arxiv: v1 [physics.ins-det] 1 Jul 2014

Similar documents
BIS MDT assembly manual

The g-2 Project at FNAL. Horst Friedsam John Kyle IWAA 2014 at Beijing October 2014

Straw Detectors for the Large Hadron Collider. Dirk Wiedner

Module design and development for LHCb VELO Upgrade Project

SciFi. Forum on Tracking Detector Mechanics R. Walet. on behalf of the SciFi Tracker Group Rev_06

RPC Upgrade for the CMS experiment

Development of low-mass, high-density, hybrid circuit for the silicon microstrip sensors in high track density environment

The Phase-2 Upgrade of the Silicon Strip Tracker of the ATLAS experiment

Large Area and Fine Pitch testing using Silicon Micro-cantilever

RPCs for an atmospheric neutrino experiment

The LHCb experiment. The LHCb experiment. dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges:

LHCb Silicon Tracker & Testbeam Data Analysis

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

Production and high voltage testing of the LZ detector grids

The ATLAS Detector at the Large Hadron Collider. Peter Krieger IPP/University of Toronto

Cooling Tests of the NectarCAM camera for the Cherenkov Telescope Array

The H1 Silicon Tracker. Benno List

600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS

CBM Engineering. Mechanical Concept, design and prototyping of the STS for the CBM Experiment at FAIR

CHAPTER 3 PROBLEM DEFINITION

Cooling Tests of the NectarCAM camera for the Cherenkov Telescope Array

Created: 4/23/2003 Page: 1 of 12. Abstract

PETRA III Damping Sections

Figure 1 Linear Output Hall Effect Transducer (LOHET TM )

A Study of EGR Stratification in an Engine Cylinder

LAPPING OR GRINDING? WHICH TECHNOLOGY IS THE RIGHT CHOICE IN THE AGE OF INDUSTRY 4.0?

Girder Alignment Plan

Analysis and control of vehicle steering wheel angular vibrations

The ITk strips tracker for the phase-ii upgrade of the ATLAS detector of the HL-LHC

Pendulum valve control system Series 65

Nikhef VELO module measurement results

More Precision. mainsensor Magneto-inductive displacement sensor

Study of intake manifold for Universiti Malaysia Perlis automotive racing team formula student race car

Quality control considerations for the development of the front end hybrid circuits for the CMS Outer Tracker upgrade

Extremely High Load Capacity Tapered Roller Bearings

Accelerated Testing of Advanced Battery Technologies in PHEV Applications

VACUUM FOR PARTICLE ACCELERATORS LUND, SWEDEN, JUNE 8 9, 2017 MECHANICAL VACUUM PUMPS

Analysis of Spur Gear Box Using Software tool Ansys

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

Microgrid solutions Delivering resilient power anywhere at any time

Simulating Rotary Draw Bending and Tube Hydroforming

THE APACHE INTELLIGENT PIGGING PROJECT

DAVINCH Lite Chamber Design By Analysis and Full-Scale Testing CWD 2014 London, United Kingdom June 4-6, 2014

Powering Schemes for the Strip Trackers

[Rao, 4(7): July, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785

Bearing retention and clearances

Table 4 Magnet Parameters mm

SBS Update Mark Jones

ITER Magnets Update European perspective

Recent Cooling Tests on the Pixel Staves and Real Scale Circuits

CFD ANALYSIS ON LOUVERED FIN

SKF Explorer angular contact ball bearings. Designed to run faster, cooler, smoother, longer

Magnet, Support and Infrastructure. Whit Seay November 7, 2014

Internal Combustion Optical Sensor (ICOS)

EXAMINATION OF NOZZLE INNER RADIUS AND PIPING FROM THE OUTER SURFACE

Powering Schemes for the Strip Trackers

Bearing Handling. 15. Bearing Handling Bearing storage Installation

Thermal Characterization and Modeling: a key part of the total packaging solution. Dr. Roger Emigh STATS ChipPAC Tempe, AZ

Saab Avitronics THE CHALLENGES OF DEVELOPING A COMINT DF AND MONITORING ANTENNA FOR THE HIGH PRESSURE ENVIRONMENT OF SUBMARINE OPERATIONS

Combustion Equipment. Combustion equipment for. Solid fuels Liquid fuels Gaseous fuels

MODELS FOR THE DYNAMIC ANALYSIS OF THE SUSPENSION SYSTEM OF THE VEHICLES REAR AXLE

Evaluation of sealing performance of metal. CRIEPI (Central Research Institute of Electric Power Industry)

Guideline No.M-10(201510) M-10 Marine Diesel Engine Fuel Injection Pump

The Deployable Gage Restraint Measurement System - Description and Operational Performance

LOW SHOCK RELEASE UNIT EASY RESETTABLE AND 100 % REUSABLE. Jens Müller 1, Christoph Zauner 2

Propeller Blade Bearings for Aircraft Open Rotor Engine

INFLUENCE OF TEMPERATURE ON THE PERFORMANCE TOOTHED BELTS BINDER MAGNETIC

Transient Thermal Analysis of Screw Compressors, Part III: Transient Thermal Analysis of a Screw Compressor to Determine Rotor-to-Rotor Clearances

Linear Servo Motor Driven

Design and Analysis of Hydrostatic Bearing Slide Used Linear Motor Direct-drive. Guoan Hou 1, a, Tao Sun 1,b

CHAPTER 3 DESIGN OF THE LIMITED ANGLE BRUSHLESS TORQUE MOTOR

DESCRIPTION OF THE DELPHI SUBCRITICAL ASSEMBLY AT DELFT UNIVERSITY OF TECHNOLOGY

ABB FACTS Customer Service. FACTS Care Upgrades

AVL PLU 131U FLOW METER

ENGINEERING CAPABILITIES

RENOVATION OF NMIJ'S 5 MN HYDRAULIC AMPLIFICATION TYPE FORCE STANDARD MACHINE

Wind Turbine Testing

SLEWING RING CHARACTERISTICS, APPLICATIONS

Optimization of Seat Displacement and Settling Time of Quarter Car Model Vehicle Dynamic System Subjected to Speed Bump

Reliability is our profession

Model Comparison with Experiments. 341 N. Science Park Road State College, PA U.S.A.

ALS20000 Series. Mechanical Bearing, Linear Motor Stage. Protective metal waycover. Integral cable management system

Note on preliminary cost estimate for an integrated tracker for the STAR experiment at RHIC

Institut für Thermische Strömungsmaschinen. PDA Measurements of the Stationary Reacting Flow

MIKLOS Cristina Carmen, MIKLOS Imre Zsolt UNIVERSITY POLITEHNICA TIMISOARA FACULTY OF ENGINEERING HUNEDOARA ABSTRACT:

LINEAR MOTION CONTROL

Available online at ScienceDirect. Procedia CIRP 33 (2015 )

15. Bearing Handling Storage Fitting A-97

Electron Beam Alignment Strategy in the LCLS Undulators

Recent progress on R&D toward Neutral Beam Injector for ITER and JT-60SA

Grooved gaskets. Types of gaskets

Circumstances affecting the protection against electrode potential rise (EPR)

Investigation of Potential Mitigation of Driver Injury in Heavy Truck Frontal and Rollover Crashes

Micropulse Transducers Applications

ROTATABLE CLAMP FOR BALLISTIC TESTING OF FABRIC

Autoweigh Feeder Series 600. A New Generation of Weigh Feeders

Verifying the accuracy of involute gear measuring machines R.C. Frazer and J. Hu Design Unit, Stephenson Building, University ofnewcastle upon Tyne,

LOAD CELL TROUBLESHOOTING

Investigation of a promising method for liquid hydrocarbons spraying

Development of Waterproof Hall IC Torque Sensor

Transcription:

Construction and test of high precision drift-tube (smdt) chambers for the ATLAS muon spectrometer arxiv:1407.085v1 [physics.ins-det] 1 Jul 014 Sebastian NOWAK E-mail: nowak@mppmu.mpg.de Oliver KORTNER E-mail: kortner@mppmu.mpg.de Hubert KROHA E-mail: kroha@mppmu.mpg.de Philipp SCHWEGLER E-mail: philipp.schwegler@cern.ch E-mail: federico.sforza@cern.ch For the upgrade of the ATLAS muon spectrometer in March 014 new muon tracking chambers (smdt) with drift-tubes of 15 mm diameter, half of the value of the standard ATLAS Monitored Drift-Tubes (MDT) chambers, and µm positioning accuracy of the sense wires have been constructed. The new chambers are designed to be fully compatible with the present ATLAS services but, with respect to the previously installed ATLAS MDT chambers, they are assembled in a more compact geometry and they deploy two additional tube layers that provide redundant rack information. The chambers are composed of 8 layers of in total 64 aluminium drift-tubes. The assembly of a chamber is completed within a week. A semi-automatized production line is used for the assembly of the drift-tubes prior to the chamber assembly. The production procedures and the quality control tests of the single components and of the complete chambers will be discussed. The wire position in the completed chambers have been measured by using a coordinate measuring machine. Technology and Instrumentation in Particle Physics 014-6 June, 014 Amsterdam, the Netherlands Speaker. c Copyright owned by the author(s) under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike Licence. http://pos.sissa.it/

1. Introduction This paper describes the production, the quality assurance and the geometry characterization of two new muon tracking chambers constructed at the (MPI, Münich) and designed for the upgrade of the ATLAS Muon Spectrometer (MS) during the 01-014 shutdown of the Large Hadron Collider (LHC) at CERN. The ATLAS MS is immersed in a toroidal magnetic field and it is instrumented almost completely with three stations (Inner, Medium, and Outer) of Monitored Drift-Tube (MDT) chambers for precision tracking in the bending plane of the traversing charged particles. The new chambers are designed to improve the -station coverage of the MS in the so-called BME region where two elevator shafts, used for the access to the inner part of the ATLAS detector, limit the MDT tracking stations to only two. The momentum resolution of simulated 1 TeV muons passing trough the BME region would be improved by about 50% thanks to the additional chambers. Figure 1 shows a schematic view of the chambers designed for the BME upgrade. With respect to the MDT chambers currently instrumenting the ATLAS MS, the newly produced chambers (also named smdt) are characterized by a technology using small drift-tubes, with diameter one half of the standard 0 mm diameter drift-tubes used for the ATLAS MDT chambers. This allows a factor higher tolerance to γ and neutron backgrounds [1], redundant track information, and a compact design suitable for the upgrade of the hard-to-access MS regions. At the same time the smdt chambers, operated with a voltage of 70 V on the anode wire and with a gas mixture Ar:CO (9:7) at bar pressure, are fully compatible with the present services and electronics. Figure 1: Schematic view of a new Monitored Drift Tube (MDT) chamber designed for upgrade of the ATLAS MS during the 01-014 LHC shutdown. The chamber uses 64 drift-tubes of 15 mm diameter arranged in multi-layers sustained by an aluminum spacer frame. Each multi-layer is composed by 4 layers of 78 drift-tubes. The chambers themselves are build by 64 aluminum,. m long, drift-tubes arranged in two multi-layers each composed by 4 layers of 78 tubes, for a total width of 1. m. The quality assurance and the precision assembly of so many individual components are two of the main

challenges of the smdt production. The two multi-layers are sustained by an aluminum spacer frame equipped with four RasNiK [] optical alignment lines to monitor deformations with a few micron precision. Rail supports are mounted on the frame to allow the sliding of the chamber from the parking position, that still allows the access to the elevator shaft area, to the data-taking position. During data taking, precision alignment platforms mounted on the chamber allow a nominal positioning accuracy of 0 µm with respect to the rest of the ATLAS MS.. Tube Production and Quality Assurance Each drift-tube is a multi-component device [] that must be assembled and tested for tight quality criteria. In particular, each tube must satisfy to three important requirements: correct crimping and tensioning (with tension of.5±0.15 N) of the anode wire to ensure uniformity and centrality of the wires in the aluminum tubes, low leakage current (< 1 na) to ensure noise rates below threshold, and gas pressure tightness (leak rate 0.4 < 8 bar L/s) to avoid changes in the drift properties of the gas. The drift-tube assembly and checks are performed in clean environment using a production line composed by two semi-automated wiring and testing stations. The values resulting from the tests, associated to the bar-code identifier of each drift-tube, are stored in an MySQL database. Figure shows the results of the quality assurance checks on the last 111 drift-tubes produced. Each tube not passing the requirements is discarded. The leak current test failure rate of approximately 6.5% can be improved by more strict requirements on the handling and storing of the not tested drifttubes. At regime and operated by three persons, the current setup has a production and test capability of 50 60 drift-tubes per day.. High Precision Chamber Assembly The ATLAS experiment requires the wire positions to be known with an uncertainty of 0 µm to ensure optimal tracking resolution performance of the chamber. To achieve such precision goal two jigging, each composed by five metal blocks with pin supports and precision surfaces, are mounted on a very stable granite table and are used to sustain the drift-tubes on the two sides (named North side, and South side) and glue them in position. The precision surfaces have been machined with an accuracy of 15 µm and the pin supports ensure the positioning of the wires as these are tensed at the center of a micron-precise cylindrical brass end-plug. The complete assembly of a smdt chamber is performed in five working days with the help of a programmable gluing machine: on day 1 the first two layers of 78 drift-tubes are positioned and glued; on day the first multi-layer is completed with other two drift-tube layers and from the jigging; on day the first two layers of the second multi-layer are positioned and glued; on day 4 the second multilayer is completed and a dry-test of the frame support positioning is performed to check the optical alignment lines mounted on the frame; on day 5 the frame support is glued to the second multilayer that is still in position and the first multilayer is glued on the top. The assembly procedure is critical because no repairs are possible after the gluing of the multilayers. To achieve the maximal precision and reliability the metal plates of the jigging are inspected

70 60 50 40 i.o. (40 < tension < 70 g), total = 11 Not i.o., total bad = 11 0 0 0 80 00 0 40 60 80 Wire tension [g] i.o. (gas leak < 4 e-09 barl/s), total = 10 Not i.o., total bad = 1 i.o. (current leak < na), total = 40 Not i.o., total bad = 7 1 1-9 -8-7 -6 Gas leak-rate [ mbar s L ] -1 1 Current [na] Figure : Result of the quality assurance checks performed on the last 111 drift-tubes produced for the construction of. The upper plot shows the anode wire tension force, the optimal value of.5±0.15 N has been increased to account for 0.05 to 0.07 N relaxation of the wire observed in the days after the crimping. The lower left plot shows gas leak rate of the tested tube when injected with bar pressure of Ar:CO (9:7) gas. The bottom right plot shows the measured leakage current for the drift tube under pressure and for an anode voltage set to 015 V. before every step and the parameters of each drift-tube are checked in the database before positioning. The successive steps in the chamber construction are the gas distribution and electronic system montage. These phases are less critical because repair and substitution of defective components can be done also at later stage, however the procedure may be time consuming because of the high number of components to be connected and tested. 4. Evaluation of Chamber Geometry and Precision After the chamber assembly but before the gas distribution system montage, the geometry of the chamber is tested with a D Coordinate Measuring Machine (CMM) used to measure the wire positions, through the brass end-plugs, with a precision below 5µm. The wire position measurements are used to characterize the chamber geometry with a wiregrid for the North and for the South sides. Five parameters 1 describe the wire-grid for each side: two wire pitches (z pitch and y pitch along y and z), the z displacement of even layers with respect to the odd ones (z odd/even), the z and y distance between the two multi-layers (z ML and y ML). 1 According to the ATLAS reference system the x coordinate is defined in the direction of the drift-tube wires, the y coordinate is vertical and growing with the drift-tube layer count, and the z coordinate is along the single drift-tube layer. 4

These are extracted from the CMM measurements with a minimum χ fit, then the single z and y positions of the wires are compared to the fitted grid values and the standard-deviations, σ z and σ y, of an iterative Gaussian fit of the distribution is used to evaluate the geometrical precision of chamber. Table 1 shows the geometrical characterization of the two smdt chambers BME-A and BME-C produced for the BME upgrade (they are named according to the ATLAS MS installation side). par. [mm] BME-A N. BME-C N. Nominal N. BME-A S. BME-C S. Nominal S. z pitch 15.09950±(1 5 ) 15.0990±(1 5 ) 15.0 15.09900±(1 5 ) 15.09880±(1 5 ) 15.0 y pitch 1.0956±(1 4 ) 1.097±(1 4 ) 1.095 1.0857±(1 4 ) 1.0851±(1 4 ) 1.085 z odd/even 7.559±( 4 ) 7.5511±( 4 ) 7.550 7.5509±( 4 ) 7.5461±( 4 ) 7.550 z ML 0.0089±( 4 ) -0.007±( 4 ) 0 0.08±( 4 ) 0.0095±( 4 ) 0 y ML 15.417±(5 4 ) 15.56±(5 4 ) 15.47 15.815±(5 4 ) 15.996±(5 4 ) 15.71 σ z 6 6 0 7 7 0 σ y 1 1 0 8 8 0 Table 1: Parameters describing the wire-grid of the North (N.) and South (S.) side of the constructed smdt chambers. Parameters are derived from a minimum χ fit of the wire position measurements obtained with a D CMM. The σ z and σ y parameters, used to evaluate the precision of the chamber geometry, are extracted from an iterative Gaussian fit of the distribution of the residuals of the z and y wire coordinates with respect to the wire-grid. Using the described geometry parametrization of the chambers we obtain a construction precision well below the stringent requirement of 0 µm. The two newly constructed smdt chambers result as the most precise produced chambers of this size. 5. Conclusions Two precision MDT chambers using small (15 mm ) drift-tube technology have been developed and produced at MPI, in Munich, for the upgrade of the ATLAS MS during the 01-014 shutdown of the LHC at CERN. The smdt chamber production line consists of drift-tube production and quality testing stations with a capacity of 50 drift-tube a day, and an area for the precision assembly and gluing of the chambers. The current setup of the production line can be used for future upgrades of the ATLAS MS using the smdt technology. The geometry of the newly produced chambers has been evaluated with D coordinate measuring machine revealing a construction precision of approximately µm resulting in the most precise MDT chambers of these dimension ever produced. References [1] B. Bitter et al., Performance of drift-tube detectors at high counting rates for high-luminosity LHC upgrades, NIM A 7 (01), p05. [] H. van der Graf et al., RasNiK, an Alignement System for the ATLAS MDT Barrel Muon Chambers - Technical System Description, Apr. 000, NIKEHF/ET81. [] B. Bitter et al., Development offast high-resolution muon drift-tube detectors for high counting rates, NIM A (011), p 154. 5