GAS UNITS KITS AND ACCESSORIES 504,605M 02/2002

Similar documents
Installation instructions for KIT15017, KIT15018, KIT15019, and KIT15020

Power Direct Vent PDV T Model

This parts list is current as of the above revision date. See for the current revision.

GY8S UPFLOW/HORIZONTAL (80%) NATURAL GAS FURNACES (STYLE C, see back ) INCLUDING LO-NOX (LY8S Models)

G95V Series Gas-Fired 95% 2-Stage High Efficiency (Condensing) Multi-Positional Furnace w/ ECM Circulator

Contents. Burner Components. Control Panel. Blower Assembly. Bard Manufacturing Company, Inc. Bryan, Ohio 43506

Contents. Burner Components. Control Panel. Blower Assembly. Bard Manufacturing Company, Inc. Bryan, Ohio 43506

REPLACEMENT PARTS MANUAL

TECHNICAL INSTRUCTIONS

TECHNICAL INSTRUCTIONS

ELITE SERIES Multi Position Two Stage Heat Variable Speed Blower

Ford 6.7 EGR Delete Kit

REPLACEMENT PARTS MANUAL

XIII. Repair Parts 106

TOP LEVEL FOR AUX1B080A9421AB Parts List Number :FURUP158 Model Number :AUX1B080A9421AB. Page 1 of 11

G23 Bulletin # September 1998 Supersedes June 1995

Figure 1-1(d) Tft Installation Kit

Heater Parts. LXi Low NOx. See Detail on next page Zodiac Pool Systems, Inc. Product Catalog. Heater Parts. After. July Before.

Save This Manual For Future Reference

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

TECHNICAL INSTRUCTIONS

NEW FURNACE PLATFORM PARTS LIST

RAYPAK ILLUSTRATED PARTS LIST

COMMERCIAL MODELS: XTHERM 1005A THROUGH 2005A

This parts list is current as of the above revision date. See for the current revision.

TECHNICAL SERVICE BULLETIN

INSTALLATION INSTRUCTIONS

RAYPAK ILLUSTRATED PARTS LIST

JANDY HEATERS A QUICK REFERENCE OF MOST COMMONLY REPLACED PARTS

15B SERIES II. Models 15B045FE 15B070FE 15B096FE 15B120FE 15B145FE 15B170FE 15B195FE 15B245FE 15B295FE

KG7T (C and L Series)

RAYPAK ILLUSTRATED PARTS LIST

This parts list is current as of the above revision date. See for the current revision.

COMMERCIAL and POOL MODELS: 302C THROUGH 902C

KG7T (E and N Series)

FG7T (E and N Series)

Q90-50/75/100 Series 4

nufacturing Company, L.P San Felipe, Suite 500

UB90-50/75/100 Series 4

Installation Instructions

This parts list is current as of the above revision date. See for the current revision.

RAYPAK ILLUSTRATED PARTS LIST

Q90-50/75/100 Series 2 Q Series 3

INSTALLATION INSTRUCTION ELECTRIC HEATER ACCESSORY MODELS 2NH THRU 2NH045025, 2NP THRU 2NP045025, 2ND , AND 2NX GENERAL

REPLACEMENT PARTS MANUAL

TECHNICAL INSTRUCTIONS

Replacement Parts List. Armor Condensing Water Heater. AW 151 thru 801. AWII-RP_ _ _Rev V

Replacement Parts List. Knight Fire Tube Boilers. KH 55 thru _ _Rev D

G60UHV. DAVE LENNOX SIGNATURE COLLECTION Up Flow / Horizontal Two Stage Heat Variable Speed Blower G A S F U R N A C E S

GUH 95 Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS

REPAIR PARTS. DCG 12.5 Ton Package Gas Unit. This manual is to be used by qualified technicians only. This manual replaces RP-D1011E.

2013 MASTER PARTS LIST Effective: 2013-May-01 to 2014-Apr-30

M-SERIES DIAPHRAGM COMPRESSOR REBUILD KIT

SUBMITTAL COVER SHEET

Energysaver 559FT. Rinnai New Zealand Limited Page 1 of 6 Rinnai Energysaver 559FT Spare Parts: 01-11

REPAIR PARTS. CPG Ton Commercial Pkg Gas Unit

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 6.7L

Replacement Parts List. Armor Condensing Water Heater. AW 151 thru 801. AWII-RP_ _ _Rev W

Installation Manual v2.2: Twin CP3 Fuel Injection Kit Dodge 5.9L

INSTALLATION INSTRUCTIONS NATURAL TO PROPANE CONVERSION KIT

N-084M and N-069M-DV Series Heat Exchanger Replacement

RAYPAK ILLUSTRATED PARTS LIST

UB Series 2 GAS-FIRED, DIRECT VENT, CONDENSING, HOT WATER BOILER. Models UB90-50 UB90-75 UB90-100

A.O. SMITH WATER PRODUCTS CO., INC W. 115TH STREET ALSIP, ILLINOIS Phone: Fax: Website:

Predator Model Number Nomenclature

Product Data. 95% AFUE Single Stage Furnace Upflow / Downflow / Horizontal. ama 58HDX COMFORT 95 DIRECT OR NON---DIRECT VENT CONDENSING GAS FURNACE

INSTALLATION INSTRUCTION ELECTRIC HEATER ACCESSORY MODELS 2NH THRU 2NH045025, 2NP THRU 2NP045025, 2ND , AND 2NX GENERAL

2500/2700 Series Gas Convection Oven

VG7S (D and M Series) High Efficiency, Single Stage Condensing Upflow/Horizontal and Downflow Gas Furnace Models 95.0 AFUE 38, ,000 Btuh Input

Installation, Operation and Maintenance Manual

nufacturing Company, L.P San Felipe, Suite 500

Circuit Board Diagnostics

N9MSB. PS 92 Product Specifications. 92.1% AFUE, Single Stage, PSC Gas Furnace EASIER TO SELL /2/17

KG7T (C and L Series)

WALL MOUNTED STAINLESS STEEL CONDENSING GAS BOILER PARTS, KITS & OPTIONAL ACCESSORIES

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

2006 Honda Civic SI Supercharger Kit Installation Instruction Kit #

REPAIR PARTS. Tubular Gas Furnaces GDT, GMT, GMTH

SECTION 4 - FUEL SYSTEMS AND CARBURETION

Installation, Operation and Maintenance Manual

Legacy Combustion Chamber Replacement Kit

G21Q Bulletin # September 1992 Supersedes March 1992

GAS-FIRED, DIRECT VENT, CONDENSING, HOT WATER BOILER PARTS, KITS & OPTIONAL ACCESSORIES. Models (Series B) BW9AAN BW9AAN BW9AAN000100

[-]GTA. Parts List. CATALOG TAB - Downflow/Horizontal Gas Furnaces. Series A Sizes Downflow/Horizontal Furnace

PILLOWS DECK-MOUNT BATH FAUCET WITH FLUME SPOUT

Solstice and Solstice Supreme High Efficiency Gas Fryers SG/SSH Series Service Manual

Powerstroke EGR Delete A B C

CATALOG OF REPLACEMENT PARTS C24GA6 & C24GA10 GAS CONVECTION STEAMERS PRIOR MLS COVERED IN THIS MANUAL

INSTALLATION MANUAL

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model ACO. R EN - Edition 04-01/04/2008

1997 Volvo 850 GLT. Fig. 2: Removing Drive Shaft, Engine Mount Bolt & Torque Arm (5-Cylinder) Courtesy of VOLVO CARS OF NORTH AMERICA.

6.4L EGR Delete With Intake Elbow

ULTRA HIGH EFFICIENCY MODELS WITH DIRECT SPARK IGNITION

Up to 96% AFUE, Single Stage, PSC Gas Furnace EASIER TO SELL

A.O. Smith Water Heater Parts Fulfillment 125 Southeast Parkway, Franklin, TN

G21Q ENGINEERING DATA. Typical Applications. Bulletin # March 1993

(a) Remove the rear floor service hole cover. (b) Disconnect the fuel pump connector.

TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS WARRANTY

DUAL COMFORT CONTROL TWO-STAGE DOWNFLOW/HORIZONTAL GAS FURNACES WITH

Remove Air Cleaner Cover and. Filter

Transcription:

LENNOX {' 2002 Lennox Industries Inc. Dallas, Texas, USA GAS UNITS KITS AND ACCESSORIES 504,605M 02/2002 HEAT EXCHANGER REPLACEMENT KIT INSTALLATION INSTRUCTIONS FOR REPLACEMENT HEAT EXCHANGER (32K47, 32K48, 32K49 & 32K79) USED WITH GHR26 & GHR32Q/V SERIES GAS FURNACES Package 1 of 1 contains the following: 1 - Heat exchanger assembly 1 - Burner box gasket 16 - #8-18 X 314" screws 1-2" plug 1 - Insulation shield 1 - Flanged insulation shield Check equipment for shipping damage. If you find any damage, immediately contact the last carrier. These instructions are intended as a general guide and do not supersede local codes in any way. See table 1 for unit model numbers and corresponding replacement kit catalog numbers. TABLE 1 UNIT MODEL NUMBER REPLACEMENT KIT CATALOG NUMBER GHR26_50 GHR32Q_50 32K47 GHR26W5 GHR32Q/V-75 32K48 GHR26-100 GHR32Q/V-100 32K49 GHR26-120, GHR32Q- 120 32K79 ELECTROSTATIC DISCHARGE (ESD) Precautions and Procedures CAUTION,WARNING Follow the procedure below and refer to figure 1 when disassembling furnace. Use papers or protective covering in front of furnace while removing heat exchanger assembly. Pay attention to wire routing and plumbing connections. Tools needed are: slotted screwdriver, 1/4 inch nut driver with long extension, 5/16 inch nut driver with long extension, and duckbill pliers. 1 - Turn off electrical and gas power supplies to furnace. 2 - Remove upper and lower furnace access panels. 3 - Remove 3/8 inch rubber cap from condensate drain plug and drain. Replace cap after draining. 4- Disconnect and remove intake pipe from air intake fitting. 5 - Mark all gas valve wires and disconnect them from valve. 6- Remove gas supply line connected to gas valve. Disconnect gas valve sensing hose from side of burner box. Remove six (or four) securing screws which hold the burner box cover in place and remove the cover. Remove gas valve/manifold assembly. 7 - Remove sensor wire from ignition control. Disconnect wiring from the ignitor. Disconnect wires from flame roll-out switch. 8 - Remove four screws which secure the burner box to the vestibule panel. Remove burner box. Remove and discard existing burner box gasket. Replacement gasket is provided, 9 - Remove wires from patch plates. NOTE - Take the opportunity to check the burners, ff necessary, clean burners using the procedure outlined in the unit installation instructions. 10 - Loosen three clamps which hold the flexible exhaust tee in place and remove the exhaust tee. 11 - Disconnect drain line attached to condensate trap. Remove screws that secure both condensate collars to either side of the furnace and remove collars. It may be necessary to cut the pipe to allow for removal of the condensate trap. Remove drain tubes from cold end header collector box. Page 1

PARTS IDENTIFICATION (GHR26 Unit in Downflow Application Shown) SECONDARY AUTO-RESET LIMIT (Located on Backside of Blower Wrapper) SUPPLY AiR BACK FILTER CLIP TOP CAP IGNITION CONTROL CONTROL VOLTAGE CIRCUIT BREAKER _ CONTROL "_'-_ '_ BOX CONTROL TRANSFORMER _ CABINET o!! COMBUSTION AIR INDUCER DOOR INTERLOCK SWITCH / t COLD END HEADER (COLLECTOR) BOX X COMBUSTION AiR INDUCER MOUNTING *ACKET FRESH AiR _-I INTAKE EXHAUST TEE _ INTAKE AtR_ --_ GASKET FITTING WITH BARBED PATCH FITTING PLATE i _/- -" " BUR_E_BURNERToP BOX BURNER BOX _ COVER / _ / I / l PRIMARY LIMIT AUTO-RESET (ALTERNATE BURNER BOX GASKET STYLES) COMBUSTION PROVING () SWITCH HOT ENDHEADER (COLLECTOR) CONDENSER COIL DuralokPtusTM HEAT EXCHANGER ASSEMBLY AIR FLUE COLLAR CONDENSATE COLLAR BOX ASSEMBLY _ FLAME ROLL-OUT SWITCH ORIFICE (MANUAL RESET) GLASS FLAME SENSOR IGNITOR GAS VALVE AND MANIFOLD CONDENSATE TRAP FIGURE 1 Page 2

12-Disconnectcondensatedraintubingfrom exhaust pipe.removescrewsthatsecurebothfluecollarsinto place.removefluecollars.it maybenecessary tocut the exitingexhaustpipeto allowfor removalof the fittings. 13- Disconnect wiring harness plug from the combustion air inducer. Remove combustion air inducer from bracket by removing four securing screws. Remove ground wire from bundle. 14 - Remove combustion air inducer bracket by removing two screws from collector box and two screws from vestibule panel. 15 - Disconnect combustion air pressure and condensate sensing hoses from cold end header collector box. Remove the pressure hose from two blank stems on cold end header collector box (early models only). 16-Mark and remove wires from pressure switch. Remove pressure switch/bracket assembly. Keep hoses attached to pressure switch. Remove pressure switch installation screws from both sides of the furnace. 17 - Disconnect harness connector plugs at the blower deck. Remove both plugs from the heat exchanger side of the blower deck. NOTE - The 9-pin harness connectors which join at the blower deck were replaced by a one-piece harness routed through a snap bushing in the blower deck in units produced after November 2001. 18 - Remove the primary limit from vestibule panel. 19 - Remove two screws from the front cabinet flange at the blower deck. Remove front screws from cabinet at blower deck on left and right sides. Cabinet sides must be slightly spread apart to clear heat exchanger passage. NOTE - To protect insulation in horizontal applications, slide the provided sheet metalshields between the coil section of the heat exchanger and the cabinet when removing and replacing heat exchanger. Remove indoor blower for horizontal installations. Remove sheet metal when complete. 20- Remove screws along vestibule sides and bottom which secure vestibule panel and heat exchanger assembly to cabinet. Remove heat exchanger, 21- Install replacement heat exchanger into cabinet (blower deck end first) making sure that the clamshells of the heat exchanger assembly are resting on the supports at the rear of the cabinet. This can be viewed by removing the indoor blower and examining through the blower opening. 22 - Secure the heat exchanger to the cabinet along the vestibule sides and bottom using the provided #8-32 X 3/4" screws. 23 - Reinstall primary limit on vestibule panel. 24-Reconnect 9-pin plug at the blower deck to the matching 9-pin plug from below the blower deck. Reconnect 2-pin or 3-pin plug (depending on unit) to matching plug from below the blower deck. 25-Reinstall pressure switch/bracket assembly and replace pressure switch screws on both sides of furnace from installed pressure switch, Reconnect wires to pressure switch. IMPORTANT MPL TRIDELTA / HONEYWELL PPS (Metal/Plastic Construction) POSITIVE (Marked With "-" POSITIVE (Marked With "+") TRIDELTA / HONEYWELL (All Metal Construction) TRIDELTA / HONEYWELL IS2 (NO Markings) Hose Connection Side OnIy) POSITIVE (NO Markings EiectricaI Terminal and Hose Connection Side) side marked "-") POSITIVE (btack side marked "+") FIGURE 2 Page 3

HORIZONTAL LEFT-HAND AIR DISCHARGE Connecthose (redsquare) to POSITIVEside on pressure switchandopen tap on FRONT of collectorbox. Pressure Switch DOWNFLOW AIR DISCHARGE Connect hose (black round To side on pressure switch and open tap on FRONT of collector box. Pressure Switch AIR FLOW Connect hose (red square) to POSITIVE side.. on pressure switch and open tap on FRONT of collector box. Connect hose (black round) To "'side on pressure switch and open tap on SIDE of collector box. HORIZONTAL RIGHT-HAND DISCHARGE Connectthe red squarehose to the POSITIVEside on pressure switchand the open tap on the FRONT of the collectorbox. f CONNECTIONS (Downfiow Air Discharge Application Shown) (Black round tubing beginning with =6 models) o no o[1 o _ BLANK STEMS EARLY MODEL _ UNITS ONLY _ Pressure Collector Box Switch _ must be on top side of unit. O O AIR FLOW i o o /_ POSI'TIVE CONNECTIONS (Red square tubing beginning with -6 models) FIGURE 3 Connect the black round hose to the side on the pressure switch and SIDE of the collector box. 26- Connect combustion air pressure and condensate sensing hoses from pressure switch to cold end header collector box, See figure 3 to confirm hose location.,&warning 27 - Reinstall the combustion air inducer bracket. 28 - Reinstall the combustion air inducer on the bracket. Reconnect the harness connector plug to the wiring harness. 29 - Replace flue collars with securing screws to either side of the furnace. Reconnect exhaust piping and exhaust drain tubing. 30 - Replace condensate collars with secunng screws to either side of the furnace. Reconnect drain line to condensate trap. Reconnect drain tubing from cold end header collector box. Reconnect condensate drain tubing from exhaust pipe. 31- Replace flexible exhaust tee to combustion air inducer and exhaust pipes and secure with three clamps, 32-Align replacement burner box gasket to securing holes closest to the end of the furnace, Use a small piece of tape to secure gasket to vest panel. Gasket must provide a continuous seal between the burner box and the vestibule panel, 33 - Replace four screws to secure reassembled burner box assembly to vestibule panel. Make sure burners line up in center of burner ports. 34 - Reconnect flame roll-out switch wires. 35-Reconnect sensor wire to ignition control and reconnect wiring harness plug from ignitor. Page 4

36-Reinstall gas valve manifoldassembly.replace burnerboxcover.reconnectgassupplylineto gas valve.attachgas valvepressuresensinghoseto burnerbox. 37- Reconnect gasvalvewirestogasvalve. 38- Reinstallintakevent pipeon rubberconnectoron intakefittingusinghoseclamp. 39- Replacebothupperandloweraccesspanels. 40- Refertotheunitinstallationinstructions toverifygas and electricalconnectionswhen re-establishing supply.use a leak detectingsolutionor other preferredmeanstocheckforgasleaks. A, CAUTION 41 - Light the burners and allow the unit to operate for 5 minutes to ensure that the heat exchanger is clean, dry, and operating safely. Follow the lighting instructions on the unit sticker or in the unit installation instruction manual. Page 5