RET PROCESS FOR OWNERS OF SMALL GENERATION UNITS (SGUs)

Similar documents
Origin Solar Presentation

ESS Lighting Instruction Pack Original Energy Saver

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Feed in Tariffs. What is the feed-in tariff? Guaranteed for 25 years - by the UK Government. How do I claim the feed-in tariff?

GST/HST Memoranda Series

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

24. SOLAR INCENTIVE PROGRAM II

Connecting your home or small business generation

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

TRANSPORT ACT 1985 APPLICATION FOR A SECTION 19 SMALL BUS (MINIBUS) PERMIT (9 to 16 passenger seats)

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

COMMUNITY SOLAR PROGRAM

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

White River Electric Association, Inc. Net Metering Information & Service Requirements

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

Resident Permit and Visitor Permit Guidelines

JEA Distributed Generation Policy Effective April 1, 2018

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Dublin Airport Chauffeur Code of Conduct Dublin Airport Chauffeurs Code of Conduct. Dublin Airport Parking

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

Municipality Generator Interconnection Application Single Meter Application Part I

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

UK Power Networks Use of System Charging Methodology

TERMS AND CONDITIONS

Net Energy Metering and Interconnections. Community Solar in the District of Columbia

Government Gazette ISSN

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

ALZ Electrical Solar Consumer Guide

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

# 1, Bowes Place, Phillip, ACT 2606, Australia. Phone:

This Distribution Charter explains how PLS distributes collective licensing

MISSOURI SERVICE AREA

PART 2 GUIDELINES. To be eligible to receive a financial incentive, the following conditions must be met:

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Solar*Rewards Frequently asked questions system size and customer usage

Standard retail electricity supply

MCS Accreditation Support Renewable services the easy way For more information call

RIDER NM NET METERING

Contents. Solar Select TM Frequently Asked Questions

Umatilla Electric Cooperative Net Metering Rules

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

London Hydro Connection Checklist

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

Electricity Trends in Pennsylvania

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Docket 50-ER-108 Algoma Utilities. Final Form Rate and Rule Tariff Sheets Amendment 78. Filed By: Public Service Commission of Wisconsin

Application for Steam Service

New Brunswick transitional rules for HST increase

MAINE LEMON LAW SUMMARY

Renewable Energy System - Electricity System Connection Application Form

YOUR CONTACT WITH ELECTRICITY COMPANIES

January 1, 2018 RATE SCHEDULE. 395 Southgate Drive, Guelph, ON N1G 4Y1. Billing: Admin: Fax:

To complete the process for a net metering interconnection, please follow the steps below:

APPENDIX A 2018/ Where do you apply to obtain membership of the Scheme and the required vehicle stickers?

Green Drive Nov 2020

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

Note: it is a criminal offence to give false information in this application.

HydroGenerations PROGRAM HANDBOOK

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B;

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.

FEED-IN TARIFFS SCHEME (ELECTRICITY GENERATED FROM SOLAR PHOTOVOLTAIC INSTALLATIONS) REGULATIONS

Basic Connection Services Application and Price Guide

Draft Guidance for generators: Co-location of electricity storage facilities with renewable generation supported under the Renewables Obligation or

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

ATTACHMENT 14 RESOLUTION NO. 5888(14) Supersedes Schedule NEM of Resolution No. 5592(09) Schedule NEM NET ENERGY METERING

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Georgia Department of Revenue Policy Bulletin - MVD HB 170 Transportation Funding Act of 2015

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

Street Address. City-Village-Township

To complete the process for a net metering interconnection, please follow the steps below:

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Michigan Renewable Energy Case Study

Street Address. City-Village-Township

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

REBATE APPLICATION. 1. Rebate Applicant Information. 2. Dealer Information OKLAHOMA NATURAL GAS COMPRESSED NATURAL GAS (CNG)

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Connecting your business diesel generation

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

Solar Net Metering and Billing FAQ

d. Note: LPG conversions are acceptable providing the relevant Vehicle Declaration is completed by the HSVOC Registrar.

ENERGY EFFICIENCY NATIONAL BUILDING REGULATIONS. Development Management Department 1 of 49

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Transcription:

SGU Owners Guide RET PROCESS FOR OWNERS OF SMALL GENERATION UNITS (SGUs) small-scale solar photovoltaic panels, wind and hydro electricity units In this fact sheet: Options for gaining financial benefits from your RECs RECs defined SGU process options diagram Installation advice Option 1: Agent assisted Option 2: Individual trading REC calculation Options for gaining financial benefits from your RECs The Renewable Energy Target (RET) scheme does not provide a rebate or feed-in tariff. The purchase of an SGU (small-scale solar photovoltaic panel, wind or hydro electricity system) may entitle you to renewable energy certificates (RECs) if your SGU is eligible. These certificates can then be sold and transferred to liable parties on a market based online system called the REC Registry. For more information about RET visit RET- the basics For more information about rebates and feed-in tariffs for SGUs contact your State Government or agent/retailer/installer. You must be the owner of the system at the time it is installed to be entitled to assign RECs to an agent or create RECs in the REC Registry. In some circumstances where the SGUs are installed in new buildings, this can be the builder or property developer. There are two options for reimbursement of your RECs under the RET scheme: OPTION 1 - AGENT ASSISTED Find an agent and assign your RECs to the agent in exchange for a financial benefit which could be in the form of a delayed cash payment or upfront discount on your SGU. A majority of owners take this option. OPTION 2 INDIVIDUAL TRADING Create the RECs yourself. Find a buyer then sell and transfer RECs in the REC Registry. Page 1 of 26

What is a SGU? A small generation unit (SGU) is classified as a small-scale solar photovoltaic panel, wind or hydro unit. Small generation units generate electricity and have the following requirements. Unit type Unit capacity and annual electricity output Installation periods Small wind No more than 10 kw and a total annual On or after 1 April 2001 turbines electricity output less than 25 MWh Solar (photovoltaic) units No more than 100 kw and a total annual electricity output less than 250 MWh On or after 14 November 2005 Solar (photovoltaic) units Hydroelectric units RECs defined No more than 10 kw and a total annual electricity output less than 25 MWh No more than 6.4 kw and a total annual electricity output less than 25 MWh Between 1 April 2001 and 13 November 2005 On or after 1 April 2001 Renewable Energy Certificates (RECs) are an electronic form of currency created on the REC Registry by eligible parties. A REC is generally equivalent to: 1 MWh of renewable electricity generated above the power station baseline; or 1 MWh of renewable electricity deemed to be generated by small generation units; or 1 MWh of electricity deemed to be displaced by the installation of solar water heaters. Properly created RECs are validated by ORER and registered RECs can be transferred between eligible parties (renewable energy power stations, solar water heaters, small generation units) and liable parties (typically wholesale purchasers of electricity) for a negotiated price. Payment is arranged outside the REC Registry. RECs are surrendered annually by liable parties to demonstrate liability compliance against the requirements of the RET or voluntarily surrendered. REC prices The Office of the Renewable Energy Regulator (ORER) does not set the price of RECs nor does it get involved in disputes between buyers and sellers. Payment for RECs or the rights to create RECs is a contractual matter between the buyer and seller. In the past decade the spot price of a REC has varied between AUD$15 and AUD$60. This information is based on third party data provided to ORER. Page 2 of 26

Installation advice and procedures Units must be installed before creating RECs. Under the Act and Regulations CEC accreditation is required for the following installation periods: Unit type Date of installation CEC accreditation required Solar (photovoltaic) units Before 20 August 2010 Yes, for 15 year deeming period No, for 1 and 5 year deeming period Solar (photovoltaic) units On or after 20 August 2010 Yes, for all deeming periods Wind and hydro units Before 20 December 2010 Not required Wind and hydro units On or after 20 December 2010 Yes, for all deeming periods CEC accredited installers are required to: Ensure that the installation has all applicable local and state/territory Government approval requirements Ensure that the SGU and its installation, including wiring, meets Australian and International Standards, and that key components are listed on the Clean Energy Council s list of approved products. Ensure that the mounting and orientation of the SGU are in line with the Clean Energy Council accreditation requirements. Documents required for safety and compliance before RECs can be assigned to the agent If you are installing a solar photovoltaic panel on or after 20 August 2010 or installing a small-scale wind or hydro unit on or after 20 December 2010 your agent/installer/retailer: May ask you to sign a statement that all required local and state/territory Government requirements have been met. Is required to provide you with a copy of any documentation required, by the laws of the jurisdiction in which the unit was installed, certifying that the electrical installation of the unit complies with laws relating to safety and technical standards. This could be in the form of a Certificate of Compliance, Installation Report and Electrician s Licence. For further information regarding relevant installation certification please contact your relevant state authority. Do not assign your RECs until you have been provided with this documentation and you are happy that the unit is installed and working. If your SGU unit has not been installed and you have already assigned your RECs to an agent by signing a REC Assignment Form contact the ORER compliance team by emailing compliance@orer.gov.au Page 3 of 26

Page 4 of 26

GAINING FINANCIAL BENEFITS FROM YOUR RECS: OPTION 1 Agent Assisted Gaining a financial benefit through REC assignment A majority of owners of SGUs find it convenient to assign their rights to create RECs to a registered agent at the time the SGU is installed in exchange for a financial benefit. RECs are assigned when the owner completes a REC Assignment Form. A registered agent will: Determine whether your SGU is eligible for the RET Determine for you how many RECs your SGU is entitled to under the RET scheme. Offer a financial benefit to you. This may be in the form of a cash payment or discount on your SGU. Before assigning your right to create RECs to the agent through a REC Assignment Form: Make sure the unit is installed. RECs cannot be assigned prior to installation. Obtain all safety and compliance documentation from your agent/installer. See Installation advice and procedures. Make sure you are satisfied with the financial benefit and the date of payment the agent is offering for your RECs. Check that details are recorded in writing through a REC Assignment Form that should be provided by your agent. Keep a copy of the REC assignment form for your records. If you experience a delay in receiving payment for your RECs contact the agent you have agreed to sell them to. Agents offer differing financial benefits for your RECs. ORER recommends that you contact a range of agents before entering into any contractual agreement. Visit List of registered agents Calculating the RECs yourself The number of RECs an SGU is entitled to is calculated by determining the amount of electricity the SGU produces over a determined period (called a deeming period). Units are usually deemed for the maximum period of 15 years to receive the maximum amount of RECs upfront. If you would like to determine the approximate number of RECs that your unit could receive under the RET the REC Registry contains a Small Generation Unit REC Calculator. Visit Small Generation Unit REC Calculator It is important to note that agents list different prices and payment processes for RECs. After buying the RECs from you the agent will register your RECs and usually bundle them with other small generation unit and solar water heater RECs for sale and transfer in the REC Registry. ORER does not set the price of RECs nor does it get involved in disputes between buyers and sellers. Payment for RECs or the rights to create RECs is a contractual matter between the buyer and seller. Page 5 of 26

Solar Credits If your unit is installed on or after 9 June 2009 it may be eligible for additional RECs under Solar Credits. The multiplication for additional RECs under Solar Credits is as follows. Installation Period Multiplication 9 June 2009 30 June 2010 5 x 1 July 2010 30 June 2011 5 x 1 July 2011 30 June 2012 5 x 1 July 2012 30 June 2013 4 x 1 July 2013 30 June 2014 3 x 1 July 2014 30 June 2015 2 x Your agent should factor this multiplication into your REC calculation and resulting financial benefit. Your agent will determine the eligibility of your unit but if you wish to understand the eligibility criteria for Solar Credits see Option 2: Individual Trading/Step 4: Determine if your unit is eligible for Solar Credits. Installing additional capacity If you wish to install additional capacity to an existing unit it may be entitled to RECs. Additional capacity is not entitled to the REC multiplier through Solar Credits. To determine the number of RECs the additional capacity may be entitled to insert the rated power output (in kw) for the additional capacity into the Small Generation Unit REC Calculator. Note the number of RECs without Solar Credits in the results. Visit Small Generation Unit REC Calculator Page 6 of 26

GAINING FINANCIAL BENEFITS FROM YOUR RECS OPTION 2 Individual Trading As this process is relatively complex a majority of owners assign their RECs to an agent. For information on how to engage an agent see Option 1: Agent Assisted Step 1: Determine if your unit is an SGU or power station Compare your unit s kw capacity against the following criteria to determine if your unit is an SGU or power station: Unit type Unit capacity and annual electricity output Installation periods Small wind No more than 10 kw and a total annual On or after 1 April 2001 turbines electricity output less than 25 MWh Solar (photovoltaic) units No more than 100 kw and a total annual electricity output less than 250 MWh On or after 14 November 2005 Solar (photovoltaic) units Hydroelectric units No more than 10 kw and a total annual electricity output less than 25 MWh No more than 6.4 kw and a total annual electricity output less than 25 MWh Between 1 April 2001 and 13 November 2005 On or after 1 April 2001 If the kw rating or MWh generation for a SGU is above the respective thresholds or if the unit was installed prior to 1 April 2001, it is not eligible to have RECs created for it as a SGU. However, it may be eligible for accreditation as a renewable energy power station. Upon installation of a small hydro, small wind or small solar (photovoltaic) unit with a capacity of less than the prescribed threshold for a SGU RECs may be created under the legislation as if the unit were a SGU. Any subsequent installation of additional capacity with the effect that the total capacity of the unit exceeds the prescribed threshold of capacity for a SGU, will mean the unit is no longer a SGU. The operator of the unit may apply for accreditation of the unit as a power station and if the unit satisfies the requirements for accreditation then the Regulator will accredit it. However, RECs may not be created for electricity generated by that part of the power station that was the small generation unit as originally installed, and for which RECs were created. The nominated person for the power station will need to determine what proportion of electricity generated by the whole power station was generated by the 'old' small generation unit and deduct that electricity from the total electricity generated by the power station. The nominated person will then only be able to create RECs for that portion of electricity generated by the 'extended' part of the power station. Information on the power station accreditation process is available on the power stations page of the ORER website. If your unit meets the above eligibility criteria go to Step 2. Page 7 of 26

Step 2: Check if your SGU installation is within the time limit for creating RECs Time limits for the creation of RECs for SGUs may apply depending on their installation date and SGU type. If the installation date and REC creation time limit for your SGU falls outside of the following thresholds your unit is not eligible to create RECs. SGU installation date On or before 6 October 2007 On or after 6 October 2007 On or after 6 October 2007 Deeming SGU type period 1 or 5 years Wind, solar (photovoltaic), hydro First deeming Wind, hydro period (1 or 5 years) First deeming Solar (photovoltaic) period (1, 5 or 15 years) REC creation time limit Anytime after installation Within 12 months of the installation date Within 12 months of the installation date Step 3: Establish the deeming period for your SGU If your SGU meets the eligibility requirements you can establish the deeming period for your SGU. RECs may be created for SGUs in batches, for either 1, 5 or 15 year deeming periods, depending on the particular installation. At the beginning of each subsequent deeming period, the Regulator must be satisfied that the SGU is still installed and is likely to remain functional for the next deeming period. The ORER may request evidence to support this claim. RECs may be created for wind and hydro SGUs either: annually; or on installation for the first 5 years after the installation (the deeming period) and then at the start of each subsequent 5 year deeming period. RECs may be created for solar (photovoltaic) SGUs either: annually; or on installation for the first 5 years after installation (the deeming period) and then at the start of each subsequent 5 year deeming period; or on installation for 15 years (the deeming period) - no further RECs may be created. Special eligibility requirements are associated with the 15-year deeming option. The unit needs to be designed and installed by an accredited Clean Energy Council installer for stand-alone and grid-connected power units. Page 8 of 26

Step 4: Determine if your unit is eligible for Solar Credits Solar Credits is a mechanism under the expanded RET which multiplies the number of RECs able to be created for eligible installations of SGUs. There is not means testing for Solar Credits under the legislation. Solar credits will apply to the first 1.5 kilowatts (kw) of capacity installed. Generation from capacity above 1.5 kw will still be eligible for the standard 1:1 rate of REC creation. Eligibility requirements are as follows: the small generation unit in respect of which the certificates are created is installed at eligible premises between 9 June 2009 and 30 June 2015. at the time the small generation unit is installed at the eligible premises, there is no pre-approval or funding agreement in force in respect of the unit under the Solar Homes and Communities Plan (SHCP), the Renewable Remote Power Generation (RRPGP), or the National Solar Schools Program (NSSP) and no financial assistance has been provided in respect of the unit under the SHCP, the RRPGP or the NSSP. at the time the small generation unit is installed at the eligible premises, financial assistance under the SHCP, the Photovoltaic Rebate Programme (PVRP), the RRPGP or the NSSP has not been approved or provided in respect of any other small generation unit at the eligible premises the small generation unit is a new and complete unit. A unit is a complete unit if: o the unit is capable of generating electricity in a form that is usable at the eligible premises where it is o installed without the need for an additional part or parts to be added to or incorporated into the unit. the unit is wired directly to the eligible premises where the unit is installed so that its output is capable of being metered at the premises or the unit includes a meter that is dedicated to measuring the electricity output of the unit. at the time the small generation unit is installed at eligible premises, certificates have not been multiplied in respect of any small generation unit at the premises and: o on one occasion only, irrespective of whether the certificates are created for a 1-year, 5-year or 15- year period; and o only if the certificates relate to the first 1.5 kw of the rated power output of the unit. The multiplication for additional RECs under Solar Credits is as follows. REC calculation is detailed on page 10. Installation Period Multiplication 9 June 2009 30 June 2010 5 x 1 July 2010 30 June 2011 5 x 1 July 2011 30 June 2012 5 x 1 July 2012 30 June 2013 4 x 1 July 2013 30 June 2014 3 x 1 July 2014 30 June 2015 2 x If you are installing an off-grid SGU your system may be eligible for additional Solar Credits. For more information see the Current Agents Guide off-grid Installing additional capacity If you wish to install additional capacity to an existing unit it may be entitled to RECs. Additional capacity is not entitled to the REC multiplier through Solar Credits. To determine the number of RECs the additional capacity may Page 9 of 26

be entitled to insert the rated power output (in kw) for the additional capacity into the Small Generation Unit REC Calculator. Note the number of RECs without Solar Credits in the result. Definition of an eligible premises Regulation 20AA covers the circumstances in which Solar Credits can be claimed. Solar Credits can only be claimed for one small generation unit installed at each eligible premises. Eligible premises is defined in the Regulations to mean any of the following: a house (including the land on which the house is located and any outbuildings on the land) a townhouse a residential apartment a shop (including the land on which the shop is located and any outbuildings on the land) other premises located at an address An outbuilding is a detached building subordinate to a main building and is not considered to be an eligible premises in its own right. House A house is an eligible premises. For a house that is an eligible premises: a home office located in the house or in an outbuilding on the land where the house is located; or a business operated from the house or in an outbuilding on the land where the house is located; is not a separate eligible premises. Townhouse, residential apartment A townhouse, residential flat, unit or apartment is an eligible premises including those located in a: multi-story apartment building; or retirement village (this does not include a room in a nursing home, hostel or similar assisted living facility). For a townhouse, residential flat, unit or apartment that is an eligible premises: a home office located in the townhouse, residential flat, unit or apartment; or a business operated from the townhouse, residential flat, unit or apartment; is not a separate eligible premises. Shop A shop is an eligible premises (except when located in a house (land or outbuilding), townhouse, residential flat, unit or apartment that is itself an eligible premises see above). Each shop in a shopping mall or other multi-shop type complex is an eligible premises. Page 10 of 26

Other premises located at an address Business premises (eg factories and offices) Each separate business which is located at an address will be a premises located at an address (except when located in a house (land or outbuilding), townhouse, residential flat, unit or apartment that is itself an eligible premises). Some businesses may be located at an address which covers several numbers in a street (e.g. a factory might be at 42-56 Smith Street). In such a situation, there is only one eligible premises. Alternatively, some businesses will occupy a separate unit at a single street address, where a different business is carried out in the separate units, (e.g. Unit 2 of 56 Smith Street). Each unit is a separate eligible premises. Specific types of premises Each of the following types of businesses are regarded as a single eligible premises: a motel, hotel, resort or caravan park (each room/cabin/villa etc in a motel, hotel or resort and each stationary caravan in a caravan park is not a separate eligible premises) a nursing home, hostel (each room is not a separate eligible premises) a hospital a restaurant Community and educational buildings The building(s) located at an address where a community group or institution carries out its activities (including the land on which the building is located and any outbuildings on the land) is a single eligible premises (eg a scout hall, guides hall, sporting club, school, church or other religious building). In the situation where the building(s) is or are used by more than one organisation, there is one eligible premises only. More than one premises located at a single address Where more than one separate premises (excluding outbuildings) is located at a single address, all of those premises are separate eligible premises. Examples might include a: dairy on a farm that is separate to the residential house on the same farm both premises are eligible premises; owner/manager s house that is separate to the rest of a caravan park but at the same address the house is a separate eligible premises to the caravan park; green keeper s house that is separate to the rest of the golf course at the same address the house and the business premises are separate eligible premises. To be another 'eligible premises' at a single address, the premises must be clearly separate from the other eligible premises located at the address (e.g. the house). A building is not an eligible premises if it is an outbuilding associated with a house. For example: a garage, studio or other small building situated in close proximity to a house which itself is an eligible premises (where a small business may be carried out) is as an outbuilding and not another eligible premises; Page 11 of 26

a larger business premises that is not subordinate to a house which itself is an eligible premises, and which more commonly is located further from the house than is usual for a garage or studio, is not an outbuilding and therefore is a separate eligible premises. Structures that are not eligible premises The following structures are NOT eligible premises: street lights, street signs, mobile phone towers, boats, cars and trailers; and mobile homes, caravans or similar wheeled vehicles not intended to be permanently attached to the land (these are not defined as eligible premises because they do not remain at a location for a long period of time). Premises that are not eligible If you would like clarification regarding the eligibility of a particular premises, please contact the Small Units Team at the ORER via email orer@orer.gov.au. Include in your email as much detail as possible including location, address, boundaries, road access, title information, access to electrical connection and metering, ownership, occupancy, nature of business, maps and other information you may wish to provide. If a system is not eligible for Solar Credits the system can still create RECs with the standard 1:1 rate of REC calculation. Step 5: Obtain all relevant compliance paperwork Under the regulations all SGUs installed on or after the below dates will require additional compliance documentation that must be acquired before you can create RECs: PV Solar installations on or after 20 August 2010 Hydro and wind installations on or after the 20 December 2010 The additional compliance documentation is as follows: Request a copy of the installer s electrician s licence. The electrical wiring associated with grid-connected installation of the unit must be undertaken by an electrical worker holding an unrestricted licence for electrical work issued by the State or Territory authority for the place where the unit was installed. Obtain the site and grid connected written statement. Either the installer or the owner must sign a statement that all required local and state/territory approvals have been met for: The siting of the unit If the unit is attached to a building or structure including the attachment of the unit to the building or structure If the unit is grid connected including the grid connection of the system. Obtain from the installer a signed written statement that includes the name of the designer and the installer of the unit, and their CEC classification and accreditation number. Obtain from the installer a copy of any documentation required, by the laws of the jurisdiction in which the unit was installed, certifying that the electrical installation of the unit complies with laws relating to safety and Page 12 of 26

technical standards. This could be in the form of a Certificate of Compliance, Installation Report and Electrician s Licence. A written statement is required from the installer of an off-grid installation if the wiring for the unit involves an alternating current of 50 or more volts and/or a direct current of 120 or more volts. The statement must confirm: The unit is off grid; and An electrical worker holding an unrestricted licence for electrical work issued by the State or Territory Authority for the place where the unit was installed undertook all wiring of the unit that involves: : alternating current of 50 or more volts; or : direct current of 120 or more volts. For examples of written statements visit Example written compliance statements for SGU installations The REC Registry will contain additional questions that require confirmation that the above processes have been actioned. Ensure that you keep on file the documents stipulated in the regulations. Visit - Regulations ORER will continue to conduct auditing and compliance activities which will include sighting the additional paperwork required. Failure to comply with the regulations can result in penalties and prosecution where warranted. Step 6: Determine how many RECs your SGU is entitled to Installations of SGUs are deemed to be eligible for RECs based on rated power output (kilowatt capacity), eligibility for Solar Credits and geographic location or resource availability. If you would like to determine the approximate number of RECs that your unit could receive under the RET the REC Registry contains a Small Generation Unit REC Calculator. Visit Small Generation Unit REC Calculator Alternatively, to determine the number of RECs for your unit is entitled to see: Page 16 for REC calculation of small hydroelectric units and small wind turbines Page 17 for REC calculation of small hydroelectric units and small wind turbines with Solar Credits Page 19 for REC calculation of small solar photovoltaic units Page 20 for REC calculation of small solar photovoltaic units with Solar Credits Page 13 of 26

Step 7: Become a registered person in the online REC Registry Once you know the number of RECs you are entitled to you will need to become a registered person in the REC Registry, an internet based registry system that: maintains various registers (as set in the Act) facilitates the creation, registration, transfer and surrender of RECs. A registered person can create, sell and transfer RECs in the REC Registry. To become a registered person in the REC Registry you will need to: a. Create an account on the REC Registry. See the Apply for an Account link on bottom right of the REC Registry home page. Visit REC Registry b. Complete an Application for Registration and send it to the ORER. Visit - Application for Registration c. The ORER will notify you via phone when your Application for Registration has been approved and explain the REC Registry process. d. Pay a $20 registration fee to complete the registration process. Please DO NOT send any payment to the ORER with this application form - payment of the $20 registration fee is made via your account in the REC Registry. The application fee is GST exempt. Step 8: Create RECs through the REC Registry Once your application has been approved you are ready to complete the registration process online and create RECs for your SGU installation. Visit REC Registry The main details required to create RECs include the following: Type of unit solar, wind, hydro Unit brand Unit model Panel serial numbers (solar only) Number of panels (solar only) Equipment module serial number (wind and hydro only) Resource availability (wind and hydro only) Rated power output (in kw) Installation date Installation address Installer s details Owner s details Page 14 of 26

The REC registry contains online help screens and a REC Registry Support Desk to assist in the use of the Registry. Step 9: Wait while your RECs are validated Once you have created your RECs, they will be validated by an ORER officer to ensure they have been created correctly. This can take up to 4 weeks. When your RECs have passed the ORER validation, they will become Registered. Registered RECs are able to be sold and transferred in the REC Registry, and surrendered either voluntarily or meet a liability under the Renewable Energy Electricity (Act) 2000. If the RECs are not correctly created they are failed by ORER. Visit REC Registry Step 10: Find a buyer for your RECs. Sell your RECs and transfer them in the REC Registry You do not have to sell your registered RECs at all, but if you wish to create RECs for your SGU installation you must create them within 12 months of the date of installation of the system. If you wish to sell your RECs, it is your responsibility to find a buyer and negotiate the price and other terms of sale. Potential buyers may include: electricity retailers who may need to purchase RECs to meet their REC liability registered agents for deemed units, who create and trade RECs from SGUs traders of RECs Price and payment date should be key considerations when negotiating the sale of your RECs. You should ensure that: you are satisfied with the price and payment date your receive for your RECs details are recorded in writing before entering any contractual arrangement to sell your RECs. Once you have found a buyer and negotiated the terms of sale, you will need to transfer the RECs to the buyer through the REC Registry and arrange payment outside the REC Registry. The ORER does not set the price of RECs nor does it get involved in disputes between buyers and sellers. Payment for RECs or the rights to create RECs is a contractual matter between the buyer and seller. Helpful links The below links are helpful for owners of SGUs: Living Greener is an Australian Government website containing information for householders to help them live more sustainably. This includes information on solar photovoltaic panels and small-scale wind and hydro units. Your Home is an Australian Government website that contains a suite of consumer and technical guide materials and tools developed to encourage the design, construction or renovation of homes to be comfortable, healthy and more environmentally sustainable. Department of Climate Change and Energy Efficiency For policy updates. The Department of Climate Change and Energy Efficiency also offers a solar water heater and heat pump rebate through the Energy Efficiency, Solar and Water Initiative in addition to RECs. For more information contact 1800 808 571. Clean Energy Council - Manages the accreditation of installers of small generation units and is the peak body representing Australia s clean energy sector. Page 15 of 26

REC CALCULATION Calculating RECs for small hydroelectric units and small wind turbines The number of RECs that you are eligible to create for your small hydroelectric unit or wind turbine is determined by the rated capacity of the unit and the number of hours the unit can operate at that capacity (resource availability). To establish how many RECs you may be eligible to create from your unit you should undertake the following steps: 1. Establish your resource availability. If you do not know the actual resource availability, then you must claim for the default amount, which is: Hydroelectric - 4000 hours/year Wind 2000 hours/year If you claim for resource availability above the default amount, then you must provide and retain copies of sitespecific audit reports and advise the ORER of the name and contact details of the person or company that conducted the audit. 2. Establish the rated output of your unit in kilowatts (kw). You can find the rated power output of your unit in the specifications provided by the unit manufacturer. Please ensure that you use the exact figure that applies to your particular make and model. 3. To calculate the annual number of RECs your unit is eligible for you multiply the rated power output (in kw) of your unit by 0.00095, multiplied by the resource availability of your unit (eg. 8kW x 0.00095 x 4000 (or 2000 for wind) hours/year). 0.00095 X The rated power X Resource = output (in kw) of availability of the your system system (hours per annum) Annual number of eligible RECs 4. If your unit s rated output is greater than 25 MWh your unit (ie. generates more than 25 MWh of electricity) is classified as a power station and you cannot assign RECs to an agent. To apply to ORER to become an accredited power station visit the power stations page of the ORER website. Page 16 of 26

5. You have the option of claiming RECs in regular one-year or five-year periods (deeming periods). Multiply the annual number of eligible RECs by one year or five years depending on the period over which you wish to create RECs. 6. If your calculated number of eligible RECs, over a one-year or five-year period, is: a. greater than 1 MWh you must round down the calculated number to the nearest whole number of RECs. b. between 0.5 MWh and 1 MWh you are allowed to round up the calculated decimal number to 1 REC. Calculating RECs for small hydroelectric units and small wind turbines with Solar Credits The number of RECs that you are eligible to create for your small hydroelectric unit or wind turbine is determined by the rated capacity of the unit and the number of hours the unit can operate at that capacity (resource availability). Units that are eligible for Solar Credits are able to create additional RECs based upon the calculation methodology below. If you unsure of eligibility see Step 4: Determine if your unit is eligible for Solar Credits. To establish how many RECs you may be eligible to create from your unit you should undertake the following steps: 1. Establish your resource availability. If you do not know the actual resource availability, then you must claim for the default amount, which is: Hydroelectric - 4000 hours/year Wind 2000 hours/year If you claim for resource availability above the default amount, then you must provide and retain copies of sitespecific audit reports and advise the ORER of the name and contact details of the person or company that conducted the audit. 2. Establish the rated output of your unit in kilowatts (kw). You can find the rated power output of your unit in the specifications provided by the unit manufacturer. Please ensure that you use the exact figure that applies to your particular make and model. 3. Establish the multiplied value for your RECs under Solar Credits See Table 4 Multiplication for additional RECs under Solar Credits. Page 17 of 26

4. To calculate the annual number of RECs your unit is eligible for use the formulas below. Solar credits only apply to the first 1.5 kw of a unit. If the rated power output of the unit is 1.5 kw or below then the following REC calculation applies: 0.00095 X Rated power output (in kw) X Resource availability of the unit (hours per annum) X Multiplied value in Table 4 Solar Credits X Deeming period If the rated power output of the unit is over 1.5 kw then the following REC calculation applies: ( 0.00095 ) Resource X 1.5 X availability of the system X Multiplied value in X (hours per annum) Table 4 Solar credits Deeming period ( 0.00095 + Total rated Resource availability of ) power output (in the system (hours per X X kw) minus 1.5 annum) X Deeming period 5. If your unit s rated output is greater than 25 MWh (ie. generates more than 25 MWh of electricity) your unit is classified as a power station and you cannot assign RECs to an agent. To apply to ORER to become an accredited power station visit the power stations page of the ORER website. 6. If your calculated number of eligible RECs, over a one-year or five-year period, is: a. greater than 1 MWh you must round down the calculated number to the nearest whole number of RECs. b. between 0.5 MWh and 1 MWh you are allowed to round up the calculated decimal number to 1 REC. Page 18 of 26

Calculating RECs for small solar (photovoltaic) units Once you have established that a small solar (photovoltaic) unit meets the above eligibility requirements, to calculate how many certificates that may be created for it: 1. Establish your Zone by using Table 2, Ratings and Postcode Zones for Small Solar (Photovoltaic) Units on Page 18 of this document. 2. Once you have established your Zone, look up the corresponding Zone Rating in Table 3, Zone ratings for solar (photovoltaic) Units on Page 18 of this document. 3. To calculate your unit s annual REC entitlement, multiply the Zone Rating by your SGU s rated power output (in kw). You can find the rated power output of your unit in the specifications provided by the manufacturer please ensure that you use the exact figure that applies to your particular model. Zone Rating Rated power output (kw) of your solar = (photovoltaic) system Annual REC entitlement 4. If your unit s annual output is greater than 250 MWh (ie. generates more than 250 MWh of electricity) your unit is classified as a power station and you cannot assign RECs to an agent. To apply to ORER to become an accredited power station visit the power stations page of the ORER website. If it is less than 250 MWh proceed to step 5. 5. Choose the deeming period for which you would like to create RECs: 1-year, 5-years or 15-years, as described in the Deeming Periods section above. (Step 2 and 3) Calculate the REC entitlement for each deeming period by multiplying the Annual REC Entitlement (as calculated in step 3) by the number of years in the deeming period you choose, either 1, 5 or 15. 6. If your calculated REC entitlement, over a one, five or 15 year period, is not a whole number and is: greater than 1 MWh you must round down the calculated number to the nearest whole number of RECs. between 0.5 MWh and 1 MWh you are allowed to round up the calculated decimal number to 1 REC. Page 19 of 26

Calculating RECs for small solar (photovoltaic) units with Solar Credits Units that are eligible for Solar Credits are able to create additional RECs based upon the calculation methodology below. If you unsure of eligibility for Solar Credits see Step 4: Determine if your unit is eligible for Solar Credits. To establish how many RECs you may be eligible to create from your unit you should undertake the following steps: 1. Establish your Zone by using Table 2, Ratings and Postcode Zones for Small Solar (Photovoltaic) Units on page 18 of this document. 2. Once you have established your Zone, look up the corresponding Zone Rating in Table 3, Zone ratings for solar (photovoltaic) units on page 18 of this document. 3. Establish the multiplied value for your RECs under Solar Credits See Table 4, Multiplication for additional RECs under Solar Credits 4. Establish the rated output for your unit in the specifications provided by the manufacturer please ensure you record the exact figure that applies to your particular model. 5. If your unit s annual output is greater than 250 MWh (ie. generates more than 250 MWh of electricity) your unit is classified as a power station and you cannot assign RECs to an agent. To apply to ORER to become an accredited power station visit the power stations page of the ORER website. If it is less than 250 MWh proceed to step 6. 6. To calculate the annual number of RECs your unit is eligible for use the formulas below. Solar credits only apply to the first 1.5 kw of a unit. Page 20 of 26

If the rated power output of the unit is 1.5 kw or below then the following REC calculation applies: Rated power output (in kw) X Postcode Zone Rating X Multiplied value in Table 4 Solar credits X Deeming Period If the rated power output of the unit is over 1.5 kw then the following REC calculation applies: ( 1.5 Multiplied value in ) Postcode Zone Table 4 Solar X Rating X Credits X Deeming period ( Total rated power output (in kw) minus 1.5 + ) Postcode Zone Rating X X Deeming period 7. Choose the deeming period you for which you would like to create RECs: 1-year, 5-years or 15-years, as described in the Deeming Periods section above. (Step 2 and 3) 8. If your calculated REC entitlement, over a one, five or fifteen year period, is not a whole number and is: greater than 1 MWh you must round down the calculated number to the nearest whole number of RECs. between 0.5 MWh and 1 MWh you are allowed to round up the calculated decimal number to 1 REC. Page 21 of 26

TABLE 2 Ratings and Postcode Zones for Small Solar (Photovoltaic) Units Postcode range Postcode range Postcode range Postcode range from to zone from To Zone from to zone from to zone 0 799 3 2900 2999 3 4474 4476 1 6251 6254 3 800 869 2 3000 3390 4 4477 4478 2 6255 6270 4 870 879 1 3391 3398 3 4479 4485 1 6271 6315 3 880 1000 2 3399 3413 4 4486 4490 2 6316 6357 4 1001 2356 3 3414 3426 3 4491 4492 1 6358 6393 3 2357 2357 2 3427 3474 4 4493 4499 2 6394 6400 4 2358 2384 3 3475 3514 3 4500 4721 3 6401 6430 3 2385 2393 2 3515 3516 4 4722 4722 2 6431 6431 2 2394 2395 3 3517 3520 3 4723 4723 3 6432 6433 3 2396 2398 2 3521 3524 4 4724 4735 2 6434 6439 2 2399 2399 3 3525 3538 3 4736 4736 1 6440 6441 1 2400 2400 2 3539 3539 4 4737 4824 3 6442 6444 3 2401 2404 3 3540 3549 3 4825 4827 2 6445 6459 4 2405 2407 2 3550 3560 4 4828 4828 3 6460 6467 3 2408 2410 3 3561 3569 3 4829 4829 2 6468 6469 2 2411 2414 2 3570 3570 4 4830 5261 3 6470 6471 3 2415 2536 3 3571 3606 3 5262 5263 4 6472 6474 2 2537 2537 4 3607 3617 4 5264 5270 3 6475 6506 3 2538 2544 3 3618 3622 3 5271 5300 4 6507 6555 2 2545 2557 4 3623 3628 4 5301 5429 3 6556 6573 3 2558 2626 3 3629 3657 3 5430 5450 2 6574 6602 2 2627 2629 4 3658 3684 4 5451 5653 3 6603 6607 3 2630 2630 3 3685 3687 3 5654 5669 2 6608 6641 2 2631 2639 4 3688 3724 4 5670 5679 3 6642 6724 1 2640 2820 3 3725 3731 3 5680 5699 2 6725 6750 2 2821 2842 2 3732 3999 4 5700 5709 3 6751 6797 1 2843 2872 3 4000 4416 3 5710 5722 2 6798 6799 2 2873 2874 2 4417 4417 2 5723 5724 1 6800 6999 3 2875 2876 3 4418 4422 3 5725 5733 2 7000 8999 4 2877 2889 2 4423 4423 2 5734 5799 1 9000 9999 3 2890 2897 3 4424 4426 3 5800 6243 3 - - - 2898 2899 3 4427 4473 2 6244 6250 4 - - - TABLE 3 Zone Ratings for Solar (Photovoltaic) Systems Zone Rating 1 1.622 2 1.536 3 1.382 4 1.185 Page 22 of 26

TABLE 4 Multiplication for additional RECs under Solar Credits Installation Period Multiplication 9 June 2009 30 June 5 x 2010 1 July 2010 30 June 2011 5 x 1 July 2011 30 June 2012 5 x 1 July 2012 30 June 2013 4 x 1 July 2013 30 June 2014 3 x 1 July 2014 30 June 2015 2 x REC calculation examples EXAMPLE 1 SMALL SOLAR PHOTOVOLTAIC UNITS If you wish to create RECs for a 15-year deeming period for a small solar panel (photovoltaic) unit installed by a Clean Energy Council (CEC) accredited installer on 9 April 2009 in the postcode area of 2315, which has a rated power output of 2.5 kw. To determine eligibility: Is the small solar panel (photovoltaic) unit installed within the last 12 months? Yes Does the unit have a rated output of not more than 100 kilowatts (kw) or a total annual output less than 250 MWh? Yes Was the unit designed and installed by a person accredited for stand-alone and grid-connected power units under the Clean Energy Council accreditation scheme? Yes The unit meets all of the eligibility requirements, so we can now proceed to calculate the number of RECs it is entitled to create. 1. Look up the postcode in Table 2 to establish your Postcode Zone: 3 2. Look up the Postcode Zone in Table 3 to establish your Zone Rating: 1.382 3. Multiply your Zone Rating by the kw capacity to get the annual REC entitlement: 1.382 x 2.5kW = 3.455 MWh 4. Multiple by 15 years to get the total REC entitlement: 3.455 x 15 years = 51.825 MWh 5. Round down the total amount of electricity taken to be generated to the last whole MWh to determine the number of RECs you are eligible to create: 51.825 MWh = 51 RECs Page 23 of 26

6. This unit is rated at less than 100 kw and has a total annual output of less than 250 MWh per year, it does not need to be accredited as a power station. EXAMPLE 2 SMALL SOLAR PHOTOVOLTAIC UNITS UNDER SOLAR CREDITS If you wish to create RECs for a 15-year deeming period for a small solar panel (photovoltaic) unit installed by a Clean Energy Council (CEC) accredited installer on 3 August 2009 in the postcode area of 2315, which has a rated power output of 4.5 kw. To determine eligibility: Is the small solar panel (photovoltaic) unit installed on or after 9 June 2009? Yes Is the small solar panel (photovoltaic) unit installed within the last 12 months? Yes Does the unit have a rated output of not more than 100 kilowatts (kw) or a total annual output less than 250 MWh? Yes Does the unit have a total rated power output of more than 1.5 kw? Yes Was the unit designed and installed by a person accredited for stand-alone and grid-connected power units under the Clean Energy Council accreditation scheme? Yes Is the unit a new and complete unit as defined on page 6? Yes Is the unit installed at an eligible premises? Yes Is there pre-approval or financial assistance for any small generation unit at your address for a Solar Homes and Communities (SHCP), Photovoltaic Rebate Programme (PVRP), Renewable Remote Power Generation (RRPGP) or National Solar Schools Program (NSSP) rebate? No The unit meets all of the eligibility requirements, so we can now proceed to calculate the number of RECs it is entitled to create. 1. Look up the postcode in Table 2 to establish your Postcode Zone: 3 2. Look up the Postcode Zone in Table 3 to establish your Zone Rating: 1.382 3. Multiply your Zone Rating by 1.5, your chosen deeming period and the multiplied value for Solar Credits Table 4: 1.382 x 1.5 x 15 x 5 = 155.475 MWh This provides you with the total REC entitlement for the first 1.5 kw of capacity installed 4. Look up your total rated power output. Minus 1.5 from the total rated power output. Page 24 of 26

4.5 kw 1.5 = 3 kw 5. Multiply this number by the postcode zone rating and the deeming period. 3 kw x 1.382 x 15 = 62.19 MWh This provides you with the total REC entitlement for the remainder of the kw capacity installed. 6. Add the REC entitlement for the first 1.5 kw of capacity installed and the REC entitlement for the remainder of the kw capacity: 155.475 kw + 62.19 kw = 217.665 MWh 7. Round down the total amount of electricity taken to be generated to the last whole MWh to determine the number of RECs you are eligible to create: 217.665 MWh = 217 RECs 8. This unit is rated at less than 100 kw and has a total annual output of less than 250 MWh per year, it does not need to be accredited as a power station. EXAMPLE 3 SMALL WIND TURBINES If you wished to create RECs on a 5-year basis for a unit that has a rating of 2.9 kw and a wind resource availability of 2,000 hours, you must: 1. Multiply 0.00095 by the kw capacity and the wind resource availability: 0.00095 x 2.9 x 2000 = 5.51 MWh 2. Multiply the annual electricity output by the number of years: 5.51 x 5 = 27.55 MWh 3. Round down the total electricity output to the last whole MWh to determine the number of RECs you are eligible to create: 27.55 = 27 RECs 4. This wind turbine has a total annual output of less than 25 MWh, it does not need to be accredited as a power station. Page 25 of 26

EXAMPLE 4 SMALL WIND TURBINES UNDER SOLAR CREDITS If you wished to create RECs on a 5-year basis for a unit that has a rating of 2.9 kw and a wind resource availability of 2,000 hours, you must: 1. Multiply 0.00095 by 1.5 by the wind resource availability by the multiplied value by the deeming period. 0.00095 x 1.5 x 2,000 x 5 x 5 = 71.25 MWh This provides you with the total REC entitlement for the first 1.5 kw of capacity installed 2. Look up your total rated power output. Minus 1.5 from the total rated power output. 2.9 1.5 = 1.4 kw 3. Multiply this number by 0.00095 by the wind resource availability and the deeming period 0.00095 x 1.4 x 2,000 x 5 = 13.3 MWh This provides you with the total REC entitlement for the remainder of the kw capacity installed. 4. Add the REC entitlement for the first 1.5 kw of capacity installed and the REC entitlement for the remainder of the kw capacity: 71.25 MWh + 13.3 MWh = 84.55 MWh 5. Round down the total amount of electricity taken to be generated to the last whole MWh to determine the number of RECs you are eligible to create: 84.55 MWh = 84 RECs 6. This wind turbine has a total annual output of less than 25 MWh, it does not need to be accredited as a power station. Page 26 of 26