WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

Similar documents
Public Information Workshop

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Rolling Road (Route 638) Widening Project

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Business Advisory Committee. November 3, 2015

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Basic Project Information

ACTION TRANSMITTAL No

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

DRAFT Subject to modifications

APPENDIX A INTENT-TO-STUDY LETTER

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Conventional Approach

AASHTO Policy on Geometric Design of Highways and Streets

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Summary of the Alcoa Highway Redevelopment Project

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Project Working Group Meeting #5

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Proposed Project I 35 Improvements from SH 195 to I 10

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Wentzville Parkway South Phase 2 & 2A

Railroad Impact Study

STATE LOOP 195 PUBLIC MEETING. Footer Text

West Broadway Reconstruction/LRT Design. March 19, 2015

Business Advisory Committee. July 7, 2015

Committee Report. Transportation Committee. Business Item No

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Dixie Transportation Planning Office

Corridor Management Committee. March 7, 2012

STH 60 Northern Reliever Route Feasibility Study Report

METRO Light Rail Update

CROSSING RAIL PROJECT (P4) RAIL

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

800 Access Control, R/W Use Permits and Drive Design

SC Highway 41 Existing Conditions

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

EXCEPTION TO STANDARDS REPORT

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

CR 510/85 Street from CR 512 to 58 Avenue

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

ITEM 13 - NOTICE May 20, 2009

3/16/2016. How Our Cities Can Plan for Driverless Cars April 2016

2.0 Development Driveways. Movin Out June 2017

Restoration of Historic Streetcar Services in Downtown Los Angeles

Traffic Impact Statement (TIS)

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

The Eastern Connector Study November, 2007 planning for the future

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

50TH STREET CONCEPTUAL DESIGN

Harlem Avenue between 63 rd and 65 th

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA)

Lacey Gateway Residential Phase 1

Welcome. Green Line in Your Community

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

Maintaining Pavement Marking Retroreflectivity

ALTERNATIVE PROJECT DELIVERY

Sound Transit East Link: Bus/LRT System Integration Study

Click to edit Master title style

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Appendix 3 Traffic Technical Memorandum

KALAMAZOO AREA TRANSPORTATION STUDY (KATS) CITIZEN ADVISORY COMMITTEE JUNE 6, :00 P.M. KALAMAZOO METRO TRANSIT 530 N. ROSE STREET AGENDA

Denver Metro Association of Realtors

COMMISSION WORKSHOP Tuesday, May 12, :00 a.m. 12:00 p.m.

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

1 Downtown LRT Connector: Draft Concept

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Station Evaluation Summary

ANDERSON PROPERTY SITE ANALYSIS

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Purple Line Functional Master Plan Advisory Group (MPAG)

2017 MAX Program. Red & Blue Line Platform Extension. John Rhone Vice President, Capital Design & Construction June 22, 2017

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Richmond Area MPO Regional Priority Transportation Projects

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

Community Advisory Committee. October 5, 2015

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO

METRO Orange Line BRT American Boulevard Station Options

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Transcription:

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: 424009-3 Public Hearing May 9, 2013

This Public Hearing is being held in accordance with the Federal-aid Highway Act of 1968, amended, 23 USC 128, 40 CFR 1500-1508, 23 CFR 771; Section 339.155, Florida Statute; and Executive Order 11988, Floodplain Management and Executive Order 11990, Protection of Wetlands of the Constitution of the United States of America. This Public Hearing was advertised consistent with the federal and state requirements and is being conducted consistent with the Americans with Disabilities Act of 1990.

This Public Hearing is being held relative to State Project Number 424009-3-28-01. The proposed improvements involve widening SR 363 (Woodville Highway) to four lanes from Capital Circle to Gaile Avenue and providing circulation improvements from Gaile Avenue to Paul Russell Road. In addition to new travel lanes, the improvements will provide for access management measures, pedestrian and bicycle facilities, relocation of the St. Marks Trail within FDOT Rightof-Way, as well as aesthetic improvements.

This project meets the maximum air quality standards established by the U.S. Environmental Protection Agency (EPA).

This hearing is being held to give all interested persons the right to understand the project and comment on their concerns to the Capital Region Transportation Planning Agency and the Florida Department of Transportation. Public participation at this hearing is encouraged and solicited without regard to race, color, creed, religion, sex, age, national origin, disability or family status. This information is also provided in the project brochure and on a sign displayed at this hearing.

TOPICS TO DISCUSS... Project Timeline Review of the Alternatives Considered Presentation of the Recommended Alternative Public Comments

PROJECT TIMELINE Start of Woodville Highway Corridor Master Plan March 2010 PD&E Study Begins May 2011 Public Hearing Today September October 2010 Stakeholder Meetings and 2 day Charrette April 2012 Public Alternatives Meeting Fall 2013 Anticipated FHWA approval of the PD&E

SEGMENT 1 From Capital Circle Southeast to Gaile Avenue Four separate Build alternatives were considered

SEGMENT 1 Alternatives 4-lane Urban Curb & Gutter Typical Section No new ROW needed for the 4-lane roadway Requires ROW for stormwater ponds (locations to be finalized during Design phase) 135 RIGHT-OF-WAY 12 ST. MARKS TRAIL EXTENSION 10 4 12 12 20 12 12 4 9 5 TRAVEL LANE TRAVEL LANE MEDIAN TRAVEL LANE TRAVEL LANE SIDE- WALK

SEGMENT 1 Alternatives 4-lane Rural 3 options (Left, Right, Center) Requires an additional 45-ft of ROW Stormwater management needs addressed in adjacent swales 180 RIGHT-OF-WAY 12 ST. MARKS TRAIL EXTENSION Varies 10-25 Varies 5 12 5 10-25 5 12 TRAVEL LANE TRAVEL LANE 20 MEDIAN 12 TRAVEL LANE 12 TRAVEL LANE SIDE- WALK

POTENTIAL STORMWATER POND LOCATIONS

SEGMENT 1 Alternatives Comparison PD&E Considerations Urban Rural (Left) Rural (Right) Rural (Center) No Build Potential ROW Acquisition (parcels) 0 26 29 55 0 Potential Relocations 0 23 30 37 0 Cultural Resources Impact? No No Yes Yes No Potential Contamination Parcels for ROW 0 2 3 4 0 Total Project Cost $17.8M* $25.1M* $27.6M* $31.6M* $0 * Includes estimated cost for stormwater treatment ponds.

ACCESS MANAGEMENT... involves the careful planning of the location, design, and operation of driveways, median openings, interchanges, and street connections in order to preserve safety and efficiency of the transportation system.

ACCESS MANAGEMENT CHANGE IN SEGMENT 1 The recommended improvements would change the Access Classification in Segment 1 from a Class 4 to a Class 5.

ACCESS MANAGEMENT CHANGE IN SEGMENT 1 Access Management Standards from F.A.C. Rule 14 97 Class Medians Median Openings Signal Connection Current 4 Non Restrictive Proposed 5 Restrictive Full Directional 2,640 at greater than 45 MPH Posted Speed 660 1,320 at 45 MPH or less Posted Speed More than 45 MPH Posted Speed 45 MPH and less Posted Speed 2,640 660 440 2,640 at greater than 45 MPH Posted Speed 1,320 at 45 MPH or less Posted Speed 440 245

SEGMENT 2 Gaile Avenue to Paul Russell Road Two separate Build alternatives proposed

SEGMENT 2 Alternatives Tram + Gaile Extend Tram Road to Crawfordville/Adams and construct additional left-turn lanes on Gaile Avenue

SEGMENT 2 Tram Road Alternatives

SEGMENT 2 Gaile Avenue Alternatives

SEGMENT 2 Alternatives Loop Tram and Gaile improvements with the elimination of a travel lane on Woodville Highway and Crawfordville Road and conversion to one-way traffic flow

SEGMENT 2 Alternatives Loop North End

SEGMENT 2 Alternatives Loop - South End

SEGMENT 2 Alternatives Comparison PD&E Considerations Tram + Gaile Loop No Build Potential ROW Acquisition (parcels) 6 6 0 Potential Relocations 1 1 0 Potential Contamination Parcels for ROW 0 1 0 Avg. System Delay (per user) 2 minutes 19 seconds 2 minutes 2 seconds 2 minutes 24 seconds Total Delay (all users) 47.5 hours 38 hours 48 hours Total Project Cost $6.0M $8.4M $0

RECOMMENDED ALTERNATIVE Build vs. No Build Comparison PD&E Considerations Overall Recommended Alternative No Build Potential ROW Acquisition (parcels) 6 0 Potential Relocations 1 0 Cultural Resources Impact? No No Potential Contamination Parcels for ROW 1 0 2035 Level of Service Meets Standard Does Not Meet Standard Total Project Cost $26.2M $0

ROW ACQUISITION AND RELOCATION On this project, it is anticipated that ROW will be purchased from 6 parcels and will result in the relocation of 1 business. The next phase of the project is Design, and ROW acquisition typically follows the Design phase. FDOT ROW acquisition brochures are available at tonight s meeting.

WHAT S NEXT AFTER TONIGHT? Public Comment Period Now thru May 20, 2013 Type 2 CE submitted to FHWA July 2013 Location Design Concept Acceptance Fall 2013

2 minute break before the Public Comment period begins If you would like to speak, please complete a Speaker s Card.

Public Comments

PD&E STUDY CONTACTS Greg Vaughn Richard Barr, AICP 580 7907 553 3500 greg.vaughn@atkinsglobal.com richard.barr@kimley horn.com Wiatt Bowers, AICP Ryan Wetherell, PE (904) 363 8488 553 3500 wiatt.bowers@atkinsglobal.com ryan.wetherell@kimley horn.com

PUBLIC COMMENTS All comments postmarked by May 20, 2013 will be included in the Public Hearing record. Jack Kostrzewa CRTPA 300 South Adams Street, A-19 Tallahassee, FL 32301 john.kostrzewa@talgov.com

!