Westland No. 1 Mine (Bob Ciminel 2012)

Similar documents
Morris Mine (Bob Ciminel 2012)

Montour No. 10 (Bob Ciminel 2012)

Scott Mine (Bob Ciminel ) Montour Railroad Milepost 6. Montour Trail Milepost 5

Montour No. 4 (Bob Ciminel 2012)

Partridge Mine (Bob Ciminel 2012)

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado

David W. Salter Collection

Former Yreka Western No. 19 Arrives at Age of Steam Roundhouse

Highwall Mining System

MEMOIRS 1974 MEMOIRS Bird, R.H Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp Published by the

New Mexico Geological Society

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

Summary of the Alcoa Highway Redevelopment Project

Agenda Cover Memorandum

2 FOREWORD. 2.1 Description of Mine 2.2 Report Preparation Process 2.3 General Acknowledgements

The Dash 9 Locomotive Pack

David W. Salter Collection

GUIDE TO COAL MINES Mines Served by BNSF Railway

Soldier Summit + Salt Lake City Route Extension Scenario Pack 01

158 PURDUE ENGINEERING EXTENSION DEPARTMENT

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

WEST VIRGINIA OFFICE OF MINERS HEALTH, SAFETY AND TRAINING REPORT OF FATALITY FEBURARY 14, 2013 CONSOLIDATION COAL COMPANY LOVERIDGE MINE

David W. Salter Collection

ENVIRONMENTAL SETTING

LONE MOUNTAIN PROCESSING, INC. CLOVER FORK NO. 1 Holmes Mill, KY JUNE 16, 2010

APPENDIX C. Existing Utilities

David W. Salter Collection Gainesville Midland Railroad Photographs MS P

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRIATION COAL MINE SAFETY AND HEALTH REPORT OF INVESTIGATION. Underground Coal Mine

ASHPRINGTON ROAD Part 1

Validation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008.

FREQUENTLY ASKED QUESTIONS

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

NICTI Alternatives Analysis

ANDERSON PROPERTY SITE ANALYSIS

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

MYRIAD BOOKS. For the best in regional photography aerial, landscape and nostalgia. Beautiful books, superbly produced at unbeatable prices.

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

Poster book. by Marvin T. Broyhill. Copyright All rights reserved. May not be used in whole or in part without prior written consent.

CTA Blue Line Study Area

Port Terminal Railroad Association. Committed to Safety and Service

Preserving Railroad History along the Donner Pass Route. A Tale of Two Locomotives (and Their Donner Route Connections)

MODEL RAILWAYS ON-LINE STAFFORD. Constructed by Harry Howell. Photographed and described by Paul Plowman

Guide to the Pittsburgh Locomotive and Car Works Collection

Bedford/Franklin Regional Rail Initiative (BFRRI) Rationale for a Bedford Amtrak Station June 30, 2015

PUBLIC INFRASTRUCTURE PROJECTS

FREQUENTLY ASKED QUESTIONS

BULK MATERIAL HANDLING SYSTEM

Cleary Rd and Belvedere Rd West Palm Beach, FL Great Centralized PB County location. Easy access to I-95 and Fl. Turnpike

Northeast Corridor New York to Philadelphia

10-10 TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL. Brighton Avenue Both Between Route NJ 71 (Norwood Avenue) and Railroad Avenue.

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

SIGN PLACEMENT CONDITIONS AND REQUIREMENTS

Layout Track Plans. All Rights Reserved.

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Corridor Sketch Summary

We photographed it as well as a UP eastbound doublestack lead by UP #8638 (SD70ACe).

Corduroy Road. Corduroy road

EXCEPTION TO STANDARDS REPORT

DIRECTORY OF COAL MINES IN ILLINOIS

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

The following section summarises the present conditions related to transportation for the proposed development of the Matimba B Power Station:

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

The Eastern Connector Study November, 2007 planning for the future

Formation of single/double Track

Dave Matthews Band 25 th Anniversary Show

First 1 to 5 Minutes of the calls will determine

CASE NUMBER: 15SN0627 APPLICANT: Stafford H. Cassell

NORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD CIT-01

Directions to The MITRE Corporation

Commitment to Innovation Leads Fairchild International to Launch New AC Scoop Powered by Baldor Products

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

Attachment D Environmental Justice and Outreach

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

STH 60 Northern Reliever Route Feasibility Study Report

Project Location. Purpose and Need for Action. File Code: 1950 Date: September 14, Dear Interested Party,

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Downtown Lee s Summit Parking Study

SPECIFICATIONS FOR 456,000 SF

The Blayney Demondrille Cross country line. Presented by Lawrance Ryan

Coal-Mining. By: Lakyn Wallace

Construction Realty Co.

CONSUMERS SERVICE COMPANY PHOTOGRAPHS, CA. 1915

THE BELT RAILWAY COMPANY OF CHICAGO

Naval Station Norfolk Transit Extension Study. October 2014

Mining the Past Powering the Future

SECTION 1 DESCRIPTION OF THE PROPOSED PROJECT

WILSHIRE/RODEO. Westside Subway Extension - DRAFT IMAGES FOR DISCUSSION PURPOSES ONLY. Torti Gallas and Partners, Inc. June SAAG Workshops 2011

HW300. Highwall Mining System

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

Forest Hill Street Clutter study

CTA Blue Line Study Area

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description

9. Downtown Transit Plan

TECHNICAL SPECS. PORTSMOUTH PAVILION 16 Crawford Circle Portsmouth, VA (Fax)

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT

RAILYARDS SUPPORT A VARIETY OF OPERATIONS INCLUDING: LOCOMOTIVES, ON-ROAD AND OFF-ROAD TRUCKS, CARGO-HANDLING EQUIPMENT, TRANSPORTATION

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Transcription:

Westland No. 1 Mine (Bob Ciminel 2012) Westland Mine No. 1 was owned by the Pittsburgh Coal Company and located at the eastern (timetable) end of the Montour Railroad s Midland Spur/Westland Branch, just east of Route 519 at the aptly named community of Westland. It was adjacent to the Midland No. 2 Mine on the east and the Arden Mine on the south. The exact date when Westland No. 1 opened is not known, but it was concurrent with the completion of the Montour Westland Branch in 1928. An article in Coal Age magazine in 1916 reported that the Pittsburgh Coal Company was opening two mines at Westland that had been closed for two years. In all likelihood, these were the Midland No. 1 and 2 mines since the Montour Westland Branch had not been built yet. Pittsburgh Coal operated the three mines at Midland, which were served by the Panhandle Palanka Branch (Midland 1 & 2) and the Westland Branch (Midland 3) from the early 1900s. With the completion of the Montour s Mifflin Extension in 1914, the Pittsburgh Coal Company wanted to ship its coal on its wholly-owned railroad subsidiary and avoid the costs incurred by shipping on the PRR. The completion of the Champion preparation plant in 1928 also provided an impetus to ship via the Montour. In its initial phases, Westland mined coal toward the south where it could tap the reserves remaining north of the Midland Nos. 1 and 2 mines. A new entry was eventually opened to the north where mining could continue in the direction of Hickory and Gilmore until reaching the boundaries of the Montour No. 1 and Morris mines. This is where the major mining activity occurred through World War II. To the west of Westland, Pittsburgh Coal was mining in the Midland No. 3 Mine and shipping via the PRR Westland Branch. The ability of this very important mining district able to ship coal using two separate railroads certainly enhanced protection against sabotage. Coal could move via the PRR Westland and Palanka Branches to Carnegie or Washington and on the Montour Westland Branch to Montour Junction or to the PRR, Pittsburgh & West Virginia, Union, or B&O through its interchanges with those railroads. Following the war, Westland opened a third entry on the west side of Route 519 to mine toward the west and northwest. This required building a trestle for the mine railroad over the highway to bring the coal to the Westland tipple for processing and shipping on the Montour. During the war, the miners village at Westland was a bustling place and probably deserves its own story to properly discuss its rich history. Geologically speaking, the Westland No. 1 Mine was located on the west side of a structure called the Westland Dome, with the Pittsburgh coal seam sloping upward to the northeast and

downward toward the southwest. The Midland No. 2 Mine was located directly on the dome to the east of Westland. The Arden Mine was southwest of Westland and the two mines are interconnected at the northwest corner of the Arden Mine. Both mines are flooded, with the water level held at 938 feet above sea level by pumping. The pump for the Westland mine is located at the northern entries which penetrated the hillside at about 1,040 feet above sea level. This entry was used for taking miner and supplies in and out of the mine; coal was unloaded into a conveyor belt about 140 feet below grade and brought the surface. The western entry penetrated the hillside at 1,038 feet above sea level and worked down-dip to reach the coal. The following table shows the production figures for Westland No. 1 before it closed and production shifted to Westland No. 2, which was about one mile north of Westland. Coal from Westland No. 2 was brought down to the Westland No. 1 tipple for shipping. Year Production (tons) Days Worked Employees 1931 1,080,877 230 896 1932 68,336 58 203 1934 648,928 221 755 1936 1,225,265 241 1,247 1944 1,014,894 289 488 1978 68,768 1979 741,407 1980 572,613 1983 26,484* *This coal would have come from Westland No. 2, as Westland No. 1 was already closed by this time.

The following maps, drawings and photos illustrate the Westland No. 1 Mine. This Google Earth image shows the Westland area as it existed after the mine was closed; the waste pile remediated, and before the new yard for the Mark West Gas Plant was built. The former Montour right-of-way is the straight clearing above the W. The AMD pumping station is directly northwest of the W.

This is what the area around Westland looked like in 1905. Westland Mine has not been opened yet, and the Midland No. 3 Mine is at the end of the PRR Westland Branch. Also note the mine at Menden, south of Westland.

This topographic map shows the Westland No. 1 and No. 2 mines, with No.2 located north of Westland School. A 6,000-foot mine railway and bridge were built to bring coal from No. 2 mine to the tipple. The new track used the old trestle over Route 519, but a new trestle had to be built across the road south of the school.

This diagram shows the entire Westland Mine complex and the surrounding mines. Westland and Arden are connected in the northwest, and both are flooded. Drainage from Westland s northern workings are pumped to the Arden AMD plant on Arden Road southwest of Westland.

This WPA map from the 1930s shows the extent of Westland Mine. At this time, the workings on the west were still part of the Midland No. 3 Mine and most of Westland s production was coming from the workings in the southeastern section of the mine with work just beginning in the northern sections.

This aerial photo is from 1939. The waste dump is relatively small. Note the large number of miners homes on the west side of Route 519 compared with today.

By 1958, the new section has been opened on the west side of Route 519 and the trestle is completed over the highway. It is obvious that coal was stripped along the western outcrop before deep mining began. The northern section now appears to be in production.

This 1967 view shows few changes over the past nine years, except that the waste dump is much larger.

The following photos were taken by John Collins for the Office of War Information during WWII. This is a photo of the waste conveyor coming out of the mine and dumping onto a second conveyor to take the waste up the dump. Note all the timbers stacked on the ground and in the mine cars. The ones in the mine cars still need to be cut into posts.

This view is looking north. A string of loaded mine cars has exited the southern portal and is passing beneath the coal conveyor running up to the tipple. The waste conveyors are in the background.

This is the southern portal. Based on the clean faces of the miners, it is obvious this is a mantrip heading into the mine to begin work, and the angle of the sun would allude to it being the evening shift.

This is another view looking northward showing three of the locomotive and both loaded and empty coal cars. The train in the background beneath the shed is for taking miners into the mine. The shed helped keep the cars used for the mantrip dry. The extensive trackwork shows what a large mine Westland was.

These are the outhouses located behind the miners homes at Westland. Although living conditions here were not as bad as some of the mines in West Virginia, they would be considered substandard today.

This was the company store at Westland. Note the man in the Army uniform on the right. This photo was taken during an inspection to evaluate living conditions in the town.

This shot was taken from Meadow Street and is looking due east. The waste conveyor is behind the garage and the coal conveyor is on the right.

This 1977 photo by Gene Schaeffer shows a Montour crew putting its train together at Westland Mine.

This photo was taken by Jason Capra in July 2012. It shows the new yard being built for Mark West LLC. Construction required filling in the old Westland Mine workings with concrete. The tipple would have been located approximately where the loading dock is located. The yard capacity is 200 cars.