RIGID PENDANT. Phoenix Pipeline Products Limited. Installation, Operation and Maintenance Manual

Similar documents
FLEXIBLE PENDANTS with Axis MEDICAL GAS TERMINAL UNITS

Axis MEDICAL GAS TERMINAL UNITS

PRECISION UK Ltd. Medical Gas Outlet BS Standard

Axis AGSS TERMINAL UNITS

PRECISION UK Ltd DUPLEX AGSS PLANT

Installation and Maintenance Manual. Medical Gas Outlet. British Standard Compatible

Installation and Maintenance Manual. Medical Gas Outlet. British Standard Slim Style Compatible

THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions

(UK) Date : January 2014

Technical Datasheet. SP Terminal Units. Classification. Services. Terminal Block. Check Valve Assembly. Tailpipe Options

THERMOSTATIC CONCENTRIC DUAL CONTROL SHOWER VALVES Installation & aftercare instructions

Navigator 550 Sodium wet-section

3 Ton Trolley Jack. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference.

Navigator ADS551 Low level dissolved oxygen Replacement / Upgrade procedures wet section spares

VANDAL RESISTANT FITTINGS VR105, VR125, VR145 (VR106, VR115 Export only) PRODUCT MANUAL IMPORTANT

Servicing Instructions

Warning. Document ref: A October 2015

KD1E Range Potential Indicators

1901 Thermostatic Shower Mixer

Quickdraw. Model 2400 Series. Operating Instructions & Maintenance Manual. Clearing The Airway Is Our #1 Priority


Installation, Care and Maintenance Instructions. Optiflush OP1 Battery and OP2 Mains Versions

BATH FILLER & BATH / SHOWER MIXER Installation & aftercare instructions

RELAY BOX PRODUCT MANUAL IMPORTANT

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

FABER BURNER ROUTINE MAINTENANCE

Oxford /Hoyer. Professional Series. Presence Lift SERVICE MANUAL Rev B

HILLSTONE DC LOAD BANK

Technical Specification

Guidance to Installers of Viridian EV Charging Stations

Installation & aftercare instructions

DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS

Zip FlushMaster Surface mounted sensor

ORIGINAL INSTRUCTIONS

Installation, operation and maintenance manual

ROM Series. Keeping the World Flowing. Installation Manual. Valve Actuators

GMR-S and GMR40-S Disc Brake Caliper - Spring Applied, Air Released

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR T40 Mk. 2 DISC BRAKE CALIPER M1492

Infrared Control Valve Installation Guide

VR2-CC VR2-RS VR2-ES PRODUCT MANUAL

Zenith Aqua Sense Taps

Accessory Fitting Instructions

LNG Screw Down Non-Return Valve Installation, Operation and Maintenance Manual

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

INSTALLATION, OPERATION & MAINTENANCE INSTRATIONS

250L Cartridge Dual Seal

The EFL 2000/1 & 2 User Guide Test Sieve Shaker. Contents

Model 2310 Series. Operating Instructions & Maintenance Manual. Clearing The Airway Is Our #1 Priority

QA4 Surgery Trolley System Manual Function Operating Instructions

HR25 Solo. Installation and User Instructions. Through the Wall Heat Recovery Ventilators

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Maintenance and Service Instruction

SERIES G3DB/AG3DB ELEVATOR

Rental Industry Safety Tester Safe Check 5s

PN9000 Series Pneumatic Actuators Installation and Maintenance Instructions

MARTINDALE INSTRUCTIONS ELITE FUSE FINDER KIT ELECTRIC. Trusted by professionals. 4.4 Storage Conditions

2 Ton - 50 Ton Bottle Jack

Authorised By: Health and Safety Committee TITLE : ELECTRICAL SAFETY GUIDELINES IN-STORE DISPLAYS

DB4604 GMR-SD and GMR40-SD Disc Brake Caliper - Spring Applied, Air Released

English. Fitting Instructions: Trophy and Trophy SE A and A of 10 A Parts Supplied:

AP50 MANUAL AND PARTS LIST VERSA-MATIC PUMP. Service / Maintenance Log SUBMERSIBLE CENTRIFUGAL PUMP. Contact Information. Date Details Completed

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

HYDRAULIC QUICK HITCH

VANDAL RESISTANT FITTINGS VR105, VR125, VR145 (VR106, VR115 Export only) PRODUCT MANUAL IMPORTANT

Operating, Safety. Maintenance Manual. for. Roller Shutter & Sectional. Overhead Doors

Infrared Control Valve Installation Guide

Condor Manual. Corporation

To the Fitter: Ensure all relevant personnel read the points listed below and that a copy is passed on to the end user.

Aerocourse Fan Assisted Trench Heating

Index. 1. Important safety instructions Overview of the lift Installation instructions Operation instructions 8-9

12v / 24v Diesel Transfer Pump Kit

HEAVY DUTY TROLLEY JACK. Operation Manual

Installation, Operating, Maintenance and Safety Instructions for CW332 Pressurised water system for boats 24 volt d.c.

HYDRAULIC BENDER VZ1536

Fitting Instructions: Street Triple from VIN and Street Triple R from VIN A

6722 Rev. A CAPACITY: 22 TON TRUCK AXLE JACK WITH AIR RETURN

200 Series Flow Meters

INSTRUCTION MANUAL MARTINDALE CM52 CLAMP METER. ELECTRIC Trusted by professionals. Other products from Martindale:

TOUCH-ACTIVATED DUAL FLUSH WC FLUSHING SYSTEM - FRONT ACCESS

SELF PRIMING CHEMICAL SERVICE PUMPS

PNEUTORQUE PTM, PTME & TRUKTORQUE TM SERIES STALL TOOLS

Instruction Manual PC104/PC105 3-PHASE SOCKET TESTER. Check out what else you can get from Martindale:

4 shelf wide bookcase

Gas Actuated Valve Supplement

OPERATION MANUAL HARVEST ROYAL

3.25 Ton Heavy Duty Floor Jack

EXOTHERMIC CUTTING EQUIPMENT

OPERATION MANUAL HARVEST CAVALIER

Airfield Industrial Estate Hixon Staffordshire ST18 0PF

GREEN & GREEN 1000 ELECTRONIC LAVATORY FAUCET. InstallatIon and maintenance guide

IRC Urinal Flush Control Valve

G SERIES - E TOUCH MIXER / TAP

GPS AutoSteer System Installation Manual

CPX DUPLEX MEDICAL VACUUM PLANT INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

DC Master 24/ A

PART NUMBER: C (Gun Metal Grey Finish) P (Vacuum Metalized Chrome - VMC)

The Powermatic User Guide Test Sieve Shaker

Installation, Operation, and Maintenance Manual

SM64052 Maintenance & Repair Manual Commercial 2" Unisex Coupling - Valved Model 64052

Your Guide to the Installation, Care and maintenance of PERFORMA. Electronic Self Closing Fittings - Mains Powered 886V (343029) 885V (343027)

Transcription:

RIGID PENDANT Phoenix Pipeline Products Limited. Unit 8, McKenzie Industrial Park, Tel No.: 44 (0) 161 428 7200 Bird Hall Lane, Fax No.: 44 (0) 161 428 7010 Stockport, Email: info@p3-phoenix.com U.K., SK3 0SB www.p3-phoenix.com

Contents Page Section Page Product Description General 3 1 st Fix 3 2 nd Fix 3 Hoses 3 Terminal Units 3 Operation General 3 Probe Connection/Disconnection 3 Electrical/Data Sockets 3 Safety General 4 Installation General 4 Assembly 4 Testing General 4 First Fix Testing 5 Second Fix Testing 5 Electrical Testing 5 Commissioning 5 Maintenance General 5 Preventative Maintenance 6 First Fix Hex NIST Check Valve Assembly 6 NIST Hose Assembly 6 Terminal Unit First Fix Assembly 7 Terminal Unit Check Valve Assembly 7 Spare Parts Lists Gas Specific Components 8 General Components 8 Drawings First Fix Plate 9 Fixed Pendant Assembly 10 Typical Electrical Wiring Diagram 11-2 -

1. Product Description 1.1 General Rigid Pendants comprise a first fix assembly and second fix pendant assembly complete with customer specified electrical sockets, data outlets, hose assemblies and medical gas terminal units. 1.2 1 st Fix Assembly The 1 st Fix comprises a 6mm thick Flat steel plate into which are mounted the 1 st fix Hex NIST connectors. This assembly is secured to a supporting structure (not supplied) at false ceiling height. The 1 st fix Hex NIST connectors incorporate a maintenance valve which will automatically shut off the gas supply if the Hose is removed whilst the pipeline system is under pressure. All Hex NIST connectors are supplied with a blank nut as standard. 1.3 2 nd Fix Pendant Assembly 1.4 Hoses The Second Fix Pendant Assembly consists of a fabricated, white epoxy powder coated shell. Within the second fix, the customer specific electrical sockets, data outlets and the medical gas terminal units are fitted. Hose Assemblies fully comply with BS EN 739. 1.5 Terminal Units Medical gas terminal units comply with BS EN 737-1. Terminal units for AGSS comply with BS 6834. 2. Operation 2.1 General Each terminal unit is gas specific and will only accept the appropriate BS probe ensuring that a probe for one service cannot be inserted into a terminal unit for another service. It is important that only probes conforming to BS 5682 are used. The probe should be inserted so that the cutout in the indexing collar is uppermost. This cut-out aligns with an anti-swivel pin incorporated into the second fix assembly which prevents the probe from rotating. This ensures that equipment such as flowmeters remain vertical when plugged directly into the terminal unit. Pendant mounted terminal units do not incorporate an anti-swivel pin as it is not necessary to restrict probe orientation. 2.2 Probe Connection/Disconnection To connect, the appropriate probe is pushed firmly into the second fix until it engages. This action opens the check valve and allows gas to flow. To disconnect, the probe should be held and the front of the second fix pushed forward. This action releases the probe. When the probe is removed, the check valve closes providing a gas tight seal. 2.3 Electrical/Data Sockets Please refer to the relevant manufacturers instructions for use and maintenance. - 3 -

3. Safety 3.1 General This equipment should be installed, operated and maintained by personnel who are suitably trained, are fully conversant with HTM 2022 & BS EN 737 and are familiar with this product. This equipment should be kept clean and be free from oil and grease at all times. Oil and grease will ignite spontaneously in the presence of oxygen If you suspect that any equipment is contaminated, do not use it. No attempt should be made to use or modify this equipment for use with a gas other than as identified. This equipment should not be operated at pressures exceeding those stated in HTM 2022 and BS EN 737. 4. Installation 4.1 General Rigid Pendants should be ideally mounted with the terminal units at a height of 2000mm above finished floor level. 4.2 Assembly 1. Determine the required position of the Rigid Pendant, fabricate a spacing structure which is secured to the slab and finish level with false ceiling. Secure the first fix assembly using suitable fixings ensuring that the assembly is square and plumb. 2. A fused spur must be provided for the ring main for each mains power circuit in the pendant. 3. Braze the 1 st Fix Hex NIST connectors to the fixed pipeline system ensuring that each NIST is brazed to the appropriate service. If the joint to be brazed is close to the NIST body, remove the internal components during the brazing operation. 4. Fit the blank nut to the Hex NIST connectors and pressure test the pipeline system. 5. Upon satisfactory completion of the pressure test, the ceiling can be finished. 6. When the ceiling is finished, remove the blank nuts and fit the 2 nd Fix Column to the fist fix plate, connect the hoses and make any electrical connections. Check the column is plumb and at the correct height, adjust as necessary. Ensure that NIST nuts are fully tightened (do not over-tighten) and test all electrical connections. 7. Fit the Cowl, pressure test and purge the pipeline system. 8. Fit Danger Do Not Use label as required. 5. Testing 5.1 General All terminal units should be pressure tested once incorporated into the fixed pipeline system. The testing is split into two phases as detailed below. The second phase of testing can only be carried out when the first phase has been deemed satisfactory and accepted. - 4 -

5.2 First Fix Testing This pressure test is carried out when the first fix installation has been completed. Do not Test at the pressures with hoses i.e. second fix fitted. The required testing pressures are as stated below or as per the contract specification if different. First fix testing pressures in accordance with HTM 2022 are; (a) 10 barg. for compressed medical gas systems. (b) 18 barg. for compressed surgical gas systems. (c) 7 barg. for vacuum systems. First fix pressure tests in accordance with BS EN 737-3 are 1.5 times nominal distribution pressure for compressed gas systems and 500 kpa for vacuum systems. 5.3 Second Fix Testing This pressure test is carried out upon completion of the second (final) fix installation (i.e. hoses and terminal units fitted), with the system pressurised to nominal distribution pressure in accordance with HTM 2022 and BS EN 737. 5.4 Electrical Testing Ensure that all electrical sockets are functioning correctly using the appropriate equipment. 5.4 Commissioning The terminal units must not be used until all testing & commissioning procedures for the pipeline system as detailed in HTM 2022 and/or BS EN 737-3 have been satisfactorily completed and accepted. 6. Maintenance 6.1 General The only maintenance required is to replace parts that will become worn during normal usage, however the use of damaged probes or faulty equipment may require further maintenance to be undertaken. The first fix hex NIST check valve incorporate o rings that will require replacing periodically. The hoses incorporate o rings that will require replacing periodically but otherwise are generally maintenance free and should be replaced if damaged. The terminal unit first fix assembly and check valve assembly incorporate o rings that will require replacing periodically. The terminal unit second fix assembly is generally maintenance free and should be replaced if damaged. The maintenance valve in the terminal unit first fix assembly is designed to prevent the flow of gas during short periods of maintenance. If a second fix assembly is to be removed for a long period, it is recommended that alternative arrangements be made for a more secure seal. Should the any of the external surfaces of the pendant require cleaning, we recommend that this be carried out using a damp cloth along with a mild soap solution if required. Do not use abrasive or solvent based cleaning solutions. Do not let any liquid enter the terminal unit s. - 5 -

6.2 Preventative Maintenance Regular inspections and maintenance of the pendant will prolong its life and reduce the possibility of sudden, inconvenient component failures. Pendants should be subjected to regular inspection and testing as detailed below. Monthly; (a) Visually inspect the hoses for signs of abrasion and damage. (b) Visually inspect the terminal unit for signs of damage. (c) Check the TU second fix assembly operates freely. (d) Any reluctance in the operation of the second fix should result in the removal of the unit for closer inspection/repair/replacement as necessary. Annually; (a) Remove ceiling cowl and clean any debris from the fist fix. (b) Remove hoses and replace NIST Nipple o rings. (c) Remove check valve from first fix hex NIST and replace o ring. (d) Remove terminal unit second fix assembly and replace the terminal unit first fix o rings. (e) Remove second fix assembly and replace check valve assembly. (f) Test second fix for correct operation (connection and disconnection of probe) using a blank probe. (g) Check that all electrical sockets are working correctly. 6.3 P3 First Fix Hex Nist Check Valve Assembly To replace the o rings in the first fix assembly; 1. Isolate the gas supply to the terminal unit via the AVSU or line valve. 2. Undo the two screws and remove the ceiling cowl. 3. Remove the NIST hose. 4. Remove the Plunger from within the NIST body using a 6mm parallel tipped flat point screwdriver, taking care not to mark any of the surfaces within the NIST. Note: There is no Check valve in vacuum and AGSS first fix hex NISTS. 5. Remove the o rings from the plunger taking care not to damage the groove. 6. Fit a new o ring into the groove. 7. Refit the plunger. 8. Reconnect the NIST hoses and terminal units. 9. Turn on the gas supply and check for leaks. 10. Ref-fit the ceiling cowl. 6.4 NIST Hose Assembly To replace the o ring in the NIST Hose Assembly; 1. Remove the ceiling cowl. 2. Remove the NIST hose (first fix NIST end First!). Note: The first fix NIST check valve will restrict the gas flow. On vacuum and AGSS hoses, fit a blank nut if the system is under vacuum. 3. Remove the o rings from the NIST nipple taking care not to damage the groove. 4. Fit a new o ring into the groove. - 6 -

5. Check the entire length of the hose for any signs of abrasion / damage, replace if required. 6. Reconnect the NIST hoses and terminal units. 7. Turn on the gas supply and check for leaks. 6.5 P3 Terminal Unit First Fix Assembly To replace the o rings in the first fix assembly; 1. Remove the ceiling cowl. 2. Remove the NIST hose (first fix NIST end First!). Note: The first fix NIST check valve will restrict the gas flow. On vacuum hoses, place fit a blank nut if the system is under vacuum. 3. Remove the two Allen head screw that secure the second fix assembly to the first fix assembly. 4. Remove the second fix assembly and check valve assembly and place on one side. 5. Remove the o rings from inside the brass block taking care not to damage the grooves. 6. Fit new o rings into the grooves after checking that the maintenance valve is in place and the right way round. Note: There is no maintenance valve in vacuum terminal units. 7. Place the check valve assembly and second fix assembly in position. Fully tighten the two Allen head screws, alternating between the two, screwing them in a few turns at a time. 8. Turn on the gas supply and check for leaks. 6.6 P3 Terminal Unit Check Valve Assembly To replace the check valve assembly; 1. Remove the two Allen head screw that secure the second fix assembly to the first fix assembly. 2. Remove the second fix assembly and check valve assembly. 3. Discard the check valve assembly and place the second fix assembly on one side. Note: The maintenance valve will restrict the gas flow. On vacuum terminal units, place a blank disc over the inlet if the system is under vacuum. 4. Insert a new replacement check valve assembly into the first fix block and re-fit the second fix assembly. Fully tighten the two Allen head screws, alternating between the two, screwing them in a few turns at a time. 5. Test second fix for correct operation (connection and disconnection of probe) using a blank probe. 7. Spare Parts Lists When ordering spare parts, please use the following component descriptions and part numbers to ensure that you receive the component that you require! Please advise the length of the pendant to enable confirmation of the hose assembly length. - 7 -

7.1 Gas Specific Components Gas 1 st Fix Hex NIST Connector Hose Assembly, Str.NB, StrNN&N P3 Pendant Terminal Unit P3 TU 2 nd Fix Check Valve P3 TU 2 nd Fix Assy Oxygen 1-19000-01 1-63000-01 1-03000-01 1-09090-09 1-09080-01 N2O 1-19001-02 1-63001-02 1-03001-02 1-09090-09 1-09081-02 50% O2/50% N2O 1-19002-03 1-63002-03 1-03002-03 1-09090-09 1-09082-03 7.2 General Components Item No. MA4 1-19003-04 1-63003-04 1-03003-04 1-09090-09 1-09083-04 SA7 1-19004-05 1-63004-05 1-03004-05 1-09090-09 1-09084-05 Vacuum 1-19005-06 1-63005-06 1-03005-06 1-09090-09 1-09085-06 AGSS 1-19006-07 1-63006-07 1-03006-07-1-09086-07 Description Part Number 1 P3 Pendant Terminal Unit Refer to 7.1 2 P3 TU Second Fix Assembly Refer to 7.1 3 Hose Assembly, Straight NIST Body, Straight NIST Nut & Nipple. Refer to 7.1 4 First Fix Hex NIST Connector Refer to 7.1 5 P3 TU Check Valve Assembly 1-09090-09 6 P3 TU Maintenance Valve 1-09105-09 7 NIST Nipple O Ring 1-63900-09 8 P3 AGSS NIST Nipple O Ring 1-63901-07 9 P3 NIST Check Valve O Ring 1-63799-09 10 P3 TU First Fix O Ring 1-09106-09 11 P3 TU First Fix Test Plug 1-09104-09 12 Twin 13A Unswitched Electrical Socket 1-58105-09 Due to our policy of continuous product improvement, Phoenix Pipeline Products Ltd. reserve the right to alter dimensions and/or specification without notice although every effort will be made to advise of any such modifications. Certain aspects of P³ Ltd. designs are protected. - 8 -