NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project

Similar documents
Introduction. This paper sets out the Eskom approach

SunZia Southwest Transmission Project

RENEWABLE ENERGY SITUATION IN BOTSWANA

Electricity industry structure and key players

AES Corporation A CLEAN Program Brief

Oakey Solar Farm Community Consultation

Shifting Seasons Wind Energy in the Philippines

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Renewable Energy Wheeling Agreement for Green Power Trading

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015

PRESS RELEASE. C-Power completes first wind farm in the Belgian North Sea

Amayo Project Summary

Regulatory Status and Road Map for Wind Energy in Namibia

SunZia Southwest Transmission Project

ABB. Carlos Poñe, ABB South Africa, 14/02/2013 ABB South Africa Media Presentation 2012 Annual Results

Joint presentation by: Lead investor EPC, O&M

Alstom in South Africa

Title of presentation

Energy from Waste Grid Connections

LOGO. August 16,2010

LIQUID FUELS CHARTER

Case Study - DeGrussa Solar Hybrid Project

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Power Purchase and Grid Connection Procedures

Green Power Feasibility Study Econet Lesotho

Arizona Energy Consortium Conference

ILF Consulting Engineers

DEVELOPMENTS & STATUS IN PAKISTAN WITH CASE STUDY OF

CANADA LINE a Canadian P3 Success Story

SAIREC Panel Discussion

Brownfields to Brightfields

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

Guidelines for Solar Grid Power Projects

System Status Briefing

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

28 June, Attention: Mondli Shozi NERSA By

Progress Towards Meeting Charter Objectives

Siemens BRI Summit 2018 Country Pavilion CC China

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

Southern California Edison

DeGrussa Solar Hybrid Project

Willingdon Substation Decommission

LIPA PEAKING PLANT OPPORTUNITY

Metal Bulletin Conference

System Reliability in Renewables-driven Power Systems. The political economy of cheap renewables in South Africa. Grové Steyn 19 April 2018

Introduction to Veja Mate Offshore Project

MassDOT Highway ROW Solar PV Energy Program. Hongyan (Lily) Oliver Massachusetts Department of Transportation Office of Transportation Planning

Siemens Hybrid Power Solutions. Technical and Financial Simulation Tools for High Penetration Hybrid Power Systems, Bangkok June 2015

Presentation KC Cottrell Solar Business

Bohn to Kettle River Transmission Project

The Gambia National Forum on

MAN engines supporting Wind power EAPIC, Nairobi, 2 nd September 2010

Kettle River Transmission Project

Vattenfall Capital Markets Day 2009

STATUS OF LAND-BASED WIND ENERGY DEVELOPMENT IN GERMANY

A Transformational Approach to Energy Supply. September 2016 Gail Scholes, Jo Gilbert


Jakarta November

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

Energy Bridge. Delivering Irish wind energy to GB before 2020

Project Title: Lowertown Ballpark (CHS Field) Solar Arrays Contract Number: EP4-34 Milestone Number: 1 Report Date: June 21, 2016

Regional Meeting on Sustainable Energy for Asia -Pacific Least Developed Countries Kathmandu, Nepal. Surendra Rajbhandari

Westinghouse AP1000 Plant

O-Train Confederation Line Stage 1

Renewable Energy System Tariffs and Pricing

Purple Line Light Rail P3 Project

File No February Prepared for: Prepared by:

DESIGN, INSTALLATION AND MAINTENANCE OF SOLAR HOME SYSTEMS IN RURAL AREAS. by Matimba Mathebula, Xahumba Engineering Consulting (Pty) Ltd

Electricity sector transformation and the expected impact of Climate Change mitigation measures

Iowa Statewide Solar Readiness Initiative

SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE

Merger of the generator interconnection processes of Valley Electric and the ISO;

Independence- Freedom- Happiness No.: 96/2012/TT-BTC

Case study: Utility-scale battery for balancing power in Germany

MYPD3 tariff restructuring plan use-of-system charges. Brochure

2012 INSTALLERS MEETING UES INSTALLER S MEETING

Currant Lake Transmission Project

Wind Energy in the Southeast: Offshore and Land-Based Potential

Sasol is a global integrated chemicals and energy company. Through our talented people, we use selected technologies to safely and sustainably

TEMPORARY POWER FOR PERMANENT GROWTH

ELECTRICITY GENERATION LICENCE APPLICATION - PUBLIC CONSULTATION BADGINGARRA WIND FARM

Siemens Gamesa Renewable Energy Unlocking Vietnam s Nearshore Wind Potential

LOUIS BERGER POWER 2018 CALENDAR. power.louisberger.com

Department of Energy. Integrated National Electrification Programme. February 2011

Private Sector led solar micro-grids in remote and rural Nepal

Energy Storage Summit

SOLAR POWER SOLUTIONS

Fortune Electric Co., Ltd.

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

City of Austin. Airport Leadership Eliminates GSE Emissions

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

CHARTER FOR PETROLEUM AND LIQUID FUELS INDUSTRY

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Power Purchase Agreement for Commercial PV Systems


China's Sany Electric completes first US wind project

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

AN OUTLINE HISTORY OF DANISH WIND TURBINE PRODUCTION: Output and Longevity from 1977 to 2014.

Transcription:

NERSA PUBLIC HEARING: RENEWABLE ENERGY POWER PLANT LICENCE APPLICATION Riverbank Wind Power (Pty) Ltd: Wesley-Ciskei Wind Project 10 September 2015 Presented by: Louis Dewavrin and Angela Hobbs

AGENDA 1 2 Introduction to InnoWind (Pty) Ltd / EDF EN Wesley-Ciskei Wind Project Project overview Technology Consortium structure Site layout Permitting Economic Development Value for money 2

Introduction to InnoWind/EDF EN InnoWind is the South African subsidiary of EDF Energies Nouvelles (EDF EN) Group, which owns over 7,500 MW gross of wind powered generating capacity in 18 countries InnoWind is an integrated wind operator that develops, finances, builds, owns and operates commercial wind-powered generation facilities to supply energy into the national power grid 20 employees based in PE and CT Currently operates three Eastern Cape based wind projects (totalling 104.1 MW) which were awarded under Round 2 of the DOE s Renewable Energy Independent Power Producer Procurement program (REIPPPP) 1. Grassridge (59.8 MW) 2. Waainek (23.3 MW) 3. Chaba (21 MW) All projects follow local community-ownership model whereby communities in the vicinity of each project own 26 % of each wind farm with dividends flowing to fund community development initiatives through the lifetime of the projects, 3

AGENDA 1 2 Introduction to InnoWind (Pty) Ltd / EDF EN Wesley-Ciskei Wind Project Project overview Technology Consortium structure Site layout Permitting Economic Development Value for money 4

Project overview ORIGINATOR The Wesley-Ciskei wind project was first originated and partially developed by Just Energy (a non-profit organization affiliated to Oxfam) and was later taken over and fully developed by InnoWind. LOCATION & LAND Eastern Cape Province, approximately 57 km southwest of East London. The project site is situated on local farm land and sits about 6 km from the coast, between the villages of Wesley, Hamburg and Gcinisa, in the Ngqushwa Local Municipality, Amathole Municipal District, Eastern Cape Province. CONNECTION Eskom Wesley Substation via dedicated 66 kv power line and on-site new substation. TIMELINES Construction start Q3 2016 Commissioning start (first unit) Q2 2017 Commercial Operation start Q4 2017 for 20 years (November 2017) 5

Technology Vestas the leading wind turbine manufacturer was selected under a turnkey EPC contract for the construction and the operation of the project, under the supervision of InnoWind. Selected turbine model is the 3.3 MW V-126: 117 m hub height 126 metre rotor diameter 3.3 MW rated capacity output Cutting-edge wind technology complies with most stringent manufacturing and grid code regulations worldwide. 6

Consortium overview The structure of the successful bidding consortium: InnoWind (Pty) Ltd (Lead Member) (Telagystix (Pty) Ltd) Uncedo Lwethu Winds of Change (Pty) Ltd Riverbank Winds of Change BBBEE Co (RF) (Pty) Ltd 60% 20% 5% 15% Standard Bank Debt Riverbank Wind Power (Pty) Ltd Photomontage taken from the R72 immediately adjacent to the site looking south-west 7

Site layout 8

Permitting Permits obtained Date Status Environmental Authorisation August 2013 No objections received CAA Clearance July 2014 Valid SAWS Clearance June 2013 Valid DWA Water Use Licenses July 2014 May 2014 General Authorisation received (The National Water Act (Act 36 of 1998) Water supply authorised NERSA Generation license 24 June 2015 Application submitted To Execute February 2016 (to be confirmed) PPA (Eskom) Distribution Agreement (Eskom) Direct Agreement (DOE) Generation Licence (NERSA) 9

Economic Development Element Threshold level Target level Consortium s response 1: Job Creation 100-SR-01 RSA Based Employees who are Citizens 50.00% 80.00% Exceed Target 100-SR-02 RSA Based Employees who are Black People 30.00% 50.00% Exceed Target 100-SR-03 Skilled Employees who are Black People 18.00% 30.00% Exceed Target 100-SR-04 RSA Based Employees who are Citizens from Local Communities 12.00% 20.00% Exceed Target 2: Local Content 200-SR-01 Value of Local Content Spend 40% 65% Exceed Threshold 3: Ownership 300-PC-01 Shareholding by Black People in the Seller 12.00% 30.00% Exceed Target 300-PC-02 Shareholding by Local Communities in the Seller 2.50% 5.00% Exceed Target 300-CC-01 Shareholding by Black People in the Contractor responsible for Construction 8.00% 20.00% Meet Target 300-OM-01 Shareholding by Black People in the Operations Contractor 8.00% 20.00% Exceed Threshold 4: Management Control 400-SR-01 Black Top Management 0.00% 40.00% Exceed Target 5: Preferential Procurement 500-SR-01 BBBEE Procurement 0.00% 60.00% Exceed Target 500-SR-02 QSEs and EMEs Procurement 0.00% 10.00% Meet Target 500-SR-03 Women Owned Vendor Procurement 0.00% 5.00% Meet Target 6: Enterprise Development 600-SR-01 Enterprise Development Contributions 0.00% 0.60% Meet Threshold 600-SR-02 Adjusted Enterprise Development Contributions 0.00% 0.60% Meet Threshold 7: Socio-economic Development 700-SR-01 Socio-Economic Development Contributions 1.00% 1.50% Meet Target 700-SR-02 Adjusted Socio-Economic Development Contributions 1.00% 1.50% Exceed Target 10

Value for money (1 of 2) Price Despite its small size (33MW) and high local community ownership, two factors which impact negatively on price by making a project less competitive, this project was able to remain competitive enough to be selected alongside projects 3 to 4 times its size. Economic impact A first for the REIPPPP as it is the only project to be awarded within the former Homelands one of the most economically disadvantaged areas of RSA. The project s unique location means there will be no overlap of ED / SED / local job creation with other projects (wealth de-centralising effect) 11

Value for money (2 of 2) Community Upliftment: 20% shareholding is held by local community in two tranches: 15% by broad-based local community Former Ciskei rural communities living within 50km of the project; 5% by a small holding farmers grouping one of the few groups of black farmers who have historically held private land title within the Former Ciskei homeland. All in all the project will benefit the area in terms of: Job creation Socio-Economic development from electricity sale revenue contributions (CSI funds) to communities within a 50km radius to the project site Community development (Trust dividends) Procurement 12

Thank you Please visit www.innowind.com 13