BOILER PM & INSPECTION

Similar documents
CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

6. Document tasks performed during visit and report any observations to the appropriate

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

Electric Duct Heater X X X X X X

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER INSPECTION SERVICES ITB NO.: DMS-13/14-035

Heating and Gas Installations - December 2014

Air Handling Unit Construction Checklist

Eclipse 2000 Service Parts

Secondary Coolant 301

AIR COOLED CHILLERS WATER COOLED CHILLERS

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , ,

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8

Prodigy Eclipse 600, 800, 1000 Service Parts

Hoshizaki America, Inc.

Centrifugal Chiller. PF/PFH Size: 063. Replacement Parts List No Revision V 05/2012

EXHIBIT A SCOPE OF SERVICES MAINTENANCE OF TRANE HVAC SYSTEMS

9/28/2018. Refrigeration compressor operation, maintenance and safety

Parts List. Stackable Crescent Cuber. Models KM-1601SAH/3 KM-1601SWH/3 KM-1601SRH/3. hoshizakiamerica.com

Prodigy Eclipse ECC, EH330 and EH430 C or D Service Parts

Parts List. Stackable Crescent Cuber. Models KM-1301SAH/3, SWH/3, SRH/3. hoshizakiamerica.com

Parts List. Stackable Crescent cuber. Models KM-1301SAH-E KM-1301SWH-E KM-1301SRH-E. hoshizakiamerica.com

Prodigy Eclipse 600, 800, 1000 Service Parts

FABER BURNER ROUTINE MAINTENANCE

Liebert CSU3000 DISCONTINUED PRODUCT. CSI Mainframe Cooling Systems. CT(Three Module) Model 20, 30 & 37 ton Mainframe Chiller

NME650R SERVICE PARTS

Maintenance Guide Rooftops

SCROLL - AIR COOLED PACKAGED & SPLIT SYSTEM ICE CHILLERS

C1448, C1848, C2148 Service Parts

CWP-CO / CWP-RC / CWP-HP 02 to 35

Copeland Screw TM Compressors

Parts List. Modular Crescent Cuber. Models KM-1340MAH, MWH, MRH/3. hoshizakiamerica.com

Solenoid valves REFRIGERATION AND AIR CONDITIONING. Fitters notes

Parts List. Stackable Crescent Cuber. Models KM-1601MRJ/3. hoshizakiamerica.com

Hanna Daily Preventive Maintenance Schedule

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

Planned Preventative Maintenance Schedule. AC Systems PPM Schedule

BITZER Liquid Injection Guidelines for CSH Compressors

Pump Acceptance Test Data

Routine Compressor Maintenance

McQuay. Two-Stage Centrifugal Chiller WTC 500. Replacement Parts List No Revision A 10/2011

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

SERVICE PARTS MANUAL ICE SERIES CUBERS MODEL - ICE0806A3-W3-R4, ICE1006A3-W3-R4 Includes 50Hz. and 3 Phase Units

FM800R SERVICE PARTS

Component Coverage* A/C Presidential Plan. A/C Executive Plan $ $278

Item MF CMF EMF LP Code Part Description Part #

Hoshizaki America, Inc.

Power Flame Incorporated

Hoshizaki America, Inc.

Air-Cooled Liquid Chiller with integrated hydraulic module

Air-to-water heat pump for indoor installation - LIK 8TES. Spare parts list

Hoshizaki America, Inc.

34.0 EMF SERIES FLAKERS EMF 450, EMF800, EMF1106 AIR, WATER AND REMOTE

Hoshizaki America, Inc.

Section 3 Technical Information

HS17. HS17 SERIES CONDENSING UNITS 17.6 to 65.2 kw ( to Btuh) Cooling Capacity. MATCHED REMOTE SYSTEMS 50hz ENGINEERING DATA

Ph: (07) Fax: (07) Pump Manual

McQuay. Two-Stage Centrifugal Chiller WTC 700. Replacement Parts List No Revision B 07/2017

INSTRUCTION MANUAL: Industrial Series Piston Air Compressor. Model Number: V Part Number: L001128KNA

PACKAGED LIQUID CHILLER 6. HUMIDIFIER SECTIONS. C Member. Liquid Chiller. nowlc And noalc Series

CM500 SERVICE PARTS TABLE OF CONTENTS. Exterior Panels Interior Panels Air Cooled Refrigeration Water Cooled Refrigeration...

Copeland Screw Compressors Semi-Hermetic Compact Operating Instructions

E1RA, E2RA SERIES - 10 SEER, 1PH & 3PH HEAT PUMP- OUTDOOR UNIT

OEZ IEZ NOMENCLATURE STANDARD FEATURES FACTORY INSTALLED OPTIONS

Inspection Points - Motor Homes

Enclosed Electric Rotary Screw Compressor Installation Guide

30GX AIR-COOLED LIQUID CHILLER


30GX AIR-COOLED LIQUID CHILLER

TECHNICAL MANUAL OPERATOR S, UNIT, INTERMEDIATE (DS) AND INTERMEDIATE (GS) MAINTENANCE MANUAL FOR

Centrifugal Chiller PFH087 PL

34.0 EMF SERIES FLAKERS EMF 450, EMF800, EMF1106 AIR, WATER AND REMOTE

Table of Contents. 1. Model Designation And Unit Models Guide Specifications Technical Data Performance Data 10

Section 5 AIR - COOLED CONDENSING UNITS MODEL PC 05Z TO PC NOMINAL COOLING CAPACITY RANGE 56.6 TO 772 MBH

PT, PTS & PTP Series Pump/Reservoirs

of Fire Pump Assemblies

Supersedes CL2 (512) Form CL2 (615) STARTUP CHECKLIST PHONE: CUSTOMER ORDER NO: JCI TEL NO: JCI ORDER NO: JCI CONTRACT NO:

McQuay Westinghouse. Centrifugal Chiller PF, PFH 063. Last Manufactured: Replacement Parts List No Revision AB 06/2018

SERVICE PARTS MANUAL ICE SERIES CUBERS MODEL-ICE0250, ICE0400, ICE0500, ICE0606

Centrifugal Chiller PE046, PE047, PE048, PE050 PEH PF083, PF096, PF105, PF116 PH PHH PL

Hoshizaki America, Inc.

Parts List. Stackable Crescent Cuber. Models KM-2400SRF3 KM-2400SRH3. hoshizakiamerica.com

EcoNet and Flash Codes

Item MF CMF EMF LP Code Part Description Part # GRP

HUNTLEY COMMUNITY SCHOOL DISTRICT #158 Addendum No. 1 to Bid Specifications for HVAC Preventative Maintenance Services Bid #

BAS Construction Checklist

EC 200 EC 300 GE 360 GE 400 GE 600 L-S BM

Nordic Model CCM0830 1, Service Parts Manual (Includes 50Hz. Units)

PERFORMANCE DATA TYPICAL FIELD WIRING CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS

Instructions for Installation, Operation, Care and Maintenance

A I R H A N D L E R S CB26UH-R. MERIT Series R-22 - Upflow / Horizontal P R O D U C T S P E C I F I C AT I O N S

CGA CXA VGA VXA CG-PRC006-E4

CHILLER START UP PROCEDURE FORM DOC. N (DOC.N BELOW TO BE RETURN TO AERMEC)

HS18 HS18 SERIES CONDENSING UNITS EXPANSION VALVE AIR CONDITIONING SYSTEM. 3.6 to 16.0 kw ( to Btuh) Cooling Capacity ENGINEERING DATA

XID ENHANCEMENT SYSTEM IMPROVED EFFICIENCY AND PERFORMANCE

NM650 SERVICE PARTS TABLE OF CONTENTS. Cabinet Air Cooled Refrigeration Water Cooled Refrigeration Water System Gearmotor...

BAC Custom Engineered Controls

100% OUTSIDE AIR MAKE-UP UNITS WITH DISCHARGE TEMPERATURE CONTROL & c.pco DIRECT DIGITAL CONTROL MODULE

Centrifugal Chiller Single Compressor WSC087, TSC087, HSC087 PL

McQuay. Ceiling Mounted Water Source Heat Pump. WCRH, WCRW 030, 036, 042 Design 1. Replacement Parts List No Revision B 10/2016

Planned Maintenance Agreement Renewal Between Illingworth-Kilgust Mechanical, Inc. and River Valley School District

Transcription:

BOILER PM & INSPECTION Record inspection log for Gaming Commission and Safety Department. The following listed maintenance items are not intended to be a complete list. Follow any additional maintenance items listed in the Camus Boiler Operation Manual, see attached. Annual Inspection & Maintenance (October 2016) General Assembly Secure and drain the boiler. Open the fire and water side for cleaning and inspection. Check the heating surfaces and water side for corrosion, pitting, scale, blisters, bulges, and soot. Check the expansion tank and pressure along with drain. Clean the fire inspection glass. Perform hydrostatic test, if required. Replace Condensate Treatment Kits(Install and Expiration Dates need to be on Filter Kits). GAS TRAIN BURNER ASSEMBLY Follow Manufacture guidelines for Cleaning. Check the gas train isolation valves for leaks. Check the gas supply piping for leaks. Check the gas pilot (where exists)solenoid valve for wear and leaks. Check the main gas and the pilot (where exists) gas regulators for wear and leaks. Test the low gas pressure switch. Calibrate and record setting. Test the high gas pressure switch. Calibrate and record setting. Verify the operation of the burner fan air flow switch. Inspect and clean the burner assembly. Inspect and clean the pilot (where exists) igniter assembly. Inspect and replace (if needed) High Temp Sealant for Ignitor. Sealant must be replaced if Ignitor is removed. Inspect and clean the burner fan. Run the fan and check for vibration. Inspect the flue and flue damper. Burner control panel: Inspect for cleanliness, and inspect for wiring and connections for tightness and signs of overheating and discoloration. Clean burner fan wheel and air dampers. Check for vibration. Verify tightness of the linkage set screws. Check the gas valves against leakage (where test cocks are provided). Wash out or Replace Stack drain tubing and replace loop seal. Clean and/or replace all air filters. Controls and Safety Disassemble and inspect the low water flow switch. Reassemble or replace the boiler low water flow switch with new gaskets. Clean the contacts in the program timer, if applicable. Page 1 of 10

Check the operation of the low water flow switch safety device and feed controls. Verify the setting and test the operation of the operating and limit controls. Inspect and Calibrate CO Sensors. Inspect and Verify Boiler Sequencer is operating correctly and perimeters correct. Check/Replace all boiler Sequence indicator lights. Quarterly Inspection & Maintenance -(3 per year)(january, April, July) Check the general condition of the unit. Inspect the burner. Inspect and replace(if needed) High Temp Sealant for Ignitor. Sealant must be replaced if Ignitor is removed. Adjust the burner controls to obtain proper combustion. Check the operation of the pressure relief valve. Check the opeation of the low water flow switch and feed controls. Check the setting and test the operation of the operating and limit controls. Check the operation of the modulating motor. Lift the safety/relief valves with at least 70% of rated pressure. Log operating conditions after the system has stabilized. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate uncorrected deficiencies detected. Replace Condensate Treatment Kits if Filter has expired(install and Expiration date need to be on Filter Kits) Clean and/or replace all air filters Check/Replace all boiler Sequence indicator lights Page 2 of 10

PUMPS Report in with customer representative Provide email and hard Copy of Annual PM Report within 30 days of PM Start Date PM must start first week of each quarter. Must follow PM Yearly schedule PM Reports must show Exact Equipment Label, Plant, Location Annual Inspection & Maintenance(April 2017) General Assembly Check motor shaft and pump shaft for alignment, if applicable. Inspect the coupling for wear. Verify that the shaft guard is in place and tight, if applicable. Verify the water flow through the pump. Check for leaks on the mechanical pump seals, if applicable. Verify proper drip rate on the pump seal packing, if applicable. Verify smooth operation pump. Clean pump strainers as needed but minimum of once per year. CHW - Winter, HHW - Summer Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Lubrication Lubricate the motor bearings as necessary. Lubricate the pump bearings as necessary. Motor and Starter Clean the starter cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Meg the motor. Verify tight connections on the motor terminals. Check the condition of the contacts for wear and pitting, if applicable. Check the contractors for free and smooth operation. Verify proper volts and amps. Quarterly inspection & Maintenance -(3 per year)(october, January, July) Lubricate pump bearings per manufacturer's recommendations. Lubricate motor bearings per manufacturer's recommendations. Check suction and discharge pressures and log. Check motor voltage and amperage, and log. Check for excessive vibration and noise. Verfiy smooth operation of the pump. Check for leaks on the mechanical pump seals, if applicable. Verify proper drip rate on the pump seal packing, if applicable. Provide a written report of completed work, operating log, and indicated any uncorrected deficiencies detected. Page 3 of 10

COMBUSTIBLE GAS MONITOR Annual Inspection & Maintenance-(October 2016) General Inspect location and mounting of monitor. Inspect location of sensor. Verify non-used inlets and exhausts are capped. Check with equipment operator for unit history. Check Monitor Connections. Test and calibrate Sensor. Quarterly Inspection & Maintenance-(3 per year)(january, April, July) General Inspect location and mounting of monitor. Inspect sensor. Check with equipment operation logs for unit history. Page 4 of 10

CHILLER PM & INSPECTION Eddy Current Testing (January 2017) Perform Eddy Current test for All Chiller Evaporators/Condensers for Fiscal year 2017 Provide detailed Hard and Email copy Eddy Current testing with Annual Inspection report Eddy Current testing paperwork broken down to each plant and site. Compare and Provide in report any loss in tube thickness from previous Eddy Current Test. Annual Inspection & Maintenance(January 2017) Refrigerant Circuit Check and record refrigerant level. Inspect for leaks. Calculate refrigerant lost and report to the customer. Repair minor leaks as required (e.g. valve packing, flare nuts). Brush Condenser Tubes using Brush designed for Enhanced Tubes(Patriot Brush, Its red white and blue ). Provide detailed and labeled pics of before and after cleaning. End Bell included. Visually inspect condenser tubes for cleanliness. Check vanes for free and smooth operation. Check mechanical linkages for wear. Adjust refrigerant level with customer's refrigerant. If purge minutes show sign of a leak perform a complete leak test on chiller with electronic detector. Tighten flange nuts, bolts, when appropriate. Vibration Testing - August Change Oil and Filter. Provide Oil Analysis and report from Certified Laboratory. Purge System Check purge unit controls for proper operation. Check and clean purge drum as required. Clean the condensor coil. Clean strainers or replace filters as required. Check the purge compressor assembly for leaks as required. Check the purge unit for proper operation. Inspect and report on operating conditions. Confirm purge compressor effectiveness. Internal purge condenser inspection and cleaning (includes new gaskets), when applicable Inspect purge float, adjust if needed. Clean purge sight glass (includes new gaskets), if removable. Inspect, adjust solenoid valve, air relief oil separator. Perform leak test on purge system. Controls and Safety Page 5 of 10

Verify all settings in the electronic control panel. Inspect the control panel for cleanliness. Inspect wiring and connections for tightness and signs for overheating and discoloration. Verify the operation of the vane control system Verify the working condition of all indicator/alarm lights and LED/LCD displays. Verify the operation of the oil sump temperature control devise. Test high condensor pressure safety device. Calibrate and record setting. Test low evaporator temperature safety device. Calibrate and record setting. Test low oil pressure safety device. Calibrate and record setting. Test high motor temperature safety device. Calibrate and record. Test operation of chilled water pump and condenser water pump starter auxillary contacts. Lubrication System Pull oil sample for spectroscopic analysis. Check oil for acid content and discoloration. Make recommendations to the customer based on the results of the test. Measure and record the oil pump voltage and amperage. Verify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater. Change the oil filter. Verify the oil level. Tighten terminal on oil pump motors and heaters. Replace factory mounted refrigerant filter. Inspect and report on conditions of oil pump, oil cooler, oil heater. Motor and Starter Clean the starter and cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Check condition of the contacts for wear pitting. Check contactors for free and smooth operation. Check the mechanical linkages for wear, security, and clearances. Check tightness of the motor terminal connections. Meg the motor and record rating. Verify the operation of the electrical interlocks. Confirm proper compressor/motor transition time. Quarterly Inspection & Maintenance ( 3 times a year)(october, April, July) Check the general operation of the unit. Log the operating temperatures, pressures, voltages, and amperages. Check the operation of the purge unit. Check the operation of the control unit. Check the operation of the lubrication system. Check the operation of the motor and starter. Anaylze the recorded data. Compare the data to the original design conditions. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Controls: Inspect, calibrate, test safety controls: log cut-in, cut-off points. Refrigerant/Lubrication Circuits: Adjust refrigerant level with customer's refrigerant, if available. Page 6 of 10

Compressor/Motor Assembly: Megger main compressor motor, log tighter terminals. MISC: Check for proper flows through chiller. Vibration analysis. Inspect sight glasses, log levels. Log amperages/voltages/temperatures/pressures. Inspect thermometers/gauges. Analysis of log readings by factory trained service technician, report on unusual conditions. Generate reports on problems and conditions: log readings and compressor oil. Condensor tube brushing once annually. FG/Ramona Screw Chiller Annual Inspection & Maintenance-(April 2017) Inspect for Refrigerant and Oil Leaks. Inspect for vibration eliminators and water piping for leaks. Check Freeze Protection, evaporator and piping heaters. Check and clean water piping strainers. HHW - August, CHW - January. Check refrigerant in sight glass. Check Compressor oil presence in sight glass, if applicable. Change oil and oil filter. Provide lab analysis and report of oil test. Check and record liquid line filter drier pressure drop. Inspect and tighten electrical connections. Check relays and operating/safety controls. Inspect components for signs of overheating or deterioration. Check contactors for pitting and replace as needed. Check crankcase heater operation. Meg Hermetic Motor. Perform Compressor vibration test. Check operation of electronic expansion valve. Perform Micro Tech check, log, fault analysis, analyze performance. Check condenser Coils, clean debris from around condenser. Clean condenser coils. Check Condenser fan operation. Check and record water side pressure drop across vessel. Review chiller operation with onsite contact. Quarterly Inspection & Maintenance-(3 per year)(october, January, July) Inspect for Refrigerant and Oil Leaks. Inspect for vibration eliminators and water piping for leaks. Check and clean water piping strainers. Check Compressor oil presence in sight glass, if applicable. Check Condenser Fan operation. Inspect and tighten electrical connections. Check relays and operating/safety controls. Check crankcase heater operation. Page 7 of 10

Perform Micro Tech check, log, fault analysis, analyze performance. Check condenser Coils, clean debris from around condenser. Clean condenser coils in early morning hours (May, June, July). Review chiller operation with onsite contact. CONTROL SYSTEM Perform Tracer program database back-ups on diskette for site. Replace Tracer Processor Back-up Batteries. REFRIGERANT MONITOR Annual Inspection & Maintenance-(October 2016) General Inspect location and mounting of monitor. Inspect location of sensor. Check with equipment operator for unit history. Check Monitor Connections. Test and calibrate Sensor. Quarterly Inspection & Maintenance-(3 per year)(january, April, July) General Inspect location and mounting of monitor. Inspect sensor. Check with equipment operation logs for unit history. Page 8 of 10

COOLING TOWER PM & INSPECTION ANNUAL INSPECTION & MAINTENANCE(April 2017) General Assembly Clean debris from platform and surrounding area. Check and clean bleed line and overflow. Check sump heaters and thermostats for calibration and proper operation. (October & January) Inspect general tower condition for water treatment problems. Inspect drive belts, check and tighten if required. Inspect bearings, lubricate when required. Inspect motors. Inspect tower fill for deterioration. Inspect for dust and dirt, wipe down motors and moving parts as required. Inspect fans for balance/vibration.. Structure Disassemble all screens and access panels for inspection. Inspect the conditions of the slats, if applicable. Inspect the condition of the tower fill. Inspect the condition of the support structure. Inspect the condition of the basins (upper and lower) and/or spray nozzles. Verify clean basins and strainer(s). Verify the condition and operation of the basin fill valve system. Mechanical Inspect gear box for leaks. Inspect drive and coupling for condition and security. Inspect fan assembly for condition, security, and clearances (e.g. blade tip clearance). Lubrication Lubricate motor bearings. Check gear box oil level. Motor and Starter Clean the starter cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Check condition of the contacts for wear and pitting. Check contactor(s) for free and smooth operation. Meg the motor and record reading. Check disconnect terminal block for wear, tightness and signs of overheating and discoloration. Check the condition and operation of the basin heater. Page 9 of 10

Quarterly Inspection & Maintenance(3 times a year)( January, April, July) Check the general condition of the tower. Check sump heaters and thermostats for calibration and proper operation. (January) Verify clean basins and strainers (upper and lower) and/or spray nozzles. Verify proper water level in the basin. Verify proper operation of the water level control device. Verify smooth operation of the fan(s). Verify proper operation of the bypass valve(s), if applicable. Verify operation and Inspect Solid Separator System, if applicable. Verify Operation and Inspect Cooling Tower Sump Basin Sweeper System, if applicable. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate uncorrected deficiencies detected. Inspect drive belts. Inspect bearings, lubricate when required. VFD DRIVE PM & INSPECTION Page 10 of 10