Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

City of Perris Development Services Building & Safety

RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

EV Charging Station Submittal Requirements

City of Palo Alto (ID # 8028) City Council Staff Report

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Expedited Permitting Process for Electric Vehicle Charging Stations

CHAPTER V RESIDENTIAL WIRING

Electric Vehicle Charging System Guidelines for Residential Buildings

Application for Service Residential Subdivision / Development

ADVANCED CALCULATIONS

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

Spring Test 7 due 05/03/2013

Spring Test 10 due 05/11/2013

City of Manhattan Beach Community Development

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

UPFRO. Residential Electric. Voltage & Amperage

City of Manhattan Beach Community Development

OWNER S MANUAL AND INSTALLATION INSTRUCTIONS

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Title 24: Building Codes for Plug-in Electric Vehicles September 22, 2015 Webinar Questions

Chapter 4 Utility Systems Electrical

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

INSTALLATION AND OPERATING INSTRUCTIONS

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

Components for your PV Solar Electric System

GENERAL INFORMATION 1.01 PURPOSE

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

1000 Watt Power Inverter INSTRUCTION MANUAL HT87112-AUOXY

ENGINEERING SPECIFICATION

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

Photovoltaic Solar Plan Review

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

STREAMLINED SOLAR CHECKLIST Owner Name:

Installation and Construction Notes for EVSE4

Electrical Tech Note 106

Electric Plug-In Vehicle/Electric Vehicle Status Report

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Circuit Concepts (Residential)

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

Electrical Equipment and Terminology

Standby Electric Generators for Alaskan Residences. Advice & Installation

Customer Requirements Downtown Secondary Network Service

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Please Refer to Attached Sample Form

What is included in a circuit diagram?

HydroGenerations PROGRAM HANDBOOK

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

SECTION 300 OVERHEAD SERVICE

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

Even When the Power s Out.

MOBILEHOME PARK CONVERSION PROGRAM APPLICATION

Electric Service Guide. Residential

QSSE, QSSEX INDUSTRIAL Battery Chargers

NET METERING APPLICATION

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Electric Vehicle Appendix Notes

TERMS AND CONDITIONS

POWER INVERTER 700 WATT / 1800 WATT PEAK

Optimizing Emergency Power Systems for Health Care Applications

Metering and Service Installation:

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES

Line Gard. Underwriters Laboratories (UL) Applicable Code Notation

ELECTRICAL CONSISTENCY MEETING

New Jersey Motor Vehicle Commission

12VDC TO 230VAC INVERTERS

OWNER S MANUAL. Please read installation and operation instruction before using this Power inverter.

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

OBE, OBEXU, ON BOARD Battery Chargers

ERIC S. CASHER, CITY ATTORNEY WINSTON RHODES, AICP, PLANNING MANAGER

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

OBAE, OBAEXU, ON BOARD Battery Chargers

City of San Juan Capistrano Agenda Repo_rt

A Look at the 2017 NEC Significant Changes

Indianapolis Power & Light Company

ORDINANCE NO WHEREAS, the City Council wishes to advance the use of electric vehicles; and

Electrical Safety Program

A Homeowner s Guide to Natural Gas Service

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

FACT SHEET Standard: Electrical Safety

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1

EV Charging Stations: Permitting and Inspection

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

2. There are 2 types of batteries: wet cells and dry cells.

Overcurrent Protection (2014 NEC) (Homestudy)

THREE PHASE WIRING SPECIFICATIONS

SINGLE PHASE WIRING SPECIFICATIONS

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Residential Energy Audit (Electrical) Internal Lighting Annual kwh Entertainment Equipment Annual kwh Laundry Annual kwh Tel: (03)

12.7 Power in Electric Circuits

Transcription:

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT RESIDENTIAL ELECTRIC VEHICLE (EV) CHARGER GUIDELINES Mike Lara Director The purpose of this guideline is to assist permit applicants in streamlining the permitting, installation and inspection process for Residential EV Chargers. Be aware that there are different types of Electric Vehicle (EV) Chargers. There are 2 basic types of EV chargers for home use (Level 1 and Level 2). Level 1 Chargers are smaller units that plug directly into a standard 120 volt receptacle outlet. These types of chargers typically require a longer period of time to recharge the vehicle. As long as the receptacle outlet being used to plug-in the Level 1 Charger is existing, there is no requirement to secure a permit from the Building and Safety Division. On the other hand, if you will be installing a new 120 volt receptacle outlet for the charger, you will need to obtain a permit but you will not need to provide any plans or electrical load calculations as would be required for the more powerful Level 2 type charging systems. A Level 2 EV charging system requires a 240 volt electrical circuit and charges the vehicle battery much faster than a Level 1 charger. Level 2 charger installations typically require an electrical permit and inspections of the installation. In order to obtain the permit you will need to provide some basic information to show that your existing electrical service can handle the added load. What information do I need to provide in order to obtain the permit? This Residential EV Charger Permit Guideline has been developed to streamline the permit, installation and inspection process. In most cases, you or your contractor merely need to fill-in the blanks on this document, attach the manufacturer s installation instructions and charger specifications and submit it to the Building and Safety Department for an over-the-counter review and permit issuance. If all of the information is provided and the proposal complies with the applicable codes, the review and approval process can usually be performed over-the-counter or within a day or two depending upon workloads and staffing levels at the time of submittal. Once the permit is issued, the installation may begin. When the installation is complete, an inspection of the work must be scheduled with the Building Inspector. Inspections are typically performed on the work day following your request for inspection. Keep in mind that someone will need to be present during the inspection so that the Building Inspector can access the location of the electrical meter and EV charger (typically in the garage). Installing a Level 2 EV Charging system often requires changes to building s electrical wiring. Before installing the EV charging equipment and the associated wiring, talk to your EV manufacturer about the electrical requirements for the charger unit to be installed at your home. When installing your EV charger, be sure to use a licensed Electrical contractor whose state contractor s license and insurance are current. The contractor should follow the installation instructions of the EV charger manufacturer and the requirements of California Electrical Code. Why is the Electric Utility concerned about your EV charger installation? Though an individual Level 2 EV charger may have a negligible impact on the utility electric system, the combined effect of several chargers in the same neighborhood could result in overloads on utility secondary wires and transformers. It is important that the Electrical Utility provider be notified of any Level 2 charger installations to ensure that utility electrical system components are adequately sized to maintain high levels of service reliability. Page 1 of 6 284-164 (Rev. 8-2012) 4080 Lemon Street 2 nd Floor Riverside CA 92502-1629 Telephone: 951-955-1800 Fax: 951-955-1806 www.rctlma.org

LEVEL 2 ELECTRIC VEHICLE CHARGER - SERVICE LOAD CALCULATION INSTRUCTIONS: Review the list of electrical loads in the table below and check ( ) all that exist in your home (don t forget to include the proposed Level 2 EV Charger). For each item checked ( ), fill-in the corresponding Watts used (refer to the Typical usage column for wattage information). Add up all of the numbers that are written in the Watts Used column and write that number in the TOTAL WATTS USED box at the bottom of the table, then go to the next page to determine if your existing electric service will accommodate the new loads. (Loads shown are rough estimates; actual loads may vary for a more precise analysis, use the nameplate ratings for appliances and other loads and consult with a trained electrical professional.) Check All Applicable Loads Description of Load Typical usage Watts used GENERAL LIGHTING AND RECEPTACLE OUTLET CIRCUITS Multiply the Square Footage of House X 3 3 watts/sq. ft. KITCHEN CIRCUITS Kitchen Circuits 3,000 watts 3,000 Electric Oven 2,000 watts Electric Stove Top 5,000 watts Microwave 1,500 watts Garbage Disposal under Kitchen 1,000 watts Sink Automatic Dish Washer 3,500 watts Garbage Compactor 1,000 watts Instantaneous Hot Water at Sink 1,500 watts LAUNDRY CIRCUIT Laundry Circuit 1,500 watts 1,500 Electric Clothes Dryer 4,500 watts HEATING AND AIR CONDITIONING CIRCUITS Central Heating (gas) and Air 6,000 watts Conditioning Window Mounted AC 1,000 watts Whole-house or Attic Fan 500 watts Central Electric Furnace 8,000 watts Evaporative Cooler 500 watts OTHER ELECTRICAL LOADS Electric Water Heater (Storage 4,000 watts type) Electric Tankless Water Heater 15,000 watts Swimming Pool or Spa 3,500 watts Other: (describe) watts Other: watts Other: watts ELECTRIC VEHICLE CHARGER CIRCUIT Level 2 Electric Vehicle Charger Wattage Rating* (Add-up all of the watts for the loads you have checked ) TOTAL WATTS USED 284-164 (Rev. 8-2012) County of Riverside Building and Safety Departmment Page 2 of 6

*Use name plate rating in watts or calculate as: (Ampere rating of circuit X 240 volts = Watts) INSTRUCTIONS: Using the TOTAL WATTS USED number from the previous page, check ( ) the appropriate line in column 1 and follow that line across to determine the minimum required size of the electrical service panel shown in column 3. In column 4, writein the size of your existing service panel (main breaker size). If your Existing service panel (column 4) is smaller than the minimum required size of the existing service (column 3), then you will need to install a new upgraded electrical service panel to handle the added electrical load from the proposed Level 2 EV Charger. Table based on CEC 220.83(A), 230.42, and Annex D. 1 2 3 4 Minimum Required Size of Total Watts Used Existing 240 Volt Electrical (from previous page) Service Panel (Main Service Breaker Size) Check the appropriate line up to 48,000 100 amps 48,001 to 63,000 125 amps 63,001 to 78,000 150 amps 78,001 to 108,000 200 amps 108,001 to 123,000 225 amps Identify the Size of Your Existing Main Service Breaker (Amps)** **Please note that the size of your Existing service (column 4) MUST be equal to or larger than the Minimum Required Size (column 3) or a new larger electrical service panel will need to be installed in order to satisfy the electrical load demand of the EV charger. STATEMENT OF COMPLIANCE By my signature, I attest that the information provided is true and accurate. Job Address: Signature: (Signature of applicant) (Print job address) (Date) In addition to this document, you will also need to provide a copy of the manufacturer s installation literature and specifications for the Level 2 charger you are installing. Note: This is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative methodology. Use of this electrical load calculation estimate methodology is at the user s risk and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to seek professional assistance in determining the electrical capacity of a service panel. 284-164 (Rev. 8-2012) County of Riverside Building and Safety Departmment Page 3 of 6

OTHER HELPFUL INFORMATION FOR EV CHARGER INSTALLATIONS: The Table below illustrates the type and size of wire and conduit to be used for various Electric Vehicle Charger circuits. Size of EV Charger Circuit Breaker Required minimum size of Conductors (THHN wire) Electrical Metallic Tubing (EMT) Type and Size*** Rigid Nonmetallic Schedule 40 (RNC) Flexible Metal (FMC) 20 amp #12 1/2 1/2 1/2 30 amp #12 1/2 1/2 1/2 40 amp #10 1/2 1/2 1/2 50 amp #8 3/4 3/4 3/4 60 amp #6 3/4 3/4 3/4 70 amp #6 3/4 3/4 3/4 ***Based on 4 wires in the conduit (2-current carrying conductors, 1-grounded conductor, 1-equipment ground). As an alternate, Nonmetallic Sheathed Cable (aka: Romex Cable or NMC) may be used if it is protected from physical damage by placing the cable inside a wall cavity or attic space which is separated from the occupied space by drywall or plywood. The Table below illustrates the required supports for various types of electrical conduit or cable. Support Support Intervals Maximum Distance from Box to Support Electrical Metallic Tubing (EMT) Rigid Nonmetallic Schedule 40 (RNC) Flexible Metal (FMC) Nonmetallic Sheathed Cable (NMC) 10 3 4-1/2 4-1/2 3 3 1 1 In addition to the above noted requirements, the California Electrical Code contains many other provisions that may be applicable to the installation of a new electrical circuit. Installers are cautioned to be aware of all applicable requirements before beginning the installation. For additional information or guidance, consult with the Building and Safety Division staff or a qualified and experienced Electrical Contractor. 284-164 (Rev. 8-2012) County of Riverside Building and Safety Departmment Page 4 of 6

GENERAL INSTALLATION GUIDELINES FOR LEVEL 2 RESIDENTIAL EV CHARGERS 1. GENERAL REQUIREMENTS - All Electrical Vehicle Charging Systems shall comply with the applicable sections of the California Electrical Code, including Article 625. 2. EQUIPMENT HEIGHT - The coupling means of the Electric Vehicle Supply Equipment shall be stored at a height of 18 48 inches above the finished floor. (CEC Art 625.29(B)). 3. LISTED EQUIPMENT - All Electric Vehicle Supply Equipment shall be listed by a nationally recognized testing laboratory. 4. FASTENED IN PLACE - Level 2 Electric Vehicle Supply Equipment must be permanently connected and fastened in place in accordance with the manufacturer s installation instructions (CEC Art. 625.13). 5. PROTECTION FROM PHYSICAL DAMAGE - Electrical Vehicle Supply Equipment shall be protected against vehicle impact damage when located in the path of a vehicle. In order to avoid the installation of a substantial pipe bollard as an equipment guard, locate the Electrical Vehicle Supply Equipment on a garage side wall, out of vehicular path. (see sample drawing below) (CEC Art. 110.27(B)) 6. IF MORE THAN 60 AMPS- When EV charging equipment is rated at more than 60 amps, the disconnect means shall be provided and installed in a readily accessible location and shall be capable of being locked on the open position. (CEC Art. 625.23) 284-164 (Rev. 8-2012) County of Riverside Building and Safety Departmment Page 5 of 6

SAMPLE ELECTRICAL PLAN FOR LEVEL 2 ELECTRIC VEHICLE CHARGER CIRCUIT INSTALLATION SAMPLE PROJECT DESCRIPTION: NEW 40 AMP RATED LEVEL 2 ELECTRIC VEHICLE CHARGER SECURED IN PLACE NEW ½ CONDUIT WITH #10 CONDUCTORS PER CALIFORNIA ELECTRICAL CODE GARAGE INSTALLATION OF A NEW 40 AMP CIRCUIT FOR A LEVEL 2 ELECTRIC VEHICLE CHARGER PER MANUFACTURER S INSTALLATION INSTRUCTIONS AND CALIFORNIA ELECTRICAL CODE. VEHICLE BATTERIES LISTED AS SUITABLE FOR CHARGING INDOORS WITHOUT VENTILATION. MINIMUM SERVICE PANEL SIZE TO BE IN ACCORDANCE WITH THE RESIDENTIAL EV CHARGER GUIDELINES NEW 40 AMP CIRCUIT BREAKER INSTALLED IN THE EXISTING ELECTRIC METER PANEL HOUSE 284-164 (Rev. 8-2012) County of Riverside Building and Safety Departmment Page 6 of 6