THE WAY WE MOVE LRT FOR EVERYONE

Similar documents
Welcome. Metro Line Northwest LRT Expansion Project

1 Downtown LRT Connector: Draft Concept

2015 LRT PASSENGER COUNT. CAPITAL and METRO LINES

2015 LRT STATION ACTIVITY & PASSENGER FLOW SUMMARY REPORT

West LRT Lewis Estates to Downtown Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Branch Edmonton Transit

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Green Line LRT: Beltline Recommendation Frequently Asked Questions

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Attachment 5. High Speed Transit Planning Study REPORT SUMMARY. Prepared by: City of Edmonton Transportation Planning Branch. Stantec Consulting Ltd.

Green Line LRT: Beltline Segment Update April 19, 2017

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION

Welcome. Green Line in Your Community

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

The Engineering Department recommends Council receive this report for information.

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

What We Heard. Edmontonians in communities Northwest of City Centre share their vision of the Metro Line NW LRT Expansion

Transportation Infrastructure Investment Program moving

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Results Report. Downtown to NAIT LRT Station Visioning Workshops Saturday, November 22, 2008 Robbins Health Learning Centre Grant MacEwan College

What We Heard Report - Metro Line NW LRT

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Downtown Transit Connector. Making Transit Work for Rhode Island

Kendall Drive Premium Transit PD&E Study

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

The City of Toronto s Transportation Strategy July 2007

Sales and Use Transportation Tax Implementation Plan

DOWNTOWN LRT FEASIBILITY STUDY

vision42

5. OPPORTUNITIES AND NEXT STEPS

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour

METRO Orange Line BRT American Boulevard Station Options

Waco Rapid Transit Corridor (RTC) Feasibility Study

Rapid Transit and Land-Use Integration a Reality

Key Transfer Stations - Technical Memo

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Halifax Commuter Rail: A Fresh Concept

Develop ground transportation improvements to make the Airport a multi-modal regional

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Needs and Community Characteristics

PROJECT BACKGROUND 3

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

Proposed Program of Interrelated Projects

Maryland Gets to Work

Restoration of Historic Streetcar Services in Downtown Los Angeles

The South Waterfront District and the Portland Aerial Tram

Changes in Direction for LRT Planning in Edmonton J.J. Bakker Department of Civil Engineering, University of Alberta Edmonton, Alberta, Canada

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

West Broadway Transit Study. Community Advisory Committee September 17, 2015

2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION

Restoration of Historic Streetcar Services in Downtown Los Angeles

Mississauga Bus Rapid Transit Preliminary Design Project

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

4 Circulation & Transportation

LRT Almaty, PPP. 23 January 2018, Brussels

August 2, 2010 Public Meeting

WAKE TRANSIT PLAN Summer 2018

Valley Metro: Past, Present and Future. September 11, 2014

GO Transit s deliverable: the 2020 Service Plan

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Click to edit Master title style

Executive Summary. Phase 2 Evaluation Report. Introduction

MetroExpress Improvements

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Capital Metro Downtown Multimodal Station

The Future of Transportation on the Caltrain Corridor

TORONTO TRANSIT COMMISSION REPORT NO.

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

Tempe Streetcar. March 2, 2016

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Troost Corridor Transit Study

Chapter 4 : THEME 2. Transportation

Attachment 5 Eglinton West LRT Planning and Technical Update

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

2.0 Development Driveways. Movin Out June 2017

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

Branch Edmonton Transit

Regional Integration of Public Transit - From the Perspective of a Transit Company. April 2019 Thomas Werner MVG Munich

Public Meeting. June 15, :30 7:30 p.m.

PROPOSAL OF HIGH CAPACITY URBANAUT PUGET SOUND REGIONAL MONORAIL MASTERPLAN WASHINGTON STATE, USA

SERVICE DESIGN GUIDELINES

State Avenue Corridor Bus Rapid Transit (BRT)

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

Draft Results and Open House

WELCOME. Transit Options Amherst - Buffalo Public Workshops

Program Overview. February 2018

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Draft Results and Recommendations

O-Train Confederation Line Stage 1

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Transcription:

THE WAY WE MOVE LRT FOR EVERYONE

2 LRT for Everyone LRT FOR EVERYONE Light rail is about more than transit; it s about transforming Edmonton. As the city grows, so do its transportation needs. LRT is an investment in Edmonton s future: the development of a modern, globally competitive city with a transportation system that meets the needs of a diverse, dynamic and growing population. LRT is reliable, accessible and frequent. LRT is a preferred choice that gets people where they need to go. THE WAY WE MOVE The Way We Move is the City s 30-year transportation master plan to help Edmonton: GO Create sustainable transportation options, such as public transit, that make getting around reliable and accessible. GROW Accommodate a growing city by providing transportation alternatives designed and built for generations of Edmontonians. THRIVE Develop a city that is economically, socially and environmentally sustainable with an integrated transportation system that creates links throughout the city. High-Floor light rail vehicles are used on Edmonton s existing LRT system and will be used on future extensions of the Capital and Metro lines. Low-Floor light rail vehicles adopt a more urban style that does not require a station with a raised platform but only a raised curb. Low-Floor vehicles will be used on the Valley Line LRT.

3 LRT NETWORK PLAN AND PROJECTS Edmonton s LRT Network Plan is a long-term vision to expand the City s LRT to five lines by 2040. Expansion of the LRT network involves changes from the existing suburban-style system to a more urban style, regardless of high-floor or low-floor vehicles. Changes include: most tracks at street level. stations built closer together. some connections between different LRT lines, especially at Churchill Station. reduced speeds through residential areas. LRT in Edmonton will always have dedicated right-of-way but the Valley Line LRT will have some reduced requirements for crossing arms, lights, bells, gates and barriers: Extensions of Edmonton s existing LRT system will pre-empt traffic. LRT has priority at every intersection and requires standard bells, lights, gates, etc. The Valley Line LRT will have traffic priority. Sometimes LRVs will stop at red lights, with fewer bells, lights, gates, etc. The Valley Line LRT will communicate with light signals at some intersections to maximize efficiency of traffic flow and LRT. LRT SYSTEM MAP Existing LRT Line Route approved by City Council Corridor for Future Study PROJECT STAGES Corridor Definition Alignment Definition Preliminary Engineering Detailed Engineering Construction Complete Service Opening Metro Line (Between Downtown & NAIT) 2014 2015 Capital Line (Between Century Park & Ellerslie Road) Capital Line (Between Clareview & Gorman) Valley Line (Between Downtown & Mill Woods) Valley Line (Between Downtown & Lewis Farms) Metro Line (Between NAIT & Northwest Edmonton) Central Area Circulator TBD TBD East LRT (Between Downtown & Sherwood Park) TBD TBD

111 STREET 4 LRT for Everyone CAPITAL LINE HISTORY 1978 Edmonton opens its new LRT line for the Commonwealth Games. The line runs between Belvedere Station to Central Station. 1981 Clareview Station opens. 1983 Bay and Corona stations open. 1989 Grandin/Government Centre Station opens. 1992 University Station opens. It includes a North Saskatchewan River bridge crossing. 2006 Health Sciences Station opens. 2009 McKernan/Belgravia and South Campus/Fort Edmonton Park stations open. CAPITAL LINE LRT Capital LRT Line JASPER AVENUE GRANDIN/ GOVERNMENT CENTRE PARK & RIDE FACILITY CHURCHILL STADIUM UNIVERSITY HEALTH SCIENCES/JUBILEE MCKERNAN/BELGRAVIA SOUTH CAMPUS/ FORT EDMONTON PARK SOUTHGATE N COLISEUM CLAREVIEW BELVEDERE PARK & RIDE FACILITY CENTRAL BAY/ENTERPRISE SQUARE CORONA PARK & RIDE FACILITY NORTH SASKATCHEWAN RIVER 2010 Southgate and Century Park stations open. CENTURY PARK TEMPORARY PARK & RIDE FACILITY FAST FACTS Frequency: peak-hour service every five minutes, 10 15 minutes off-peak. Capacity: 9,600 people per hour per direction using four-car trains on five-minute service. Ridership: 98,144 boardings per weekday. 21 km long. 15 stations. Integrates with buses (transit centres), cyclists (shared-use paths), pedestrians (downtown pedway and sidewalks) and motorists (park-and-ride). Park-and-ride available at Clareview, Belvedere, Stadium and Century Park stations. Operates at a maximum speed of 70 km/hr. Trains run between 5 a.m. and 1:45 a.m. Fully accessible to people with mobility challenges.

5 METRO LINE Street-level, except for 700 m tunnel between Churchill and MacEwan stations. Shared-use path parallel to the LRT. Service opening in 2015. STATIONS MacEwan Surrounded by an outdoor plaza, landscaped green space and intersecting pedestrian walkways. New downtown connection to LRT network. Catalyst for Downtown North Edge development. Convenient access to MacEwan University and Rogers Place. Kingsway/Royal Alexandra Hospital Easy access to Royal Alexandra Hospital and Kingsway Mall. Transit centre, opened in 2014, will help create a major transit hub for northwest Edmonton. Northern Alberta Institute of Technology (NAIT) Easy access to NAIT and Kingsway Mall. Adjacent to Blatchford redevelopment. METRO LINE TO ST. ALBERT The Metro Line LRT to city limits is currently in the concept planning phase. The extension is an integral part of the transit-oriented community planned for the Blatchford redevelopment. It will travel across Blatchford and over Yellowhead Trail towards a future park-and-ride at the northwest city limits. METRO LINE LRT FINANCING Cost: $655 million (includes land purchases and 20 new LRVs). Financing from three orders of government: City of Edmonton, Government of Alberta and Government of Canada. FAST FACTS 3.3 km extension from Churchill Station to NAIT Station. Will ultimately operate between NAIT Station and Health Sciences Station. Expected ridership: 13,200 additional weekday boardings with capacity for growth with extension to St. Albert. Travel time between NAIT and Downtown: 9 minutes. Passengers can change trains downtown to travel northeast to Clareview Station or south to Century Park Station. METRO LINE LRT TO ST. ALBERT

6 LRT for Everyone VALLEY LINE LRT N Existing LRT SE-W LRT MILLBOURNE FAST FACTS The Valley Line LRT is Edmonton s next LRT priority and is expected to be completed in phases starting with the southeast portion of the line. Construction on the first phase between Downtown and Mill Woods is expected to begin in 2016 and be complete by the end of 2020. Funding has been secured for the first phase from all three orders of government: the City of Edmonton, the Government of Alberta and the Government of Canada. Will feature new operations and maintenance facility on southeast portion. Will travel 27 km between Mill Woods Town Centre and the Lewis Farms Transit Centre. Approximately 100,000 daily boardings expected. Will have 25 street-level stops and three elevated stations at Wagner, the Misericordia Hospital and West Edmonton Mall. Passengers will be able to transfer to the existing LRT at Churchill Station. Preliminary engineering was completed in late 2013.

7 Multi-level view of current underground Churchill Station with future Valley Line Churchill stop at street level. WHY IS LRT FOR EVERYONE? As Edmonton grows our transportation needs are outpacing infrastructure capacity. LRT provides a proven, high-quality, high-capacity, efficient and environmentallyfriendly means to move people. HOW LRT IS FOR EVERYONE Increases the availability, reliability, speed and comfort of travel. Links communities and frees people from dependence on single-occupant vehicles. Reduces citizen costs for gas and vehicle maintenance. Environmentally friendly and sustainable.

8 LRT for Everyone TRANSPORTATION: FROM ROADS TO RAILS 660 people (based on existing LRT system design guidelines) = 10 people = 600 cars (based on 1.1 person per vehicle occupancy during peak periods) = 10 cars = One 4-car train FOR FURTHER INFORMATION OR TO COMMENT, PLEASE CONTACT: LRT Projects Information Line 780.496.4874 LRT Projects Email lrtprojects@edmonton.ca LRT Projects Website www.edmonton.ca/lrtprojects Edmonton Transit www.takeets.com