Transportation Improvement Program (TIP) Candidate Project List for Public Review

Similar documents
Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

2040 Metropolitan Transportation Plan -- Table XVII-1

Current Corridor Characteristics. MN 62 Corridor Performance

State Avenue Corridor Bus Rapid Transit (BRT)

Recommended Transportation. Capital Improvement Program

DISTRICT/ATP 6 Data Input Worksheet Final STIP

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

Population Trends. US 12 Corridor Performance

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

Committee Report. Transportation Committee. Business Item No

December 12, Dear Secretary Foxx:

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

Business Advisory Committee. November 3, 2015

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Basic Project Information

Rural Planning. Highway Projects - CULLMAN COUNTY

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

I-35W Past, Present, and Future: METRO Orange Line

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Williamson County Projects

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Develop ground transportation improvements to make the Airport a multi-modal regional

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

2.0 Development Driveways. Movin Out June 2017

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Capital Improvement Plan Review

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

West Broadway Reconstruction/LRT Design. March 19, 2015

IMPROVEMENT CONCEPTS

I-394 Corridor Performance

Sound Transit East Link: Bus/LRT System Integration Study

Janice Fortunato Senior Director Business Partnerships

ACTION TRANSMITTAL No

District 7 10-Year Capital Highway Investment Plan ( )

The Smart Growth Countywide Transit Master Plan

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Transportation Infrastructure Investment Program moving

Annual Listing of Projects Receiving Federal Funds

Alternatives Analysis Findings Report

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

Business Advisory Committee. July 7, 2015

Transportation Improvement Program

METRO Orange Line BRT American Boulevard Station Options

Local Public Agency Obligated Projects SFY 2015

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

Appendix F-1 Description of the Long-Term Alternatives

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

PARTIAL PROGRAM OF PROJECTS FFY

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Balancing the Transportation Needs of a Growing City

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

Swift Green Line April 11, 2019

City of Grand Forks Staff Report

Kentucky Highway District 6

FY Regional Surface Transportation Program (RSTP) Allocations *

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

Wentzville Parkway South Phase 2 & 2A

Reston Transportation Strategy July 9, 2018

Lacey Gateway Residential Phase 1

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Kalamazoo Area Transportation Study FY Transportation Improvement Program 10/1/2016 (05/30/18)

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

US 10 Corridor Performance

Central Loop Bus Rapid Transit

2040 REGIONAL TRANSPORTATION PLAN

Strategies to keep people and goods moving in and through Seattle

ANDERSON PROPERTY SITE ANALYSIS

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

LACEY CITY COUNCIL MEETING July 09, 2015

CTA Blue Line Study Area

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Public Works. Capital Projects FY

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

I-405 Sepulveda Pass Improvements Project

VAN NESS AVENUE BUS RAPID TRANSIT

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000.

Sales and Use Transportation Tax Implementation Plan

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

4.14 TRANSPORTATION AND CIRCULATION

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Local Public Agency Obligated Projects SFY 2018

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

1 Downtown LRT Connector: Draft Concept

Corridor Sketch Summary

Transcription:

2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review

Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit 410080 Purchase bus for Handi Wheels for City of transit Shop equipment for hybrid buses for City of transit Amendment Amendment Transit 410082 Purchase bus shelters for City of transit Amendment Transit 410084 Land Acquisition for future expansion for City of transit Amendment Estimated Cost Actual Cost 65.00 FTA 5309 90.00 FTA 5309 45.00 FTA 5309/5307 200.00 FTA 5309 Transit 410060 Miscellaneous bus support equipments Programmed 50.00 FTA 5309 Transit 410075 Transit 410081 Transit 410032 36th St S 409226 45th Street 409010 Senior Services Purchase three hybrid expansion fixed route transit buses Auto bus stop announcements for City of transit Replace paratransit vehicles (#1170, #1171 and #1172) Construction of shared use path and bridge along 36th St S from 40th Ave S to 38th Ave S and along 38th Ave S from 36th St S to 34th St S Reconstruct and Widen 's 45th Street from 26th Avenue South to 52nd Avenue South Programmed 1,120.00 FTA 5309 Amendment 150.00 FTA 5309 Programmed 210.00 Programmed 280.00 /TE Programmed 18,000.00 ARRA & /U Transit 409227 New Senior Services Transit Building Programmed 1,750.00 FTA 5309 12th Ave N 910090 Landscaping along 12th Ave N Programmed 160.00 /TE I-94 910080 Install high mast lighting fixtures from Drain 21 Programmed 3,244.00 to 45th Street I-29 910060 Reconstruct SB lanes from N Int N to Sheyenne River Programmed 8,944.00 I-94/45th 910040 Street Interchange Main Avenue 910030 10th Street N 910050 Reconstruction and widening of I-94 interchange. includes multi use path. The includes addition of auxillary lanes to I-94 from 45th St interchange to the I-29 interchange and WB off ramp modifications. Purchase ROW for the reconstruction of Main Ave from I-94 to 45th Street in West. includes pedestrian sidewalk/multi use path. Rehabilitate 10th St from 8th Ave S to 2nd Ave N underpass to repair pavement, retaining walls, sidewalks and lighting Programmed 8,396.00 / Programmed 5,626.00 /R Programmed 3,000.00 /R Actual Total Cost (To Date) Estimated Total Cost 51,330.00 Wednesday, December 02, 2009 Section 1 15

Table 2 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 Minnesota s Number I-94 810010 Unbonded Overlay from TH 336 to Downer (WB) TH 10 811010 Milling and bituminous surfacing of TH 10 EB and WB from East limit of TH 75 to East limits of Dilworth Transit 510112 Purchase Paratransit Computer Software Amendment Transit 510111 New Freedom Funds for Accessible Pedestrian Amendment Signal at 7th Ave and Hwy 75 Estimated Cost Actual Cost Programmed 7,780.60 Programmed 4,358.50 30.00 5340 ARRA 200.00 FTA 5317 & State Transit 510030 Preventive Maintenance Programmed 60.00 Actual Total Cost (To Date) Estimated Total Cost 12,429.10 Wednesday, December 02, 2009 Section 1 18

Table 3 Four Year Summary of North Dakota Candidate s 411080 411070 411040 411030 411020 406050 2011 Total Cost (Thousands) Transit Funds for Mobility Manager: connected with Transit #511095 Illustrative 56.00 FTA 5317 Transit Miscellaneous bus support equipments Illustrative 57.51 FTA 5309 Transit Transit Planning Programmed 52.25 Transit Operation of fixed routes, paratransit, GTC, Programmed 3,487.13 preventative maintenance, and misc. capital items Transit Replace 2008 vehicle # 1190 and 1155 for Illustrative 90.00 FTA 5309 Senior Services 1st Avenue North Reconstruct and widen 1st Ave to 3 lanes between University Drive and 25th St in. Programmed 5,315.00 /U 911090 52nd Ave S Landscaping 52nd Ave S from I-29 to University Dr Candidate 63.00 TE 911070 I-94 I-94 eastbound concrete pavement repair from drain Candidate 172.00 #21 east to 1 mile west of 45th Street 911080 I-94 I-94 westbound concrete pavement repair from drain Candidate 172.00 #21 east to 1 mile west of 45th Street 911050 I-94 I-94 eastbound concrete pavement repair from near Candidate 193.00 West to Horace Rd 911060 I-94 I-94 westbound concrete pavement repair from near Candidate 194.00 West to Horace Rd 911040 University Drive Landscaping along University Dr South from 52nd Ave S to 40th Ave S Programmed 125.00 /TE 911020 Main Avenue Purchase ROW for the reconstruction of Main Ave Programmed 2,500.00 from 45th St to 5th St Street in West. includes pedestrian sidewalk/multi use path. /R Various 1011010 Metro Area Funds for Regional Bicycle Safety Education Program Candidate 412060 412050 412020 412030 411041 412080 2012 Transit Funds for Mobility Manager: connected with Transit #512095 Illustrative 58.00 FTA 5317 Transit Miscellaneous bus support equipment Illustrative 58.66 FTA 5309 Transit Operation of fixed routes, paratransit, GTC, Programmed 3,587.13 preventative maintenance, and misc. capital items Transit Transit Planning Programmed 54.25 Transit Replace 6 paratransit vehicle #s Programmed 720.00 1177,1178,1179,1180,1181 and 1182 (2008 vehicles) 52nd Ave S Bridge reconstruction and widening at Drain 27 Programmed 2,200.00 BR Wednesday, December 02, 2009 19

Table 3 Four Year Summary of North Dakota Candidate s 909200 Total Cost (Thousands) 9th St E/I-94 Ramp revisions EB & WB for City of West (AC Programmed 3,846.00 payback for 2009 construction) 912060 7th Avenue Bridge deck replacement at 7th Ave/I-29. also Programmed 1,000.00 includes widening of 7th Avenue from 36th St to 39th St N for pedestrian facility /U 911010 Main Avenue Main Avenue (I-94 to 45th St in West ) Programmed 16,250.00 construction project. includes pedestrian sidewalk/multi use path. /R 909010 10th Street N Reconstruct 10th Street North in from 12th Programmed 3,960.00 Avenue North to 17th Avenue North /R 912050 Main Avenue ROW for Main Avenue reconstruction from 5th St to Programmed 3,750.00 45th St in West /R 413012 413020 413013 413014 413011 413010 411050 2013 Transit Miscellaneous bus support equipment Illustrative 59.83 FTA 5309 Transit Funds for Mobility Manager: connected with Illustrative 60.00 FTA 5317 Transit #513040 Transit Replace three fixed route transit vehicles in 2013 (units Illustrative 1,080.00 FTA 5309 1126, 1127, and 1128) Transit Replace two 2009 senior services vans Programmed 40.00 FTA 5307/5309 Transit Transit Planning Programmed 56.25 Transit Operation of fixed routes, paratransit, GTC, Programmed 3,687.13 preventative maintenance, and misc. capital items Transit Resealing and Maintenance of GTC deck Programmed 200.00 / 5309 913010 Main Avenue Purchase ROW for the reconstruction of Main Ave Programmed 3,750.00 from I-94 to 45th Street in West. includes pedestrian sidewalk/multi use path. /R 913020 I-94 Concrete pavement repair for I-94 from 1 mile west of Programmed 56.00 45th St to near 42nd St in 913030 I-94 Concrete pavement repair for I-94 from 25th St Programmed 156.00 interchange to Red River in 913040 I-94 Concrete pavement repair for I-94 from 0.5 mile east Programmed 223.00 of I-29 east to the Red River in West 313020 Main Avenue Landscaping from Sheyenne St to 45th St Programmed 157.00 /TE West 313010 7th Ave E Rebuild as urban 3-lane roadway from 17th St E to Programmed 2,500.00 45th St SW /U 2014 Wednesday, December 02, 2009 20

Table 3 Four Year Summary of North Dakota Candidate s West 414080 414070 414010 314010 Total Cost (Thousands) Transit Planning Activities for Transit Candidate 57.37 Transit Operations Assistance for Transit Candidate 3,387.00 25th St S 25th St S reconstruction and widening including Candidate 9,000.00 U bridge widening from 13th Ave S to 24th Ave S 13th Ave E Reconstruct existing lighting system from Sheyenne St Candidate 535.00 to 17th St E Estimated Total Cost 72,965.52 Wednesday, December 02, 2009 21

Table 4 Four Year Summary of Minnesota Candidate s STIP # Total Cost (Thousands) 2011 211020 TRF-3291-11 Transit Operating Assitance for flex-route and Programmed 143.22 commuter service throughout FTA 5311 211040 14-612-017 CR 12 Milling and bituminous surfacing on CR 12 Programmed 475.00 south of (Tied to 1406-61) Local 811050 1480-142AC I-94 Unbonded Overlay from TH 336 to Downer Programmed 1,800.00 (WB) AC Payback for 2010 811020 1406-61 TH 75 Roundabout at Junction TH 75 and Clay CR 12 Programmed 1,645.56 south of (Tied to SP 14-612-017) 511095 Transit Funds for Mobility Manager (tied to Illustrative 28.00 #411080) FTA 5317 511020 TRF-0034-11A Transit Paratransit Operating Assistance and Metro Programmed 301.29 Senior Ride Operations 511010 TRF-0034-11B Transit Operation of fixed routes, evening service, and Programmed 1,845.34 GTC 511030 511040 511050 TRF-0034-11C TRF-0034-11D TRS-0034-11 Transit Transit Planning Programmed 19.72 Transit Preventive Maintenance Programmed 60.00 Transit Replacement of paratransit vehicle #1150 Programmed 66.00 & 5307 510040 512060 144-143-01 Transit General Public Demand Response Service Illustrative 150.00 FTA 5316 28th Ave S Construct 28th Ave S from 20th St S to 26th St Programmed 1,500.00 S in 512080 511080 144-090-14 144-146-01 20th St S Construct pedestrian underpass at 40th Avenue S Programmed 490.00 50th Ave S Grade and surfacing of 50th Avenue South Programmed 2,421.00 Parkway in (East bound lanes from 1.38 miles west of TH 75 - TH 75). /TE 2012 212030 212020 TRS-3291-12 TRF-3291-12 Transit Purchase 1 Class 500 Bus Programmed 121.00 Transit Operating Assitance for flex-route and Programmed 127.31 commuter service throughout FTA 5311 212040 14-652-09 CSAH 52 Unbonded concrete overlay from CSAH 4 to Programmed 2,685.00 Sabin near CO Rd 67 812050 TH 75/TH 10 Pedestrian and Bike Improvements along TH 75 from 40th Ave S to Main Ave and along TH 10 from Red River to E jct of TH 75 Candidate State 812030 1480-157 I-94 I-94 Buffalo River Bridge 14803 and 14804 Programmed 5,115.20 redecking and painting BH 512095 Transit Funds for Mobility Manager (Tied to Illustrative 29.00 # 412060) FTA 5317 512020 TRF-0034-12A Transit Paratransit Operating Assistance and Metro Programmed 388.87 Senior Ride Operations 512010 TRF-0034-12B Transit Operation of fixed routes, evening service, and Programmed 2,095.13 GTC 512030 TRF-0034-12C Transit Transit Planning Programmed 20.93 Tuesday, December 01, 2009 23

Table 4 Four Year Summary of Minnesota Candidate s STIP # Total Cost (Thousands) 512040 511051 511060 TRF-0034-12D 144-126-13 Transit Preventive Maintenance Programmed 70.00 Transit General Public Demand Response Service Illustrative 156.00 FTA 5316 20th Street Reconstruct 20th Street in from 6th Programmed 1,425.00 Avenue South to 12th Avenue South 2013 213010 TRF-3291-13 Transit Operating Assitance for flex-route and Programmed 131.20 commuter service throughout FTA 5311 513040 Transit Funds for Mobility Manager (tied to Illustrative 30.00 #413020) FTA 5317 513038 512090 513031 TRF-0034-13A Transit Bus Related Equipment Illustrative 50.00 Transit General Public Demand Response Service Illustrative 162.24 FTA 5316 Transit Paratransit Operating Assistance and Metro Programmed 423.16 Senior Ride Operations 513036 TRF-0034-13B Transit Operation of fixed routes, evening service, and Programmed 2,178.93 GTC 513032 513033 513034 TRF-0034-13C TRF-0034-13D TRF-0034-13E Transit Transit Planning Programmed 20.93 Transit Preventive Maintenance Programmed 70.00 Transit Replacement of 2008 Paratransit expansion Programmed 77.20 vehicle (Class 400) FTA 5307/ 513035 TRF-0034-13G Transit Purchase two 2009 vans for Metro Senior Ride Programmed 44.00 2014 814010 TH 75 Bituminous overlay on TH 75 from Wilkin county line to Rd 12 Candidate 514040 SE Main Ave Resurfacing SE Main Ave from Oak Way to I-94 Candidate 2,500.00 514060 Transit Transit Planning for Transit Candidate 20.50 514080 Transit Funds for Mobility Manager Candidate 29.00 514050 Transit Preventive Maintenance for Transit Candidate 70.00 514030 Transit Replace Vehicle System Candidate 110.00 FTA 5309 514020 Transit Replacement of 2 2009 Paratransit Vehicles Candidate 158.50 (Units 1202 and 1203) FTA 5307/ 513037 514070 Transit General Public Demand Response Service Illustrative 162.24 FTA 5316 Transit Operation of Paratransit and Metro Senior Ride Candidate 402.62 Services 514090 Transit Operation of fixed route, evening service and Candidate 1,738.68 GTC Estimated Total Cost 31,557.77 Tuesday, December 01, 2009 24