Background Information

Similar documents
Pacific Gas and Electric Company s Revised 2015 Annual Progress

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s 2013 Annual Progress Report

TRANSMISSION PROJECTS MODELED IN PHASE IIA DELIVERABILITY STUDY BASECASE

2018 & 22 Final LCR Study Results Greater Bay Area

2019 & 2023 Final LCR Study Results Greater Bay Area

APPENDIX F: 2012 Request Window Submittals

Report of Gary DeShazo

2018 & 22 Final LCR Study Results Sierra and Stockton Areas. Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Call April 13, 2017

2019 & 23 Final LCR Study Results Sierra and Stockton Areas. Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Call May 1, 2018

2017 Final LCR Study Results Fresno. Vera Hart Regional Transmission Engineer Stakeholder Call April 14, 2016

PACI RAS Updates. Vahid Madani Pacific Gas and Electric Co. August 2, 2017

Contingency Description

Agenda Draft Transmission Plan and transmission project approval recommendations

PG&E s 2017 Request Window Proposals CAISO 2017/2018 Transmission Planning Process

APPENDIX E: Project Need and Description

Wheeling Access Charges

SDG&E Valley-Rainbow Project

PG&E s 2012 Request Window Proposals

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA (U 39 E)

Agenda Day 1 Preliminary Reliability Assessment Results

Full Network Model Scope for FNM DB61

Introduction and Overview

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

California ISO DG Deliverability Study Results - PGE Area February, A B C D E F G H I J K L DG Node Unassigned PDGD.

Agenda Less than $50 Million Projects and Preliminary Economic Assessment Results

Full Network Model Scope for FNM DB2016Q1

APPENDIX E: Project Need and Description

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

Decision on the ISO Transmission Plan

Agenda Day 2 Preliminary Reliability Assessment Results

California Independent. System Operator. Market Overview and Design Construct

APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems

ISO Transmission Plan February 2, 2015 APPENDIX H: Contingencies on the ISO System that may Impact Adjacent Systems

monthly rates for individuals and families

Full Network Model Scope for FNM DB59

Total Usage (kwh) Present Reading (kwh) (=)

Appendix II: County & City Data

Total Usage (kwh) Present Reading (kwh) (=)

2016 SDG&E Grid Assessment Results

Wheeling Access Charges

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Board of Vocational Nursing and Psychiatric Technicians

Pacific Gas and Electric Company TM

PREPARED DIRECT TESTIMONY

for DRECP Alternatives

Operating Procedure. EIR (webregistry) (POR/POD dropdown) AZPS NGILAN_5_N034 North Gila 500 NRTHGILA500 NRTHGILA500 NORTHGILA500_ITC

California Local Government Shopping Cart Ordinances. As of November 27, 2012

Opening Transmission Planning Process Stakeholder Meeting Tom Cuccia Lead Stakeholder Engagement and Policy Specialist November 19-20, 2014

Board of Vocational Nursing and Psychiatric Technicians

Agenda Day 2 Preliminary Reliability Assessment Results

1108 Murphys Grade Road Angels Camp Anna Bayless-Martinez Afternoon 4/27/ West 2nd Street Antioch CeCelia DeLa Torre Morning 4/28/

CSHA GYMKHANA. Region Sponsor Arena Location Contact Telephone

Region Sponsor Arena Location Contact Telephone

Updates and Modifications to Report

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Valley - Rainbow Interconnection Project Feasibility Study Report

Proposed New Construction for

Avoid the 10 Solano County DUI Campaign

EXHIBIT D. Fuel System Improvements Project Elements East Bay Fuel Facilities

APPENDIX F: Project Need and Description

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Western Area Power Administration Sierra Nevada Region

Updates and Modifications to Report

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

STOP FUELING AMAZON DESTRUCTION

Western Area Power Administration Sierra Nevada Region

2014 California High School Exit Examination (CAHSEE) Results Riverside County Office of Education September 19, 2014

INDUSTRY IMPACT TAX REVENUE. $353 Million Income Taxes from Payments for Automakers, Suppliers and Dealers REGISTRATIONS

PRESENTATION Metro s Streets & Freeways Subcommittee

An Inside Look at Electric Reliability 2016 Electric Reliability Report

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

Designer Select. Premium Offerings for Projects of Distinction. Northern California. USA Owned. USA Made.

March 7, Subject: Southern California Edison 2011 Annual Progress Report

Agenda Day 2. Tom Cuccia Lead Stakeholder Engagement and Policy Specialist

Custom ad programs and sponsorships designed to. reach your customers

Pacific Northwest/Canada To Northern California Transmission Feasibility Study

Report on Tuberculosis in California, 2006

Report on Tuberculosis in California, 2005

STATE ECONOMIC IMPACT

Second Report of the Tehachapi Collaborative Study Group

WECC Regional Planning Pacific Northwest/Canada to Northern California Transmission Project

Status of PNM s Completed Transmission Construction Projects 11/30/2017

6. Hydroelectric Power Modeling

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

Southern California - CHSRA

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Black Hills Project Summary

I ADJUSTMENTS TO LEVIES I

April 2012 TRANSMISSION IMPACTS IN THE DRECP

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

Electric Generation Workpapers Jeff Huang SDG&E/SoCalGas 2013 TCAP

Retail Hydrogen Fueling Station Network Update

FLAT RATE LAX TAXI AND LIMO SERVICE BY WILSHIRE TRANSPORTATION COVERAGE AREA MAP (800) zoom to find your location and flatrate price

Tri-State December 2013 Board Meeting

Transcription:

Background Information On Local Capacity Areas: Import Facilities Substations LSTobias / ISO Grid Planning 1

Humboldt Area Import Facilities 1) Humboldt-Bridgeville-Cottonwood 115 kv line #1 2) Humboldt-Trinity 115 kv line#1 3) Willits-Garberville 60 kv line #1 4) Trinity-Maple Creek 60 kv line #1 LSTobias / ISO Grid Planning 2

Substations delineating the Humboldt Area 1) Low Gap 115 kv 2) Humboldt 115 kv 3) Kekawaka 60 kv 4) Ridge Cabin 60 kv LSTobias / ISO Grid Planning 3

North Coast/North Bay Import Facilities Eagle Rock-Fulton Pocket 1) Fulton-Lakeville 230 kv line #1 2) Fulton-Ignacio 230kV line #1 3) Cortina 230/115 kv Transformer #1 4) Lakeville-Sonoma 115 kv line #1 5) Corona-Lakeville 115 kv line #1 6) Willits-Garberville 60 kv line #1 Lakeville Pocket 1) Vaca Dixon-Lakeville 230 kv line #1 2) Tulucay-Vaca Dixon 230 kv line #1 3) Lakeville-Sobrante 230 kv line #1 4) Ignacio-Sobrante 230 kv line #1 5) Lakeville-Fulton 230 kv line #1 6) Ignacio-Fulton 230 kv line #1 7) Lakeville-Corona 115 kv line #1 8) Lakeville-Sonoma 115 kv line #1 LSTobias / ISO Grid Planning 4

Substations delineating North Coast/North Bay Area Eagle Rock-Fulton Pocket 1) Fulton 230 kv 2) Corona 115 kv 3) Sonoma 115 kv 4) Cortina 115 kv 5) Laytonville 60 kv Lakeville Pocket 1) Lakeville 230 kv 2) Ignacio 230 kv 3) Tulucay 230 kv 4) Lakeville 115 kv LSTobias / ISO Grid Planning 5

Sierra Area Import Facilities 1) Table Mt-Rio Oso 230 kv line #1 2) Rio Oso-Poe 230 kv line #1 3) Rio Oso-Cresta 230 kv line #1 4) Gold Hill-Ralston 230 kv line #1 5) Colgate 230/60 kv Transformer #1 6) Atlantic 230/60 kv Transformer #1 7) Gold Hill 230/115 kv Transformer #1 8) Gold Hill 230/115 kv Transformer #2 9) Palermo 230/115/60 kv Transformer #1 10) Caribou-Palermo 115 kv line #1 11) Bogue-Rio oso 115 kv line #1 12) Rio Oso-Nicolaus 115 kv line #1 13) Pease-Rio Oso 115 kv line #1 14) Drum-Rio Oso 115 kv line #1 15) Drum-Rio Oso 115 kv line #2 16) Drum-Summit 115 kv line #1 17) Drum-Summit 115 kv line #2 18) Spaulding-Summit 60 kv line #1 19) Table Mt-Pease 60 kv line #2 LSTobias / ISO Grid Planning 6

Substations delineating Sierra Area 1) Palermo 230 kv 2) Rio Oso 230 kv 3) Colgate 230 kv 4) Atlantic 230 kv 5) Gold Hill 230 kv 6) Drum 115 kv 7) Caribou 115 kv 8) Table Mountain 60 kv 9) Tamarack 60 kv LSTobias / ISO Grid Planning 7

Cortina & Davis/W. Sacramento Area Import Facilities Cortina 60 kv Pocket 1) Cortina 230/60 kv transformer #1 Davis-West Sacramento Pocket 1) Rio Oso-Woodland 115 kv #1 2) Rio Oso-Woodland 115 kv #2 3) Davis-West Sacramento 115 kv #1 4) Davis-Brighton 115 kv #1 Boundary Substations 1) Woodland 115 kv 2) Davis 115kV LSTobias / ISO Grid Planning 8

Import Facilities Stockton Area Stockton: Tesla-Bellota Pocket 1) Bellota 230/115 kv Transformer #1 2) Bellota 230/115 kv Transformer #2 3) Tesla-Schulte 115 kv line #1 4) Tesla-Manteca 115 kv line #1 5) Tesla-Tracy 115 kv line #1 6) Tesla-Stockton Cogen Jct 115 kv line #1 7) Tesla-Salado 115 kv line #1 8) Tesla-Salado 115 kv line #2 Boundary Substations 1) Tesla 115 kv 2) Bellota 15 kv California Independent LSTobias / ISO Grid Planning 9

Greater Bay Area Import Facilities California Independent Lakeville-Sobrante 230 kv Crocket-Sobrante 230 kv Parkway-Moraga 230 kv Bahia-Moraga 230 kv USWind-Contra Costa Sub 230 kv Peabody Tap-Contra Costa P.P. 230 kv Brentwood-Contra Costa PP 230 kv Windmaster-Contra Costa PP 230 kv Flowind-Pittsburg 230 kv JV Enterprises- Pittsburg 230 kv Tesla-Newark 230 kv Tesla-Tracy #1 & #2 230 kv Tesla-Ravenswood 230 kv Tesla-Metcalf 500 kv Moss Landing-Metcalf 500 kv Moss Landing-Metcalf #1 230 kv Moss Landing-Metcalf #2 230 kv Green Valley-Morgan Hill #1 115 kv Green Valley-Morgan Hill #2 115 kv Oakdale TID-Newark #1 115 kv Oakdale TID-Newark #2 115 kv Tesla-Newark #2 230 kv Tesla-Tracy #1 & #2 230 kv LSTobias / ISO Grid Planning 10

Substations that delineate the Greater Bay Area 1) Sobrante 230 kv 2) Moraga 230 kv 3) Contra Costa Sub 230 kv 4) Contra Costa P.P. 230 kv 5) Pittsburg 230 kv 6) Tesla 230 kv 7) Metcalf 500 kv 8) Moss Landing 500 kv 9) Morgan Hill 115 kv 10)Newark 115 kv LSTobias / ISO Grid Planning 11

Greater Fresno Area Import Facilities California Independent Gates-Henrietta Tap 1 230 kv Gates-Henrietta Tap 2 230 kv Gates #1 230/115 kv Transformer Bank Los Banos #3 230/70 Transformer Bank Los Banos #4 230/70 Transformer Bank Panoche-Gates #1 230 kv Panoche-Gates #2 230 kv Panoche-Coburn 230 kv Panoche-Moss Landing 230 kv Panoche-Los Banos #1 230 kv Panoche-Los Banos #2 230 kv Panoche-Dos Amigos 230 kv Warnerville-Wilson 230 kv Wilson-Melones 230 kv Corcoran Alpaugh - Smyrna 115 kv Coalinga #1-San Miguel 70 kv LSTobias / ISO Grid Planning 12

Substations delineating the Greater Fresno Area California Independent 1) Los Banos 230 kv 2) Gates 230 kv 3) Panoche 230 kv 4) Wilson 230 kv 5) Alpaugh 115 kv 6) Coalinga 70 kv LSTobias / ISO Grid Planning 13

Kern Area Import Facilities Gates Midway 230 kv line Morro Bay Midway 230 kv lines #1 and #2 Midway 230/115 kv transformer banks Gates Arco 230 kv line Arco 230/70 kv transformer bank Smyrna - Semitropic Midway 115 kv line Temblor San Luis Obispo 115 kv line Arco Cholame 70 kv line LSTobias / ISO Grid Planning 14

Substations delineating the Kern Area 1) Midway 230 kv 2) Arco 230 kv 3) Smyrna 115 kv 4) Temblor 70 kv LSTobias / ISO Grid Planning 15

Eastern & Western LA Basin Boundary substations Devers Mirage Vincent San Onofre Lugo Sylmar LSTobias / ISO Grid Planning 16

San Diego Area Boundary Transmission Lines Imperial Valley Miguel 500 kv Line San Onofre - San Luis Rey #1, #2, & #3 230 kv Lines San Onofre Talega #1 & #2 230 kv Lines San Diego Area Boundary Substations Miguel San Luis Rey Talega LSTobias / ISO Grid Planning 17