Solar System Main Panel

Similar documents
Going Off the Grid in our Keystone Cougar

Going Off the Grid in our Keystone Cougar

Adjusting brake shoes for AutoPark parking brake

b o o s t r e t a i n e r v a l v e

Connecting the rear fog light on the A4 Jetta, while keeping the 5 Light Mod

Before you build that scale model a few things to consider

SAILMON SYSTEM LOAD CELL BOX MANUAL. Sailmon LoadCellBox Manual V1.0 Page 1

X-Type w/ non-premium sound amplifier installation instructions

ALTERNATING CURRENT - PART 1

TONY S TECH REPORT. Basic Training

Please be aware that some things have no exact answer and opinions vary. Also not all situations are the same.

Some tips and tricks I learned from getting clutch out of vehicle Skoda Octavia year 2000

Questions Section: Do you have questions that aren't covered? Please contact us!

Fitting HID Xenon Headlamp system to R75/MG-ZT

Cruise Control Wiring

EV Display User Guide

Installing LED lights in a Hypercharger By Keith Edwards Joker s Wild! (Wildjokr)

Fitting Instructions For The TDV6 EGR Blanking Kit To A 2006 Model Discovery 3 TDV6 GHSE

Fitting the Bell Auto Services (B-A-S) TDV6 EGR Blanking Kit to a 2006 model Discovery 3 TDV6 HSE

The Life of a Lifter, Part 2

Electrical Testing in the Operating Room; Part 6

Servicing a Katadyn PUR40E

XW E-Panel installation manual

Installing AMP-wiring in a New Beetle

Hydro-Sync Slide-Out System

Door panel removal F07 5 GT

SMARTSTRINGSTM. Owner's Manual

LECTURE 6: HETEROSKEDASTICITY

Rostra Electronic Cruise Control Install On a Stratoliner or Roadliner

OEM Cruise Control Installation in GMC/Chevy NBS trucks

Assessing a Site for Installation of Consumption Monitoring

RC4WD Timberwolf Build Document

User Guide. BreezePro TPW-400DT 12/24V 400W Wind Turbine A. NOTICE. B. SAFETY PRECAUTIONS (Important) C. About BreezePro

The Car Tutorial Part 2 Creating a Racing Game for Unity

The man with the toughest job in F1

Smart Opener Retrofit by Richard Bevan (bimmerfest riku2)

Megasquirt II with V3.0 PCB Stock Rotary CAS Setting up your 2 rotor engine to use a stock unmodified Mazda Crank Angle Sensor with Megasquirt

Operating and programming instructions at =AMPS or =WATTS REPLACED PERCENTAGE FROM LAST DISCHARGE

Setup Guide and Chassis Tuning Tips (simple version) By Jim Daniels

The Starter motor. Student booklet

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017

elabtronics Voltage Switch

Chapter 6: Small scale solar electricity

High-Tech Solar System

DC Series Motors by Thomas E. Kissell Industrial Electronics, Second Edition, Prentice Hall PTR

GET GROUNDED. Renewable Energy System Grounding Basics

Triumph Street Triple VSM Grip Heater Install

2016 HONDA 1000 Pioneer PN 3102 Turn signal / horn kit rev nc

ND Shock & Spring installation tips 13-4XXX, 13-5XXX 13-6XXX

GVW AGM Auxiliary Battery Kit for Air-cooled Westfalia Campers and all Vanagon NON-campers

Revision Date: Building a dual pump system for an open boat. Description:

VLADAR SOLARBOX 9.2 ASSEMBLY GUIDE

What Is Analysis? Rebecca Jarvis, Ph.D., and Ginger, Ca.T., Eastern Arizona College

Q&A FOR Webinar on Electrical Basics & Boiler Wiring

The Invision kit comes with everything you need to install the DVD players into your X5; two leather headrests with integrated DVD players, two

Prius XM Radio Installation Instructions. Eddie Bell

Electronic Dynamo Regulator INSTRUCTION MANUAL. COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved

User Manual. Wind and Solar Hybrid Charge Controller 1KW / 2KW 48VDC. HCON Series

MAX-FIRE AND E-FIRE ELECTRONIC DISTRIBUTORS

Williams Electronics, Inc. Defender Servicing. Power Supply and Interface Board. Recap Sheet

Electronic Dynamo Regulator INSTRUCTION MANUAL. COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved

Supplies: I purchased the following:

mygrid Installation Notes

Once again, another four weeks have gone by and I am quite sure everyone is tired of me wondering where the time has gone. To say that everything

Overview of operation modes

Fog Light setup for a 2003 XL F250 Super Duty using the OEM kit.

ELON MUSK'S GRAND PLAN TO POWER THE WORLD WITH BATTERIES

RZR 900 spring/shock installation

Not Included. Rear Half Harness

USER MANUAL MINI BMS DISTRIBUTED VERSION

Installation Tips for your Crimestopper/ProStart Remote Start system (for GM vehicles) v1.01 updated 2/27/2012

240V UPS Typical Installation Guide

HOW TO USE A MULTIMETER, PART 1: INTRODUCTION

LHT CC LIGHT WIRING Instructions for Club Car DS Models

Solera Power Awning TROUBLESHOOTING AND SERVICE MANUAL

Thanks for Ordering The Kawasaki KLX Adjustable Lowering Kit From

MiniBMS User Manual. Distributed version

Battery-Back-Up Power for Amateur Radio

Installing the EFILive LBZ/LMM DSP2 & DSP5 Custom Operating Systems

Solar Power. Questions Answered. Richard A Stubbs. Richard A Stubbs 2003, distribution permitted see text for details

Selecting and Installing a Battery Backup System for Your Sump Pump

Builder s Log Helicycle N750G

Raxiom Factory GPS Rear Back-up Camera Kit (07-17 Wrangler)

BMW 2002 M42 Swap Notes-THIS IS NOT FINISHED

(Refer Slide Time: 1:13)

MAGPOWR Spyder-Plus-S1 Tension Control

MASTERsine Inverter PXA Series Installation Guide

DCX2496 Linear Power Supply mod by

Biasing the Vintage Series (Nomad, BelAir, VT50, Vintage 33)

Winterizing the Truma-Equipped Winnebago Travato

How to fit the remote parking heater module

We all put our heads together to try and determine what the facts were. They were as follows:

QUICK START GUIDE FOR ACCESS CONTROL BOARDS. DX Series Four Door TCP/IP Web Server Controller. Model: ACP-DXEL4

1980 Suzuki GS850GT Stator Replacement by BassCliff (a.k.a.bikecliff)

Mini EV Prize Solar Car Kit

Ex. 1-1 Nacelle Familiarization and Safety Discussion

Proton 4 - Operation Manual Balance Charger for Lipo (Lithium Polymer) and A123 (LiFe) Batteries

CARE AND FEEDING OF YOUR XJ GAS CAP

Virtual Ground for HV Boosters Calibration

Tusk UTV Horn & Signal Kit Installation Instructions

Transcription:

Solar System Main Panel Copyright Kelly J. Lipp 2013, All Rights Reserved. May not be copied without permission. This paper highlights the design and wiring of the solar power main system control panel used in our Keystone Cougar. I owe the overall idea to HandyBob but the implementation is my own. I believe the key to doing this right is to keep everything very neat and tidy. I was fortunate to have plenty of room in the forward hatch of the rig. I easily fit the main panel, inverter panel and four Trojan T-105 batteries in this space. Hopefully these annotated pictures will provide guidance as you build your own system.

System Block Diagram

From a previous paper you might recall the above diagram. The lines and boxes are all correct but may be a bit complicated to follow. The series of photos below show how I implemented these connections.

Main Panel

I divided the main panel into two: the left side holds the Magnum 2012 Inverter and components and the right holds the main terminal blocks, charge controller and the fusible disconnect. I used a fusible Air Conditioner (A/C not to be confused with Alternating Current!) to isolate the system properly. This device allows one to completely disconnect the panels from the charge controller and the charge controller from the batteries making it easy to service any portion of the system. It also provides fused electrical security in the event of a short circuit somewhere in the system. In my case, the left fuse in the panel is used for the solar panel input while the right is used for the battery charging output. Both sides use 60A fuses as that is what the Tristar Charge Controller (CC) is rated. I was able to make almost all of the connections with the panel on the workbench. I could have made them all had I added two more terminal posts for the solar panel wires. I would recommend doing this on your panel. Fishing the two #6 copper wires into the Disconnect box and to their respective terminal posts was a bit difficult. That wire is stiff! Notice that I gave myself plenty of room. If your space is limited you may have to tighten things up to make them fit. But you have the overall idea. Let s dive into more detail

Positive and Negative Terminal Post Connections

Smack dab in the middle is the Shunt used by the Trimetric meter to determine current flow through the system. A shunt is a very low resistance device capable of having large amounts of current pass through it. Since it has some resistance, there is a voltage drop across it that varies with the amount of current passing through it. The Trimetric measures this voltage drop and from that knows the current flow. It then keeps track of that and based on its settings knows the state of charge of the batteries. The key to the shunt installation is that the only connection on one side is to the battery. All other negative connections are made to the other side. This way all of the current that flows to any electrical device in your rig passes through the shunt to be measured. On this panel you see a #3/0 cable on the left that runs to the battery bank and on the right all the other negative connections including the white wire that is the original RV negative connection. The Positive Terminal Post is used to tie all positive power points together. I purchased this terminal post here: http://www.amazon.com/gp/product/b000oto6hk/ref=oh_details_o09_s00_i00?ie=utf8&psc=1 Remember to have three of these: one for the positive post and two for the solar panel connections.

Additional Detail Main Connections

Charge Controller and Fusible Disconnect

On the left is the A/C Fusible Disconnect box. There are two fuses and two sets of connections to route power through. On the left we can see the positive feed from the solar panels entering the box and being connected to the top of the left fuse. The bottom of the fuse is then wired to the positive input on the Tristar Charge Controller. The negative wire from the panels passes through the disconnect box and is wired to the negative input side of the CC. On the far right is the positive red wire from the CC heading back to the disconnect box right side. Through the fuse and then on to the positive terminal post outside the box. The negative output wire is also routed back through the disconnect box and to the right side (opposite the battery) of the shunt. These two wires carry the current and voltage to the batteries for charging. Not shown is the blade that actually connects the top of the fuses to the wire from the panels and to the batteries. When this blade is installed, the connections are made and current flows as designed into the CC from the panels and from the CC to the batteries. There are three other connections in the CC box. The battery remote temperature sensor is connected to the negative terminal post on one of the batteries. The charge controller uses the information provided by the sensor to determine the maximum voltage to expect from the battery at charge completion. The colder the batteries are the higher the voltage provided by the CC to complete the charge process. The battery sense connection provides a direct voltage reading at the batteries themselves. The CC can determine what that voltage is from the positive and negative charge posts but this reading may not reflect the accurate voltage due to wire losses in the cable runs. In this case the wire gauge is sufficient to provide almost zero loss. However, the sensor exists so one might as well use it. Finally, there is an 802.1 Ethernet port on the CC to provide advanced setup features. I have connected this to my network once to see what was available. Suffice it to say every arcane battery charging parameter can be tweaked using this interface. For most of us this is not necessary. The basic settings available using the dip switches are all we need. This port is also used to update the firmware in the CC. The solar panel to CC and CC to battery connections are the most complicated part of installing your system. But as you can see this isn t really complicated at all. Simple positive to positive and negative to negative is all that is required. Using the A/C Disconnect makes it simple to deenergize and energize your system by pulling the blade. This connection scheme can be used with any charge controller and provides the safest method of making these connections.

Close-Up View of Main Connections

Finally, another look at the main connections. Before you start to wire your system make sure you understand all of the wire routing I ve shown in these photos. The more thorough your understanding the less likely you are to make mistakes. Before I put the fuses in the box and inserted the blade I made sure I had positive to positive and negative to negative by using a voltmeter. Reverse polarity is death to electronics! Be cautious and careful.