments to compensate for delays. 1

MANAGEMENT ISSUES Concern No. 1: Resolution of remaining open items on Conditionally Accepted vehicles and vehicle configuration finalization. Status/Action No. 1: The Project Team is working closely with AB to address all field observed issues to insure vehicle revenue service reliability. Several project meetings with AB were held during the period to address remaining open technical issues and to close remaining open items. The work is on-going. Concern No. 2: As of April 1, 2012 thirty-one (31) of the P2550 Fleet are still under basic warranty, AB is responsible for supporting the fleet with repairs and spare parts. For the most part this service is acceptable; however, lately Metro has noticed part shortages and is concerned that AB is not properly managing warranty parts processing. Status/Action No. 2: The Metro Project Team previously brought this concern to AB top management requesting full attention given to the warranty support parts shortage problems. AB has contacted their sub-suppliers and has also procured requisite parts for this purpose, when possible Metro loans AB parts to support the revenue fleet. Although AB is still borrowing parts, they are also returning parts to Metro as they arrive from suppliers. Concern No. 3: AB project management recently discussed that there are production parts issues on the remaining 2 cars, specifically on prototype vehicles 701 & 702. Status/Action No. 3: The majority of the parts issues previously identified have been addressed. Metro has also loaned AB small component parts for this purpose. The Project Team receives updated lists on a bi-weekly basis and will continue to monitor this concern on a weekly basis. 2

P2550 LIGHT RAIL VEHICLE CONTRACT & PROPOSED DELIVERY SCHEDULE No. Of Cars VEHICLE NUMBER CONTRACT DELIVERY REQUIREMENT - MONTHS AFTER JUNE 6, 2003 NTP CONTRACT REQUIRED DELIVERY DATE (End of Month) ACTUAL DATE OF ARRIVAL AT METRO CONDITIONAL ACCEPTANCE DATE FINAL ACCEPTANCE DATE 1 701 24 MONTHS JUNE/05 6/11/05 SEE NOTE 1 2 702 24 MONTHS JUNE/05 7/26/05 SEE NOTE 1 3 703 27 MONTHS SEPTEMBER/05 7/28/10 10/20/10 12/30/11 4 704 26 MONTHS AUGUST/05 1/30/07 8/6/08 12/30/11 5 705 28 MONTHS OCTOBER/05 1/09/07 8/3/09 8/31/11 6 706 28 MONTHS OCTOBER/05 2/28/07 3/5/08 12/30/11 7 707 29 MONTHS NOVEMBER/05 5/31/07 9/10/09 6/30/11 8 708 29 MONTHS NOVEMBER/05 6/20/07 3/5/08 12/30/11 9 709 30 MONTHS DECEMBER/05 7/31/07 4/16/09 12/30/11 10 710 30 MONTHS DECEMBER/05 8/30/07 6/13/08 12/30/11 11 711 31 MONTHS JANUARY/06 5/30/08 7/15/08 12/30/11 12 712 31 MONTHS JANUARY/06 6/06/08 8/29/08 12/30/11 13 713 32 MONTHS FEBRUARY/06 6/24/08 11/25/08 10/31/11 14 714 32 MONTHS FEBRUARY/06 7/22/08 11/12/08 10/31/11 15 715 33 MONTHS MARCH/06 8/5/08 10/31/08 10/31/11 16 716 33 MONTHS MARCH/06 8/26/08 3/31/09 8/31/11 17 717 34 MONTHS APRIL/06 9/23/08 10/24/08 10/31/11 18 718 34 MONTHS APRIL/06 9/30/08 11/20/08 10/31/11 19 719 35 MONTHS MAY/06 11/6/08 3/23/09 10/31/11 20 720 35 MONTHS MAY/06 11/13/08 12/12/08 10/31/11 21 721 36 MONTHS JUNE/06 11/19/08 12/23/08 10/31/11 22 722 36 MONTHS JUNE/06 12/2/08 1/23/09 10/31/11 23 723 37 MONTHS JULY/O6 12/16/08 2/20/09 10/31/11 24 724 37 MONTHS JULY/O6 1/8/09 1/31/09 9/29/11 25 725 38 MONTHS AUGUST/06 1/28/09 2/27/09 9/29/11 26 726 38 MONTHS AUGUST/06 3/20/09 4/30/09 9/29/11 27 727 39 MONTHS SEPTEMBER/06 4/9/09 5/19/09 9/29/11 28 728 39 MONTHS SEPTEMBER/06 5/1/09 5/29/09 9/29/11 29 729 40 MONTHS OCTOBER/06 5/20/09 6/23/09 9/29/11 30 730 40 MONTHS OCTOBER/06 5/29/09 6/29/09 9/29/11 31 731 41 MONTHS NOVEMBER/06 6/12/09 12/20/09 9/29/11 32 732 41 MONTHS NOVEMBER/06 6/30/09 5/12/11 8/31/11 33 733 41 MONTHS NOVEMBER/06 7/31/09 12/31/09 8/31/11 34 734 42 MONTHS DECEMBER/06 8/21/09 2/8/10 8/31/11 35 735 42 MONTHS DECEMBER/06 10/21/09 4/14/10 8/31/11 36 736 42 MONTHS DECEMBER/06 12/2/09 2/3/10 6/30/11 37 737 43 MONTHS JANUARY/07 1/7/10 2/23/10 6/28/11 38 738 43 MONTHS JANUARY/07 2/4/10 4/19/10 6/28/11 39 739 43 MONTHS JANUARY/07 3/4/10 4/12/10 6/30/11 40 740 44 MONTHS FEBRUARY/07 4/15/10 5/20/10 6/7/11 41 741 44 MONTHS FEBRUARY/07 5/12/10 6/30/10 5/26/11 42 742 44 MONTHS FEBRUARY/07 5/19/10 7/20/10 5/26/11 43 743 45 MONTHS MARCH/07 7/8/10 8/31/10 5/20/11 44 744 45 MONTHS MARCH/07 10/20/10 11/30/10 8/31/11 45 745 45 MONTHS MARCH/07 12/10/10 12/31/10 8/31/11 46 746 46 MONTHS APRIL/07 01/19/11 02/28/11 8/31/11 47 747 46 MONTHS APRIL/07 03/03/11 4/29/11 8/31/11 48 748 46 MONTHS APRIL/07 5/11/11 6/24/11 6/30/11 49 749 47 MONTHS MAY/07 6/1/11 8/3/11 9/29/11 50 750 47 MONTHS MAY/07 7/6/11 9/30/11 10/31/11 NOTE 1: Prototype cars 701 & 702 were sent to Assembly Site (Pittsburg, CA) for rework to final configuration. 3

SCHEDULE ISSUES Notice to Proceed was given June 6, 2003. The base contract engineering and assembly effort for the first vehicle was scheduled to take approximately two years and delivery of the first two cars was scheduled for June 2005. The 50 car base contract funding was divided between Metro (40 cars) and the FTA (10 cars). The last (fiftieth) base contract LRV was scheduled for delivery 48-months after NTP, or approximately May 2007. Status as of this writing follows: A total of forty-eight (48) cars have been delivered and have been final accepted by MTA. Revised Delivery Schedule. AB s current schedule calls for delivery of 50 th vehicle by May 2012. MTA is monitoring delivery of missing production parts for the remaining vehicles at the Pittsburg Assembly Plant. Prototype Vehicles. Vehicles 701 and 702 are at the Pittsburg Assembly Plant undergoing modification to current configurations. The work is ongoing and is monitored by MTA inspectors. Warranty Extension. Metro s Project Team negotiated extended warranty on 13 vehicles due to AB being late on delivery of e.g. final manuals, critical spare parts including traction motors and trucks, special tools and equipment. Without these deliverables Rail Fleet Services is not able to maintain the fleet; AB concurred and realized that the additional time is also needed by them to fulfill these requirements. 4

PROJECT BUDGET STATUS ELEMENT LRV PROJECT BUDGET FOR 800151 (40 LRV S) LRV PROJECT BUDGET FOR 800088 (10 LRV S) TOTAL LRV PROJECT BUDGET COMMENTS Base Buy 50 LRVs Base Buy Spare Parts $88,647,263 $22,161,816 $110,809,079 $5,849,886 $1,462,471 $7,312,357 Base Buy Special Tools & Test Equip $1,407,051 $351,763 $1,758,814 Additional Tools $1,400,000 $350,000 $1,750,000 Subtotals $97,304,200 $24,326,050 $121,630,250 Rail Consultant Total $10,868,759 $2,717,190 $13,585,949 Contract PS 8310-1267 for Rail Consultant staff technical services Contingency $343,542 $85,885 $429,427 Subtotals $11,212,301 $2,803,075 $14,015,376 MTA Staff $6,073,920 $1,518,480 $7,592,400 TOTALS $114,590,421 $28,647,605 $143,238,026 5

FINANCIAL/GRANT STATUS MARCH 2012 STATUS OF FUNDS BY SOURCE in $ millions (A) (B) (C) (D) (D/B) (E) (E/B) (F) (F/B) ORIGINAL TOTAL TOTAL COMMITMENTS EXPENDITURES BILLED to FUNDING SOURCE BUDGET FUNDS FUNDS SOURCE ANTICIPATED AVAILABLE $ % $ % $ % FEDERAL - STIP 71.1 15.4 15.4 15.4 100% 15.4 100% 15.4 100% FED-SEC 5309 FIXED GUIDEWAY 38.3 25.9 25.9 25.9 100% 25.9 100% 25.9 100% FEDERAL - RSTP 7.7 0.0 0.0 0.0 0% 0.0 0% 0.0 0% FEDERAL - CMAQ 14.2 0.0 0.0 0.0 0% 0.0 0% 0.0 0% STATE STIP 6.0 61.7 61.7 61.7 100% 61.7 100% 61.7 100% STATE STA 15.6 8.6 8.6 8.6 100% 8.6 100% 8.6 100% PROPOSITION A 35% BONDS 0.0 2.9 2.9 2.9 100% 0.8 28% 0.5 0% UNBILLED ACRUALS TOTAL 152.9 114.6 114.6 114.6 100% 112.5 98% 112.2 98% (1) Based on September 06 Regional Programming Funding Plan. Note: Expenditures are cumulative through February 2012. The 2550 Rail Vehicle Program consists of 40 light rail vehicles (LRV) and associated costs. The remaining 10 LRV's and associated costs under Contract P2550 are being charged directly against the Metro Gold Line Eastside Extension Project. STATUS OF FUNDS ANTICIPATED STIP STATE: LACMTA requests for STIP allocation have been approved. $61.73 million is available for drawdown. FEDERAL SECTION 5309: LACMTA grant applications have been approved. $25.9 million in section 5309 funds were approved. Funds have been drawdown. FEDERAL RSTP: A grant agreement for $7.7 million was executed on April 7, 2005. FTA approved the transfer of funds on August 11, 2011 to the P3010 LRV Project. FEDERAL CMAQ: A grant agreement for $14.2 million was executed on August 25, 2005. FTA approved the transfer of funds on August 11, 2011 to the P3010 LRV Project. 6

CURRENT PHOTOS 2550 LRV Coming Around the Curve into Union Station. 2550 LRV at Metro Gold Line Yard with Decals for LA Olympic Bid. 7

APPENDIX COST AND BUDGET TERMINOLOGY COMMITMENTS: The total of actual contract awards, executed change orders or amendments, approved work orders of Master Cooperative Agreements, offers accepted for purchase of real estate, and other Metro actions that will result in specific expenditures at a future time. INCURRED COST: The total value of work performed to date of services received and acquired materials or properties. EXPENDITURES: The total dollar amount of checks written by Metro s Accounting department for contractor or consultant invoices, third party invoices, staff salaries, and closing payments for escrow accounts that is reported in Metro s Financial Information System (FIS). CONSTRUCTION: Includes guideways, yards and shops, systems equipment, stations, and vehicles. PROFESSIONAL SERVICES: Includes general engineering, construction management services, consultant design support services during construction, legal counsel, and agency (Metro staff) costs. CONTINGENCY: A fund established at the beginning of a project to provide for anticipated but unknown additional costs that may arise during the course of the project. SPECIAL CONDITIONS: Includes utilities relocation, environmental compliance and mitigation, master cooperative agreements, insurance program, artwork, systems integration testing and pre-revenue operations. 8

APPENDIX LIST OF ACRONYMS ATP Automatic Train Protection CN Change Notice CO Change Order CMAQ Congestion Mitigation & Air Quality CTC California Transportation Commission FFGA Full Funding Grant Agreement FIS Financial Information System FTA Federal Transit Administration FY Fiscal Year HVAC Heating, Ventilation, Air Conditioning LACMTA Los Angeles County Metropolitan Transportation Authority (Metro) LNTP Limited Notice To Proceed LRV Light Rail Vehicle METRO Los Angeles County Metropolitan Transportation Authority MGLEE Metro Gold Line Eastside Extension N/A Not Applicable NTE Not to Exceed NTP Notice To Proceed PGL Pasadena Gold Line PMOC Project Management Oversight Consultant QPSR RSTP Regional Surface Transportation Program SSPP System Safety Program Plan STIP State Transportation Improvement Program TBD To Be Determined TWC Train to Wayside Communications US&S Formerly Union Switch and Signal 9