VBM Fault Interrupter Instructions

Similar documents
TRIMOD TM 300R SERIES VACUUM RECLOSER

Longest Life Product for Electric Furnace Applications! 100,000 Operations No Routine Maintenance Required!

Power & High Voltage Joslyn Hi-Voltage Overhead Reclosers & Switches H-220. Series HVI Hi-Velocity Interrupter Attachment

Horizontal Circuit Switchers

Horizontal Circuit Switchers

Transmission Overhaul Procedures-Bench Service

ichards MANUFACTURING COMPANY, SALES, INC. 517 LYONS AVENUE, IRVINGTON, NJ Phone Fax

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

1.0 Features and Description

Installation, Operating & Maintenance Instructions

TRINETICS CSD SERIES OIL SWITCH INSTALLATION INSTRUCTIONS

KFE10010-E. Reclosers. Contents. Type KFVE and KFVME (27kV) Bus Bar Kit KRK710-1 Installation Instructions. Cooper Power Systems

Valtek Auxiliary Handwheels and Limit Stops

Tech Note Truck 14 & 15.5 Twin Plate Cast Iron Type Installation Guidelines

ProTrip Conversion Kits. For GE Types AK-15, AK-25, and AKU- 25 Low-Voltage Power Circuit Breakers INTRODUCTION. DEH Installation Instructions

Maintenance Instructions & Parts List

920 Remote Control Switches

CR193 Vacuum Limitamp* Contactors

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

Instructions for Replacing

ANDCO Eagle Actuator Instruction Manual

INSTRUCTIONS For Field Assembly and Installation

FEBRUARY 14, 2017 Joslyn Hi-Voltage Capacitor switches customer presentation

CATALOG. Joslyn Hi-Voltage Capacitor switches

Electric Actuator Instructions

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

ELECTRIC ACTUATOR 94OE IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

S Fault Indicators. S.T.A.R. Type TPR Faulted Circuit Indicator Installation Instructions. Contents INSTALLATION PROCEDURES

www. ElectricalPartManuals. com INSTRUCTIONS "INERTEEN AND OIL INSULATED FEEDER SWITCHES DESCRIPTION INSTALLATION MAINTENANCE

Florham Park, NJ USA Call (ASCO) for sales or service

Fisher 657 Diaphragm Actuator Sizes and 87

COOPER POWER SERIES. KA716L7001 adjustable control valve kit for Types L, E, 4E, V4E, and V4L reclosers installation and adjustment instructions

Installation Manual. Model T680A/B Engine Brakes. For Mack 6 Cylinder, 4 Valve Head E6 and E7 Series Engines. Engine Brakes

Solid Dielectric, Triple Option Reclosers Catalog O-vlt14

Installation Instructions

Handy Lift HD Owners Manual WARNING. BURR 500 lb. Capacity Handy Lift HD PN (40 ) PN (45 ) PN (50 )

Instructions for Installation and Operation

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER

Installation Instructions Z-Gate Shifter

Instructions for Installation and Operation

Operator s Manual Series ATB Automatic Transfer & Bypass Isolation Switches 150, 260, and 400 amp sizes A. Rating Label.

Product Specifications for Aluminum Vertical Break Switches

This Kit Is for Use with Types RE, RVE, WE, WVE, VWE, VWVE27, and VWVE38 Reclosers.

INSTALLATION INSTRUCTIONS 88029

Installation and Operation

Florham Park, NJ USA Call (ASCO) for sales or service

GPS AutoSteer System Installation Manual

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual

DeZURIK R1 AND R2 POWERRAC ACTUATORS

S Reclosers. Contents. Types VXE15 and VXE27 Electronically Controlled, Single-Phase Recloser Maintenance Instructions

MODEL JH JACKSHAFT INDUSTRIAL DOOR OPERATOR INSTALLATION MANUAL. OPERATOR SPECIALTY COMPANY, INC. P.O. Box 128 Casnovia, MI 49318

1989 Jeep Cherokee. STEERING COLUMN' '1989 STEERING Jeep Steering Columns STEERING COLUMN STEERING Jeep Steering Columns

UNIVERSAL PUMP HANGER INSTALLATION INSTRUCTIONS

Installation. S&C Omni-Rupter Switches Outdoor Distribution 14.4 kv and 25 kv

JOSLYN HI-VOLTAGE CAPACITOR SWITCHES

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

UNIVERSAL PUMP HANGER INSTALLATION INSTRUCTIONS

A B C D E F. Tools Required (supplied by others)

BL7000 SYSTEM OPERATING MANUAL

Installation Instructions

ABB Automation, Inc. Substation Automation & Protection Division Coral Springs, FL Allentown, PA

OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION

OPERATION AND MAINTENANCE OF TRAYER 4000 SERIES PADMOUNTED VACUUM FAULT INTERRUPTER

Assembly & Installation Instructions

Instructions for Installation

Instruction manual. Type 3AH35-MA vacuum circuit breaker magnetic-actuator operator module.

Instruction Bulletin. Jockey Pump Controller

E.S.P. Embedded Sensing Probes for Motor Brushes

Electric Actuator Installation, Operation & Maintenance Manual

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

COOPER POWER CA280012EN

97-06 Jeep Wrangler TJ Installation Instructions Kit #: TJ251K-SVX / TJ253K-SVX TJ401K-SVX / TJ403K-SVX

CALIFORNIA TRIMMER MOWER MAINTENANCE MANUAL

Solid Dielectric, Triple Option Reclosers Catalog O-vlt14

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Types VSA12, VSA12B, VSA16, VSA20, and VSA20A; three-phase; air-insulated; electronically controlled recloser

THE GLIDER 5th Wheel Attachment

An Investment in Plant Floor Safety. 802C Safety Cable Pull Switches 802E Hinge Safety Interlock Switches 802F Safety Interlock Switches

COOPER POWER SERIES. Mercury switch to microswitch retrofit kit KA349WE installation instructions. Reclosers MN280022EN

Installation Instructions QUICKSILVER CONSOLE SHIFTER Fits: Chevelle / El Camino

Self-Adjust Clutch Installation Guide

Solid Dielectric, Single Phase Recloser

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage.

AL625 & AL625HD INSTALLATION & OWNER S MANUAL

S&C Type FVR Substation Circuit Breaker

DeZURIK R1 POWERRAC ACTUATOR ON 1/2-3" PEC ECCENTRIC VALVES

ABB ! CAUTION. Type KRV Directional Overcurrent Relay E 1.0 APPLICATION 2.0 CONSTRUCTION AND OPERATION. Instruction Leaflet

Operator s Manual Series ACTS Automatic Closed Transition Transfer Switches 150 through 4000 amps A. Rating Label.

The steering column is of a modular construction and features easy to service electrical switches.

A Summary of Major Improvements to the ABB Recloser and Type R Breaker

COOPER POWER SERIES. Types D and DV recloser installation instructions. Reclosers MN280030EN

SUREPOWR TM SERIES -SURE 24/25 FIELD INSTALLATION INSTRUCTIONS

Product Specifications for Phase Over Phase GOABS(r)

Installation Instructions

'99-03 CHEVROLET/GMC IFS 4WD 6" SUSPENSION SYSTEM P/N INSTALLATION INSTRUCTIONS

Vacuum Circuit Breaker Type VAD-3

Clutch Installation Guide

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

MC-351, 421, 431, MC-4311

Transcription:

VBM Fault Interrupter Instructions Revision: July 2007 Supersedes: June 2007 THREE PHASE THREE PHASE THREE PHASE 15kV/25kV Grounded 400A 25kV 200A 38kV 300A 15kV/25kV Grounded 600A 25kV 300A 25kV 400A ONE POLE* ONE POLE* ONE POLE* 38kV 400A 48.5kV 300A 72.5kV 300A 38kV 600A 48.5kV 400A 48.5kV 200A (with longer insulators) *Three poles required for a three phase installation. Joslyn Hi-Voltage 4000 E. 116 th St. Cleveland, OH 44105 Ph (216) 271-6600 Fax (216) 341-3615 Email: info@joslynhv.com www.joslynhivoltage.com

TABLE OF CONTENTS: I. Safety... 4 Hazard Statement Definitions... 4 II. General... 5 Description... 5 III. Installation... 7 Inspection and Uncrating... 7 Mounting... 8 Clearance Requirements... 9 Clearance Requirements - Continued... 10 Control Voltage... 11 Control Wiring... 12 High Voltage Connections... 12 VACSTAT TM Operational Information... 13 Vacuum Interrupter Integrity Test... 14 High Potential Withstand... 14 Vacuum Contact Resistance Test... 15 IV. Servicing... 16 Tools Required... 16 Replacement Parts... 17 Removal and Replacement of the Housing Cover and Breather Bag... 17 Removal and Replacement of a Vacuum Module Assembly... 20 Synchronization of Replacement Module Assembly... 25 Switch Operators... 28 The Solenoid Operator... 28 The Motor Operator... 30 Servicing Electrical... 32 Removal and Installation of Control Assembly - Brief... 32 Installation of Control Assembly - Detailed... 33 Servicing Mechanical... 35 Install Motor Mechanism... 35 Install and Pre-adjust two Power springs into the assembly.... 37 Setup tripping.... 39 Replacement of Motor... 42 Auxiliary Switch Adjustment... 43 V. Switches Rated 1,000 Amperes and Higher... 45 2

TABLE OF FIGURES: Figure 1: Diagram VBM Switch... 5 Figure 2: Cutaway Drawing of a Single Vacuum Module on 15kV Line-to-Ground Insulator... 5 Figure 3: VBM Switch with VACSTAT TM vacuum monitor... 6 Figure 4a: Motor Operator Figure 4b: Solenoid Operator... 7 Figure 5: Typical Erecting Sling... 8 Figure 6a: 32 Clearance Around Interrupters Front View (38 kv Single Phase shown)... 9 Figure 6b: 32 Clearance Around Interrupters - Side View... 9 Figure 7: Terminal Pad Diagram... 12 Figure 8: VACSTAT TM Operational Information... 13 Figure 9: AC High Potential Test Set Connections... 14 Figure 10: Contact Resistance Test Connections... 15 Figure 11: Replacement Module with Temporary Bolts... 22 Figure 12: Synchronization of Replacement Module Assembly... 26 Figure 13: Description of Operation... 28 Figure 14: VBM Motor Operator Picture... 30 Figure 15: VBM Motor Operator Diagram... 31 Figure 16: Sequence of Motor Operation... 31 Figure 17: Sequence of Motor Operation... 31 Figure 18: Sequence of Motor Operation... 31 Figure 19: Sequence of Motor Operation... 32 Figure 23: Shim Placement... 43 Figure 24: Auxiliary Switch Adjustment... 43 Figure 25: Auxiliary Switch Adjustment (Prior to 1997)... 44 Figure 26: Wiring Harness and Auxiliary Contact Adjustment... 45 3

I. Safety Hazard Statement Definitions!!!!!! WARNING: Refers to hazards or unsafe practices which could result in death, severe personal injury, or significant equipment damage. CAUTION: Refers to hazards or unsafe practices which could result in damage to equipment or in personal injury. WARNING: Before installing, operating, maintaining, or testing this equipment, carefully read and understand the contents of this manual. Improper operation, handling, or maintenance can result in death, severe personal injury, or equipment damage. WARNING: This equipment is not intended to protect human life. Follow all locally approved procedures and safety practices when installing or operating this equipment. Failure to comply may result in death, severe personal injury and/or equipment damage. WARNING: Hazardous voltage. Do not rely on the contact position indicator to determine that the line has been de-energized. Always establish a visible disconnect and establish person grounds when performing de-energized line work. Failure to follow proper safety practices can result in contact with high voltage, which can cause death or severe personal injury. WARNING: Hazardous voltage. Contact with high voltage will cause serious personal injury or death. Follow all locally approved safety procedures when working around high voltage lines and equipment. 4

II. General Description The VBM switch is manufactured in voltage ratings from 15kV to 69kV with continuous current capabilities from 200 amperes. The mechanism may be operated manually, or electrically by solenoid or motor operators. SINGLE VACUUM MODULE LINE-TO-GROUND INSULATOR CONTROL CABLE CONNECTOR VACUUM MODULE PAIR ASSEMBLY UPPER MODULE LOWER MODULE MECHANISM HOUSING POSITION INDICATOR OPERATING HANDLE BREATHER BAG COVER MECHANISM COVER Figure 1: Diagram VBM Switch The assembly containing the vacuum interrupter is called a module (Figure 2). Each module has a vacuum interrupter contact sealed in Joslyte, a solidified foam which provides mechanical strength, high dielectric strength and complete moisture sealing. The module housings are cycloalephetic or EPR rubber bonded to a fiberglass tube. One or two modules are mounted on each insulator and connected to the mechanism by a high strength pull rod. Figure 2: Cutaway Drawing of a Single Vacuum Module on 15kV Line-to-Ground Insulator 5

Optional VACSTAT TM feature VBM Instruction Manual The VBM is also available with a new feature, the VACSTAT TM vacuum interrupter monitor. This feature will monitor the vacuum inside each interrupter assembly. If loss of vacuum is detected, a flag type indicator will rotate to indicate the loss of vacuum. In addition, a relay will be energized that will block all close and trip operations. A second relay will also be energized and close its normally open contacts. The two wire output of this dry contact status signal is available for remote signaling if a loss of vacuum occurs. See Figure 8 on Page 13 for a more detailed description of VACSTAT TM operation. The cutaway drawing shows the placement of the vacuum sensor. It is connected via fiberoptic cable to a control board located in the base of the unit. Flag type indicator. Normally dark. Shows Orange on loss of vacuum. Figure 3: VBM Switch with VACSTAT TM vacuum monitor 6

The VBM is offered with two types of mechanisms: motor and solenoid. Figure 4a: Motor Operator (For single mechanism switches only) Figure 4b: Solenoid Operator The completely sealed operating mechanism housing supports line-to-ground insulators and the modules. An expansion bag in the housing prevents breathing-in contaminants or moisture and contains a desiccant package to maintain dry air. All electrical control connections to the mechanisms are made through a single environmental control cable connector. An Open-Closed position indicator is directly coupled to the mechanism. A separate operating crank enables manual operation of the switch. The entire assembly can withstand several G s without damage. Depending upon rating there may be one or more mechanisms for a three-phase switch. III. Installation Inspection and Uncrating Carefully inspect the equipment on arrival. Contact carrier and file a claim if damaged during shipment. Remove crating or carton surrounding the VBM switch. Do not unbolt switch from the wooden base to prevent accidental contact from knocking over switch. Consult the factory if VBMs with multiple interrupters (Figures 6d thru 6h) are being installed in a metal enclosure. An indoor RC network option can be supplied to reduce the 32 requirement to standard clearances.! CAUTION: PERFORM A VACUUM INTERRUPTER INTEGRITY TEST DESCRIBED IN THIS SECTION, PRIOR TO PUTTING EQUIPMENT INTO SERVICE. 7

Mounting Attach an erecting sling to each mechanism as shown in Figure 5. Make certain the lift is stabilized. Remove the three nuts holding VBM to wooden base. Hoist the switch to its mounting location with the manual operating handle facing the desired direction. Fasten the VBM to its mounting with three 5/8 bolts and remove the erecting sling. CAUTION The two boards shown are for stabilization only. Be careful that the sling exerts no forces on the vacuum contacts or insulators. CAUTION Do not lift from terminal pads Figure 5: Typical Erecting Sling! CAUTION: THE STRUCTURE AND VBM MECHANISM HOUSING MUST BE SOLIDLY GROUNDED. 8

Clearance Requirements VBM Instruction Manual NOTE: For switches with multiple vacuum interrupters in series, a 32 inch (81.3 mm) clearance must be maintained from all switch line parts to adjacent equipment (bus, reactors, CT s, transformers, frames). This also includes the high voltage conductors, which must run horizontally for at least 32 inches before bending upwards. Failure to meet this clearance requirement will adversely affect the electrical voltage distribution and electromagnetic field within the interrupters during opening and closing operations. This insufficient clearance can prevent proper interruption within the vacuum switch interrupters resulting in undesirable restrikes during opening operations for some application parameters. 32 Incorrect! Conductor within 32 inch area. 32 32 32 2 Interrupters in series (with bus bar) 32 Correct. Conductor outside 32 inch area. Figure 6a: 32 Clearance Around Interrupters Front View (38 kv Single Phase shown) 32 32 32 Figure 6b: 32 Clearance Around Interrupters - Side View 9

Clearance Requirements - Continued VBM Instruction Manual The 32 inch requirement does NOT apply to switches with only 1 interrupter per phase, as shown in Figure 6c below. All other configurations shown must maintain a 32 inch clearance from adjacent objects, as previously stated. NO Clearance Requirement! (Only 1 interrupter per phase) Figure 6c: 15kV/25kV 3 Phase Ungrounded Figure 6d: 25kV 3 Phase 32 Inch Clearance Requirement! (2 or more interrupters per phase) 32 Inch Clearance Requirement! (2 or more interrupters per phase) Figure 6e: 38kV 3 Phase Figure 6f: 48.5 kv Single Phase Figure 6g: 69kV Single Phase Figure 6h: Double-Stack Interrupters 10

Control Voltage VBM Instruction Manual A variety of control voltage options are available. Refer to the table below. Control Operating Control Current Close Time Trip Time Voltage Mechanism Per Switch Mechanism 48 VDC Motor 1 Solenoid 4 Reclosing 3 amps 60 amps 3,4 7 amps 5 sec 6 cycles 6 cycles 2 cycles 6 cycles 3 cycles 125 VDC Motor 1 Solenoid Reclosing 4 amps 60 amps 2 7 amps 3 sec 6 cycles 6 cycles 2 cycles 6 cycles 3 cycles 120 VAC Motor 1 Solenoid Reclosing 5 amps 60 amps 3,4 7 amps 3 sec 6 cycles 5 cycles 2 cycles 6 cycles 3 cycles 250 VDC Solenoid 60 amps 6 cycles 6 cycles Note 1: Motor operating mechanisms are designed for single mechanism switches. Note 2: Current is 60 amperes peak for one, two, or three mechanism switch systems. Note 3: Current is 120 amperes for 34.5kV 300A VBM. Note 4: Current for three mechanism switch systems is approximately 180 amperes. Control power must meet the requirements of the drawing supplied with the switch. Refer to the appropriate power input tables for proper requirements. Solenoid Operated Switches Direct Energy DC Operated VBM Switch Direct Energy AC Operated VBM Switch 3045A0176 3045A0169 Motor Operated Switches 5A max during operation! C AUTION: FAILURE TO COMPLY WITH THE CONTROL POWER AND WIRING REQUIREMENTS MAY RESULT IN SWITCH MALFUNCTION OR DAMAGE. 11

Control Wiring All control connections to the VBM switch are made through either of the following methods: a. Environmental cable and connector. The cable may be shortened to desired length if supplied with a connector on the switch end only. NOTE: For multiple mechanism switches, all cable lengths should be cut to the same length. Connection to the control enclosure must be in accordance with the specific wiring diagram for the system supplied. b. A junction box mounted on the housing wired to the mechanism through conduit. High Voltage Connections The terminal pads are aluminum alloy with standard NEMA two-hole drilling. The electrical connection at the terminal pad must be treated with Alcoa No. 2 joint compound or equivalent. Remove brown paper from terminal pad before making electrical connections. Wire brushing through the compound will improve the connection. 1 ¾ [44mm] ½ [13mm] Figure 7: Terminal Pad Diagram 12

VACSTAT TM Operational Information VBM Instruction Manual For VBM s that have the optional VACSTAT vacuum monitor, the PC board shown in Figure 8 is added inside the VBM. This PC board will send a signal via fiber optic lines to each vacuum interrupter. If the interrupter has vacuum, the signal will be returned. In the event of a loss of vacuum on any interrupter, the signal will not be returned, indicating that a loss of vacuum has occurred. The 74 Relay (located next to the PC board inside the VBM) will then energize and open the circuits to the Close and Trip solenoids. The Flag Indicator will rotate and the 74-1 Relay will close its contacts for remote indication. Note: The 74-1 Relay is not available for all configurations. There is a Test switch on the PC board that will simulate a vacuum loss to test all indicators and relay operation. The Reset switch will clear the faulted condition. There are 3 red LED s on the board that will provide the vacuum status of each phase. A fault will cause the LED to turn on. A blinking red LED indicates an intermittent or poor fiber optic connection. On power up, the Flag indicator will rotate to show a Faulted condition, and then back to Normal. The 74 Relays will NOT change state during the initialization sequence. In the event of a power loss to the board, the Flag Indicator will remain as it was prior to the power loss. That is, if it was showing a Fault, the indication will remain. On power up, it will still go through the initialization sequence but will change back to the Faulted state. Green LED Flashing = OK Off or On Steady = Not OK Flag Indicator. Faulted condition shown. Shielded Cable Phase A Vacuum Module Fiber Optic Receive Test Switch Reset Switch 74 Relay Close and Trip Blocking Contactor (Located inside VBM) Phase B Vacuum Module Phase C Vacuum Module Fiber Optic Transmit 3 1 74-1 Relay PN 3187A0000 *74-1 Relay Output (+) AC/DC Input (-) (Power supplied by Control or VBM) *74-1 Relay Detail N.O. Dry Contacts. Will close on loss of vacuum. Contacts rated 120 VAC, 10 A Red LED s On Steady = Loss of vacuum in interrupter. Blinking = Loose connection 3 phase or 1 phase selection jumper. Caution. Use care when working around the fiber optic lines. They are fragile. Do NOT bend them sharply or they may break. Figure 8: VACSTAT TM Operational Information 13

Vacuum Interrupter Integrity Test Two tests, high potential withstand and contact resistance, may be performed to evaluate the vacuum contacts. They should be performed across each module separately. Figure 6 indicates connection points for vacuum module assemblies. High Potential Withstand! WARNING: DISCONNECT ANY HIGH VOLTAGE CONNECTIONS TO THE SWITCH PRIOR TO HIGH POTENTIAL TESTING. 30kV AC AC High- Potential Test Set 30kV AC Test Performed with switch in OPEN position Figure 9: AC High Potential Test Set Connections NOTE: Test each module separately Loss of vacuum results in complete breakdown across an open vacuum contact at voltages below 30kV RMS. Only AC high potential testing is meaningful. DC testing cannot be used. Apply 30kV RMS across each individual contact for 15 seconds with the switch open. To avoid possible generation of X-rays, do not apply more than 30kV RMS. During the high potential testing, self-extinguishing, momentary breakdowns lasting only a few microseconds may occur. These barnacles are not significant but can result in false indication of vacuum loss, if the test set utilizes a high speed overload relay or breaker. During normal operation with the switch in service, loss of vacuum or a defective switch module may be indicated by excessive radio noise with the switch open or observation of different surface temperatures of modules on the same switch. See Joslyn Engineering Memo TD 750-918. 14

Vacuum Contact Resistance Test MicroOhm Meter MicroOhm Meter Test Performed with switch in Closed position Figure 10: Contact Resistance Test Connections NOTE: Test each module separately With the switch closed, the resistance across each module should be less than 200 microohms. On switches with modules connected in parallel for higher current operation, remove the connecting bus to perform this test. If higher resistance values are measured contact Joslyn Hi-Voltage. 15

IV. Servicing Tools Required Servicing of VBM switches is easily accomplished by referring to the appropriate section of these instructions. The following tools are required: 3090X0014G1 VBM Adjustment and Repair Kit The kit above includes the following items: PART NUMBER DESCRIPTION 3090X0014P1 Brightstar 1618CT Magnet Flashlight 3090X0014P3 Mounting Fixture 3090B0005G2 3090X0014P5 Starrett Indicator 3090X0014P7 Torque Wrench (10-200 in-lbs.) 3/8 drive 3090X0014P8 Torque Wrench Preset 50 in. lbs. 3090X0014P11 1/2-3/8 Drive 3090X0014P12 5/16 Wrench 3090X0014P13 7/16-3/8 Socket 3090X0014P14 3/8 Wrench 3090X0014P15 Phillips No. 3 Screwdriver 3090X0014P16 Flat Tip 1/8 Screwdriver 3090X0014P17 7/16 Wrench 3090X0014P18 9/16 Wrench 3090X0014P19 3/4 Wrench 3090X0014P21 Tool Box 3090X0014P22 3/16 Allen Socket 3090X0014P23 Dow Corning 3090X0014P25 Adjustment Gauge 1 degree 3090X0014P26 Go-No-Go Gauge 3090A0012P1 16

30kV AC High Potential Test Set 3070A0244P2 Micro ohm meter Replacement Parts Replacement parts are available from our factory in Cleveland, Ohio. Furnish complete nameplate data and the Joslyn Hi-Voltage GO order number applying to the original purchase, along with description of the part and quantity required. Removal and Replacement of the Housing Cover and Breather Bag The parts necessary to replace the breather bag are as follows: Breather Bag Desiccant Bag Clamping Plate 17

1. Place the switch on a table or use a stand to access the bottom of the switch. Remove the ten (10) or twelve (12) screws that hold the mechanism cover to the switch base. 2. Remove three (3) cover screws from breather bag cover. ¼ -20 x 5/8 plastic screw ¼ self tapping screw Screws 3. Remove breather bag cover. 4. To remove breather bag, turn base over and remove 7/16 nut leaving the holes exposed. Turn base back over to and remove breather bag. 18

5. To install new breather bag, put desiccant bag inside breather bag. 6. Put clamping plate into breather bag with beveled side facing inside the bag. The flange of the clamping plate and breather bag MUST be aligned properly otherwise it will not seal. 19

7. Place bolt back through the center hole and attach breather bag by screwing the 7/16 bolt. Make sure the breather bag is sealed around clamping plate. 8. Replace breather bag cover by tightening the three screws. 9. Replace mechanism cover to the base of the switch by securing the ten or twelve cover screws. Removal and Replacement of a Vacuum Module Assembly Removal One or two modules are mounted on each insulator depending on switch rating. Module pair assemblies should not be separated in the field because special tools are required for assembly and adjustment. Furthermore, if a switch s breather bag ruptures, all vacuum modules on that switch must be replaced. To remove a module assembly, disconnect all power from the VBM and remove the mechanism cover. 1. Place the switch on a table or use a stand to access the bottom of the switch. Remove the ten (10) or twelve (12) screws that hold the mechanism cover to the switch base and remove the cover. 20

Screws 2. Disconnect pull rod from the switch mechanism by removing two bolts and washer plates. Caution. For VBM s with VACSTAT TM, Use care when working around the fiber optic lines. They are fragile. Do NOT bend them sharply or they may break. 3.Remove four bolts at top of insulator and lift module assembly complete with lower terminal pad and pull rod from the insulator. Insulators may be removed by taking out four cap screws holding them to switch base. Preparation of the Replacement Module Assembly 21

1. Remove the bolts temporarily holding the lower terminal plate to single replacement modules. Temporary Bolts Figure 11: Replacement Module with Temporary Bolts 2. Apply silicone grease (Dow Corning DC III or equivalent) to gasket channel and reuse rubber gasket if in good condition.! CAUTION: WITH THE BOLTS REMOVED, EXTREME CARE MUST BE USED NOT TO PUT ANY FORCE WHATSOEVER ON THE LOOSE TERMINAL PAD SINCE THIS FORCE WOULD BE DIRECTLY TRANSMITTED TO THE DELICATE BELLOWS OF THE VACUUM MODULES. ANY TWISTING COULD RESULT IN IMMEDIATE LOSS OF VACUUM. 3. Attach pullrod to the vacuum module. The double module assembly consists of two 22

modules in series, an upper terminal plate and a lower terminal. It should not be disassembled. The single module and module pair assemblies are mounted in the same manner. An aluminum clevis link may be bolted in the mechanism end of replacement pull rods. If so, remove the aluminum clevis link and discard it. DO NOT attempt to replace the link already in the mechanism. All single replacement modules are supplied with a separate screw-on pull rod. It is installed by slowly screwing onto the bolt in base of the module. Stop as thread bottoms to avoid putting any stress or strain on the vacuum contact. Back the rod off a maximum of one turn as required to mate with the clevis link on mechanism. NOTE: Do not overtighten pull rod to module. Earlier modules utilized either a permanently attached pull rod or a screw-in design. To replace a screw-in pull rod, slip the 1 nylon bushing supplied over the bolt end of the rod and slowly screw into the threaded module base. Stop as thread bottoms and back rod out approximately three full turns as required for proper orientation with the mechanism. Double module assemblies of the present design utilize a pull rod which is bolted to a draw bar in the lower module. All necessary hardware is supplied with replacement double module assemblies. The former design utilized a screw-on pull rod system. All module assemblies are interchangeable and may be used on the same mechanism, regardless of type of pull rod, however using a present and former design double module pair assembly on the same mechanism requires special considerations. If this situation is required, contact Joslyn Hi-Voltage.! CAUTION: BUMPING OR TWISTING ANY PULL ROD WHEN ATTACHED TO A MODULE CAN DAMAGE THE VACUUM INTERRUPTER AND REDUCE ITS LIFE. 23

Mounting the Replacement Module Assembly Insert pull rod through insulator with module terminals in proper position. Fasten the replacement module to insulator with the ¼-20 x 2 ½ bolts, nuts, and washers from the original module. Tighten the bolts evenly. In mounting insulators and vacuum switch modules, particular attention should be paid to torque values. If a bolt head or nut bears on porcelain it should be torqued to 25 inch-pounds, otherwise torque to 50 inch-pounds. 24

With switch mechanism closed, attach pull rod to the steel clevis link of the mechanism with ¼-20 x 1 stainless steel bolts, nuts, and lockwashers placed outside the pull rod side pieces. Do not tighten the nuts to facilitate adjustment/synchronization. Synchronization of Replacement Module Assembly Operation of a replacement module assembly must be synchronized with other module assemblies on the mechanism. Module pair assemblies are synchronized using the lower contacts only. Synchronization refers to the difference in over-travel of modules (or lower contacts of module pair assemblies) on the same operating mechanism. Although the actual over-travel measurement can vary depending upon the ambient temperature, synchronization is not affected by the ambient temperature. NOTE: Do not attempt to synchronize a lower module with an upper module on a module pair assembly. Caution. For VBM s with VACSTAT TM, Use care when working around the fiber optic lines. They are fragile. Do NOT bend them sharply or they may break. 25

Toggle Link Toggle Link Dial Indicator (Secure against bolt) Auxiliary Contact Assembly Toggle Link Support Bar Screws Open Stop Cable Connector Connecting Bolts Close Stop Bolts Figure 12: Synchronization of Replacement Module Assembly 1. Place the continuity lights across all modules connected to line-to-ground insulators on the mechanism. 2. Attach a dial indicator to the mechanism to measure vertical movement of the switch actuating bar. Joslyn recommends the dial gauge indicator be positioned against the bolt head as indicated by the arrows in Figure 8. It is shown out of position to enable photographing of other components. 3. Closed Position Initial Reference. Put switch in closed position. The close stop should be positioned so that toggle links are toward the open position of the switch. If adjustment is necessary, loosen the clamping bolts, reposition, and retorque to 120 inch-pounds. Adjust dial indicator to zero. For VBMs with Standard Controls The toggle links should be about 1 degree off vertical. 26

For VBMs with Zero Voltage Closing Controls The toggle links should be about 5 degrees off vertical. VBM Instruction Manual 1 [5 for ZVC applications] 4. Full Travel. Put switch in open position. Dial indicator should read 0.205 ± 0.005. If out of tolerance, adjust open stop. Refer to Figure 8. Retorque bolts to 120 inch-pounds. 5. Over-travel. With switch in closed position, slowly move the mechanism toward the open position with ¾ wrench on a toggle link. Observe the dial gauge reading at which the continuity light(s) on the other module(s) goes out. This movement measured is the OVERTRAVEL. At ambient temperatures between 50 F and 80 F the lights should go out at 0.040 ±.004 travel. Insert a spacer between the close stop and bumper to hold the mechanism at a reading midpoint between opening readings of the two other module assemblies, or at the same reading if there are only two module assemblies on the mechanism. The spacer should be inserted on the opposite side from that shown in Figure 4. Torque the connecting bolts on the replacement assembly pull rod to 75 inch-pounds. 6. Synchronization. Remove the spacer and close the mechanism. Slowly open the mechanism and observe the continuity lights. Note the dial readings at which the replacement and adjacent modules open. The last light must go out within.005 mechanism travel after the first light. If synchronization is not achieved, loosen pull rod varying the set position in appropriate direction until all single or lower contacts open within 0.005 of mechanism travel. 27

7. After module pair assemblies have been synchronized using the lower contacts only, the synchronization between upper and lower contacts should be verified. The synchronization of upper and lower contacts is related to ambient temperature. At temperatures between 50 F and 80 F the dial gauge should measure a maximum of 0.010 travel of the actuating bar between the opening of each lower contact and its corresponding upper contact. Switch Operators The Solenoid Operator In the single solenoid operator, two solenoids, one for opening and one for closing are used to move a toggle linkage over center releasing stored spring energy to open and close the vacuum contacts. This operation is sequentially described in Figure 9. IMPROPER CONDITION Toggle link is past vertical away from open position VRL PROPER Closed position initial reference approximately 1 toward opening Toward OPEN SOLENOIDS TOGGLE LINK Rotates around A and is fastened to actuating bar at B. CONTROL YOKE Rotates around C. ACTUATING BAR Moves in arc around D and E. DESCRIPTION OF OPERATION 1.Switch is open. Spring assembly connected between toggle link and control yoke holds open stop against bumper. 2. Control circuit energizes close solenoid. Actuating pin rotates control yoke clockwise until toggle link is over center. 3. Spring assembly pulls toggle link and actuating arm in counterclockwise arc until close stop and bumper engage. Vertical movement of actuating bar raises pull rods and closes vacuum contacts. 4. When open solenoid is energized, the control yoke is rotated counterclockwise until the toggle link is over center and pulled clockwise by the spring assembly. This returns the actuating bar to the original position, opening the vacuum contacts. Figure 13: Description of Operation Some solenoid operators use a double solenoid assembly which utilizes two solenoids each for close and open operation. The operation and maintenance of the double solenoid operator is similar to that described for the single solenoid operator. The switch may be operated manually using a switch hook. An operating crank is located on the switch housing. The crank ends are notched to receive a switch hook. To close 28

the interrupter, place a switch hook in the notch above the words push to close and push. This moves the toggle linkage over center, releasing spring energy to close the contacts at high speed independent of speed at which the arm is pushed. To trip, or open the interrupter, place the switch hook in the notch above the words push to open and push. a. Solenoid Assembly Replacement. Open splicing connectors on the yellow solenoid wires. Leave wires as long as possible. Bolts Remove four bolts (two visible in picture) and the solenoid assembly is released. The following procedure is for Decco solenoids. Replacement solenoids are sold as an assembly. Solenoid assembly can be replaced by removing the appropriate bolts attaching the assembly to the mechanism. As the assembly is removed, the nylon actuating pins will fall out. All bolts should be torqued to 70 inch-pounds. In case of Namco solenoids, one or both solenoids can be replaced by removing and replacing the appropriate bolts holding the assembly together, however replacements solenoids are sold as an assembly. The nylon actuating pins will fall out as the assembly is removed. All bolts should be torqued to 70 inch-pounds. To remount the solenoid assembly, insert new nylon actuating pins and position the assembly. Do not reuse old nylon pins. Torque four mounting bolts to 150 inch-pounds. Connect the four yellow solenoid coil leads to corresponding wires using new insulated compression splices. To insure operating components freedom of movement necessary to achieve proper operation speed, use a feeler gauge to check pin gap of each actuating pin. 29 Nylon pin

The gap should be.070 and.090. Manually change the switch position to check opposite pins. Pin gap is adjusted by adding or removing flat washer shims under nylon spacer sleeves. The Motor Operator A series motor drives a cam which loads a spring assembly. When the springs are fully loaded, the cam releases a linkage closing the vacuum switch using one-half the energy in the spring assembly. A low energy solenoid releases the remaining energy in the spring assembly through the same linkage to open the interrupter. Operation is sequentially described in the following figures. The design inherently prevents closing the switch, unless sufficient energy to trip is stored in the spring assembly. The motor consists of a mechanical energy storage assembly and a control assembly. The control assembly is located in the base of the VBM switch. Connections to external circuitry are made through a control cable with environmental connectors. The VBM motor operator is designed to operate at 24VDC, 48VDC, 125VDC, or 120VAC depending upon application. Figure 14: VBM Motor Operator Picture (G) Wiring Harness (F) Environmental Connector Actuator Bar (D) Auxiliary Switches (C) Cable Connector (E) Screws (4) (B3) Mounting Bolt Operating Lever Stops Motor Operator 30 (B2) Mounting Bolt (B1) Mounting Bolt (A) Relay Panel (Control Assembly)

Figure 15: VBM Motor Operator Diagram VBM Instruction Manual Description of Operation The following figures illustrate the sequential operation of the assembly. The motor operator lever is connected to the switch actuating bar at point M. The actuating bar linkage is connected to the pull rods (not shown) of each module assembly. Figure 16: Sequence of Motor Operation 1. Switch is open. 2. Toggle links P1 and P2 are in relaxed position. 3. Spring assembly S1 is unloaded. 4. Cam is rotated counter-clockwise by motor or manual pumping. 5. Lever is displaced in direction R1. 6. Spring assembly S1 is compressed storing energy in springs. 7. Lever pulls toggle links P1 and P2 over center. 8. Toggle spring S2 brings toggle linkage in extended position against stop. 9. The switch is open and the mechanism is ready to close. Figure 17: Sequence of Motor Operation 10. As spring assembly S1 is fully loaded the cam releases lever and stops. 11. Lever pivots around fulcrum T. Pin R moves in arc R2 and comes against motor assembly chassis stop using ½ total energy in spring assembly S1. 12. M is moved in arc M1. M s displacement moves the switch actuating bar and closes the interrupter contacts. Figure 18: Sequence of Motor Operation 31

Figure 19: Sequence of Motor Operation 13. Switch is closed. 14. Solenoid exerts force U on lever V which pivots on fulcrum W exerting force X on toggle linkage P1 and P2. 15. Toggle link assembly is displaced. The remaining ½ total energy S1 pulls lever which pivots on fulcrum R. 16. M moves in arc M2 moving switch actuating bar and opening contacts. 17. The switch is open. Manual Operation The switch may be operated manually using a switch hook. An operating crank is located on the switch housing. The crank ends are notched to receive the switch hook. To close the fault interrupter, place a switch hook in the notch above the words Push to Close and pump. After approximately 25 strokes, the switch will close. A unique rotary clutch allows strokes of any length to rotate the cam. A single swift push in the notch above the words Push to Open will trip the switch. NOTE: SLOWLY PUSHING THE HANDLE WILL NOT PROVIDE ENOUGH ENERGY TO OPEN THE SWITCH. Vacuum contact operating speed is independent of speed of manual activation. Servicing Electrical Removal and Installation of Relay Panel - Brief a. Relay panel (Figure 15): Remove entire relay panel (A) by removing the mounting bolt (B1) and disconnecting cable connector (C), trip coil leads, charging motor leads, and install new relay panel. b. Wiring harness (Figure 15): Remove wiring harness by disconnecting cable connector (C) and remove leads from terminals of auxiliary switch(es) (D). Remove four screws (E) which hold the environmental connector (F) and pull wiring harness (G) out of the housing. To install wiring harness (G), clean surfaces of casting where connector mounts. Apply a small amount of silicone grease to gasket of new connector. Install new harness (G) and rewire. 32

c. Auxiliary switch(es) (D) (Figure 15): Refer to Auxiliary Switch Adjustment section. VBM Instruction Manual Installation of Relay Panel - Detailed Relay Panel Installation. a.) Connect the motor wires to the Relay panel as shown in the picture below. b.) Remove the bolt from the Motor mechanism assembly as shown in the picture below. Bolt 33

Spacer Shock absorber Relay Panel c.) Attach the assembly to the Motor mechanism assembly. Torque bolt to 80 in-lb. d.) Reinstall the bolt. Torque the bolt down to 80 in-lb. e.) Tie the wire with Plastic Tie Rap as need to make it look neat in appearance. 34

Plastic Tie Raps Servicing Mechanical Install Motor Mechanism a.) Attach the Motor Mechanism to the Linkage. Secure the assembly with two 3/8-16x3¼ bolts. 3/8-16x3¼" bolt Motor mechanism 35

b.) Attach the assembly to the actuating bars with a clevis pin. Secure the clevis pin with three large nylon washers (two nylon washers on one side and one on the other), and a cotter pin. Open the split end of the cotter pin. Pin assembly Close the cotter pin as shown c.) Using a hammer, pound the Roll pins, located on Mech. Plate, down until the Roll pins is in the center of the mechanism. Roll pin 36

Punch holder Install and Pre-adjust two Power springs into the assembly. d.) Install two power springs to the motor mechanism assembly. Secure the power springs with ¼-20 jam nuts. Tighten the jam nut down until the end of the jam nut is even with the end of the thread of the power spring. ¼-20 jam nut 37

e.) Loosen up the ¼-20 nut of the power spring until there are 4 threads left between the power spring and the nut. f.) Torque the jam nut to 80-in-lb. Torque to 80 in-lb. 38

g.) Using a feeler gauge, adjust the gap on both of the stop bolts to 0.020 Stop bolt Setup tripping. h.) Loosen Jam nut, located on the Trip Link, all the way. Jam nut Trip screw i.) Turn the Trip Screw clockwise until it trips then back it off 2 full turns. j.) Close the switch. Fine-tune the Trip screw until it trips. Turn the Trip Screw 5/8 to ¾ of a turn backward. k.) Tighten the nut until no movement is allowed. Close the switch. l.) Using Pin gauge, reset the Stop bolts at 0.020 m.) Open the switch. Set the length of the Power Spring between 3 to 3 1/8. Make sure that both springs are set at the same length. 39

Space washer Ruler Set 3" to 3 1/8" without the thickness of the washers Torque the jam nut to 80 in-lb. n.) Check Cranks for number of strokes to manually close the switch. o.) Turn the Shaft, at the bottom of the motor; to setup one Eccentric operated at a time. p.) Pull the crank to manually close the switch. It must be no more than 30 full manual strokes before the switch is operated. 40

q.) Set eccentrics by turning shaft of motor. Rotate shaft of motor to rotate eccentrics 180 using screwdriver. Reverse position and open switch. Close switch by moving handle back and forth less than 30 times and set. Cranks Eccentrics r.) Recheck the tightness of the setscrews on the motor mechanism assembly. s.) Close the switch. Make sure that the Spring plates assembly is flat with the Actuator bar. 41

Spring Plates assembly Replacement of Motor Not all motors are identical. When ordering replacement motors, the catalog number from the VBM nameplate must be supplied. New control panel may be required for obsolete motors. 1. Loosen bolts B1-B3. (Figure 15) 2. Remove three set screws (if present) 3. Disconnect push-on connectors of motor leads from relay. 4. Unbend locking straps and remove three set screws. 5. Remove motor. 6. Install motor using set screw. 7. Retighten bolts B1-B3. (Figure 15) 8. Install locking straps and nuts and set the set screws. 9. Bend corners of locking straps. 10. Connect push-on connectors of motor leads to relay. 42

Auxiliary Switch Adjustment Auxiliary Switch Adjustment (Switches Made After 1997) VBM Instruction Manual While the switch is in the open position, place a shim with 0.100 thickness up between the close bumper stop and casting. Close the switch using the manual operating handle so shim is firmly held in place. Close Bumper Stop Shim (0.100 thickness) Figure 20: Shim Placement Move auxiliary switch contact bracket so the spring is completely depressing plungers of auxiliary switch. Adjust the angle between spring and actuating bar to 88 to 90. Tighten bolts on contact bracket. Open switch with the manual operating handle and remove the shim. Auxiliary Contacts Contact bracket Spring 88 to 90 angle Figure 21: Auxiliary Switch Adjustment Actuating Bar 43

Auxiliary Switch Adjustment (Switches Made Prior to 1997) VBM Instruction Manual With mechanism in closed position, use a C-clamp to hold the operating crank to its cover, so the crank cannot move from the closed position. Attach dial indicator and set at zero. With a wrench on toggle link move the mechanism toward the open position. The auxiliary switch should operate at or before 0.175 vertical movement is indicated. Slowly return mechanism to closed position. The auxiliary switch should operate before the mechanism has returned to within 0.025 of the fully closed position. If adjustment is not correct, release bolts and reposition bracket in appropriate direction. Retighten the bolts and recheck operation. Repeat until auxiliary switch operations occur within the allowable range. Tighten bolts to 70 inch-pounds. Switch Bracket Gasket Cable Connector Auxiliary Switch Toggle Link Dial Indicator Figure 22: Auxiliary Switch Adjustment (Prior to 1997) 44

Wiring Harness and Auxiliary Contact Replacement (Switches Made Prior to 1997) The auxiliary switch (8) and cable connector (9) are integral parts of the wiring harness assembly. The entire assembly must be removed as a unit. Open splicing connectors on the four black solenoid wires. Remove the auxiliary switch bracket (10) from the support bar (11). Remove four screws (12) which hold the environmental control cable connector and pull wiring harness assembly out of housing. Figure 23: Wiring Harness and Auxiliary Contact Adjustment To install wiring harness, clean surfaces of casting where connector mounts. Apply a small amount of silicone grease (Dow Corning DC III or equivalent) to gasket (13) of new connector. Install harness assembly, remount and adjust the auxiliary switch and rewire. See Auxiliary Switch Adjustment section to adjust properly. V. Switches Rated 1,000 Amperes and Higher These switches utilize modules connected in parallel. For some ratings, more than one mechanism per pole is used. They are installed per instructions in Installation Section III and connected per Joslyn Hi-Voltage drawings and control schematic for the particular switch. All servicing and testing is performed on separate mechanisms by removing the connecting bus and referring to the appropriate section of these instructions. 45