Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Similar documents
Transportation Improvement Program (TIP) Candidate Project List for Public Review

Committee Report. Transportation Committee. Business Item No

Current Corridor Characteristics. MN 62 Corridor Performance

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

2040 Metropolitan Transportation Plan -- Table XVII-1

Population Trends. US 12 Corridor Performance

Recommended Transportation. Capital Improvement Program

Rural Planning. Highway Projects - CULLMAN COUNTY

ACTION TRANSMITTAL No

METRO Orange Line BRT American Boulevard Station Options

IMPROVEMENT CONCEPTS

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

State Avenue Corridor Bus Rapid Transit (BRT)

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

FREQUENTLY ASKED QUESTIONS

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

US 10 Corridor Performance

Williamson County Projects

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

DISTRICT/ATP 6 Data Input Worksheet Final STIP

FREQUENTLY ASKED QUESTIONS

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

December 12, Dear Secretary Foxx:

Develop ground transportation improvements to make the Airport a multi-modal regional

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

I-394 Corridor Performance

Business Advisory Committee. November 3, 2015

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Swift Green Line April 11, 2019

Capital Improvement Plan Review

PUBLIC INFRASTRUCTURE PROJECTS

Corridor Sketch Summary

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Kentucky Highway District 6

Operating & Maintenance Cost Results Report

Maryland Gets to Work

Business Advisory Committee. July 7, 2015

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

EXCEPTION TO STANDARDS REPORT

SCHEDULE OF CAPITAL PROJECTS BY FUND

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

NET TOLL REVENUE REINVESTMENT GRANT PROGRAM. South Bay Service Council

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

Transitways. Chapter 4

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

Sherman Oaks Community Traffic Plan

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

Pace Bus Depot Location Analysis

Alternatives Analysis Findings Report

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Revised Evaluation Scores. System Preservation

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Brent Spence Bridge Design Exceptions - Alternative I

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Local Public Agency Obligated Projects SFY 2015

Transportation Highway Engineering Conference February 24, 2015

Lacey Gateway Residential Phase 1

Dixie Transportation Planning Office

ODOT District Two Monthly Construction Update

Transportation Improvement Program

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

I-35W Past, Present, and Future: METRO Orange Line

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

PUBLIC TRANSPORTATION

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Proposed Project I 35 Improvements from SH 195 to I 10

FY Regional Surface Transportation Program (RSTP) Allocations *

Tempe Streetcar. March 2, 2016

Basic Project Information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Capital Improvement Plan

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

ODOT District Two Monthly Construction Update

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

Public Works. Capital Projects FY

City of Grand Forks Staff Report

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

IH 35 FEASIBILITY STUDY

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

I-405 Sepulveda Pass Improvements Project

Transportation Infrastructure Investment Program moving

2016 Congestion Report

Transcription:

Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects

Year - Metropolitan Transportation Improvement Program Public Input Meeting Those who wish to comment may also do so in writing. Written comments can be turned in at the end of the meeting, or mailed to: Metro COG, One North Second Street, #232, Fargo, ND, 58102. Additionally, comments can be emailed to: harter@fmmetrocog.org or faxed to 701-232-5043. Written comments must be received by noon, Tuesday August 14,. Thank you for your input.

State of North Dakota (NDDOT) - TIP Project Lists: 909010 18103 Table 2-4 $3,664,000 Principal Arterial 10th Street N Reconstruct 10th Street North in Fargo from 12th Avenue North to 17th Avenue North. Includes one striped bike lane on the west side. STP/R 909199 15655 909200 15655 $2,528,000 9th St E/I-94 Principal Arterial Ramp revisions EB (AC paycack of $1.923 Million to Fargo for 2009 construction) IM $2,528,000 9th St E/I-94 Principal Arterial Ramp revisions WB (AC payback of $1.923 Million to Fargo for 2009 construction) IM 911010 17427 912050 17427 912060 16760 $14,622,000 Principal Arterial $1,250,000 Principal Arterial $2,896,000 Main Avenue Main Avenue (5th St E to 45th Street in West Fargo) construction project. Project includes pedestrian sidewalk/multi use path. STP/R Main Avenue ROW for Main Avenue reconstruction from I-94 to Morrison St in West Fargo. STP/R 7th Avenue North Bridge deck replacement and widening at 7th Ave N/I-29 in Fargo. Project also includes widening of 7th Avenue from 36th St to 39th St N for pedestrian facility. BRU State of North Dakota (NDDOT) Total for to : $27,488,000 Cass County - TIP Project Lists: 112010 $5,700,000 Collector County Road 4 *Locally Funded Regionally Significant* Reconstruction of CR 4 from CR 11 to Drain 13 - Includes Paved Shoulders 11 $100,000 Collector County Road 20 *Locally Funded Regionally Significant* Reshaping & Subgrade Repair on CR 20 from CR 11 to 5 Miles East Cass County Total for to : $5,800,000

Fargo - TIP Project Lists: 411096 Table 2-4 $1,200,000 Replace Two Hybrid Fixed Route Vehicles 411099 $1,240,000 Purchase Two 40-Foot Hybrid Fixed-Route Vehicle 412020 $3,026,000 Operation of fixed routes, GTC, paratransit, and misc. capital items 412030 $54,000 Planning Planning 412031 $863,000 Preventative Maintenance for Fargo 412050 $60,000 Miscellaneous bus support equipment 412060 $69,000 Mobility Management (tied to Moorhead Project #512095) FTA 5317 412061 $41,000 PT Reservationist Position FTA 5317 412062 $95,000 Extended Dispatch Hours and TANF Project FTA 5316 412063 $60,000 GIS/ITS Tools FTA 5316

Fargo - TIP Project Lists: 412065 Table 2-4 $97,000 Automatic Vehicle Announcement & Automatic Vehicle Locator Systems FTA 5316 FTA 5317 412066 $620,000 Replace One 40-Foot Hybrid Fixed Route Bus 412067 $108,000 Replace One 25-Foot Hybrid Paratransit Bus 412068 $50,000 Miscellaneous Bus Support Equipment 412095 $261,000 Fargo Paratransit Operating Assistance Considered Improvements Fargo Total for to : $7,942,000 City of Fargo - TIP Project Lists: 412044 $2,500,000 4th Street *Locally Funded Regionally Significant* Reconstruction of 4th Street from 12th Avenue S to Main Avenue 412045 $1,500,000 4th Avenue N *Locally Funded Regionally Significant* Reconstruction of 4th Avenue N from University Drive to Roberts St 412046 $450,000 32nd Avenue N *Locally Funded Regionally Significant* M&O 32nd Avenue N from 9.5 Street to Eagle Street 412047 $150,000 32nd Avenue S *Locally Funded Regionally Significant* Construct an Additional Westbound Lane on 32nd Avenue S from 33rd Street to 36th Street

City of Fargo - TIP Project Lists: 412048 Table 2-4 $175,000 25th Street *Locally Funded Regionally Significant* Construct an Additional Southbound Lane on 25th Street from 53rd to 58th Avenue S 412049 412096 344 $460,000 $994,000 Bikeway University Drive *Locally Funded Regionally Significant* Complete Intersection Improvements at University Drive and 70th Avenue South Red River Bicycle & Pedestrian Lift Bridge Over the Red River between Lindenwood and Gooseberry Parks TE City of Fargo Total for to : $6,229,000

Table 2-5 Summary Listing of TIP Projects City of Moorhead - TIP Project Lists: 511060 144-126-013 $1,239,000 20th Street Reconstruct 20th Street in Moorhead from 6th Avenue South to 12th Avenue South STP 512060 144-143-001 $2,120,000 Collector Construct 28th Ave S from 20th St S to 26th St S in Moorhead STP 28th Ave S 512062 144-090-016 $994,000 Bikeway Bicycle & Pedestrian Bridge over the Red River at Lindenwood/Gooseberry Park TE Red River 512064 1480-162 $1,582,000 *Locally Funded Regionally Significant* Reconstruction of I-94 and Southeast Main Avenue ramps to serve traffic to/from the west. I-94 512080 144-090-14 $1,106,000 Bikeway 40th Ave S Construct pedestrian underpass of 20th Street and BNSF Railway TE City of Moorhead Total for to : $7,041,000 State of Minnesota (MNDOT) - TIP Project Lists: 812030 1480-157 $2,713,000 I-94 Buffalo River Bridge 14803 and 14804 redecking and painting BH I-94 State of Minnesota (MNDOT) Total for to : $2,713,000 Moorhead - TIP Project Lists: 512010 TRF-0034-12B $1,900,000 of Fixed Routes, MAT Paratransit, Senior Ride Service, Evening Service and Shares of the GTC and MTG

Table 2-5 Summary Listing of TIP Projects Moorhead - TIP Project Lists: 512020 TRF-0034-12A $389,000 Paratransit Operating Assistance and Metro Senior Ride 512030 TRF-0034-12C $21,000 Planning Planning 512040 TRF-0034-12D $60,000 Preventative Maintenance for Moorhead 512095 TRF-0034-12N $28,000 Funds for Mobility Manager (Tied to Fargo Project #412060) FTA 5317 Moorhead Total for to : $2,398,000 Productive Alternatives - TIP Project Lists: 212020 TRF-1131-12 $970,000 Operating Assistance Operating Assistance for Productive Alternatives to operate rural transit services in 5 counties, including Clay County commuter service and Moorhead Sunday service. FTA 5311 Productive Alternatives Total for to : $970,000

State of North Dakota (NDDOT) - TIP Project Lists: 912110 18994 Table 2-6 $263,000 I-94/I-29 Replace approach slabs and painting at I-29/I-94 tri-level bridge structure BRU 913020 18370 $197,000 Principal Arterial Concrete pavement repair for I-94 EB lanes from 1 mile west of 45th Street to the Red River in Fargo IM I-94 913040 18370 $257,000 Principal Arterial Concrete pavement repair for I-94 WB lanes from 1 mile west of 45th Street to the Red River in Fargo IM I-94 913041 18996 $600,000 Pedestrian Structure over I-94 2 miles east of I-29 Structure Painting, Structural/Incidentals IM I-94 913045 $2,651,000 Principal Arterial NDDOT Fargo District Wide Signing Project IM I-94/I-29 914010 17427 914020 914030 $1,250,000 Principal Arterial $160,000 $160,000 Main Avenue Purchase right-of-way for Main Avenue project between I-94 and Morrison Street in West Fargo STP/R I-94 Installation of Dynamic Message Sign (DMS) on I-94 at RP 343.0 just west of Main Avenue Exit - East Bound I-29 Installation of Dynamic Message Sign (DMS) on I-29 at RP 59.5 near 52nd Avenue - North Bound ITS ITS 913050 $52,000 Bridge Structual Painting of I-94 Bridge over the Red River BRU I-94 914040 18984 $18,908,000 PCC Pavement on Northbound I-29 from Argusville to Hunter IM I-29

State of North Dakota (NDDOT) - TIP Project Lists: 914050 Table 2-6 $76,000 Principal Arterial 19th Avenue North Beacon detection on 19th Avenue North at the NDSU Barns HSIP 914032 18989 914033 915010 17427 $4,214,000 $1,512,000 $17,500,000 Principal Arterial I-29 I-29 from Wild Rice River to 0.3 miles north of Main Avenue Southbound Roadway Concrete Pavement Repair I-29 I-29 from Wild Rice River to 0.3 miles north of Main Avenue Northbound Roadway Concrete Pavement Repair Main Avenue Main Avenue reconstruction from I-94 to Morrison Street in West Fargo. IM IM STP/R 915050 18985 $19,202,000 PCC Pavement on I-29 Southbound from Argusville to Hunter IM I-29 914031 18987 $1,512,000 I-29 from Christine to Wild Rice River Northbound Roadway Concrete Pavement Repair IM I-29 916040 18361 $7,696,000 I-29 from Christine to Wild Rice River Southbound Roadway Concrete Pavement Repair IM I-29 State of North Dakota (NDDOT) Total for to : $76,210,000 Cass County - TIP Project Lists: 115010 $1,889,000 County Road Cass County 81 Maintenance Overlay on Cass County Highway 81 from 64th Avenue South to CR 16 STP/Rural 115020 $943,000 County Road Cass County 14 Maintenance Overlay of Cass County Highway 14 from I-29 to CR 81 South STP/Rural

Table 2-6 Summary Listing of TIP Projects Cass County - TIP Project Lists: Cass County Total for to : $2,832,000 Fargo - TIP Project Lists: 410032 $390,000 Replace MAT Paratransit vehicles (#1170, #1171 and #1172) with hybrid buses 412070 $50,000 Replace two vans #s 1192 and 1193 for Valley Senior Services 412080 413010 $300,000 $3,146,000 25th Avenue South - west of University Drive transfer shelter (adjacent to South Kmart) (Note: If route changes occur this project will not be completed.) Operation of fixed routes, GTC, paratransit, and misc. capital items 413011 $56,000 Planning 413012 $65,000 Miscellaneous bus support equipment 413014 $25,000 Replace one 2010 Valley Senior Services van #1206 413020 $60,000 Mobility Management (tied to Moorhead Project #513040) FTA 5317 413040 $271,000 Fargo Paratransit Operating Assistance Considered Improvements

Fargo - TIP Project Lists: 413041 Table 2-6 $898,000 Preventative Maintenance for Fargo 413061 $41,000 PT Reservationist Position FTA 5317 411041 $650,000 Replace 5 paratransit vehicle #s 1178,1179,1180,1181 and 1182 (2008 vehicles) with hybrid vehicles 412090 $250,000 New camera system for fixed route buses 413013 414060 $1,800,000 Replace three fixed route transit vehicles (units 1126, 1127, and 1128) with hybrid buses $62,000 Mobility Management (tied to Moorhead Project #514080) FTA 5317 414061 $41,000 PT Reservationist Position FTA 5317 414070 $3,271,000 Operation of fixed routes, GTC, paratransit, and misc. capital items 414071 $934,000 Preventative Maintenance for Fargo 414080 $57,000 Planning

Fargo - TIP Project Lists: 414090 Table 2-6 $282,000 Fargo Paratransit Operating Assistance Considered Improvements 414092 $300,000 GTC Deck Maintenance and Resealing 414093 $125,000 Replace five 2011 Senior Vans for Valley Senior Services unit #s 1160, 1161, 1166, 1190 & the 2011 expansion van (not yet numbered) 414094 $70,000 Miscellaneous support equipment 414095 $195,000 Handi-Wheels bus replacement of two unit #s 1189 and 1191 and expansion of one bus 415030 $3,358,000 Operation of Fargo's System Including Fixed Route Service, GTC, Paratransit, and Misc. Items. 415031 $59,000 Planning 415032 $293,000 Fargo Paratransit Operating Assistance Considered Improvements 415033 $971,000 Preventative Maintenance for Fargo 415040 $50,000 Replace two Senior Vans for Valley Senior Services

Fargo - TIP Project Lists: 415060 Table 2-6 $64,000 Mobility Management (tied to Moorhead Project #515040) FTA 5317 415061 $41,000 PT Reservationist Position FTA 5317 415062 $75,000 Miscelaneous Support Equipment 414091 $400,000 Replace two paratransit buses with hybrids and 1 paratransit bus expansion 416060 $3,495,000 Operation of Fargo's System Including Fixed Route Service, GTC, Paratransit, and Misc. Items. 416061 $1,001,000 Preventative Maintenance for Fargo 416062 $295,000 Extended Dispatch Hours, Expanded Route Service, and TANF Project FTA 5316 416064 $66,000 Mobility Management (tied to Moorhead Project #516030) FTA 5317 416065 $62,000 Planning 416066 $41,000 PT Reservationist Position FTA 5317 Fargo Total for to : $23,610,000

City of West Fargo - TIP Project Lists: 313020 Table 2-6 $157,000 Principal Arterial Landscaping from Sheyenne St to 45th St TE Main Avenue 314010 19887 413033A $535,000 $7,500,000 Local 13th Ave E Reconstruct existing lighting system from Sheyenne St to 17th St E Veterans Boulevard *Locally Funded - Regionally Significant* Purchase ROW and Reconstruct between 32nd and 40th Avenue South (Note: Project to be Funded 50/50 between Fargo and West Fargo) STP 313010 19892 $2,500,000 Rebuild as urban 3-lane roadway from 17th St E to 45th St SW STP 7th Ave E 414013A 315010 316010 316020 $6,000,000 $11,454,000 $238,000 Various $845,000 40th Avenue S *Locally Funded Regionally Significant* Reconstruct 40th Avenue S from Veterans Blvd to the Sheyenne River 12th Avenue North 12th Avenue North Reconstruction between CR 19 and 45th Street STP/U City Wide in West Fargo Energency and Signal Pre-emption at 13 locations city wide in West Fargo. STP/U Sheyenne Street Permanent traffic signals at Sheyenne Street with 40th Avenue East and 32nd Avenue East STP/U City of West Fargo Total for to : $29,229,000 City of Fargo - TIP Project Lists: 412042 $5,000,000 NP Avenue *Locally Funded Regionally Significant* Reconstruction of NP Avenue from University Drive to 2nd Street

City of Fargo - TIP Project Lists: 413021 Table 2-6 $200,000 City Wide School Zone Infrastructure Improvements and Driver Feeedback Signs at 5 Elementary and 3 Middle Schools SRTS 413033 413034 413035 413039 $7,500,000 Collector $3,000,000 $6,000,000 $350,000 Veterans Boulevard *Locally Funded - Regionally Significant* Purchase ROW and Reconstruct between 32nd and 40th Avenue South (Note: Project to be Funded 50/50 between Fargo and West Fargo) University Drive North *Locally Funded - Regionally Significant* Reconstruct between 32nd and 40th Avenue North 13th Avenue South *Locally Funded Regionally Significant* Reconstruct 13th Avenue South between 38th and 44th Street. 45th Street & 12th Avenue N Shared Use Path along 12th Ave N from 45th St to I-29 and along 45th St from 7th to 12th Ave N TE 413022 $57,000 Install 150 Pedestrian Countdown Signal Heads at 19 Signalized Intersections HSIP City Wide 414010 18768 $8,000,000 25th St S 25th St S reconstruction and widening including bridge widening over I-94 STP/U 414012 414013 414014 $3,000,000 $6,000,000 $5,000,000 40th Avenue S *Locally Funded Regionally Significant* Reconstruct 40th Avenue S from County Drain 27 to Veterans Blvd 40th Avenue S *Locally Funded Regionally Significant* Reconstruct 40th Avenue S from Veterans Blvd to the Sheyenne River 1st Avenue N *Locally Funded Regionally Significant* Reconstruct 1st Avenue N from University Drive to 2nd Street

Table 2-6 Summary Listing of TIP Projects City of Fargo - TIP Project Lists: City of Fargo Total for to : $44,107,000

City of Dilworth - TIP Project Lists: 615010 Table 2-7 $5,563,000 Collector 7th Street Reconstruction of 7th Street between TH 10 and 15th Avenue North 616010 $347,000 Bikeway 7th Street Shared Use Path along the east side of 7th Street from 3rd to 8th Avenue NE TE City of Dilworth Total for to : $5,910,000 City of Moorhead - TIP Project Lists: 512065 $2,023,000 Principal Arterial *Locally Funded Regionally Significant* Round-a-bout at TH 75 (8th Street) and 50th Avenue South TH 75 512085 $625,000 50th Ave S *Locally Funded Regionally Significant* Intersection Improvements at 50th Avenue S and 3rd Street 511072 511074 $463,000 Main Avenue *Locally Funded - Regionally Significant* M & O along Main Avenue from 14th St S to 18 1/2 St S $1,302,000 15th Ave N *Locally Funded - Regionally Significant* M & O on 15th Avenue North from 7th Street to 28th Street 514040 144-136-011 $2,500,000 Resurfacing SE Main Ave from Oak Way to I-94 STP SE Main Ave 514012 515025 $532,000 $240,000 Collector 40th Avenue South *Locally Funded - Regionally Significant* M&O between River Haven Rd to 8th Street - Includes Bikepath Improvements 24th Avenue South *Locally Funded Regionally Significant* Reconstruct 24th Avenue S from Rivershore Drive to 8th Street

City of Moorhead - TIP Project Lists: 515026 Table 2-7 $392,000 Local 20th Avenue South *Locally Funded Regionally Significant* Reconstruct 20th Avenue S from 4th to 8th Street 510103 $1,523,000 20th St S *Locally Funded - Regionally Significant* 20th Street construction from 34th Ave S to 41st Ave S 510104 511073 511075 511100 $1,075,000 $645,000 $313,000 $1,367,000 20th St S *Locally Funded - Regionally Significant* Reconstruct 20th Street South from I-94 bridge to 34th Ave S 11th St S *Locally Funded - Regionally Significant* Reconstruction of 11th Street South from 9th Ave S to 12th Ave S 34th St S Locally Funded - Regionally Significant* M & O on 34th Street South from 12th Ave S to SE Main Avenue 11th St S *Locally Funded - Regionally Significant* Reconstruction of 11th Street South from Main Ave to 6th Avenue South 511102 $1,786,000 30th Ave S *Locally Funded - Regionally Significant* 30th Avenue South reconstruction from 14th St S to 20th St S 512102 516020 516080 $462,000 Collector $646,000 Local 4th Ave S *Locally Funded - Regionally Significant" Rehabilitation from 14th St S to SE Main Ave Red River Bicycle & Pedestrian Lift Bridge Over the Red River between Oak Grove and Memorial Parks (Note: Total project cost is estimated at $1,250,400 split 50/50 between Fargo and Moorhead) 7th Avenue North *Locally Funded Regionally Significant* Rehabilitation of 7th Avenue North from 12th Street to TH 75 including RR xing improvements. TE

Table 2-7 Summary Listing of TIP Projects City of Moorhead - TIP Project Lists: City of Moorhead Total for to : $15,894,000 State of Minnesota (MNDOT) - TIP Project Lists: 812050 1401-166 $3,821,000 TH 75/TH 10 Principal Arterial Mill and overlay from the US 10 Bridge to the west jct. of US 75/US 10. ADA and signal improvements from the US 10 Bridge to the jct. of US 10/34th Street. ADA and signal improvements from Jct. of US 75/US 10 to 40th Avenue South. STP 813020 2180-99 $2,658,000 I-94 Addition of cable median guardrail along I-94 from RP 0.312 to RP 7.667 (from approximately the TH 75 interchange to east of TH 336). DPS 814010 1406-67 $3,233,000 Mill & bituminous overlay on TH 75 from Wilkin county line to Clay County Rd 12 STP TH 75 814020 1481-9066B $330,000 Structual Painting of I-94 Bridge over the Red River I-94 816010 1406-66 $12,654,000 TH 75 and I-94 Reconstruct TH 75 and I-94 Interchange in Moorhead (AC Payback in 2017) STP State of Minnesota (MNDOT) Total for to : $22,696,000 Moorhead - TIP Project Lists: 513031 TRF-0034-13A $404,000 Paratransit Operating Assistance and Metro Senior Ride 513032 TRF-0034-13C $21,000 Planning

Table 2-7 Summary Listing of TIP Projects Moorhead - TIP Project Lists: 513033 TRF-0034-13D $70,000 Preventative Maintenance for Moorhead 513034 TRF-0034-13E $75,000 Replacement of 2008 Paratransit vehicle Unit #1177 (Class 400) STP 513035 TRF-0034-13G 513036 TRF-0034-13B $50,000 $1,900,000 Replace two 2009 vans for Metro (Unit #'s 1204 & 1205) Senior Ride of Fixed Routes, MAT Paratransit, Senior Ride Service, Evening Service and Shares of the GTC and MTG 513038 TRF-0034-13F $50,000 Bus Related Equipment 513040 TRF-0034-13N $29,000 Funds for Mobility Manager (tied to Fargo Project #413020) FTA 5317 514020 TRF-0034-14E $159,000 Replacement of two 2009 Paratransit Vehicles (Unit #s 1202 and 1203) with Class 400 STP 514050 TRF-0034-14D $70,000 Preventative Maintenance for Moorhead 514060 TRF-0034-14C $22,000 Planning 514070 TRS-0034-14A $448,000 Operation of Paratransit and Metro Senior Ride Services

Table 2-7 Summary Listing of TIP Projects Moorhead - TIP Project Lists: 514080 TRF-0034-14N $30,000 Funds for Mobility Manager (tied to Fargo Project #414060) FTA 5317 514090 TRF-0034-14B 515030 TRF-0034-15B $2,000,000 $2,100,000 of Fixed Routes, MAT Paratransit, Senior Ride Service, Evening Service and Shares of the GTC and MTG of Fixed Routes, MAT Paratransit, Senior Ride Service, Evening Service and Shares of the GTC and MTG 515031 TRF-0034-15D $70,000 Preventative Maintenance for Moorhead's System 515032 TRF-0034-15C $22,000 Planning 515033 TRS-0034-15A $458,000 Operation of Moorhead Paratransit & Senior Ride System 515040 TRF-0034-15N $30,000 Funds for Mobility Manager (tied to Fargo Project #415060) FTA 5317 515051 TRF-0034-15E $440,000 Replacement one Class 700 Bus (Unit # 370) 515053 $1,760,000 Replacement of four Class 700 Buses (Unit #'s 371, 380, 381, & 382) 515060 $437,000 Purchase one expansion Class 700 fixed route transit bus.

Table 2-7 Summary Listing of TIP Projects Moorhead - TIP Project Lists: 515050 TRS-0034-16E $80,000 Replacement of One Class 400 Bus (Unit #1218) for MAT Paratransit STP 516030 TRF-0034-16N $32,000 Mobility Management (tied to Fargo Project #416064) FTA 5317 516031 $281,000 for the Expansion of the Fixed Route System FTA 5316 516032 516040 TRF-0034-16A $161,000 $485,000 Operating Costs for General Public Demand Response System FTA 5316 Paratransit Operating Assistance and Metro Senior Ride 516050 TRF-0034-16C $22,000 Planning 516060 TRF-0034-16D $200,000 Preventative Maintenance for Moorhead 516070 TRF-0034-16B $1,887,000 of Fixed Routes, MAT Paratransit, Senior Ride Service, Evening Service and Shares of the GTC and MTG Moorhead Total for to : $14,108,000 Productive Alternatives - TIP Project Lists:

Table 2-7 Summary Listing of TIP Projects Productive Alternatives - TIP Project Lists: 213010 TRF-1131-13 $1,000,000 Operating Assistance for Productive Alternatives to operate rural transit in 5 counties, including Clay County commuter service and Moorhead Sunday service. FTA 5311 214020 TRF-1131-14 215010 TRF-1131-15 216010 TRF-1131-16 $1,030,000 $1,060,000 $1,060,000 Operating Assitance for Productive Alternatives to operate rural transit services in 5 counties, including the Clay County commuter service and Moorhead Sunday service. FTA 5311 Operating Assitance for Productive Alternatives to operate rural transit services in 5 counties, including the Clay County commuter service and Moorhead Sunday service. FTA 5311 Operating Assitance for Productive Alternatives to operate rural transit services in 5 counties, including the Clay County commuter service and Moorhead Sunday service. FTA 5311 Productive Alternatives Total for to : $4,150,000