Case Study. Utility-Owned Smart Grid Smart Grid, Smart Cities Trial. 1 March 31 May 2012

Similar documents
Redflow White Paper Field Application Experience of Zinc- RedFlow Field Application Experience of. Zinc-Bromide Flow Batteries in a Smart Grid

Case Study. R510 Residential Energy Storage Newington Smart Home Trial. October - December 2012

Singapore CEEA, Oct 2010 Chris Winter, CTO RedFlow. Energy Storage, renewables and the Smart Grid: Technology and business case considerations

THE REAL-WORLD SMART CHARGING TRIAL WHAT WE VE LEARNT SO FAR

Load profiling for balance settlement, demand response and smart metering in Finland

Smarter Network Storage UK first multi-purpose application of grid scale storage. Dr. Panos Papadopoulos, PhD, CEng

11. Electrical energy tariff rating

The potential for local energy storage in distribution network Summary Report

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Meter Insights for Downtown Store

Virtual Power Plants Realising the value of distributed storage systems through and aggregation and integration

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Residential Time-of-Day Service Rate Schedule R-TOD

Broken Hill Solar Plant. Community Information Session 9 September 2015

Market Drivers for Battery Storage

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Cost Reflective Tariffs

System Status Briefing

Redflow Telco Application Whitepaper

SMART SUN PILOT CREATING HOUSEHOLD ENERGY SOLUTIONS FOR THE FUTURE

Operational Opportunities to Minimize Renewables Curtailments

2-MWh Flow Battery Application by PacifiCorp in Utah Mark T. Kuntz VP Marketing & Business Development

American Electric Power s Energy Storage Deployments

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

2018 Load & Capacity Data Report

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

Rate Schedules. Effective 1/1/2019

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

THE BUSINESS CASE FOR INDUSTRIAL-SCALE BATTERIES

ENERGY STORAGE AS AN EMERGING TOOL FOR UTILITIES TO RESOLVE GRID CONSTRAINTS. June 18, 2015 E2Tech Presentation

The Swedish Government Inquiry on Smart Grids

Presented by Eric Englert Puget Sound Energy September 11, 2002

Evaluation and modelling of demand and generation at distribution level for Smart grid implementation

Australian Solar Cooling Interest Group (ausscig) Conference Queensland Solar City

Renewable Energy in Small Island Grids. Design and Case study - Tuvalu

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

Building a smart energy home

Evaluating Batteries: Deployment, Integration and Market Drivers

THE UNIQUE FLOW BATTERY SYSTEM DESIGNED FOR YOUR HOME OR OFFICE

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Solar Power. Demonstration Site. Annual Performance Report 2017

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

Group 3: Pricing from 1 April 2018 and load management

The Role of Electricity Storage on the Grid each location requires different requirements

Smart Grids from the perspective of consumers IEA DSM Workshop

Building the Business Case for Energy Storage

The Status of Energy Storage Renewable Energy Depends on It. Pedro C. Elizondo Flex Energy Orlando, FL July 21, 2016

Energy Storage Interconnection Initiative

Guideline on Energy Storage

Genbright LLC. AEE Technical Round Table 11/15/2017

The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options

2016 UC Solar Research Symposium

RedFlow Technologies Ltd

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

2012 Water Consumption Statistics Report. Water Services Department

EPRI Intelligrid / Smart Grid Demonstration Joint Advisory Meeting March 3, 2010

RESILIENT SOLAR CASE STUDY: SUNY New Paltz NYPA Integrated Grid Pilot

Microgrids Outback Power Technologies

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Analysis of Impact of Mass Implementation of DER. Richard Fowler Adam Toth, PE Jeff Mueller, PE

Electrical Power Analysis of the Cal Poly Organic Farm for the Cal Poly SuPER Project

ELG 4126 DGD Sustainable Electrical Power Systems

Sacramento Municipal Utility District s EV Innovators Pilot

Residential Energy Storage System PowCube 4.8

DYNAMIC MODELING RESIDENTIAL DATA AND APPLICATION

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

Microgrids in Australia

Renewables induce a paradigm shift in power systems, is energy storage the holy grail?

GRID INNOVATION CAUCUS CO-CHAIRS

Managing EV Load Workplace Charging Project Utility Perspective

2016 Load & Capacity Data Report

Planning Guidelines SMA SMART HOME

Flow Battery Testing & Demonstration Project

Manager of Market Strategy and Planning September 22, 2008

Norris Public Power District

Electric Transportation and Energy Storage

Net Metering in Missouri

Wind Interconnection and Net-Metering in MA. Tim Roughan - National Grid Joe Feraci - NStar

Electric vehicles and heat pumps providing flexibility to facilitate integration of large amounts of intermittent renewables

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

EC Forum on Model Approaches to Distribution Pricing. June 2009

2018 Customer generation rates

Docket 50-ER-108 Algoma Utilities. Final Form Rate and Rule Tariff Sheets Amendment 78. Filed By: Public Service Commission of Wisconsin

Irrigation energy efficiency How to analyse your energy costs. Nick Bullock The Energy Guys

Solar PV and Storage Overview

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Tariff cover sheets reflecting all rates approved for April 1 in Dockets 4218 (ISR) and 4226 (Reconciliation Filing).

100% Renewable Energy for Islands. Case studies Tuvalu & Tokelau

STANDBY SERVICE. RULES AND REGULATIONS: Terms and conditions of this schedule and the General Rules and Regulations govern use of this schedule.

off-grid Solutions Security of supply Basics: Off-grid energy supply

ALZ Electrical Solar Consumer Guide

Y9. GEH2.3: FREEDM Cost Benefit Analysis based on Detailed Utility Circuit Models

Energy Storage and Sector Coupling at SA Energy Storage by Dr Peter Klein, CSIR Energy Centre

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

RESERVOIR SOLUTIONS. GE Power. Flexible, modular Energy Storage Solutions unlocking value across the electricity network

V2G and V2H The smart future of vehicle-to-grid and vehicle-to-home. September 2016

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

Transcription:

Case Study Utility-Owned Smart Grid Smart Grid, Smart Cities Trial 1 March 31 May 2012 11 July 2012

Background The Australian Government has chosen Ausgrid to lead a $100 million initiative across five sites in Newcastle, Sydney and the Upper Hunter regions (see Figure 1). Smart Grid, Smart City creates a testing ground for new energy supply technologies. At least 30,000 households will participate in the project over three years. The demonstration project gathers information about the benefits and costs of different smart grid technologies in an Australian setting. Building a smart grid involves transforming the traditional electricity network by adding a chain of new, smart technology. It includes smart sensors, new backend IT systems, smart meters and a communications network. RedFlow has won the bid to supply 61 energy storage systems (ESS) to Ausgrid for installation in Newcastle, Scone and Newington in Sydney. 40 of these were installed in Newcastle in late 2011 and early 2012, with the other 20 ESS installed in Scone in April 2012. One ESS has also been operational in Newington since 2010 as part of the ongoing Smart Home sub-project. The 40 systems in Newcastle have been operating since February 2012 and have been feeding into the grid during peak demand periods. The 20 systems in Scone have been operational since mid-may 2012. 20 RedFlow ESS 40 RedFlow ESS 1 RedFlow ESS Figure 1: The locations and highlights of the Smart Grid, Smart City Trial [1] RedFlow s ESS are based on its core zinc bromide module (ZBM) flow battery technology. Each ESS contains one ZBM, battery management system (BMS), remote terminal unit (RTU), inverter and 3G modem for communications. All components are housed in a metal enclosure installed near customer houses on private property. 11/10/2012 Page ii

Summary Increases in both general and peak electricity demand, the integration of intermittent and distributed generation, and developments in communications technology have all enabled, as well as necessitated a more advanced electricity network. This moves away from the traditional unidirectional grid, with central generation and one-way communications. As such, utilities have seen Smart Grids as an answer to the need for greater grid capacity, as well as allowing transmission and distribution infrastructure upgrade deferral. According to the Electric Power Research Institute (EPRI), a Smart Grid integrates and enhances other necessary elements including traditional upgrades and new grid technologies with renewable generation, storage, increased consumer participation, sensors, communications and computational ability [2]. The use of energy storage in Smart Grids can provide utilities with many benefits, including improved operational efficiency and increased value of distributed generation, thereby improving customer satisfaction [3]. This is done through the time-shifting of electricity from low demand, as well as times of high distributed generation output, to high demand times. However, despite the many benefits of energy storage, existing proven technologies are either inappropriate for Smart Grid applications (in the case of lead acid batteries), or are physically impossible to implement on a large scale in a variety of areas (in the case of pumped hydro or compressed air energy storage (CAES)). As such, new and advanced technologies are emerging to satisfy this new market. These must be trialed and tested to ensure that they are both reliable and align with the needs of utilities. As such, the Australian Government has initiated, and is currently funding the Smart Grid, Smart Cities (SGSC) Trial. It aims to test several hypotheses about many types of Smart Grid technology. In particular, the Trial aims to quantify the following seven benefits of energy storage: 1. Reduction in peak demand energy storage as a cost-effective and reliable alternative to network capacity expansion 2. Improvement in network reliability/voltage/power factor/power quality costeffectiveness and value of energy storage 3. Energy supply during peak price events net benefit to retail sector 4. Minimisation of customers energy bills with innovative tariffs e.g. time of use together with energy storage. 5. Combined benefit between consumer, retail and network sectors 6. Investigation of large capacity (~1MVA) storage extra cost and other benefits compared to smaller capacity storage 7. Intermittent generation support optimisation of renewable energy sources value RedFlow has been selected as one of several advanced energy storage companies to supply energy storage systems (ESS) for the trial to test these seven benefits of energy storage to Smart Grids. The ESS supplied for the Trial by RedFlow are the zinc-bromide module (ZBM)-based R510 model (see Appendix B R510 Product Brochure). These systems are rated at 5kW, 10kWh, and comprise one ZBM, inverter, 3G modem for communications, battery management system (BMS), remote terminal unit (RTU) and other power electronics housed in a metal enclosure (see Figure 8). 11/10/2012 Page iii

kwh % Power Electronics Including BMS, RTU, 3G Modem Inverter SMA Sunny Backup Enclosure 1850 H x 971 L x 567 W ZBM Figure 2: Components of RedFlow's R510 ESS 61 R510 ESS have been installed and commissioned on separate residential properties as part of the SGSC Trial. The ESS have been staggered in their installations, with all systems operational since mid-may 2012. The operational results and benefits of RedFlow s ZBM-based ESS were analysed, and the lessons learnt presented. This produced the following key conclusions: Over the period between 1 March and 31 May 2012, the R510 ESS installed for the SGSC trial have outputted a total of 14.334MWh to the grid at an average efficiency of 58.03%. This is shown in the graph below in Figure 12. 10000 8000 SGSC ESS Grid Interaction 100 80 6000 60 4000 2000 0 March April May Grid Import (kwh) Grid Export (kwh) Efficiency (%) 40 20 0 Figure 3: Total grid import and export over the trial period with average monthly efficiency 11/10/2012 Page iv

Power (kva) Grid Power (kw) The use of RedFlow s ESS reduces the traditional peak seen by the grid by 10-15% when used in a ratio of approximately 1 ESS for 16 customers during cooler months (see Figure 4). 90 80 70 60 50 40 30 20 10 0 3:40 4:10 4:40 Grid-Feed Period Monday 9 April 2012 Peak Reduction 15.19% 5:10 5:40 6:10 6:40 7:10 7:40 8:10 65 Residential Customers 4 R510 ESS 8:40 9:10 9:40 10:10 Real Power (kw) with Storage Real Power (kw) without Storage Figure 4: Results from the Melinda Avenue feeder in Newcastle show a reduction in peak demand of over 15% with the use of RedFlow's ESS during traditional peal times The use of RedFlow s ESS transforms the traditional evening peak seen by the grid to a trough when used in a ratio of approximately 1 ESS for 1 customer during cooler months (see Figure 5). 100 90 80 70 60 50 40 30 20 10 0 Power on Miranee Road Recloser Energy Storage in Use Grid Charge Period 28kW Grid Charge Period 12kW Grid- Feed Period 45kW 13 Residential Customers 15 R510 ESS 12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 3:00 6:00 9:00 12:00 AM Figure 5: Results from the Scone feeder in mid-june show a transformation from peak to trough with the use of RedFlow's ESS during traditional peak times Research and Development already undertaken by RedFlow shows that its kw-scale ESS can be scaled up to MW-scale systems (see Figure 6). 11/10/2012 Page v

Figure 6: RedFlow's M90 90kW, 180kWh ESS was installed at the University of Queensland in late May 2012 RedFlow s ESS perform well when integrated with intermittent solar generation, as well as more reliable fuel cell distributed generation 2 Solar 12 Solar 3 Solar 3 Solar 15 Solar 5 Solar Figure 7: The SGSC trial in Newcastle has integrated a total of 200kW of solar and 50kW of Blue Gen fuel cell generation with 40 RedFlow ESS 11/10/2012 Page vi

Contents Background... ii Summary... iii Contents... vii List of Figures... viii 1 Introduction... 1 2 Operation... 5 2.1 Newcastle... 5 2.2 Scone... 5 2.3 Newington... 5 3 Results... 6 3.1 Newcastle... 6 3.1.1 Peak Demand Reduction... 6 3.1.2 Reliability... 8 3.2 Scone... 9 3.2.1 Peak Demand Reduction... 9 3.2.2 Reliability... 10 3.3 Newington... 10 3.3.1 Load Following... 10 3.3.2 Reliability... 11 4 Lessons Learnt... 12 4.1 Newcastle... 12 4.2 Scone... 12 4.3 Newington... 13 5 Conclusions... 14 6 References... 15 Appendix A List of Abbreviations... 16 Appendix B R510 Product Brochure... 17 Appendix C List of Trial Sites... 20 Appendix C1 List of Newcastle Sites... 21 Appendix C2 List of Scone Sites... 23 Appendix D Cycle Profiles... 24 Appendix E Newcastle Reduction in Peak Demand... 25 11/10/2012 Page vii

List of Figures FIGURE 1: THE LOCATIONS AND HIGHLIGHTS OF THE SMART GRID, SMART CITY TRIAL [1] II FIGURE 2: COMPONENTS OF REDFLOW'S R510 ESS IV FIGURE 3: TOTAL GRID IMPORT AND EXPORT OVER THE TRIAL PERIOD WITH AVERAGE MONTHLY EFFICIENCY IV FIGURE 4: RESULTS FROM THE MELINDA AVENUE FEEDER IN NEWCASTLE SHOW A REDUCTION IN PEAK DEMAND OF OVER 15% WITH THE USE OF REDFLOW'S ESS DURING TRADITIONAL PEAL TIMES V FIGURE 5: RESULTS FROM THE SCONE FEEDER IN MID-JUNE SHOW A TRANSFORMATION FROM PEAK TO TROUGH WITH THE USE OF REDFLOW'S ESS DURING TRADITIONAL PEAK TIMES V FIGURE 6: REDFLOW'S M90 90KW, 180KWH ESS WAS INSTALLED AT THE UNIVERSITY OF QUEENSLAND IN LATE MAY 2012 VI FIGURE 7: THE SGSC TRIAL IN NEWCASTLE HAS INTEGRATED A TOTAL OF 200KW OF SOLAR AND 50KW OF BLUE GEN FUEL CELL GENERATION WITH 40 REDFLOW ESS VI FIGURE 8: COMPONENTS OF REDFLOW'S R510 ESS 2 FIGURE 9: INSTALLATION OF AN ESS IN NEWCASTLE 2 FIGURE 10: THE LOCATIONS OF THE REDFLOW ESS IN NEWCASTLE, WITH THE FUEL CELL GENERATION CONNECTED TO EACH FEEDER 3 FIGURE 11: THE R510 ESS INSTALLED AT THE SMART HOME IN NEWINGTON, SYDNEY 4 FIGURE 12: TOTAL GRID IMPORT AND EXPORT OVER THE TRIAL PERIOD WITH AVERAGE MONTHLY EFFICIENCY 6 FIGURE 13: A TYPICAL FEED-IN CURVE FOR THE 4 ESS ON THE MELINDA AVENUE FEEDER 6 FIGURE 14: THE REDUCTION IN PEAK DEMAND SEEN BY THE GRID (4-10) IN MAY ON THE MELINDA AVENUE FEEDER 7 FIGURE 15: REDUCTION IN PEAK DEMAND SEEN BY THE MELINDA AVENUE FEEDER DURING TRADITIONAL PEAK TIMES 7 FIGURE 16: THE PEAKS CAUSED BY AUTOMATIC HOT WATER SYSTEMS ON THE MELINDA AVENUE FEEDER 8 FIGURE 17: AVAILABILITY OF ZBMS AND ESS IN NEWCASTLE 8 FIGURE 18: AVERAGE POWER ON THE SCONE RECLOSER 14 TO 18 MAY (BEFORE REDFLOW ESS COMMENCED FULL OPERATION) 9 FIGURE 19: AVERAGE POWER ON THE SCONE RECLOSER 18 TO 22 JUNE (WITH REDFLOW ESS OPERATIONAL) 9 FIGURE 20: AVAILABILITY OF ZBMS AND ESS IN SCONE 10 FIGURE 21: THE ESS CAN DYNAMICALLY FOLLOW THE LOAD, AND ANY SUDDEN CHANGES TO GENERATION 10 11/10/2012 Page viii

1 Introduction Increases in both general and peak electricity demand, the integration of intermittent and distributed generation, and developments in communications technology have all enabled, as well as necessitated a more advanced electricity network. This moves away from the traditional unidirectional grid, with central generation and one-way communications. As such, utilities have seen Smart Grids as an answer to the need for greater grid capacity, as well as allowing transmission and distribution infrastructure upgrade deferral. According to the Electric Power Research Institute (EPRI), a Smart Grid integrates and enhances other necessary elements including traditional upgrades and new grid technologies with renewable generation, storage, increased consumer participation, sensors, communications and computational ability [2]. The use of energy storage in Smart Grids can provide utilities with many benefits, including improved operational efficiency and increased value of distributed generation, thereby improving customer satisfaction [3]. This is done through the time-shifting of electricity from low demand, as well as times of high distributed generation output, to high demand times. However, despite the many benefits of energy storage, existing proven technologies are either inappropriate for Smart Grid applications (in the case of lead acid batteries), or are physically impossible to implement on a large scale in a variety of areas (in the case of pumped hydro or compressed air energy storage (CAES)). As such, new and advanced technologies are emerging to satisfy this new market. These must be trialed and tested to ensure that they are both reliable and align with the needs of utilities. As such, the Australian Government has initiated, and is currently funding the Smart Grid, Smart Cities (SGSC) Trial. It aims to test several hypotheses about many types of Smart Grid technology. In particular, the Trial aims to quantify the following seven benefits of energy storage: 8. Reduction in peak demand energy storage as a cost-effective and reliable alternative to network capacity expansion 9. Improvement in network reliability/voltage/power factor/power quality costeffectiveness and value of energy storage 10. Energy supply during peak price events net benefit to retail sector 11. Minimisation of customers energy bills with innovative tariffs e.g. time of use together with energy storage. 12. Combined benefit between consumer, retail and network sectors 13. Investigation of large capacity (~1MVA) storage extra cost and other benefits compared to smaller capacity storage 14. Intermittent generation support optimisation of renewable energy sources value RedFlow has been selected as one of several advanced energy storage companies to supply energy storage systems (ESS) for the trial to test these seven benefits of energy storage to Smart Grids. The ESS supplied for the Trial by RedFlow are the zinc-bromide module (ZBM)-based R510 model (see Appendix B R510 Product Brochure). These systems are rated at 5kW, 10kWh output, and comprise one ZBM, inverter, 3G modem for communications, battery management system (BMS), remote terminal unit (RTU) and other power electronics housed in a metal enclosure (see Figure 8). 11/10/2012 Page 1

Power Electronics Including BMS, RTU, 3G Modem Inverter SMA Sunny Backup Enclosure 1850 H x 971 L x 567 W ZBM Figure 8: Components of RedFlow's R510 ESS 61 R510 ESS have been installed (see Figure 9) and commissioned on separate residential properties as part of the SGSC Trial. This includes 40 systems in Newcastle (see Figure 10), which were installed throughout late 2011 and early 2012. All systems were operational by February 2012, and operate on four different charge/discharge cycles with the aim of reducing the peak load seen by the grid in these suburban areas. They are also integrated with solar and fuel cell distributed generation. Figure 9: Installation of an ESS in Newcastle 11/10/2012 Page 2

Figure 10: The locations of the RedFlow ESS in Newcastle, with the fuel cell generation connected to each feeder Twenty systems were installed in Scone (a map cannot be given for privacy reasons) in early 2012, and were operational by May 2012. These systems are located at fringe-of-grid areas, and are being used to test islanding aspects of a Smart Grid, as well as integration with wind turbines. 11/10/2012 Page 3

One R510 ESS (see Figure 11) has also been in operation since October 2011 in Ausgrid s Smart Home, located in the suburb of Newington in Western Sydney. It was installed as an upgrade to an existing RedFlow lead-acid system that was installed in mid-2010, with a ZBM installed in late 2010 to augment the lead acid storage. This ESS originally operated on a daily charge/discharge cycle, which was followed by a zero import/export from the grid mode with the installation of the R510. This has recently been modified to a hybrid cycle including both forced charge/discharge, as well as dynamic load following. Figure 11: The R510 ESS installed at the Smart Home in Newington, Sydney This Case Study provides an overview and analysis of the performance of RedFlow s R510 ESS in their Smart Grid applications. It will cover the period of 1 March to 21 May 2012. It has been divided into the sections of Operation, Results and Lessons Learnt. Each section addresses the three locations of Newcastle, Scone and Newington separately. Appendix A contains a list of abbreviations used in this Case Study. Appendix B contains a Product Brochure for RedFlow s R10, outlining key specifications of the ESS. Appendix C contains a list of all sites testing energy storage in the SGSC trial (see Appendix D for an explanation of schedule profiles). Appendix D contains a list of charge and discharge schedule profiles. Appendix E contains a large graph of peak reduction data from Newcastle. 11/10/2012 Page 4

2 Operation 2.1 Newcastle The 40 R510 ESS installed in Newcastle were located in suburban areas, which generally experiences a very high standard of power quality. However, in relation to the installation of further embedded generation (e.g. fuel cells and extra solar panels), the value and capabilities of energy storage in meeting these non-traditional challenges to the grid were tested. As such, the ESS were set to charge from and discharge into the grid at set times every weekday. The ESS did not operate at all (apart from discharging in the early hours of each Saturday) on weekends. This time schedule was varied between four different profiles: Profile A, Profile B, Profile C and Profile D (see Appendix D). 10 ESS operated on each profile (see Appendix C1). The efficiency and reliability of the R510 ESS in reducing the peak demand seen by the grid was tested. The results of this are presented in Section 3.1. 2.2 Scone The 20 R510 ESS installed in Scone were located in fringe of grid areas, which generally experiences a lesser standard of power quality than those areas in Newcastle. As such, the islanding abilities of the ESS were tested, as well as their ability to limit peaks seen by the grid. The ESS did not operate at all (apart from discharging in the early hours of each Saturday) on weekends. This time schedule was varied between two different profiles: Profile E and Profile F, (see Appendix D). 6 ESS operated on Profile E, and 14 ESS operated on Profile F (see Appendix C1). 2.3 Newington The R510 ESS installed in Newington is located in a suburban area, which generally experiences a very high standard of power quality. While the ESS at Newington has operated under several types of cycles, it is currently operating under Profile G (see Appendix D). When it is in the load following mode, the ESS discharges power to the household load if the generation from the solar panels and the fuel cell in insufficient, and charges from any excess generation that exceeds the household load. The efficiency and reliability of the R510 ESS in reducing the peak demand of the Smart Home seen by the grid was tested. The results of this are presented in Section 3.3. 11/10/2012 Page 5

Grid Feed Power (kw) kwh % 3 Results Over the period between 1 March and 31 May 2012, the R510 ESS installed for the SGSC trial have outputted a total of 14.334MWh to the grid at an average efficiency of 58.03%. This is shown in the graph below in Figure 12. 10000 8000 SGSC ESS Grid Interaction 100 80 6000 4000 2000 60 40 20 0 March April May Grid Import (kwh) Grid Export (kwh) Efficiency (%) 0 Figure 12: Total grid import and export over the trial period with average monthly efficiency 3.1 Newcastle 3.1.1 Peak Demand Reduction The ESS installed in Newcastle have had significant impact on the peak demand seen by the grid. Analysis has shown that during the cooler Autumn months, a ratio of 4 ESS to 65 residential customers produced reductions of peak demand seen by the grid during the traditional peak period (between the hours of 4pm and 10pm on weeknights) by an average of 5.39% in May. This is with 4 ESS operational for most of the month (1 ESS recommenced operation on 10 May after being out of service since the start of the month), and therefore a ratio of approximately 1 ESS for 16 customers. A typical output curve of the cumulative ESS is shown in Figure 13. 10 9 8 7 6 5 4 3 2 1 0 3 ESS on Profile A feed in 9kW total Power Fed into the Grid by 4 ESS 3 ESS on Profile A are almost flat 1 ESS on Profile B feeds in 3kW 4:00 5:00 6:00 7:00 8:00 9:00 10:00 Figure 13: A typical feed-in curve for the 4 ESS on the Melinda Avenue feeder 11/10/2012 Page 6

Grid Power (kw) Reduction in Peak Demand (%) However, the irregularity of this curve results in only very small peak reductions when peaks occur around 7pm, or after 9pm. The variability in peak reduction can be seen in Figure 14. 12 Reduction in Peak Demand (4pm to 10pm) in May 10 8 6 Peak occurs at times of low ESS feed-in power 4 2 0 Figure 14: The reduction in peak demand seen by the grid (4pm-10pm) in May on the Melinda Avenue feeder Despite this, the ESS have been capable of achieving peak reduction of about 15% (see Figure 15). A grid peak demand graph for the week of Monday 9 April 2012, showing similar results, is given in Appendix E. Grid-Feed Period Monday 9 April 2012 90 80 70 Peak Reduction 15.19% 65 Residential Customers 4 R510 ESS 60 50 40 30 20 10 0 3:40 4:10 4:40 5:10 5:40 6:10 6:40 7:10 7:40 8:10 8:40 9:10 9:40 10:10 Real Power (kw) with Storage Real Power (kw) without Storage Figure 15: Reduction in peak demand seen by the Melinda Avenue feeder during traditional peak times However, in this particular area of Newcastle, many homes are fitted with automatic hot water systems that are set to charge at 11pm. As can be seen in Figure 16, this causes a much larger peak than that seen during traditional peak periods, when the ESS are discharging into the grid. Therefore, while the ESS are effectively reducing the traditional evening peak, they are not addressing the actual peaks see by the grid. 11/10/2012 Page 7

% kw 140 120 100 80 60 40 20 Effect of Hot Water Systems Peak Reduction shown in Figure 15 Monday 9 April 43.29% increase of traditional evening peak 65 Residential Customers 4 R510 ESS Tuesday 10 April 0 12:00 AM 6:00 AM 12:00 6:00 12:00 AM 6:00 AM 12:00 6:00 12:00 AM Real Power (kw) with Storage Real Power (kw) without Storage Figure 16: The peaks caused by automatic hot water systems on the Melinda Avenue feeder This highlights the importance of thorough load profiling prior to setting charge/discharge profiles for residential ESS aimed at reducing peaks in demand seen by the grid. In the case of the Newcastle ESS involved in the SGSC trial, this would have raised two main issues. Firstly, the ESS should be discharging between about 11pm and 2am to reduce the true peak caused by the hot water systems. Furthermore, the discharge profiles should be more appropriately staggered to achieve a smoother collective output curve, that discharges more power during times when the load curve is normally highest. These measures would aid in reducing the peak demand seen by the grid even more than the significant reductions already provided by the ESS. 3.1.2 Reliability As the ZBM is still an emerging technology, the reliability of the R510 is an important aspect of evaluating its value in Smart Grid applications of energy storage. As can be seen in Figure 17, the vast majority of ZBMs were available for operation throughout the study period, showing that ZBM failure is not the main cause for making ESS unavailable. 100 80 Percentage of Newcastle ZBM and ESS Available 60 40 20 0 1-Mar 13-Mar 25-Mar 6-Apr 18-Apr 30-Apr 12-May 24-May Newcastle ZBM Available Newcastle ESS Available Figure 17: Availability of ZBMs and ESS in Newcastle 11/10/2012 Page 8

Power (kva) Power (kva) 3.2 Scone 3.2.1 Peak Demand Reduction The ESS installed in Scone have had significant impact on the peak demand seen by the grid. This is due in part to the high ratio of ESS to customers (just over 1 ESS per customer) in this semi-rural area. Analysis has shown that during the cooler Autumn and Winter months, the usual evening peak seen by the grid (see Figure 18) is transformed into a noticeable trough with the use of RedFlow s ESS (see Figure 19). Power on Miranee Road Recloser No Energy Storage in Use 13 Residential Customers 100 90 80 70 60 50 40 30 20 10 0 12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 3:00 6:00 9:00 12:00 AM Figure 18: Average power on the Scone recloser 14 to 18 May (before RedFlow ESS commenced full operation) 100 90 80 70 60 50 40 30 20 10 0 Power on Miranee Road Recloser Energy Storage in Use Grid Charge Period 28kW Grid Charge Period 12kW Grid- Feed Period 45kW 13 Residential Customers 15 R510 ESS 12:00 AM 3:00 AM 6:00 AM 9:00 AM 12:00 3:00 6:00 9:00 12:00 AM Figure 19: Average power on the Scone recloser 18 to 22 June (with RedFlow ESS operational) However, it can also be seen that peaks occur very late at night, and in the early morning due to automatic off-peak hot water systems turning on. However, these hot water system peaks are not significantly larger in magnitude than the traditional morning and evening peaks. 11/10/2012 Page 9

Power (kw) % 3.2.2 Reliability As the ZBM is still an emerging technology, the reliability of the R510 is an important aspect of evaluating its value in Smart Grid and islanding applications of energy storage. As can be seen in Figure 20, the vast majority of ZBMs were available for operation throughout the study period, showing that ZBM failure is not the main cause for making ESS unavailable. 100 80 Percentage of Scone ZBM and ESS Available 60 40 20 0 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May Scone ZBM Available Scone ESS Available Figure 20: Availability of ZBMs and ESS in Scone 3.3 Newington 3.3.1 Load Following Results, such as those presented in Figure 21, show that the R510 ESS can charge and discharge according to the needs of the load, as well as discharge when interruptions to normal generation occur. This is known as load following. Blue Gen Fuel Cell Outage Performance 6 5 4 3 2 1 0-1 -2-3 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 Fuel cell outage 2:00 4:00 ZBM discharges to satisfy load ZBM discharges in preparation to strip 6:00 8:00 InvPwrAt [kw] Blue Gen Power Total Usage 10:00 Figure 21: The ESS can dynamically follow the load, and any sudden changes to generation 11/10/2012 Page 10

3.3.2 Reliability The R510 at Newington was installed on 5 October 2011. It engaged in daily operation until 20 December, when it was shut down because its ZBM s health was deteriorating and a fault was expected to soon occur. Soon after, the resident family moved out of the Smart Home and Ausgrid suspended the operation of most of the Smart Home s elements while it underwent upgrades and maintenance. The R510 ESS was kept shut down until late March when the ZBM was replaced. After a series of calibration and test cycles, the ESS was shut down again until the new resident family moved into the Smart Home on 28 April, at which point the ESS recommenced operation. It has not experienced a fault since this time. At the end of May 2012, the new ZBM installed at the Smart Home had undertaken 48 cycles (of less than 100% depth of discharge due to the shortage of excess generation from the Smart Home to charge the ZBM), and outputted 87.23kWh. 11/10/2012 Page 11

4 Lessons Learnt 4.1 Newcastle The 40 systems in Newcastle were the first R510s to be installed on a large scale for RedFlow. As a result of this, and early operation, the following important points were observed for future work in the area. The use of specialist installers, O Donnell Griffin (ODG), has been highly beneficial in the rollout of ESS to Newcastle. This brought expertise to the project that RedFlow did not have, and will be used in future large-scale trials. Small issues with Newcastle installations shaped changes to the process during Scone installations. RedFlow needs to have unlimited access to data sent from each ESS. In the case of the SGSC project, Ausgrid kept data on their machines, which made it highly difficult and timeconsuming for RedFlow to acquire and analyse data from systems for both monitoring and improvement purposes. An average of 76.14% of the ESS installed for the SGSC Trial were available for operation over this study period. While this can be improved, the average of 96.65% availability of ZBMs over the same time period means that most ESS faults were not due to ZBM failures. Instead, it was elements of the ESS, and in particular the analogue looms that caused most ESS faults. This shows the reliability of the core ZBM product, as well as the need for specialist system integrators to be involved in the design and manufacturing of future ESS. It is important to carry out appropriate load and distributed generation analyses prior to project commencement. In the case of Newcastle, this would have shown the large peaks caused by the automatic hot water systems. In response to this, and in addressing the true peaks in the Newcastle area, the discharge period of the ESS should be shifted, or hot water systems should begin charging at staggered times. The ESS have been installed at suitable ratios (1 ESS for every 16 customers) to the number of customers in respective areas to achieve reductions in peak demand seen by the grid by about 5-10%. However, reductions could be improved with different discharge profiles. Regardless, the number of ESS may need to be increased to see the same peak reduction results during the summer months. 4.2 Scone The following lessons were also noted for the installation and operation of the 20 ESS in Scone. The use of specialist installers, O Donnell Griffin (ODG), has also been highly beneficial in the roll-out of ESS to Scone. RedFlow needs to have unlimited access to data sent from each ESS. In the case of the SGSC project, Ausgrid kept data on their machines, which made it highly difficult and timeconsuming for RedFlow to acquire and analyse data from systems for both monitoring and improvement purposes. 11/10/2012 Page 12

An average of 79.57% of the ESS installed for the SGSC Trial were available for operation over this study period. While this can be improved, the average of 92.24% availability of ZBMs over the same time period means that most ESS faults were not due to ZBM failures. This shows the reliability of the core ZBM product, as well as the need for specialist system integrators to be involved in the design and manufacturing of future ESS. 4.3 Newington The R510 ESS, as well as previous ESS, installed at the Newington Smart Home have produced the following lessons learnt from installation and operation. The 5kW, 10kWh rating of the R510 ESS is appropriate for the needs of the Smart Home household load (approximately 15kWh/day), and would still be suitable for slightly higher loads. Large and continuous loads, such as the EV, are often too large for the ESS to sustain without requiring power from the grid. There is a need for a fuel cell or other similar reliable form of embedded generation to backup solar generation in off-grid or minimum grid import Smart Grid applications. The effectiveness of the R510 in conjunction with embedded generation to load follow and greatly reduce grid import to below 8% of the time. 11/10/2012 Page 13

5 Conclusions Overall, this project has shown that ZBMs in R510 ESS are a suitable type of energy storage to use in Smart Grid applications. The ZBM is reliable and effective in reducing peak demand seen by the grid, as well as in islanding applications. Overall, RedFlow has learnt many valuable lessons over the course of the SGSC Trial, and will use these to improve upon their technology and installation procedures for future Smart Grid ESS designs. These have included: The benefits of using specialist installers to carry out large-scale installations of ESS. The importance of complete access to trial data for monitoring and analysis. The ZBM is a reliable product, and was by far not the main cause of ESS failures. The subsequent need for specialist system integrators to be involved in the design and manufacturing of future ESS. 11/10/2012 Page 14

6 References [1] Ausgrid. (2011) Program Trial Areas, Ausgrid. [Online]. Available: http://www.smartgridsmartcity.com.au/about-smart-grid-smart- City/~/media/Microsites/SGSC/Files/PDFs/Smart%20Grid%20Smart%20City%20project%20trial %20map.pdf [2] Electrical Power Research Institute (EPRI), Estimating the Costs and Benefits of the Smart Grid: A Preliminary Estimate of the Investment Requirements and the Resultant Benefits of a Fully Functioning Smart Grid, EPRI, Palo Alto, CA, Final Report 1022519, Mar. 2011. [3] M. Dean. (2012, Jun. 20). Smart Grid growth to spur demand for energy storage [Online]. Available: http://www.pennenergy.com/index/power/display/3319716882/articles/pennenergy/power/gr id/2012/june/-smart_grid_growth.html 11/10/2012 Page 15

Appendix A List of Abbreviations BMS - Battery Management System CAES - Compressed Air Energy Storage EPRI - Electric Power Research Institute ESS - Energy Storage System RTU - Remote Terminal Unit SGSC - Smart Grid, Smart Cities ZBM - Zinc Bromide Module 11/10/2012 Page 16

Appendix B R510 Product Brochure 11/10/2012 Page 17

11/10/2012 Page 18

11/10/2012 Page 19

Appendix C List of Trial Sites 11/10/2012 Page 20

Appendix C1 List of Newcastle Sites Site ZBM # Date of Cabinet ID Number (Class) Commissioning Schedule Status Comments 159 195 R510-A1-DE13-159 17 November 2011 Profile A Operational Leak 1 Trip 160 184 R510-A1-DE14-160 17 November 2011 Profile A Operational 161 319(A+) R510-A1-DE15-161 17 November 2011 Profile A Operational 2 ZBM Replacements 162 194 R510-A1-DE22-162 17 November 2011 Profile A Not Operational 163 318 (A+) R510-A1-DE17-163 17 November 2011 Profile A Operational ZBM Replacement 164 339 (A+) R510-A1-DE18-164 17 November 2011 Profile A Operational ZBM Replacement Previous SMA Fault 165 346 (A+) R510-A1-DE19-165 17 November 2011 Profile A Unknown Fault ZBM Replacement Q4 Switching 166 304 (A+) R510-A1-DE20-166 17 November 2011 Profile A Not Operational System Noise ZBM Replacement 167 300 (A+) R510-A1-DE21-167 17 November 2011 Profile A Operational ZBM Replacement 168 311 (A+) R510-A1-DE22-168 17 November 2011 Profile A Operational Analog Loom Fixed ZBM Replacement 169 341 (A+) R510-A1-DE23-169 17 November 2011 Profile B Not Operational System Noise ZBM Replacement 170 301 (A+) R510-A1-DE24-170 17 November 2011 Profile B Operational ZBM Replacement 171 297 (A+) R510-A1-DE25-171 17 November 2011 Profile B Not Operational ZBM replacement 172 309 (A+) R510-A1-DE26-172 17 November 2011 Profile B Operational ZBM Replacement 173 307 (A+) R510-A1-DE27-173 17 November 2011 Profile B Operational ZBM Replacement 174 226 (B) R510-A1-DF01-174 21 December 2011 Profile B Operational 175 317 (A+) R510-A1-DF02-175 21 December 2011 Profile B Operational ZBM Replacement 176 238 (A) R510-A1-DF03-176 21 December 2011 Profile B Operational Leak1 Trip and Battery Voltage Fail 177 240 (A) R510-A1-DF04-177 12 December 2011 Profile B Not Operational BC Firmware Upgrade Required 178 233 (A) R510-A1-DF05-178 12 December 2011 Profile B Operational Incorrect Installation 179 329 (A+) R510-A1-DF06-179 12 December 2011 Profile C Not Operational Previous RTU Fault ZBM Replacement 11/10/2012 Page 21

Site ZBM # Date of Cabinet ID Number (Class) Commissioning Schedule Status Comments 180 235 (A) R510-A1-DF07-180 21 December 2011 Profile C Not Operational System Noise 181 244 (A) R510-A1-DE08-181 12 December 2011 Profile C Operational Previous Analog Loom Failure 182 237 (A) R510-A1-DF09-182 12 December 2011 Profile C Operational Incorrect Installation 183 234 (A) R510-A1-DF10-183 12 December 2011 Profile C Not Operational 184 295 (A+) R510-A1-DF11-184 21 December 2011 Profile C Operational Incorrect Installation ZBM Replacement Previous Analog Loom Fault 185 186 (A) R510-A1-DF12-185 12 December 2011 Profile C ZBM Fault RTU Lost Comms with BC 186 305 (A+) R510-A1-DE13-186 12 December 2011 Profile C Operational ZBM Replacement 187 239 (A) R510-A1-DF14-187 21 December 2011 Profile C Operational 188 245 (B) R510-A1-DF15-188 12 December 2011 Profile C Operational Previous Analogue Loom Fault 189 257 (A) R510-A1-DG01-189 21 December 2011 Profile D Not Operational 190 349 (A+) R510-A1-DG01-190 21 December 2011 Profile D Operational ZBM Replacement 191 264 (A) R510-A1-DG01-191 21 December 2011 Profile D Operational 192 350 (A+) R510-A1-DG01-192 21 December 2011 Profile D Not Operational ZBM Replacement 193 249 (A) R510-A1-DG01-193 21 December 2011 Profile D Unknown Fault Mains Fail, Needs AS Board Replacement 194 248 (A) R510-A1-DG01-194 21 December 2011 Profile D Operational 195 303 (A+) R510-A1-DG01-195 21 December 2011 Profile D Operational ZBM Replacement 196 330 (A+) R510-A1-DG01-196 21 December 2011 Profile D Battery Controller Amp Lockout Failure Fault ZBM Replacement 197 263 (A) R510-A1-DG01-197 21 December 2011 Profile D Operational 198 331 (A+) R510-A1-DG01-198 21 December 2011 Profile D Operational ZBM Replacement 11/10/2012 Page 22

Appendix C2 List of Scone Sites Site ZBM # Number (Class) Cabinet ID Date of Commissioning Schedule Status Comments 199 261 (A+) R510-A1-DG01-199 29 March 2012 Profile F Operational 200 262 (A+) R510-A1-DG01-200 29 March 2012 Profile E Operational ZBM Replacement 201 348 (A+) R510-A1-DG01-201 29 March 2012 Profile F Operational ZBM Replacement 202 265 (A+) R510-A1-DG01-202 4 April 2012 Profile F Operational 203 343 (A+) R510-A1-DH01-203 28 March 2012 Profile F Operational ZBM Replacement 204 271 (A+) R510-A1-DH01-204 29 March 2012 Profile E Operational 205 258 (A+) R510-A1-DH01-205 4 April 2012 Profile F Operational 206 272 (A) R510-A1-DH01-206 4 April 2012 Profile F Operational Previous Analog Loom Fault 207 342 (A+) R510-A1-DH01-207 29 March 2012 Profile E Operational ZBM Replacement 208 267 (A+) R510-A1-DH01-208 4 April 2012 Profile F Operational 209 340 (A+) R510-A1-DH01-209 29 March 2012 Profile E Operational ZBM Replacement 210 185 (A) R510-A1-DH01-210 30 March 2012 Profile F Operational Previous ZBM Fault 211 344 (A+) R510-A1-DH01-211 28 March 2012 Profile F Operational ZBM Replacement 212 282 (A) R510-A1-DH01-212 28 March 2012 Profile F Operational Previous Battery Controller Fault 213 313 (A+) R510-A1-DH01-213 28 March 2012 Profile F Operational ZBM Replacement 214 284 (A) R510-A1-DH01-214 29 March 2012 Profile E Operational 215 347 (A+) R510-A1-DH01-215 28 March 2012 Profile F Not Operational ZBM Replacement Grid Fault 216 281 (A) R510-A1-DH01-216 28 March 2012 Profile F Operational Previous Battery Controller Fault 217 278 (A) R510-A1-DH01-217 29 March 2012 Profile E Operational 218 276 (A) R510-A1-DH01-218 30 March 2012 Profile F Operational 11/10/2012 Page 23

Appendix D Cycle Profiles Profile A Profile B Profile C Profile D Profile E Profile F Profile G Profile Days of the Week Active Time Power Charge 2am to 8am 2kW Monday to Friday Discharge 4pm to 2am 3kW Charge 2am to 8am 2kW Monday to Friday Discharge 7pm to 2am 3kW Charge 2am to 8am 2kW Monday to Friday Discharge 5pm to 2am 5kW Charge 2am to 8am 2kW Monday to Friday Discharge 7pm to 2am 5kW Charge 8am to 2pm 2kW Monday to Friday Discharge 5pm to 2am 3kW Charge 1am to 7am 2kW Monday to Friday Discharge 6pm to 1am 3kW Charge 2am to 7am 2kW Monday, Wednesday, Friday, Load Follow 7am to 11pm Load Following Sunday Discharge 11pm to 2am 4.5kW 11/10/2012 Page 24

12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM 12:00 4:00 8:00 12:00 AM 4:00 AM 8:00 AM Grid Power (kw) Appendix E Newcastle Reduction in Peak Demand Effect of Storage on Peak Reduction - April 2012 140 120 Friday 6 April Saturday 7 April Sunday 8 April Monday 9 April Tuesday 10 April Wednesday 11 April Thursday 12 April Friday 13 April 100 80 Peak Reduction 17.78% Peak Reduction 15.19% Peak Reduction 14.78% Peak Reduction 14.13% Peak Reduction 14.85% 60 40 20 0 Real Power (kw) with Storage Real Power (kw) without Storage 65 Residential Customers 4 R510 ESS Operating 11/10/2012 Page 25