INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY

Similar documents
(Non-legislative acts) DECISIONS

Council of the European Union Brussels, 18 July 2014 (OR. en)

POSITION PAPER Version 3.0

QUESTION / CLARIFICATION QC-ENE-001

Guide for the application of the CR ENE TSI

(Non-legislative acts) DECISIONS

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

Guidance on the Energy TSI

(Text with EEA relevance)

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS

(Text with EEA relevance)

INTEROPERABILITY UNIT UNION RAIL SYSTEM SUBSYSTEM ROLLING STOCK TSI LOCOMOTIVES AND PASSENGER RST

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

European Railway Agency

DRAFT RECOMMENDATION N. 006REC1072

Council of the European Union Brussels, 18 July 2014 (OR. en)

Version / Status V 2.0 Date Author. Wagon Markings

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR INTERGOVERNMENTAL ORGANISATION FOR INTERNATIONAL CARRIAGE BY RAIL

Compatibility Between Electric Trains and Electrification Systems

Equipotential Bonding of Rail Vehicles to Running Rail Potential

OTIF. Uniform Technical Prescription UTP LOC&PAS Applicable to the Rolling Stock subsystem: LOCOMOTIVES AND PASSENGER ROLLING STOCK

Mechanical Trainstop Systems

APTU Uniform Rules (Appendix F to COTIF 1999) Uniform Technical Prescriptions (UTP) applicable to the Rolling Stock subsystem:

Application Guide for the European Register of Authorised Types of Railway Vehicles (ERATV)

INTEROPERABILITY UNIT

Rail Industry Standard for 750 V and 1500 V DC Overhead Lines and corresponding Rolling Stock requirements

Applicable standards in HS Infrastructure subsystem TSI (2008/217/EC)

INFORMATIVE TRANSLATION OF EXECUTIVE ORDER no 1465, DATED 5 DECEMBER 2016

High Speed Passenger Rail Interoperability in North America

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013

Guide for the application of the WAG TSI

Electric Networks/Ina Lehto Updated Original 12/2011

QUESTION / CLARIFICATION

HyLAW. HyDrail Rail Applications Assessment. Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s):

Permissible Track Forces for Railway Vehicles

Guide for the application of the CR WAG TSI

E-15 Uninterruptible Power Systems (UPS)

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

KBA Kraftfahrt-Bundesamt

COMMISSION REGULATION (EU) / of XXX

Guideline for Parallel Grid Exit Point Connection 28/10/2010

COMMISSION REGULATION (EU) / of XXX

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

UNISIG * EEIG ERTMS USERS GROUP * UNIFE

Risk Management of Rail Vehicle Axle Bearings

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

E-15 Uninterruptible Power Systems (UPS)

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

OTIF OTIF. Guide for the application of the UTP LOC&PAS ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile ("multi-map") under the NOx Technical Code 2008

Official Journal of the European Communities

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EC)

The Project North West Electrification Programme

(Text with EEA relevance)

This document is a preview generated by EVS

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure

Fast track to Sustainable Mobility. SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Small Electrical Systems (Microgrids)

National technical rules for vehicles Related Control Command and Signalling Requirements

Annex A. to Technical Specification "Operations and traffic management" adopted by

INTERNATIONAL STANDARD

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1

Draft for comments only Not to be cited as East African Standard

Decree of the Ministry of Transport and Communications

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

TRANSMISSION PLANNING CRITERIA

Research Brief. Simulation and verification of results from 125mph current collection modelling for two pantographs. T841 - January 2011.

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

DIRECTIVE 2006/40/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Official Journal of the European Union

for TECHNICAL ADVICE OF THE EUROPEAN UNION AGENCY FOR RAILWAYS THE EUROPEAN COMMISSION regarding ERA/AD V/ running gear - design of structural

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

CATALOGUE OF STANDARDS OF CENELEC / TC9X January Documents directly steered by TC 9X 2, 3, 4, 5. Documents steered by CLC / SC 9XA 6, 7

Controlling the Speed of Tilting Trains Through Curves

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Approval of new trains. Pantographs and pantographoverhead. interaction

PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

Track Circuit Assister Configuration for Rail Vehicles

GB/T / IEC :2007

Guidelines for connection of generators:

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

EXTRACT of chapter XXXIV coupling devices (version of ) ANNEX XXXIV Requirements on mechanical couplings

GLOBAL REGISTRY. Addendum. Global technical regulation No. 10 OFF-CYCLE EMISSIONS (OCE) Appendix

RESOLUTION MEPC.198(62) Adopted on 15 July GUIDELINES ADDRESSING ADDITIONAL ASPECTS TO THE NOx TECHNICAL CODE 2008 WITH REGARD TO

ANNEX MOTOR VEHICLES AND EQUIPMENT AND PARTS THEREOF. Article 1. Definitions

DANGEROUS GOODS PANEL (DGP) WORKING GROUP MEETING (DGP-WG/17)

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

Transcription:

INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY Reference: IU-ENE-071221-TSI 2.1 Document Type: Version: Title: 2.1 - Draft Technical Specification of Interoperability Preliminary Draft TSI Date: 13/02/2008 Edited by Reviewed by Approved by Name Stanislaw LIS Gianvittorio TAVOLA Andrzej HARASSEK Jean-Charles PICHANT Position Project Officers Head of Unit Date & Signature 1 of 100

Amendment record Version Date 2.0 21/12/2007 All Section number Modification/ Description Approval by ERA for DG TREN 2.1 13/02/2007 All 17 th ENE WP Author Stanislaw Lis Gianvittorio Tavola Stanislaw Lis Gianvittorio Tavola 2 of 100

Table of contents Amendment record... 2 Table of contents... 3 1.0. The energy subsystem as part of the conventional rail system... 7 1.1. Technical scope... 8 1.2. Geographical scope... 8 1.3. Content of this TSI... 8 2. SCOPE AND DESCRIPTION OF THE SUBSYSTEM... 10 2.1. Scope... 10 2.2. Description of the subsystem... 11 2.2.1. Power supply... 11 2.2.2. Overhead contact line and pantograph... 11 2.3. Interfaces with other subsystems and within the subsystem... 12 2.3.1. Introduction... 12 2.3.2. Interfaces concerning power supply... 12 2.3.3. Interfaces concerning overhead line equipment and pantographs and their interaction... 12 2.3.4. Interfaces concerning phase and system separation sections... 12 3. ESSENTIAL REQUIREMENTS... 13 3.1. General... 13 3.2. Essential requirements for the Energy subsystem... 13 3.3. Specific aspects for the Energy subsystem... 14 3.3.1. Safety... 14 3.3.2. Reliability & availability... 15 3.3.3. Health... 15 3.3.4. Environmental protection... 15 3.3.5. Technical compatibility... 16 3.3.6. Maintenance, health & safety... 16 3.3.7. Table of essential requirements and basic parameters... 18 4. CHARACTERISATION OF THE SUBSYSTEM... 20 4.1. Introduction... 20 4.2. Functional and technical specifications of the subsystem... 20 4.2.1. General provisions... 20 4.2.2. Basic parameters characterizing the energy subsystem... 20 4.2.3. Voltage and frequency... 21 4.2.4. Parameters relating to supply system performance... 21 4.2.5. Continuity of power supply in case of disturbances... 22 4.2.6. Current capacity, DC systems, trains at standstill... 22 4.2.7. Regenerative braking... 22 4.2.8. Electrical protection coordination arrangements... 22 4.2.9. Harmonics and dynamic effects... 23 4.2.10. Harmonic emissions towards the power utility... 23 4.2.11. External electromagnetic compatibility... 23 4.2.12. Protection of the environment... 23 4.2.13. Geometry of the overhead contact line... 23 4.2.14. Free passage gauge of pantographs... 25 4.2.15. Mean contact force... 25 4.2.16. Dynamic behaviour and quality of current collection... 25 3 of 100

4.2.17. Pantograph spacing used for the design of the overhead contact line... 28 4.2.18. Contact wire material... 28 4.2.19. Phase separation sections... 29 4.2.20. System separation sections... 29 4.3. Functional and technical specifications of the interfaces... 31 4.3.1. General requirements... 31 4.3.2. Locomotive and traction unit CR TSI... 31 4.3.3. Infrastructure subsystem... 32 4.3.4. Control - Command and Signalling subsystem... 32 4.3.5. Traffic Operation and Management... 32 4.3.6. Safety in Railway Tunnels... 32 4.4. Operating rules... 33 4.4.1. General requirements... 33 4.4.2. Management of power supply in case of danger... 33 4.4.3. Execution of works... 33 4.4.4. Management of power supply under abnormal conditions... 33 4.5. Maintenance rules... 34 4.6. Professional qualifications... 34 4.7. Health and safety conditions... 34 4.7.1. General requirements... 34 4.7.2. Protective provisions of substations and sectioning locations... 34 4.7.3. Protective provisions of overhead contact line system... 35 4.7.4. Protective provisions of current return circuit... 35 4.7.5. Other general requirements... 35 4.7.6. High Visibility Clothing... 35 4.8. Infrastructure and Rolling stock registers... 35 4.8.1. General requirements... 35 4.8.2. Infrastructure Register... 35 4.8.3. Rolling Stock Register... 36 5. INTEROPERABILITY CONSTITUENTS... 37 5.1. Definition... 37 5.2. List of constituents... 37 5.3. Constituents' performances and specifications... 38 5.3.1. Overhead contact line... 38 6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATION OF THE SUBSYSTEM... 39 6.1. Interoperability constituents... 39 6.1.1. Assessment procedures... 39 6.1.2. Modules... 39 6.2. Energy subsystem... 40 6.2.1. General requirements... 40 6.2.2. Application of modules... 41 6.2.3. Assessment of maintenance... 41 6.3. Validity of certificates issued against the previous published version of the TSI... 41 6.4. Interoperable Constituents not holding an EC declaration... 42 6.4.1. General requirements... 42 6.4.2. The transition period... 42 4 of 100

6.4.3. The certification of subsystems containing non-certified Interoperability Constituents during the transition period... 42 6.4.4. Monitoring arrangements... 43 7. IMPLEMENTATION... 44 7.1. Application of this TSI to new lines... 44 7.2. Application of this TSI to existing lines... 44 7.2.1. Introduction... 44 7.2.2. Upgrading/renewal - classification of works... 44 7.2.3. Upgrading/renewal of the complete subsystem... 45 7.2.4. Upgrading/renewal of the OCL and/or the power supply... 45 7.2.5. Parameters related to maintenance... 45 7.3. Specific cases... 45 7.3.1. Introduction... 45 7.3.2. List of specific cases... 47 7. x Particular features on the British network... 47 7. x Particular features on the Czech Republic network... 50 7. x Particular features on the Danish network including the Öresund link to Sweden... 51 7. x Particular features on the Finnish network... 52 7.x Particular features on the German network... 53 7. x Particular features on the Netherlands network... 54 7. x Particular features on the Swedish network... 56 7.4. Progressive strategy towards interoperability... 57 7.4.1. General requirements... 57 7.4.2. Migration strategy for voltage and frequency... 57 7.4.3. Migration strategy for pantographs and OCL geometry... 57 7.5. TSI revision... 57 8. LIST OF ANNEXES... 58 ANNEX A: CONFORMITY MODULES... 59 ANNEX B CONFORMITY ASSESSMENT OF INTEROPERABILITY CONSTITUENTS... 80 ANNEX C ASSESSMENT OF THE ENERGY SUBSYSTEM... 81 ANNEX D INFRASTRUCTURE REGISTER, INFORMATION ON THE ENERGY SUBSYSTEM... 83 ANNEX E ROLLING STOCK REGISTER, INFORMATION REQUIRED BY THE ENERGY SUBSYSTEM... 84 ANNEX F TEMPERATURE RISE IN CONDUCTORS... 85 ANNEX G DETERMINATION OF THE FREE PASSAGE GAUGE OF PANTOGRAPHS... 86 ANNEX H PHASE SEPARATION SECTION SOLUTIONS... 93 ANNEX I POWER FACTOR... 95 I.1 General... 95 I.2 Inductive power factor... 95 5 of 100

ANNEX J CONTACT WIRE HEIGHT... 97 ANNEX Z GLOSSARY... 98 6 of 100

1.0. The energy subsystem as part of the conventional rail system The conventional rail system has been broken down into subsystems as defined in Annex II to Directive 2001/16/EC, as amended by Directives 2004/50/EC and 2007/32/EC. The following subsystems are defined, two of which are operational: a. infrastructure; b. energy; c. control and command and signalling; d. traffic operation and management; e. rolling stock; f. maintenance (operational); g. telematic applications for passenger and freight services (operational). There are two TSIs describing specific aspects of the railway system and relating to several subsystems: h. safety of railway tunnels; i. accessibility to people with reduced mobility. The rolling stock subsystem is described within the following TSIs: j. freight wagons; k. locomotives and traction unit; l. passenger carriages m. noise; Aspects of maintenance will be integrated into the structural TSIs, so that no separate operational TSI for maintenance will exist. 7 of 100

1.1. Technical scope This TSI concerns the energy subsystem of the trans-european conventional rail system. It is included in the structural area of the list of Annex II to Directive 2001/16/EC, as amended by Directives 2004/50/EC and 2007/32/EC. According to Annex I of the Directive, the conventional rail network comprises the following categories: a. lines intended for passenger services; b. lines intended for mixed traffic (passenger and freight); c. lines specially designed or upgraded for freight services; d. passenger hubs; e. freight hubs, including intermodal terminals; f. lines connecting the abovementioned elements. In order to deliver interoperability cost-effectively further subcategories of all categories of lines mentioned will, where necessary, be developed. The functional and technical specifications of the present TSI may vary according to the subcategory. The categories of line for the conventional rail system are specified in the Infrastructure CR TSI. 1.2. Geographical scope The geographical scope of this TSI is the trans-european conventional rail system as described in Annex I to Directive 2001/16/EC as amended by Directives 2004/50/EC and 2007/32/EC. Reference should be made, in particular, to the lines of the conventional rail network referred to in Decision No 1692/96/EC 1 of the European Parliament and of the Council of 23 July 1996 on Community guidelines for the development of the trans-european transport network, or those included in any update of this Decision resulting from the revision provided for in Article 21 of the Decision. 1.3. Content of this TSI In accordance with Article 5(3) of Directive 2001/16/EC, as amended by Directives 2004/50/EC and 2007/32/EC, this TSI: a. indicates its intended scope and description of the sub-system Chapter 2; b. lays down essential requirements for Energy subsystem Chapter 3; c. establishes the functional and technical specifications to be met by the subsystem and its interfaces vis-à-vis other subsystems Chapter 4; d. determines the interoperability constituents and interfaces covered by European specifications, including European standards, which are necessary to achieve interoperability within the trans-european conventional rail system Chapter 5; e. states, in each case under consideration, the procedures for the assessment of conformity or suitability for use. This includes in particular the modules defined in 1 Decision as amended by Decision No 1346/2001/EC of 22 May 2001 (OJ L185, 06.07.2001, p. 1.). Decision as amended by the Treaty of Accession 2003. Decision as last amended by (rectified) Decision No 884/2004/EC of 29 April 2004 (OJ L 201, 07.06.2004, p. 1). 8 of 100

Decision 93/465/EEC or, where appropriate, the specific procedures to be used to assess either the conformity or the suitability for use of interoperability constituents and "EC" verification of subsystems Chapter 6; f. indicates the strategy for implementing the TSI. In particular, it is necessary to specify the stages to be completed in order to make a gradual transition from the existing situation to the final situation in which compliance with the TSI shall be the norm Chapter 7; g. indicates, for the staff concerned, the professional qualifications and health and safety conditions at work required for the operation and maintenance of the subsystem concerned, as well as for the implementation of the TSI Chapter 4. Moreover, in accordance with Article 5(5), provision may be made for specific cases for each TSI; these are indicated in Chapter 7. Lastly, this TSI also comprises, in Chapter 4, the operating and maintenance rules specific to the scope indicated in paragraphs 1.1 and 1.2 above. 9 of 100

2. Scope and description of the subsystem 2.1. Scope The Energy TSI specifies those requirements which are necessary to assure the interoperability of the trans-european conventional rail system. This TSI covers all fixed installations, DC or AC that are required to supply, with respect to the essential requirements, traction energy to a train. The energy subsystem also includes the definition and quality criteria for interaction between a pantograph and the overhead contact line. As the third rail and contact shoe system is not a target system, this TSI does not describe the characteristics or functionality of such a system. Transfer the current Supply current (Substation) Convey the current Figure 1: Energy subsystem Energy subsystem Rolling stock subsystem The Energy subsystem consists of: a. substations: connected on their primary side to the high-voltage grid, with transformation of the high-voltage to a voltage and/or conversion to a power supply system suitable for the trains. On the secondary side, substations are connected to the railway contact line system; b. sectioning locations: electrical equipment located at intermediate locations between substations to supply and parallel contact lines and to provide protection, isolation, auxiliary supplies; c. separation sections: equipment required to provide the transition between electrically different systems or between different phases of the same electrical system; d. contact line system: a system that distributes the electrical energy to the trains running on the route and transmits it to the trains by means of current collectors. The contact line system is also equipped with manually or remotely controlled disconnectors which are required to isolate sections or groups of the contact line system according to operational necessity. Feeder lines are part of the contact line system; e. return circuit: all conductors which form the intended path of the traction return current and which are additionally used under fault conditions. Therefore, so far as this aspect is concerned, the return circuit is part of the Energy subsystem and has an interface with the Infrastructure subsystem; 10 of 100

f. current collectors (pantographs) transmit electrical energy from the overhead contact line system to the train on which they are installed. The pantograph is integrated into and put into service with the train, and is in the scope of the conventional Locomotives and Traction Units (LOC) CR TSI. The interaction between pantograph and the overhead contact line is specified in the Energy CR TSI. 2.2. Description of the subsystem 2.2.1. Power supply The power supply system has to be designed such that every train will be supplied with the necessary power. Therefore, the supply voltage, current draw of each train and the operating schedule are important aspects for performance. As with any electrical device, a train is designed to operate correctly with a nominal voltage and a nominal frequency applied at its terminals, i.e. the pantograph(s) and wheels. Variations and limits of these parameters need to be defined in order to assure the anticipated train performance. Modern trains are often capable of using regenerative braking to return energy to the power supply, reducing power consumption overall. The power supply system can be designed to accommodate regenerative braking energy. In any power supply, short-circuits and other fault conditions may occur. The power supply needs to be designed so that the controls detect these faults immediately and trigger measures to remove the short-circuit current and isolate the affected part of the circuit. After such events, the power supply has to be able to restore supply to all installations as soon as possible in order to resume operations. 2.2.2. Overhead contact line and pantograph The compatible geometry of the overhead contact line and the pantograph is an important aspect of interoperability. As far as geometrical interaction is concerned, the height of the contact wire above the rails, the variation in contact wire height, the lateral deviation under wind pressure and the contact force have to be specified. The geometry of the pantograph head is also fundamental to assure good interaction with the overhead contact line, taking into account vehicle sway. In order to support interoperability of European networks, the pantographs specified in LOC CR TSI are the target. The interaction between an overhead contact line and a pantograph represents a very important aspect in establishing reliable power transmission without undue disturbances to railway installations and the environment. This interaction is mainly determined by: a. static and aerodynamic effects dependent upon the nature of the pantograph contact strips and the design of the pantograph, the shape of the vehicle on which the pantograph(s) is (are) mounted and the position of the pantograph on the vehicle, b. the compatibility of the contact strip material with the contact wire, c. the dynamic characteristics of the overhead contact line and pantograph(s) for single unit or multiple unit trains, d. the number of pantographs in service and the distance between them, since each pantograph can interfere with the others on the same overhead contact line section. 11 of 100

2.3. Interfaces with other subsystems and within the subsystem 2.3.1. Introduction The energy subsystem interfaces with some of the other subsystems of the trans-european conventional rail system in order to achieve the envisaged performance. 2.3.2. Interfaces concerning power supply a. Voltage and frequency and their permissible ranges interface with the rolling stock subsystem. b. The power installed on the lines and the specified power factor determines the performance of the conventional rail system and interfaces with the rolling stock subsystem. c. Regenerative braking reduces energy consumption and interfaces with the rolling stock subsystem. d. Electrical fixed installations and on-board traction equipment need to be protected against short circuits. Circuit breaker tripping in substations and on trains has to be coordinated. Electrical protection interfaces with the rolling stock subsystem. e. Electrical interference and harmonic emissions interface with the rolling stock and control-command and signalling subsystems. f. The current return circuit has some interfaces with control-command and signalling and infrastructure subsystems. 2.3.3. Interfaces concerning overhead line equipment and pantographs and their interaction a. On conventional lines, the contact wire gradient & rate of change of gradient needs special attention in order to avoid loss of contact and excessive wear. The contact wire height and gradient interfaces with the Infrastructure and rolling stock subsystems. b. Vehicle and pantograph sway interfaces with the infrastructure subsystem. c. The quality of current collection depends on the number of pantographs in service, their spacing and other traction-unit-specific details. The arrangement of pantographs interfaces with the rolling stock subsystem. 2.3.4. Interfaces concerning phase and system separation sections a. To pass transitions between different power supply system and phase separation sections, without bridging, the number and arrangement of pantographs on trains shall be stipulated. This interfaces with the rolling stock subsystem. b. To pass transitions of power supply system and phase separation sections, without bridging, control of train current is required. This interfaces with the control-command and signalling subsystem. c. When passing through power supply system separation sections, lowering of pantograph(s) may be required. This interfaces with the control-command and signalling subsystem. 12 of 100

3. Essential requirements 3.1. General The scope of this TSI is described in: - chapter 4 for the subsystem; - chapter 5 for the interoperability constituents. Conformity assessment is required to demonstrate that the essential requirements quoted in chapters 3.2 and 3.3 of this TSI have been met. Conformity and/or suitability for use of the interoperability constituents and verification of the subsystem are demonstrated when they meet the requirements of TSI (chapter 6). Nevertheless, if part of the essential requirements are covered by national rules because of: - derogation under article 7 of the Directive 2001/16/EC as amended by the Directive 2004/50/EC, - specific cases described in chapter 7.3 of this TSI, the corresponding conformity assessment shall be carried out according to procedures under the responsibility of the Member State concerned. According to Article 4(1) of Directive 2001/16/EC as amended by the Directive 2004/50/EC, the trans-european conventional rail system, its subsystems and their interoperability constituents shall fulfil the essential requirements set out in general terms in Annex III to the Directive. 3.2. Essential requirements for the Energy subsystem The essential requirements cover: - safety, - reliability and availability, - health, - environmental protection, - technical compatibility. 13 of 100

3.3. Specific aspects for the Energy subsystem 3.3.1. Safety According to Annex III to Directive 2001/16/EC as amended by the Directives 2004/50/EC and 2007/32/EC, the essential requirements for safety are the following: 1.1.1. The design, construction or assembly, maintenance and monitoring of safety-critical components and, more particularly, of the components involved in train movements must be such as to guarantee safety at the level corresponding to the aims laid down for the network, including those for specific degraded situations. 1.1.2. The parameters involved in the wheel/rail contact must meet the stability requirements needed in order to guarantee safe movement at the maximum authorised speed. 1.1.3. The components used must withstand any normal or exceptional stresses that have been specified during their period in service. The safety repercussions of any accidental failures must be limited by appropriate means. 1.1.4. The design of fixed installations and rolling stock and the choice of the materials used must be aimed at limiting the generation, propagation and effects of fire and smoke in the event of a fire. 1.1.5. Any devices intended to be handled by users must be so designed as not to impair the safe operation of the devices or the health and safety of users if used foreseeably in a manner not in accordance with the posted instructions. The aspects mentioned under 1.1.2 and 1.1.5 are not relevant to the energy subsystem. In order to satisfy the essential requirements 1.1.1, 1.1.3 and 1.1.4 above, the energy subsystem shall be designed and constructed so that the requirements set out in clauses, 4.2.5 to 4.2.9, 4.2.13 to 4.2.16, 4.2.18 to 4.2.20, 4.4.1, 4.4.2, 4.5 and 4.7.1 to 4.7.4 are met and the interoperability constituents used comply with the requirements set out in clause 5.3.1.1, 5.3.1.2, 5.3.1.4 to 5.3.1.7. The following essential requirement for safety according to Annex III to Directive 2001/16/EC as amended by Directives 2004/50/EC and 2007/32/EC is especially of concern for the energy subsystem. 2.2.1. Operation of the energy-supply systems must not impair the safety either of trains or of persons (users, operating staff, trackside dwellers and third parties). In order to satisfy the essential requirement 2.2.1 above, the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.5 to 4.2.11, 4.2.19, 4.2.20, 4.4.1, 4.4.2, 4.5, and 4.7.1 to 4.7.5 are met and the interoperability constituents used comply with the requirements set out in clause 5.3.1.1 to 5.3.1.4 and 5.3.1.6. 14 of 100

3.3.2. Reliability & availability According to Annex III to Directive 2001/16/EC as amended by the Directives 2004/50/EC and 2007/32/EC, the essential requirements for reliability and availability are the following: 1.2. The monitoring and maintenance of fixed or movable components that are involved in train movements must be organised, carried out and quantified in such a manner as to maintain their operation under the intended conditions. In order to satisfy the essential requirement 1.2, the energy subsystem shall be maintained such that the requirements set out in clause 4.2.11, 4.4.3 and 4.5 are met. 3.3.3. Health According to Annex III to Directive 2001/16/EC as amended by the Directives 2004/50/EC and 2007/32/EC, the essential requirements for health are the following: 1.3.1. Materials likely, by virtue of the way they are used, to constitute a health hazard to those having access to them must not be used in trains and railway infrastructure. 1.3.2. Those materials must be selected, deployed and used in such a way as to restrict the emission of harmful and dangerous fumes or gases, particularly in the event of fire. In order to satisfy the essential requirements 1.3.1 and 1.3.2, the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.18, 4.5, 4.7.1 to 4.7.5 are met and the interoperability constituents used comply with the requirements set out in clause 5.3.1.7. 3.3.4. Environmental protection According to Annex III to Directive 2001/16/EC as amended by the Directives 2004/50/EC and 2007/32/EC, the essential requirements for environmental protection are the following: 1.4.1. The environmental impact of establishment and operation of the trans- European conventional rail system must be assessed and taken into account at the design stage of the system in accordance with the Community provisions in force. 1.4.2. The materials used in the trains and infrastructure must prevent the emission of fumes or gases which are harmful and dangerous to the environment, particularly in the event of fire. 1.4.3. The rolling stock and energy-supply systems must be designed and manufactured in such a way as to be electromagnetically compatible with the installations, equipment and public or private networks with which they might interfere. 1.4.4. Operation of the trans-european conventional rail system must respect existing regulations on noise pollution. 1.4.5. Operation of the trans-european conventional rail system must not give rise to an inadmissible level of ground vibrations for the activities and areas close to the infrastructure and in a normal state of maintenance. The aspects mentioned under 1.4.4 and 1.4.5 are not relevant to the Energy subsystem. 15 of 100

In order to satisfy essential requirements 1.4.1 to 1.4.3 the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.7, 4.2.9 to 4.2.12, 4.2.16, 4.2.18 to 4.2.20 and 4.7.1 to 4.7.4 are met and the interoperability constituents used comply with the requirements set out in clauses 5.3.1.1, 5.3.1.3 and 5.3.1.5. The following essential requirement for environmental protection according to Annex III to Directive 2001/16/EC as amended by Directives 2004/50/EC and 2007/32/EC is especially of concern for the energy subsystem. 2.2.2. The functioning of the electrical or thermal energy-supply systems must not interfere with the environment beyond the specified limits. In order to satisfy essential requirement 2.2.2 the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.6, 4.2.11 to 4.2.14, 4.2.19 and 4.7 are met and the interoperability constituents used comply with the requirements set out in clauses 5.3.1.7. 3.3.5. Technical compatibility According to Annex III to Directive 2001/16/EC as amended by the Directives 2004/50/EC and 2007/32/EC, the essential requirement for technical compatibility is the following: 1.5. The technical characteristics of the infrastructure and fixed installations must be compatible with each other and with those of the trains to be used on the trans-european conventional rail system. If compliance with these characteristics proves difficult on certain sections of the network, temporary solutions, which ensure compatibility in the future, may be implemented. In order to satisfy the essential requirement 1.5, the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.1, 4.2.3, 4.2.4, 4.2.6 to 4.2.9, 4.2.11, 4.2.13 to 4.2.20, 4.4.3, 4.5 and 4.7.1 to 4.7.4 are met and the interoperability constituents used comply with the requirements set out in clauses 5.3.1.1 to 5.3.1.7. The following essential requirements for technical compatibility according to Annex III to Directive 2001/16/EC as amended by Directives 2004/50/EC and 2007/32/EC are especially of concern for the energy subsystem. 2.2.3. The electricity/thermal energy supply systems used must: - enable trains to achieve the specified performance levels; - in the case of electricity energy supply systems, be compatible with the collection devices fitted to the trains. In order to satisfy essential requirement 2.2.3, the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.1, 4.2.3, 4.2.4, 4.2.6, 4.2.7, 4.2.13, 4.2.15 to 4.2.20, 4.5 are met and the interoperability constituents used comply with the requirements set out in clauses 5.3.1.1 to 5.3.1.7. 3.3.6. Maintenance, health & safety According to Annex III to Directive 2001/16/EC as amended by the Directives 2004/50/EC and 2007/32/EC, the essential requirement for maintenance health and safety is the following: 2.5.1. The technical installations and the procedures used in the centres must ensure the safe operation of the subsystem and not constitute a danger to health and safety. 16 of 100

2.5.2. The technical installations and the procedures used in the maintenance centres must not exceed the permissible levels of nuisance with regard to the surrounding environment. 2.5.3. The maintenance installations for conventional rolling stock must be such as to enable safety, health and comfort operations to be carried out on all stock for which they have been designed. In the case of the energy subsystem, maintenance is carried out not in maintenance centres but along the line. Maintenance is carried out by maintenance units, for which the requirements mentioned under 2.5.1, 2.5.2 and 2.5.3 apply. In order to satisfy the above mentioned essential requirements, the energy subsystem shall be designed and constructed so that the requirements set out in clauses 4.2.12, 4.5 and 4.7.5 are met. 17 of 100

3.3.7. Table of essential requirements and basic parameters Clause Clause Title Safety R & A Health Environmental protection Techni cal Comp atibility Mainten ance H&S 1.1.1 1.1.3 1.1.4 2.2.1 1.2 1.3.1 1.3.2 1.4.1 1.4.2 1.4.3 2.2.2 1.5 2.2.3 2.5.1 2.5.2 2.5.3 4.2.1 General provision - - - - - - - - - - - X X - - X 4.2.3 Voltage and frequency - - - - - - - - - - - X X - - X 4.2.4 System performance - - - - - - - - - - - X X - - X 4.2.5 Continuity of power supply in case of X X X X - - - - - - - - - - - - disturbances 4.2.6 Current capacity, DC systems, X X X X - - - - - - X X X - - X trains at standstill 4.2.7 Regenerative braking X X X X - - - X X X - X X - X X 4.2.8 Electrical Protection Coordination X X X X - - - - - - - X - - - - Arrangements 4.2.9 Harmonics and Dynamic Effects X X X X - - - X X X - X - - X - 4.2.10 Harmonic emissions towards the - - - X X - - X X X - - - X X - power utility 4.2.11 External electromagnetic - - - X - - - X X X - X - - X - compatibility 4.2.12 Protection of the environment - - - - - - - X X X - - - X X - 4.2.13 Geometry of Overhead X X X - - - - - - - - X X - - X Contact Line 4.2.14 Free passage gauge of X X X - - - - - - - - X - - - - pantographs 4.2.15 Mean contact force X X X - - - - - - - - X X - - X 4.2.16 Dynamic behaviour and quality of current X X X - - - - X X X - X X - X X collection 4.2.17 Pantograph spacing used for the design of the overhead contact line - - - - - - - - - - - X X - - X 18 of 100

Clause Clause Title Safety R & A Health Environmental protection Techni cal Comp atibility Mainten ance H&S 1.1.1 1.1.3 1.1.4 2.2.1 1.2 1.3.1 1.3.2 1.4.1 1.4.2 1.4.3 2.2.2 1.5 2.2.3 2.5.1 2.5.2 2.5.3 4.2.18 4.2.19 4.2.20 4.4.1 Contact wire material X X X - - X X X X X X X X - X X Phase Separation Sections X X X X - - - X X X X X X - X X System Separation X X X X - - - X X X - X X - X X Sections General requirements X X X X X - - - - - - X - - - - 4.4.2 4.4.3 4.5 4.6 4.7.1 4.7.2 4.7.3 4.7.4 4.7.5 4.7.6 Management of power supply in case of danger Execution of works Maintenance rules Professional qualifications General requirements Protective provisions of substations and sectioning locations Protective provisions of overhead contact line system Protective provisions of current return circuit Other general requirements High visibility clothing X X X X - - - - - - - - - - - - X X X X X - - - - - - X - - - - X X X X X X X - - - - X X - - - X X X X - - - X X X - X - X - X X X X X - X X X X X X X - - X - X X X X - X X X X X X X - - X - X X X X - X X X X X X X - - X - X X X X - X X X X X X X - - X - - - - X - X X - - - X - - X - - - - - - - - - - - - X - - - - - 19 of 100

4. Characterisation of the subsystem 4.1. Introduction The trans-european conventional rail system, to which Directive 2001/16/EC as amended by Directives 2004/50/EC and 2007/32/EC applies and of which the subsystem is a part, is an integrated system whose consistency must be verified. This consistency must be checked in particular with regard to the specifications of the subsystem, its interfaces vis-à-vis the system in which it is integrated, as well as the operating and maintenance rules. The functional and technical specifications of the subsystem and its interfaces, described in chapters 4.2 and 4.3, do not impose the use of specific technologies or technical solutions, except where this is strictly necessary for the interoperability of the trans-european conventional rail network. But innovative solutions for interoperability may require new specifications and/or new assessment methods. In order to allow technological innovation, these specifications and assessment methods shall be developed by the process described in chapters 6.1.2.3 and 6.2.2.2. Taking account of all the applicable essential requirements, the energy subsystem is characterised by the specifications set out in clauses 4.2 to 4.7. A list of parameters relevant for the energy subsystem which shall be collected in the Infrastructure Register is in Annex D to this TSI. For Specific Cases, see chapter 7.3; where reference is made to EN standards, any variations called "national deviations" or "special national conditions" in the EN do not apply. 4.2. Functional and technical specifications of the subsystem 4.2.1. General provisions The performance to be achieved by the Energy subsystem shall correspond to the relevant performance as specified for each category of line (defined in the Infrastructure CR TSI) of the trans-european conventional rail system, with respect to: o the maximum line speed, type of train, and o the power demand of the trains at the pantographs. 4.2.2. Basic parameters characterizing the energy subsystem The basic parameters characterising the energy subsystem are: Power supply o Voltage and frequency (4.2.3) o Parameters relating to supply system performance (4.2.4) o Continuity of power supply in case of disturbances (4.2.5) o Current capacity, DC systems, trains at standstill (4.2.6) o Regenerative braking (4.2.7) o Electrical Protection Coordination Arrangements (4.2.8) o Harmonics and Dynamic Effects (4.2.9) Geometry of the OCL and quality of current collection o Geometry of the overhead contact line (4.2.13) o Free passage gauge of pantographs (4.2.14) o Mean Contact Force (4.2.15) 20 of 100

o Dynamic behaviour and quality of current collection (4.2.16) o Pantograph spacing used for the design of the overhead contact line (4.2.17) o Contact wire material (4.2.18) o Phase separation sections (4.2.19) o System separation sections (4.2.20) 4.2.3. Voltage and frequency Locomotives and traction units need standardisation of voltage and frequency. The values and limits of the voltage and frequency at the terminals of the substation and at the pantograph shall comply with EN 50163:2004, clause 4. The 25 kv 50 Hz system is to be the target supply system, for reasons of compatibility with the electrical generation and distribution systems and standardisation of substation equipment. However, due to the high costs needed to migrate from other system voltages to the 25 kv system and the possibility of using multi-system traction units, the use of the following systems for new, upgraded or renewed subsystems is permitted: o AC 15 kv 16.7 Hz o DC 3 kv, 1.5 kv Nominal voltage and frequency shall be listed in the Infrastructure Register (see Annex D). Conformity shall be demonstrated by means of a design review. 4.2.4. Parameters relating to supply system performance The design of the Energy subsystem is determined by the line speed for the planned services and the topography. Therefore the following parameters have to be taken in consideration: o the maximum train current, o the power factor of trains, o the mean useful voltage, o limits of the voltage at the pantograph. The Infrastructure Manager shall declare the maximum train current in the Infrastructure Register (see Annex D). The railway undertaking shall ensure this value is not exceeded. The Energy subsystem design shall assure the ability of the power supply to achieve the specified performance and permit the operation of trains with a power less than 2 MW without current limitation as described in clause 7.3 of EN50388:2005. The power factor of trains shall be in accordance with requirements in Annex I. The calculated mean useful voltage at the pantograph shall comply with EN 50388:2005, clauses 8.3 and 8.4, using the design data for the power factor according to Annex I in EN 50388:2005 clause 6.2 with the exception of hotelling trains in yards and sidings for which the specification is given in LOC CR RST. The conformity assessment shall be carried out in accordance with EN 50388:2005, clauses 14.4.1, 14.4.2 (simulation only) and 14.4.3. To stabilise the power supply under all operating conditions EN50388 clause 7.2 shall be fulfilled. The conformity assessment is carried out in RST CR TSI. 21 of 100

4.2.5. Continuity of power supply in case of disturbances The power supply and the overhead contact line system shall be designed to enable continuity of operation in case of disturbances. This shall be achieved by sectioning overhead contact line system into supply sections and by the provision of redundant equipment in substations. Conformity assessment shall be carried out by checking the circuit diagrams. It shall be demonstrated that the provisions for continuity, as designed, have been installed. 4.2.6. Current capacity, DC systems, trains at standstill The overhead contact line of DC systems shall be designed to sustain 300A (for a 1.5kV supply system) and 200A (for a 3kV supply system), per pantograph when the train is at standstill. This shall be achieved using a static contact force as defined in clause 7.1 of EN50367:2006. Where the overhead contact line has been designed to sustain higher values for maximum current at standstill, this shall be declared by the Infrastructure Manager in the Infrastructure Register (see Annex D). The OCL shall be designed taking into account the temperature limits in accordance with Annex F. Conformity assessment shall be carried out in accordance with EN 50367:2006, Annex A.4.1. 4.2.7. Regenerative braking AC power supply systems shall be designed to permit the use of regenerative braking as a service brake, able to exchange power seamlessly either with other trains or by any other means. The substation control and protection devices in the power supply system shall allow the use of regenerative braking unless the conditions described in EN50388:2005 clause 12.1.1 occur. Conformity assessment for AC power supply fixed installations shall be carried out according EN50388:2005, clause 14.7.2. DC power supply systems shall be designed to permit the use of regenerative braking as a service brake at least by exchanging power with other trains fulfilling the requirements in EN50388:2005 clause 12.1.1. Conformity assessment for DC power supply shall be carried out by a design review. 4.2.8. Electrical protection coordination arrangements Electrical protection coordination design of the Energy subsystem shall comply with the requirements detailed in EN 50388:2005, clause 11 ( 2 ). Conformity assessment shall be carried out for design and operation of substations in accordance with EN50388:2005 clause 14.6. 2 Regarding EN 50388:2005 clause 11 Table 8. Immediate tripping means that for high level current, substation or train circuit breaker should operate without introducing intentional delay. 22 of 100

4.2.9. Harmonics and dynamic effects The CR energy subsystem for AC supply, shall withstand overvoltages generated by rolling stock harmonics up to the limits stated in EN 50388:2005 clause 10.4. Conformity assessment shall consist of a compatibility study that demonstrates that the subsystem element can withstand harmonics up to the defined limits according to EN50388:2005, clause 10. Conformity assessment shall be conducted according to EN50388:2005 clause 10. 4.2.10. Harmonic emissions towards the power utility Harmonic emissions towards the power utility shall be dealt with by the Infrastructure Manager taking into account European or national standards and the requirements of the power utility. No conformity assessment is required within this TSI. 4.2.11. External electromagnetic compatibility External electromagnetic compatibility is not a specific characteristic of the trans-european conventional rail network. Energy supply installations shall comply with EN50121-2:2006 to meet all requirements concerning electromagnetic compatibility. No conformity assessment is required within this TSI. 4.2.12. Protection of the environment Protection of the environment is covered by other European legislation concerning the assessment of the effects of certain projects on the environment. No conformity assessment is required within this TSI. 4.2.13. Geometry of the overhead contact line Overhead contact line shall be designed for use by pantographs with the head geometry specified in the Locomotive and Traction Unit CR TSI. The contact wire height, gradient of the contact wire in relation to the track and the lateral deviation of the contact wire under the action of a cross-wind all govern the interoperability of the trans-european rail network. The nominal contact wire height, the maximum lateral deviation under cross-wind and the maximum wind speed at which unrestricted operation is permitted, shall be listed in the Infrastructure Register (see Annex D). 4.2.13.1. Contact wire height The nominal contact wire height shall be in the range of 5.0-5.75m. The contact wire height may be lower in cases related to gauge (like bridges, tunnels). The minimum contact wire height shall be calculated in accordance with EN50119:2001 clause 5.2.8.3. The maximum design contact wire height shall be 6.2m (see Annex J). 23 of 100

Conformity assessment shall be carried out by design review. 4.2.13.2. Variation in contact wire height The variation in contact wire height shall fulfil the requirements imposed by EN50119:2001 clause 5.2.8.2. It is permissible for t The contact wire gradient specified in EN50119:2001 clause 5.2.8.2 may be exceeded on an exceptional basis where a series of restrictions on the contact wire height e.g. level crossings, bridges, tunnels, prevents compliance; in this case when applying the requirements of clause 4.2.16.1, only the requirement related to the maximum contact force shall be complied with. Conformity assessment shall be carried out by design review and measurements before putting into service. 4.2.13.3. Lateral deviation The maximum permissible lateral deviation of the contact wire normal to the design track centre line under the action of cross wind is given in Table 4.2.13.3. Table 4.2.13.3 Maximum lateral deviation Pantograph length Maximum lateral deviation 1600mm 0,4m 1950mm 0,55m For different contact wire height and curve track the values shall be adjusted taking into account the movement of the pantograph and track tolerances in Annex G. The IM shall indicate in the infrastructure register the pantograph profiles that can operate on the route (see Annex D). Conformity assessment shall be by design review. 24 of 100

4.2.14. Free passage gauge of pantographs No part of the energy sub-system shall enter the kinematic mechanical pantograph gauge (see Annex G figure G.1) except for the contact wire and registration arm. The mechanical kinematic pantograph gauge for interoperable lines is determined using the method shown in Annex G clause G.2 and the pantograph profiles defined in CR LOC TSI. The pantograph profiles that can operate on the route will be recorded in the Infrastructure Register the (see Annex D). This gauge shall be calculated using a kinematic method, with values for the pantograph sway at the upper verification point - e pu of 0.110 m at a height 5,0m and for the pantograph sway at the lower verification point - e po of 0.170 m at a height 6,5m, in accordance with Annex G clause G.2.1.3 and other values in accordance with Annex G clause G.3 and electrical clearance in accordance with EN 50119:2001 clause 5.2.10. Assessment shall be by design review. 4.2.15. Mean contact force The mean contact force F m is the statistical mean value of the contact force. F m is formed by the static and aerodynamic components of the pantograph contact force. The static contact force is defined in EN50367:2006 clause 7.1. The ranges of F m for each of the power supply systems are defined in table 4.2.15. Table 4.2.15 Ranges of the mean contact force Supply system F m up to 200km/h AC 60N < F m < 0,00047*v² + 90 DC 3kV 70N < F m < 0,00097*v² + 110 DC 1,5kV 70N < F m < 0,00097*v² + 140 where [F m ] = mean contact force in N and [v] = speed in km/h. In accordance to clause 4.2.16, overhead contact lines shall be designed to be capable to sustain this upper limit force curve given in the table 4.2.15. Conformity assessment shall be carried out in accordance with EN 50317:2002, clause 6. 4.2.16. Dynamic behaviour and quality of current collection 4.2.16.1. Requirements The overhead contact line shall be designed in accordance with the requirements for dynamic behaviour. Contact wire uplift at the design line speed shall comply with the stipulations in Table 4.2.16. 25 of 100

The quality of current collection has a fundamental impact on the life of a contact wire and shall, therefore, comply with agreed and measurable parameters. Compliance with the requirements on dynamic behaviour shall be verified in accordance with EN 50367:2006, clause 7.2 by assessment of: o Contact wire uplift and either o Mean contact force Fm and standard deviation σ max or o Percentage of arcing The Contracting Entity shall declare the method to be used for verification. The values to be achieved by the chosen method are set out in Table 4.2.16. Table 4.2.16 Requirements for dynamic behaviour and current collection quality Requirement For v> 160km/h For v 160km/h Space for steady arm uplift 2S 0 Mean contact force F m See clause 4.2.15 Standard deviation at maximum line speed σ max (N) 0.3 F m Percentage of arcing at maximum line speed, NQ (%) (minimum duration of arc 5ms) 0.1 for AC systems 0.2 for DC systems 0.1 For definitions, values and test methods refer to EN50317:2002 and EN50318:2002. S 0 is the calculated, simulated or measured uplift of the contact wire at a steady arm, generated in normal operating conditions with one or more pantographs with a mean contact force F m at the maximum line speed. When the uplift of the steady arm is physically limited due to the overhead contact line design, it is permissible for the necessary space to be reduced to 1,5S 0 (refer to EN50119:2001 clause 5.2.1.3). Maximum force (F max ) on an open route is usually within the range of F m plus three standard deviations σ max ; higher values may occur at particular locations and are given in EN50119:2001, table 1 clause 5.2.1.2. For rigid components such as section insulators in overhead contact line systems, the contact force can increase up to a maximum of 350 N. 4.2.16.2. Conformity assessment 4.2.16.2.1. Assessment principles When assessing the dynamic behaviour and the quality of the current collection using simulation programs according to EN50318:2002 or measurements according to EN50317:2002, the presentation of results shall be appropriate to the speed of the line. For the purposes of simulation and analysis of the results, representative features (for example tunnels, crossovers, neutral sections etc.) shall be used. 26 of 100

4.2.16.2.2. Interoperability Constituent Overhead Contact Line A new design of overhead contact line shall be assessed by simulation according to EN50318:2002 and by measurement of a test section of the new design according to EN50317:2002. The simulations shall be made using at least two different TSI compliant 3 pantographs for the appropriate system, up to the design speed of the pantograph and the proposed Interoperability Constituent Overhead Contact Line for both a single pantograph and multiple pantographs with spacing according table 4.2.17. In order to be acceptable, the simulated current collection quality shall be within the limits of table 4.2.16 for uplift, mean contact force and standard deviation for each of the pantographs. If the simulation results are acceptable, a site test with a representative section of the new overhead contact line shall be undertaken using one of the pantographs used in the simulation, installed on a train or locomotive producing a mean contact force at the envisaged design speed as required by clause 4.2.15 when operated on one of the overhead contact line systems. In order to be acceptable, the measured current collection quality shall be within the limits of table 4.2.16. If all the above assessments are passed successfully, the tested overhead contact line design shall be considered to be compliant and may be used on lines where the characteristics of the design match the requirements of the line. This aspect is covered by this TSI. 4.2.16.2.3. Interoperability Constituent Pantograph In addition to the pantograph requirements in the LOC CR TSI, a new design of a pantograph shall be assessed by simulation according to EN50318:2002. The simulations shall be made using at least two different TSI compliant 4 overhead contact lines for the appropriate system, at the design speed of the pantograph. The simulated current collection quality shall be within the limits of table 4.2.16 for uplift, mean contact force and standard deviation for each of the overhead contact lines. If the simulation results are acceptable, a site test shall be made using a representative section of one of the overhead contact lines used in the simulation; the interaction characteristics shall be measured in accordance with EN50317:2002. The pantograph shall be mounted on a train or locomotive so as to produce a mean contact force within the upper and lower limits as required by clause 4.2.15 for the design speed of the pantograph. The measured current collection quality shall be within the limits of table 4.2.16 for uplift, mean contact force and standard deviation. If all the assessments are passed successfully, the tested pantograph design shall be considered as compliant. For the use on various designs of rolling stock see clause 4.2.16.2.5. This aspect is covered by the LOC CR TSI. 4.2.16.2.4. IC OCL in a newly installed line (Integration into a Subsystem) If the overhead contact line to be installed on a new line is certificated as an Interoperability Constituent, measurements of the interaction parameters in accordance with EN50317:2002 shall be used to check the correct installation. These measurements shall be carried out with an Interoperability Constituent pantograph installed on rolling stock exhibiting the mean contact force characteristics as required by clause 4.2.15 of this TSI for the envisaged design speed. The main goal of this test is to identify construction errors but not to assess the design in principle. The installed overhead contact line can be accepted if the measurement results comply with the requirements of table 4.2.16. This aspect is covered by this TSI. 3 i.e. a pantograph certificated as an Interoperability Constituent 4 i.e. an Overhead Contact Line certificated as an Interoperability Constituent 27 of 100