FUEL DISPENSING AND STORAGE EQUIPMENT FORM 1306 (See Form 1306 Requirements and Instructions) Form 1300 must accompany this application.

Similar documents
4. No person shall install a coaxial Phase I vapor recovery system unless the system was certified by CARB after January 1, 1994.

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-204-U. Relating to Certification of Vapor Recovery Systems

New Amendment to Executive Orders VR-203-N & VR-204-N

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District

Ohio EPA. Division of Air Pollution Control. Engineering Guide #12

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B

Important Information: Aboveground Gasoline Storage Tanks Upcoming Standing Loss Control & Phase I/II EVR Requirements

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

RULE 449 TRANSFER OF GASOLINE INTO VEHICLE FUEL TANKS

REGULATION II PROHIBITIONS. 1.1 Purpose To limit the emission of gasoline vapor into the atmosphere during the filling of motor vehicle fuel tanks.

Executive Order G F

RULE 448 GASOLINE TRANSFER INTO STATIONARY STORAGE CONTAINERS Adopted (Amended , , , , , ) INDEX

E. Augusta, Spokane, WA (509) E. Augusta, Spokane, WA (509)

Executive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer. Exhibit 2 System Specifications

State of New Jersey. Department of Environmental Protection Air Quality Permitting

RE: FINAL PERMIT TO INSTALL CERTIFIED MAIL BUTLER COUNTY Application No:

San Joaquin Valley Air Pollution Control District Vapor Recovery Requirements for Permitted Agricultural Gasoline Storage and Dispensing Operations

TRANSFER OF GASOLINE FROM STATIONARY UNDERGROUND STORAGE TANKS INTO VEHICLE FUEL TANKS (Effect. 03/01/06: Rev. 03/26/08)

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

EVR Hose Configuration

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-004A) For FUEL DISPENSING FACILITIES

Air Quality Requirements for Gasoline Dispensing

INTERIM DRAFT November 1, 2017

Enhanced Vapor Recovery and In-Station Diagnostics. Presented by: Matthew Schuessler, N Cal Territory Mgr 1

Update on Enhanced Vapor Recovery (EVR) and In-Station Diagnostics (ISD) at Gasoline Dispensing Facilities

The purpose of this rule is to limit emissions of gasoline vapors from the transfer of gasoline into motor vehicle fuel tanks.

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-301-B

SWCAA 491. Emission Standards and Controls for Sources Emitting Gasoline Vapors

Executive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer

The purpose of this rule is to limit emissions of gasoline vapors from the transfer of gasoline into motor vehicle fuel tanks.

Exhibit 5. Vapor to Liquid Volume Ratio (Executive Orders VR-201-F and VR-202-F) (Healy Model 900 EVR Nozzle)

PETROLEUM PRODUCT STORAGE TANK REGULATION SAFETY AND BUILDINGS DIVISION BUREAU OF PETROLEUM INSPECTION AND FIRE PROTECTION

REGISTRATION REQUIREMENTS FOR EQUIPMENT SUBJECT TO CALIFORNIA S OIL AND GAS REGULATION (Adopted December 21, 2017)

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

(Please type or use black ink)

The VST Enviro-Loc Vapor Recovery System

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Testing Requirements for UST s and AST s. By Mark Lindsey June 27 th, 2013

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS

Date. Director c/o Petroleum Storage Program Manitoba Conservation and Water Stewardship 1007 Century Street Winnipeg, MB R3H 0W4

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-209-A

Franklin Fueling Systems

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

Stay-put scuff guard helps to protect the dispensers from scratches and the breakaway during a drive-off event

School buses must be at least 14 years old but no older than 16 years to receive funding.

Franklin Fueling Systems

VST EVR Total Balance System Solution

APPLICATION for BUSINESS LICENSE Licensing & Permits City of Williston PO Box 1306, Williston, ND

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00

1

FACTS ABOUT: MARYLAND CONTAINMENT SUMP TESTING PROTOCOL WHO CAN PERFORM THE TEST

New Tank Installations. Peter Rollo

TRANSFER OF ORGANIC COMPOUNDS INTO MOBILE TRANSPORT TANKS (Effect: 5/6/77: Rev. Effect. 7/26/00)

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

40 CFR 63, Subpart CCCCCC

~ SWCAA TECHNICAL SUPPORT DOCUMENT BELMONT LOOP CHEVRON Belmont Loop, Woodland, WA SWCAA ID: Air Discharge Permit SWCAA

Emergency Vehicle Application Package

Owner s Manual Supplement. Liquefied Petroleum Gas (LPG) Fuel System for 1998 GM Medium Duty Chassis (C-60/C-70) with 6.0L and 7.

County of Yolo UNDERGROUND STORAGE TANK PROGRAM INSTALLATION/MODIFICATION/REPAIR APPLICATION

Instructions for Submittal of a Annual On-Street Valet Parking Permit

State of California AIR RESOURCES BOARD EXECUTIVE ORDER NVR-1-C. Relating to Certification of Non-Vapor Recovery Hoses

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Instructions for Submittal of a Annual On-Street Valet Parking Permit

LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001)

RENEWABLE FUEL INFRASTRUCTURE PROGRAM APPLICATION FORM

2018 CLEAN AIR GRANTS ON-ROAD VEHICLE PROGRAM

Safe Operating Procedure

Environmental Standard Operating Procedure (ESOP) Originating Office: Natural Resources and Environmental Affairs (NREA) Office

ADDENDUM NO. #1 ITB # FLORIDA A&M UNIVERSITY (FAMU) FUEL STORAGE TANK INSPECTIONS December 8, 2017

VOUCHER INCENTIVE PROGRAM Application Package

AUTHORITY TO CONSTRUCT

Greater Vancouver Regional District Gasoline Distribution Emission Regulation Bylaw No. 1085, 2008

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

CITY OF DALLAS WATER DEPARTMENT LIQUID WASTE PROGRAM APPLICATION FOR LIQUID WASTE TRANSPORTATION PERMIT

Compliance Strategies and Benefits

UNDERGROUND STORAGE TANK INSPECTION CHECKLIST

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT

COUNTY OF FRESNO ADDENDUM NUMBER: ONE (1) RFQ NUMBER: FUEL SITE REPAIRS, MAINTENANCE, TESTING AND TANK MONITORING UPGRADES

Petroleum Storage Program

Municipality Generator Interconnection Application Single Meter Application Part I

Taxicab and Vehicle for Hire- New Driver Packet

Regulation of Commercial Waste Originators, Pumpers, Transporters, Processors, and Disposal Facilities

Widespread Use Assessment for On-Board Refueling Vapor Recovery. Gasoline Vapor Recovery Conference Manchester, NH May 1, 2007 Eric Skelton

RHODE ISLAND New England Storage Tanks Conference Westborough, MA. Joe Cunningham Jillian Thompson

Laboratory Evaluation Report for: Laboratory Faucet Backflow Preventer

COLLECTION AND DISPOSAL PERMIT FOR SOLID WASTE, CONSTRUCTION AND DEMOLITION DEBRIS, GREEN WASTE AND RECYCLABLES

These regulations are created pursuant to and of the Colorado Revised Statutes.

REGULATION II PROHIBITIONS

APPENDIX B. DYNAMIC PRESSURE PERFORMANCE TEST (taken from BAAQMD test procedure ST-27)

Underground Oil Storage Tanks Annual Inspection Report

SECTION VEHICLE FUEL DISPENSING EQUIPMENT

Applicant Information All spaces must be filled in. Applications with blank spaces will be rejected.

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Schedule Z Additional Information Required for Net Metering Service. Is the Host Customer a: Municipality Other Governmental Entity

Transcription:

North Coast Unified Air Quality Management District 707 L Street Eureka, CA 95501 (707) 443-3093 FUEL DISPENSING AND STORAGE EQUIPMENT FORM 1306 (See Form 1306 Requirements and Instructions) Form 1300 must accompany this application. Section I - Facility/Application Information 1. Legal owner/operator: 2. Facility name: 3. Facility address: 4. Is this application for a change in throughput condition? yes no a. Date the throughput change will/did occur: / / 5. Operating Schedule: hours/day days/year Section II - Equipment Information 1. UNDERGROUND STORAGE TANK INFORMATION: COMPLETE AND CHECK THE APPROPRIATE COLUMNS Tank Phase I Design Manifold Location Tan Fuel Type Capacity New Existing Coaxial Two- Underground At Vent k (e.g. Unleaded) (Gallons) Point No. Remove a. Provide Phase I CARB Executive Order Number (see Instructions): b. Are any of these storage tanks dual or multi-compartment? No Yes Identify each compartment in a separate row by tank number and letter (e.g. 1A, 1B, 1C, etc.). c. Will any of these storage tanks be located in a vault below grade? No Yes d. Will a condensate/vapor trap be installed in the vapor return line? No Yes e. Will the tank(s) at this site contain a remote fill? No Yes f. Will a flex-type piping be used for the vapor return line? No Yes All EXISTING gasoline storage tanks shall be equipped with the following CARB certified equipment: Phase I Vapor Control; Submerged Fill Tubes; and, Spill Boxes. In addition to the above mentioned requirements, all NEW construction or tank replacement applications shall have a two point design Phase I vapor recovery system. 2. ABOVEGROUND STORAGE TANK INFORMATION: COMPLETE AND Check the Appropriate Columns Tank No. Fuel type (e.g.; Reg, Unleaded) Tank Capacity (Gallons) Tank Dimensions LxWxHxDia (Feet- Inches) Tank Manufacturer Control Type* or CARB EO Stack Height (Feet) Hose Length (Feet) New Existing Remove Are any of these storage tanks dual or multi-compartment? No Yes Identify each compartment in a separate row by tank number and letter (e.g. 1A, 1B, 1C, etc.). FORM 1306, Revised 05/2012 page 1 of 6

3. PLOT PLAN For new construction, alterations, or vent pipe relocations, submit equipment location drawings which shall be to scale and shall show at least the following: a. the property line, an outline and identification of all buildings, and a North indicator; b. all adjacent streets and properties outside the property line. Identify adjacent properties by type of business or residential; c. the location and identification of proposed equipment on the property including all underground and aboveground tanks and tank compartments, all underground and aboveground vapor recovery and product piping with pipe diameters, and all islands, dispensers, and fueling positions; and d. details of dispenser nozzles, vapor return connectors, vent pipe locations, and vapor processing systems (if any). (Any vapor processing system being installed or operated must be of a type certified by the California Air Resources Board); and e. the distance and direction to the nearest residence or business from the center of operations, and to any K-12 school property boundary within 1000 ft of the vent pipe or other air contaminant emitting equipment. 4. FUELING POSITION INFORMATION: COMPLETE FOR ALTERATIONS OR NEW CONSTRUCTION Total Number of Fueling Positions After Alteration or New Construction Total Number of Fueling Positions Prior to Alteration (For Alterations Only) 5. NOZZLE INFORMATION: COMPLETE ALL COLUMNS Fuel Type (e.g. Unleaded, Diesel) # New Nozzles # Existing Nozzles # Removed Nozzles CARB Executive Order OR Control Type* (Phase II) Maximum Monthly Throughput (Gal/Mo) Maximum Annual Throughput (Gal/Yr) *See lists in Instructions for form 1306. 6. GASOLINE PRODUCT INFORMATION: COMPLETE BLANKS BELOW Number of nozzle(s) dispensing ONE product (grade) of gasoline: X 1 = Number of nozzle(s) dispensing TWO products (grades) of gasoline: X 2 = Number of nozzle(s) dispensing THREE products (grades) of gasoline: X 3 = TOTAL NOZZLE COUNT: TOTAL PRODUCT COUNT 7. DISPENSER INFORMATION: COMPLETE AND Check the Appropriate Columns Dispenser No. of Similar Make Model No. Dispensers New Dispenser Existing Removed No. of Nozzles Per Dispenser Unleaded Diesel Methanol 8. THROUGHPUT INFORMATION: PROVIDE THROUGHPUT RECORDS FOR THE PAST 2 YEARS (EXISTING SITES) Year of Operation Fuel Type Throughput (Gal/Yr) Days of Operation Gasoline Gasoline FORM 1306, Revised 05/2012 page 2 of 6

9. For existing gasoline storage and dispensing systems and based on the following, please provide a copy of your MOST recent vapor recovery test results. a. Balance System Tests: Static Pressure (Leak-Decay); Dynamic Pressure (Back-Pressure); and, Liquid Removal (if applicable). b. Vacuum Assisted System Tests (Except Healy and Hirt Systems): Static Pressure (Leak-Decay); and, Air-to-Liquid Ratio (A/L). c.. Healy Vacuum Assisted System Tests: Static Pressure (Leak-Decay); Air-to-Liquid Ratio (A/L); and, Vapor Return Line. d. Vacuum Assisted Hirt System Test: Air-to-Liquid Ratio (A/L). e. For systems not mentioned, provide required test results as per that system s executive order. 10. Have you included the plot plan described in number 3 above with all required information? Yes No Section III - Applicant Certification Statement I HEREBY CERTIFY THAT ALL INFORMATION CONTAINED HEREIN AND INFORMATION SUBMITTED WITH THIS APPLICATION IS TRUE AND CORRECT. SIGNATURE OF RESPONSIBLE OFFICIAL OF FIRM: TITLE OF RESPONSIBLE OFFICIAL OF FIRM: TYPE OR PRINT NAME OF RESPONSIBLE OFFICIAL OF FIRM: RESPONSIBLE OFFICIAL S TELEPHONE NUMBER DATE SIGNED: ( ) - / / I HEREBY CERTIFY THAT ALL INFORMATION CONTAINED HEREIN AND INFORMATION SUBMITTED WITH THIS APPLICATION IS TRUE AND CORRECT. SIGNATURE OF PREPARER: TITLE OF PREPARER AND COMPANY NAME: TYPE OR PRINT NAME OF PREPARER: PREPARER S TELEPHONE NUMBER DATE SIGNED: ( ) - / / SIGNATURE OF RESPONSIBLE MEMBER OF ORGANIZATION This form shall be signed by a responsible person from the company applying for the permit, rather than by the contractor working on the project. In addition, include a telephone number where this person can be contacted for additional information regarding this application. NOTE: IF FORM 1306 IS INCOMPLETE, THE APPLICATION WILL BE RETURNED FORM 1306, Revised 05/2012 page 3 of 6 Requirements

FORM 1306 REQUIREMENTS WHO MUST APPLY FOR A PERMIT: A fuel transfer and dispensing permit application is required for any new installation, alteration, facility with an expired permit, change of permittee, or change of permit condition. WHEN TO APPLY: Prior to any new construction, alteration, or change of permit condition. An application should be filed prior to use if ownership has changed. Installing any equipment contrary to the Authority to Construct Permit or to the information provided in this form without notifying the AQMD will void this application or your permit, and will require submittal of a new application and associated fees. Sites with expired permits or existing equipment operating without a permit should apply as soon as possible to avoid possible enforcement action. Sites requesting a change of permit condition must receive new permit approval prior to dispensing requested throughput change. HOW TO APPLY: A. Fill out Forms 1306 for each facility for new construction, alteration, change of permittee, change of permit condition, and reinstatement of expired permits. If the NCUAQMD has identified your facility as a Title V facility, use the telephone numbers in Section B below to obtain further assistance. B. The proper filing fee is found in NCUAQMD Regulation 3, Rule 1-300. Checks or money orders should be made payable to the North Coast Unified Air Quality Management District. Send the completed application to: NCUAQMD, 2300 Myrtle Avenue, Eureka, CA 95501. Further information may be obtained by calling (707) 443-3093. C. For new construction, alterations, or vent pipe relocations, submit equipment location drawings which shall be to scale (suggested scale: 1 inch = 100 feet; accuracy of measurements to the nearest 5 feet will be satisfactory) and shall show at least the following: a. the property line, an outline and identification of all buildings, and a North indicator; b. all adjacent streets and properties outside the property line. Identify adjacent properties by type of business or residential; c. the location and identification of proposed equipment on the property including all underground and aboveground tanks and tank compartments, all underground and aboveground vapor recovery and product piping with pipe diameters, and all islands, dispensers, and fueling positions; d. details of dispenser nozzles, vapor return connectors, vent pipe locations, and vapor processing systems (if any). (Any vapor processing system being installed or operated must be of a type certified by the California Air Resources Board); and e. the distance and direction to the nearest residence or business from the center of operations, and to any K- 12 school property boundary within 1000 ft of the vent pipe or other air contaminant emitting equipment. D. For all existing sites, submit annual gasoline throughput records and days of operation for the last two years. NOTICE: Construction prior to receipt of an Authority to Construct Permit, or operation prior to receipt of a Permit to Operate constitutes a violation of the Rules and Regulations of the NCUAQMD. VAPOR RECOVERY SYSTEMS: NCUAQMD Regulation 1, Rule 1-400(a) regulates the transfer of gasoline from delivery vehicles to storage tanks and requires installation of CARB certified submerged fill pipes, spill boxes, and vapor return equipment (Phase I vapor recovery). Phase I vapor recovery transfers these vapors from the storage tank into the unloading delivery vehicle so that it can be transported back to the terminal vapor processor for recovery or destruction. NCUAQMD Regulation 3, Rule 1-400(b) regulates the transfer of gasoline into motor vehicle tanks larger than five gallons. A special fill nozzle and vapor piping allow these vapors to be returned from the vehicle fuel tank to the storage tank or to vapor processing equipment (Phase II vapor recovery). This provision does not apply to remote retail gasoline stations with an annual throughput of 100,000 gallons or less (see Rule for details). For aboveground tanks and mobile refuelers dispensing gasoline the standard Phase I and Phase II vapor control systems must be installed for compliance. FORM 1306, Revised 05/2012 page 4 of 6 Requirements

UNDERGROUND TANKS AND PIPING: All gasoline equipment shall be installed, equipped, and operated with CARB certified equipment (submerged fill tubes, spill boxes, etc.). FORM 1306 INSTRUCTIONS For Section II, #1a UNDERGROUND STORAGE TANK INFORMATION Provide the type of fuel stored in each tank (e.g. gasoline grades, diesel, or methanol). CONTROL TYPE CODES FOR PHASE I VAPOR RECOVERY SYSTEMS* Phil-Tite VR-101-A Standard G-70-97-A (Standard cannot be used on new installs after 7/1/01) *If the system is not mentioned, provide CARB Executive Order (EO) Number. For Section II, #2, Column 5 ABOVE GROUND STORAGE TANK INFORMATION CONTROL TYPE CODES FOR PHASE II VAPOR RECOVERY SYSTEMS* (ABOVEGROUND TANKS) Above Ground Tank Vault G-70-160 Healy Model 400-ORVR G-70-187 Bryant G-70-168 Hoover Fuelmaster G-70-161 Containment Solutions Hoover Vault G-70-194 LRS Fuelmaster G-70-133-A Convault G-70-116-F Lube Cube G-70-148-A Cretex Fuel Vault G-70-195 Moiser Brothers G-70-152 Ecovault (Balance) G-70-157 P/T Vault G-70-143 Ecovault (Vacuum Assist) G-70-156 Petroleum Marketing G-70-155 Enviro Vault G-70-167 Petrovault G-70-130 Firesafe G-70-136 San Luis Firesafe G-70-158-A Fuelsafe G-70-137 Steel Tank Fireguard G-70-162-A Guardian Containment Armor Cast G-70-190 Supervault G-70-132-B Hasstech VCP-3A G-70-175 Tank Vault G-70-131-A *If the system is not mentioned, provide CARB Executive Order (EO) Number. For Section II, #4 - FUELING POSITIONS The number of fueling positions is equal to the number of nozzles that can mechanically and electronically be operated at the same time. A. 3 Fueling Positions B. 2 Fueling Positions C. 4 Fueling Positions For Section II, #5, Column 5 NOZZLE INFORMATION CONTROL TYPE CODES FOR PHASE II VAPOR RECOVERY SYSTEMS* (UNDERGROUND TANKS): Balance Hi Hose Hasstech VCP-3A Hirt VCS Balance Retractor Healy 400 ORVR MCS (Gilbarco) Vapor Vac Dresser/Wayne Wayne Vac Healy 600 MCS w/ Catlow Franklin Intellivac Healy 600 ORVR OPW Vapor EZ Hasstech Hirt Hi Hose Tokheim Max Vac *If the system is not mentioned, provide CARB Executive Order (EO) Number. For Section II, #6 - GASOLINE PRODUCTS FORM 1306, Revised 05/2012 page 5 of 6 Requirements

Complete table by identifying the number of gasoline nozzles that dispenses either one, two, or three products (grades). Compute the overall total nozzle count and total product count. PLOT PLAN FORM 1306, Revised 05/2012 page 6 of 6 Requirements