Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

Similar documents
RPC Upgrade for the CMS experiment

SBS Update Mark Jones

arxiv: v1 [physics.ins-det] 1 Jul 2014

HIGH VOLTAGE, HIGH CURRENT, HIGH DI/DT SOLID STATE SWITCH

The CU Beam Test at CERN Status Report and highlights from workshop II

Status of the Tail Catcher/Muon

The LHCb experiment. The LHCb experiment. dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges:

Real-time Bus Tracking using CrowdSourcing

Summary of Working Group C: Injection, Extraction, Accelerator Systems

Powering Schemes for the Strip Trackers

Powering Schemes for the Strip Trackers

Power Pack Testing at Environment Canada s Testing Facilities Heavy-Duty Vehicle and Engine Greenhouse Gas Emission Regulations

Adams-EDEM Co-simulation for Predicting Military Vehicle Mobility on Soft Soil

LBL CALIBRATION. Kongsberg Simrad AS - Training Department LBL Calibration - page 1

RPCs for an atmospheric neutrino experiment

The ATLAS Detector at the Large Hadron Collider. Peter Krieger IPP/University of Toronto

Straw Detectors for the Large Hadron Collider. Dirk Wiedner

Implementing Dynamic Retail Electricity Prices

Testing Energy Storage Systems: From EVs to Utility Grid

Cooling tests of the MSGC barrel B1 rod prototype

Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test

AOD Data in Atlantis Event Display

Unfolding. A toolbox that connects an experiment s observable variables with true physical quantities. R Matrix connect. Observed distribution THEN

Dipl.-Ing. Thorsten Pendzialek Dipl.-Ing. Matthias Mrosek. Model-Based Testing of Driver Assistance Systems for Counterbalance Forklift Trucks

Note on preliminary cost estimate for an integrated tracker for the STAR experiment at RHIC

OPTIMIZATION STUDIES OF ENGINE FRICTION EUROPEAN GT CONFERENCE FRANKFURT/MAIN, OCTOBER 8TH, 2018

Antiproton production horn operation and testing

R. Zimmermann - Frascati, October 2002 p.1/18. Raoul Zimmermann. University of Hamburg. Status Precision Tracker

OMEGA and OMEGA EP Will Provide Key Physics Data for Laser IFE. J. M. Soures University of Rochester Laboratory for Laser Energetics

VALIDATION OF NVIDIA IRAY AGAINST CIE 171:2006

Central Region Group Status and Positron Region

50:1 Metal Gearmotor 37Dx54L mm with 64 CPR Encoder

3300mAh Zinc-Air Batteries for Portable Consumer Products

Preliminary Results of 25 ns Test Beam on Florence Detector. Simone Busoni - INFN Firenze for CMS Florence group

DESIGN OF ACTIVE FLOW CONTROL AT THE WING/PYLON/ENGINE JUNCTION

Driven Damped Harmonic Oscillations

Thanks to ATLAS and CMS (Plots are from both) SLAC Ian Hinchliffe 07/24/06 1

Accelerated Testing of Advanced Battery Technologies in PHEV Applications

Design. Model Tests for the DP System of a Drilling Semi-Submersible

E10/S3 burst injections

NEGATIVE DIFFERENTIAL PRESSURE BY IGNITION OF GRANULAR SOLID PROPELLANT

Sinfonia: a new paradigm for building scalable distributed systems

Harnessing Demand Flexibility. Match Renewable Production

Validation of a FAST Model of the Statoil- Hywind Demo Floating Wind Turbine

The H1 Silicon Tracker. Benno List

Merger of the generator interconnection processes of Valley Electric and the ISO;

Effectiveness of ECP Brakes in Reducing the Risks Associated with HHFT Trains

A simulator for the control network of smart grid architectures

TIME OF FLIGHT Components from:

SIMULATION AND EVALUATION OF ENGINE FRICTION EUROPEAN GT CONFERENCE, FRANKFURT/MAIN, OCTOBER 9TH, 2017

WP5 - Computational Mechanics B5 - Temporary Vertical Concrete Safety Barrier MAIN REPORT Volume 1 of 1

FMVSS 126 Electronic Stability Test and CarSim

Chapter 4. Vehicle Testing

Illustrations of the need for precision and repeatability in tribology testing

dcache, agile adoption of storage technologies

Monitoring of Shoring Pile Movement using the ShapeAccel Array Field

Physics 413, Methods of Experimental Physics. Experiment Q2: Electron e/m ratio

Coriolis Density Error Compensating for Ambient Temperature Effects

Low Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011

3. OPERATION 2.1. RESTRAINT CIRCUIT 2.6. INDICATING CIRCUIT 2.2. OPERATING CIRCUIT 2.7. SURGE PROTECTION CIRCUIT 2.3.

FORECASTING AND CONTROL IN ENERGY SYSTEMS

The ITk strips tracker for the phase-ii upgrade of the ATLAS detector of the HL-LHC

Automated Composite Part Inspection

Wireless Sensors in Buildings

SNS Operation and Upgrade Plans

Electric mobility in view of green growth

INTELLIGENT DC MICROGRID WITH SMART GRID COMMUNICATIONS: CONTROL STRATEGY CONSIDERATION AND DESIGN

FLUKA Monte Carlo Modelling of the CHARM Facility s Test Area: Update of the Radiation Field Assessment

FPGA-based technology for Pulse Height Analysis in nuclear spectrometry system

Impact of Vehicle-to-Grid (V2G) on Battery Life

Innovations and Energy Implications from Connected/Automated Vehicles and New Mobility Technologies

2.0 CONSTRUCTION 3.0 OPERATION. SA-1 Generator Differential Relay - Class 1E 2.5 TRIP CIRCUIT

TIME OF FLIGHT Components from:

The g-2 Project at FNAL. Horst Friedsam John Kyle IWAA 2014 at Beijing October 2014

Smart community clustering for sharing local green energy. Yoshiki Yamagata, Hajime Seya and Sho Kuroda

Prototypage rapide du contrôle d'un convertisseur de puissance DC-DC à haut rendement

Power Integrity Guidelines Samtec MPT/MPS Series Connectors Measurement and Simulation Data

DESY and NAF. Andreas Gellrich, DESY. 8th Belle II Computing Workshop May 2013, Leinsweiler, Germany

Facilities. Presented by Jim Irby for the C-Mod Group

Global Trigger and Global Muon Trigger

Dynamic Behaviour of a Fuel Cell with Ultra Capacitor Peak Power Assistance for a Light Vehicle

M545D. Stepper Motor Driver Specification. Overview. Applications

Effect of DG Installation on Customer Load Shapes

Calorimeter Subsystem. Status and Issues. W. Neil Johnson Naval Research Laboratory. Gamma-ray Large Area Space Telescope

Model-Based Investigation of Vehicle Electrical Energy Storage Systems

Met One Instruments. Met One Instruments BAM-1020 Improvements

Coreless Concept for High Gradient Induction Cell

CONVENTIONAL AND ELECTRICALLY HEATED DIESEL OXIDATION CATALYST MODELING IN GT-SUITE

MORSE: MOdel-based Real-time Systems Engineering. Reducing physical testing in the calibration of diagnostic and driveabilty features

Sport Shieldz Skull Cap Evaluation EBB 4/22/2016

Boombot: Low Friction Coefficient Stair Climbing Robot Using Rotating Boom and Weight Redistribution

Challenges of Contacting Lead-Free Devices

DEVELOPMENT OF A DRIVING CYCLE FOR BRASOV CITY

HIGH TEMPERATURE ULTRA HIGH VOLTAGE SIC THYRISTORS

DEFINING THE STABILITY LIMITS OF A MANUAL WHEELCHAIR WITH ADJUSTABLE SEAT AND BACKREST

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

ROBUST PROJECT Norwegian Public Roads Administration / Force Technology Norway AS

NOνA Project Status. Leon Mualem University of Minnesota. TAMU Seminar April 25, 2006

OPEN HARDWARE, LOW COST, AIR QUALITY STATIONS FOR MONITORING OZONE IN COASTAL AREA

AUTOMATED CFD-SIMULATION OF A TURBOCHARGER ON A HIGH PERFORMANCE BMW DIESEL ENGINE BY USE OF DFBI M. REICHHART

Transcription:

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics US N. Terentiev Carnegie Mellon University CMS EMU Meeting, Fermilab October 21, 2005

Outline Beam Test Data vs. ORCA Simulation (cathode strip signal shape and cross-talk). EMU CSC Slice Test Data Grid Transfer (CERN to FNAL). Plans. 2

Motivation: Validation of ORCA simulation is a part of Physics TDR, Vol. 1. Importance of realistic simulation of CSC input signals and electronics response (the coordinate and time resolution, L1 trigger primitives, pile-up, neutron background). Old (prototype) front-end electronics parameters are still in use in ORCA simulation. New parameters matching final cathode amplifier design and pulser strip cross-talk data are now available (S. Durkin, OSU). 3

Conditions: Beam test data - CERN H2 Muons 150 GeV, 25 ns structured beam, Oct. 2004, Track Finder Trigger. Simulation - ORCA_8_7_1, OSCAR_3_7_0. (in CMS detector geometry), single muon track with Pt = 100 Gev, generated flat in Eta and Phi, cut 1.3 < EtaGen < 1.6 ( ~ as in the beam test ), hits from CSC ME234/2 only. Select one anode hit and one cathode comparator hit per CSC layer in beam test data. 4

Fitting function for signal from one cathode strip: signal is sampled in a Switch Capacitor Array (SCA) in 8 time bins each 50 ns long; semi-gaussian fit Q = charge, ADC counts, T = (t-ts)/t0, 4*T0 = peaking time, ns Ts = arrival time, ns; note example with two pulse positions 25 ns apart and having max. SCA at one and the same SCA time bin. Additional Ts smearing due to CSC drift time. 5

Including strip to strip cross-talk: Based on external pulser strip data taken at SX5 (S. Durkin, J. Gilmore, F. Geurts, April 2005). Cross-talk is modeled by cross-talk from pulser data, convoluted with ion drift time and a square wave drift electron arrival (S. Durkin). The function!!"(s. Durkin) approximates the shape of the cross-talk to ~1% near the peak. Cross-talk from the strip with charge to the side strip: #$%&' (, (&!!"), ) = fixed normalization factor, depending on!!", ' = cross-talk coefficient. Separate fit of the cross-talk pulser data with free!!" and ' ( =1) yields ' ~ 0.1. Use (with fixed!!"and free 'to fit cross-talk in the beam test data (and in ORCA data as well though ORCA simulation used different function ) 6

Fitting function for 12 SCA time bins in 3 strips: '* & ' ( +,-- '* +,--& +,--' ( #,./ '*#,./&#,./'(+,-- where semi-gaussian signal, ( cross-talk shape. Six fitted parameters: charges +,--#,./0 peaking and arrival time and cross-talk ' at NDF = 6. Table: Example of ADC counts in SCA time bins in 3 cathode strips. Strip \ t, ns 25 75 125 175 225 275 325 375 Left 0 0 41 110 88 41 18 5 Middle 0 3 112 420 512 370 214 122 Right 0 1 33 85 57 16 6 3 7

Results The peaking time T0 is one and the same in all three types of data. The cross-talk Ct in ORCA simulation is lower than in beam test and pulser data likely due to simplified cross-talk description in ORCA. Data \ Parameters Beam Test ORCA Simulation T0, ns 34.2 +/- 1.3 (RMS) 34.2 +/- 1.7 (RMS) Ct 0.099 +/- 0.014 (RMS) 0.084 +/- 0.022 (RMS) Pulser Data 34.1-36.0 0.095-0.098 8

Beam Test Data ORCA Simulation 9

Beam Test Data ORCA Simulation 10

Beam Test Data: Cathode strip SCA arrival time Ts for one CSC layer and averaged over >= 4 CSC layers. The peaks are 25 ns apart. 11

Restoring cathode strip pulse shape with use of fitted arrival time Ts: Since Ts is scattered SCA samples the pulse in different points in each event. Eliminate the Ts dependence of SCA(t) by subtracting Ts from t of all eight SCA samples in each event. The result is the restored pulse shape measured in much more time points than original 8 time bins. Averaging SCA(t - Ts)/Q for each 6.25 ns time bin gives the detailed pulse shape (see next slide). 12

Beam Test Data ORCA, Pulser and Beam Test Data 13

Single electron response function: ORCA makes use of old cathode amplifier single electron response function. The new function is available (S. Durkin). Difference is small. For consistency, the new single electron response function should replace the old one in ORCA simulation. 14

Measuring cross-talk in data with subtracted Ts: Cross-talk as the ratio of one side strip SCA to the central strip SCA plus both side strips SCA for given time bin. In the pulser data only central strip was pulsed subtract the fitted values Q_left*S(t) and Q_right*S(t) in beam test and ORCA data. Reasonable agreement between the beam test and pulser data cross-talks. The cross-talk in ORCA simulation is different from one in the beam test and pulser data. 15

Cathode strip signal shape. Beam Test Data vs. ORCA Simulation (conclusion) The shapes of the cathode strip output pulse in ORCA simulation and data are very similar. For consistency, the new single electron response function should replace the old one in ORCA simulation. Cathode strip cross-talk. The beam test and pulser data cross-talks are similar. The cross-talk in ORCA simulation should be updated with use of functions obtained by S. Durkin. Developed methods: Averaged fitted arrival time Ts can help with timing. This cathode beam crossing time was compared with ALCT anode BX time by S. Durkin and a good agreement was found. Allow to calibrate cross-talk for each cathode strip using fitted coefficient Ct, offset and slope of the SCA ratio vs. t-ts dependence. Details are in http://www-hep.phys.cmu.edu/cms/talks/orca_vs_bt04/text_v2a.html and will go to the CMS internal note for Physics TDR, Vol. 1. Thanks to S. Durkin for very helpful discussions and pulser data. 16

EMU CSC Slice Test Data Transfer CERN-FNAL. Temporary solution (prior to use of Global DAQ and official Data Transfer Tools): Grid tools (vdt package and srm client) were installed on emuslice02 machine of EMU Slice Test (SX5,CERN). Thanks to I. Vorobiev (CMU), Yujun Wu (FNAL) for help. One simple script controls the automated data transfer from emuslice02 local disk to dcache resilient area at Fermilab: - checks the presence of completed and copied to CERN Castor data files on disk; - checks the list of available files against the list of copied to Fermilab files; - runs cksum and stores result for the file to be copied; - transfers file to Fermilab dcache resilient area by srmcp; - adds the file name to the list of copied files; - makes corresponding record in the log; - sleeps for N second. 17

EMU CSC Slice Test Data Transfer CERN-FNAL (cont d) Temporary solution (prior to use of Global DAQ and official Data Transfer Tools): Typical data file is 0.3-0.5 GB (50,000 ev), transfer rate 1.5-2 min. dcache resilient area has several copies on different disks, provides immediate access to the files (from/to UAF cluster or the grid client), but does not have tape backup (our responsibility). This temporary solution can be useful in future (copies of files from EMU local DAQ machines?). 18

Plans The beam test data vs. ORCA simulation comparison done for cathode strip signal shape and cross-talk. Corrections will be done during ORCA to CMSSW transition. Minor updates/modifications of the SX5-dCache data transfer script to allow to monitor transfer here, at LPC control room at Fermilab. Main focus now on porting ORCA EMU CSC code to new framework, EDM/CMSSW. The work has been started in LPC Muon group to port raw data unpacking and digis and begin to use CMSSW in Slice Test data analysis (see the talk by M. Schmitt). 19