MACH 1 TSQV SEVERE SERVICE PLUG VALVES

Similar documents
T-41/T-43 and ST-41/ST-43

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

GT-200 GATE VALVES PN16, Screwed end

McCannalok HIGH PERFORMANCE BUTTERFLY VALVE OPERATION AND MAINTENANCE MANUAL. The High Performance Company

MEMORY SEAL BALL VALVES MAINTENANCE MANUAL 2 12, Class 150 & 300, Regular Port, Flanged Unibody

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607)

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

for ½" thru 2" 800 lb. Piston Lift Check Valves with Resilient Seat Option

CONTROL VALVES. KOSO HAMMEL DAHL tel: Manley Street fax: Installation, Maintenance & Operating Instructions

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

Installation, Operation and Maintenance Instructions Series 608 Ball Valve

Installation, Operation, and Maintenance Manual

COMMERCIAL. BV & BVM Series Installation Instructions 06/29/15

KOSO HAMMEL DAHL CONTROL VALVES

Power-Seal High Performance Butterfly Valve: Series P1 Installation & Maintenance Manual

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

TECHNICAL SERVICE MANUAL

Introduction. Installation. I & M Mark V-100 Series. Installation & Maintenance Instructions for the Mark V-100 Series Control Valves

INSTRUCTION AND REPAIR MANUAL MODELS 341A, 342A AND 344A 6

FLOWSERVE CORPORATION NOBLE ALLOY VALVE PISTON CHECK VALVE REPAIR INSTRUCTIONS

Fisher 657 Diaphragm Actuator Sizes and 87

MERIDIAN, 2 or 3 PIECE, TRUNNION MOUNTED BALL VALVES

DP Series Diaphragm Valve Installation and Maintenance Instructions

Design GX Control Valve and Actuator System

Bray/McCannalok High Performance Butterfly Valve Operation and Maintenance Manual

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1-1/2-2 )

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1/2-1 )

KOSO HAMMEL DAHL CONTROL VALVES. Installation, Maintenance & Operating Instructions

Bray/Mckannalok Butterfly Valve Series 40/41/42/43/44/45 Installation Manual Technical Bulletin No Date: May 2004/Page 1 of 6

INSTALLATION/OPERATION/MAINTENANCE INSTRUCTIONS FOR ARCHON MODELS WD2010L, WD2010, WD2010H WASHDOWN STATIONS. ARCHON Industries, Inc.

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

CV Control Valves Installation and Operation Manual

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc.

V-SEGMENT SERIES V-Port Segment Control Valves (VS/VV/VM) Installation & Maintenance Manual

Double Offset High Performance Butterfly Valve

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

DIFFERENTIAL PRESSURE RELIEF REGULATOR TYPE A4AL Port Size 3/4"- 4" (20-100mm) For Ammonia, R-22, R134a, R404a, R507 and other common refrigerants.

Product Manual. S&S V-100 Ball Valves 2 though 8 Inch Designs. Introduction: Installation:

Fisher TBX Hydro Plug Fixture

DELTA O-RING CARTRIDGE SEAL ASSEMBLY AND INSTALLATION INSTRUCTIONS INTRODUCTION:

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR-S SEISMIC SPRING RETURN SERIES PNEUMATIC ACTUATORS

Maintenance Information

Instructions for INSTALLATION -- OPERATION -- MAINTENANCE of the SELAS AIR/GAS BLENDER VALVE. (for PROPANE/AIR, BUTANE/AIR AND OTHER BLENDS)

Spring Brake Application

Fisher GX Control Valve and Actuator System

3.2 DRIVE TORQUE HUB. Roll, Leak and Brake Testing SECTION 3 - CHASSIS & TURNTABLE. 3-2 JLG Lift

INSTRUCTION MANUAL INTERNAL GEAR PUMP TITAN G-4124A SERIES=> FLANGED TITAN G-124A SERIES => FLANGED MODELS:

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

Fisher 1051 and 1052 Style H and J Sizes 40, 60 and 70 Rotary Actuators

REACTOR DISCHARGE VALVES S & DIGESTER BLOW VALVES SB & 5300SB B FLANGED BALL VALVES

INSTALLATION & MAINTENANCE MANUAL

Technical Bulletin. 5Remove Capscrews. cascade. corporation. Char-Lynn Drive Motor Seal Service Kit Installation Instruction

Fisher GX Control Valve and Actuator System

Installation Vertical Pump: Installation 'CM' and 'CDM' Style: Operation:

INSTALLATION, OPERATION AND MAINTENANCE MANUAL (IOM)

Operating & Maintenance Manual For Steam Conditioning Valve

INSTALLATION/OPERATION/MAINTENANCE MANUAL for the FlowMax REGULATOR

Fisher CVX Hydro Plug Fixture

Service Manual Air Plus Second Stage

SERVICE MANUAL L130B / L4130 Series Logstacker Drive Axle With Bolt-On Stub End Retainer

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

Pressure Relief Valve Maintenance Manual

OPERATION AND MAINTENANCE INSTRUCTIONS

Model DF233 Control Valve

DeZURIK 24" THRU 36" RESILIENT BUTTERFLY VALVES

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com

Emergency Response Kit (ERK) B-240/B-243 Series. Instructional Manual. P/N: B-240/B-243, Rev. 0

Fisher RSS Lined Globe Valve

Maintenance Information

DESCRIPTION FUEL AND VACUUM PUMP REMOVE AND REPLACE FUEL PUMP-OVERHAUL 6B PONTIAC SHOP MANUAL. S. Install battery and connect cables.

INSTALLATION INSTRUCTIONS REPAIR SEAL KIT PowerSurvivor 40E

This file is available for free download at

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual

Remove Air Cleaner Cover and. Filter

SM64155 Maintenance & Repair Manual

Maintenance Information

155 CARTRIDGE SINGLE SEAL

VSI INDUSTRIAL BALL VALVES SERIES 7100 SERIES 8100 SERIES 7200 SERIES 8300 SERIES 7400 SERIES 8400 SERIES 8000 SERIES 8500

Maintenance Instructions

REPAIR PROCEDURES MANUAL

OPERATION AND MAINTENANCE MANUAL 2-66 SERIES 2500 RESILIENT WEDGE GATE VALVE

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS D SERIES TABLE OF CONTENTS

Before installation these instructions must be fully read and understood

EZ-IN Series Turbine Flowmeter

ONYX VALVE CO MODEL CER and CEP Installation & Maintenance

TECHNICAL SERVICE MANUAL HEAVY-DUTY BRACKET MOUNTED PUMPS SERIES 120 and SERIES 124 MODELS J, K, KK, L, LQ, LL AND LM

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

USER INSTRUCTIONS. Installation Operation Maintenance. NAF Setball SF Ball Sector Valves. Experience In Motion FCD NFENIM A4 09/16

Model QED-D, QED-A, QED-L

TECHNICAL SERVICE MANUAL

Maintenance Information

Instruction Manual For DODGE. Airport Baggage Handling Systems Speed Reducers

Service Manual Air Tech Second Stage

Transcription:

MACH 1 TSQV SEVERE SERVICE PLUG VALVES

FOREWORD The Flowserve Corporation has established this Installation, Operating and Maintenance Manual to facilitate field installation, operation and repair of Triple Seal Mach 1 Valves Only Flowserve replacement repair parts and assembly tooling made or designed by Flowserve should be used. It is recommended that questions or concerns involving the processes described in the manual be directed to the local Sales Representative of Flowerve Corporation. TABLE OF CONTENTS Section Title Page I. Installation Instructions- Flanged and Welded Valves.3 II. Operating Instructions, Parts List & Packing Options..4 Ill. Materials, Fastener Torques & Figures 6 IV. Valve Disassembly..8 V. Valve Assembly 1 "-6" 9 2

SECTION I INSTALLATION INSTRUCTIONS FLANGED AND WELDED TSQV PLUG VALVES FLANGED: Installation of Flowserve flanged valves is best accomplished by locating valves in pipeline flanges, assuring all corrosion and foreign materials are removed from pipe flange, and then centering the gaskets with the valve flanges. Fasteners or taper pins should be used to align holes and locate gaskets. Fasteners should be tightened to the corresponding valve and fastener value. WELDING: Flowserve Corporation, Flow Control Division recommends using only qualified welding procedures and personnel for weld installation of TSQV valves. The following precautions should be observed: 1. The valve should be inspected prior to welding to assure that no foreign materials obstruct the flow passageway and that the weld preparation area is free of corrosion and physical damage. 2. The valve should be in the open position while being welded. Open position is when the flats on the plug stem are parallel with the pipeline. 3. The TSQV valve contains various sleeve and diaphragm materials that have different maximum temperature limitations. Refer to Table 1.1 for temperature limitations. 4. The valve body sleeve and diaphragm area must not exceed these temperatures during welding. This includes preheats, interpasses or post weld heat treatments, as applicable. Refer to Figure 2 for locations of the sleeve and diaphragm in the center valve section 5. Welding of the TSQV Valve without disassembly may be accomplished with no damage to the sleeve and diaphragm. Precautions MUST be taken to cool the valve bowl and monitor temperature. The temperature of the center or bowl area of the valve must not exceed the listed temperature of the material. Valves, sizes two inch and smaller, must be wrapped with water soaked, fire-resistant material to cool the valve bowl and inlet where the weld is to be made. Use temperature melt crayons equal to the sleeve and diaphragm rating to mark the body welding end and monitor the body temperature. Thermocouples may be attached to the welding end of the body or surface pyrometers may be used to monitor the body bowl temperature. CAUTION: DO NOT ALLOW WATER FROM THE SOAKED WRAPPING MATERIAL TO ENTER THE WELDMENT. Table 1.1 Temperature Limitations Material Description Max. Temperature UHMWPE 200 F (93 C) PFA 500 F (260 C) FEP and Tefzel 275 F (135 C) 3

SECTION II OPERATION INSTRUCTIONS AND PARTS LIST FOR TSQV VALVES Part reference cited in this section can be identified using Figures 1-3 (Section III) and the material list. Periodic maintenance requirements for TSQV valves may vary due to operating conditions of the process. Factors such as operating temperature and pressure, flowstream, solid content, and valve cycles can greatly influence valve performance and maintenance requirements. Seal wear and degradation is compensated by correctly adjusting appropriate parts. For TSQV valves, three possible leak paths occur; for each leak path there exists a means of adjustment. Leak paths are BONNET, STEM and LINE (through). Each leak path and corresponding adjustment shall be treated separately. I. BONNET Leakage due to thermal cycling (gradients) and frequent high pressure cycling is stopped by snugging the top cap fasteners (item 10) in a "criss-cross" manner (1-3-2-4) per Fig. 3. This adjustment is most effective when the valve is not pressurized. It is important that the top cap fasteners not be torqued above the level specified in Tables 1a or 1b. 2. STEM Leakage due to wear of the service packing is stopped by tightening the packing adjuster fasteners (item 8) in 1/2 turn increments. The fasteners should be tightened evenly. The packing adjuster fasteners should not be tightened above the torque level specified in Table 3 (pg 6). If possible, the valve should be operated between adjustments to assure that the plug stem will not be "frozen" due to overloading the stem packing. If stem leakage persists, or the packing adjuster fasteners bottom out, the stem packing should be replaced. 3. LINE (through) Through leakage due to wear or damage to the valve sleeve, or primary seal can be stopped by tightening the plug adjuster fasteners (item 12) in 1/4 turn increments. The fasteners should be tightened evenly. If possible, the valve should be operated between adjustments to assure that the plug has not been forced into the sleeve excessively, producing an unnecessary high valve operating torque. Should the valve be leaking excessively after numerous adjustments, the sleeve will require replacement. TSQV Assembly and Parts List 4

Stuffing Box Options: The Durco TSQV valve will accommodate standard packing of most manufacturers. A. Standard Polymer Cup and Cone B. Fire Sealed Options 5

SECTION III MATERIALS, FASTENER TORQUES & FIGURES Durco Material Code Cross-Reference 6

SECTION III (CONT.) 7

SECTION IV TSQV VALVE DISASSEMBLY Recommended Precautionary Measures 1. Valves must be relieved of process fluid and pressure prior to disassembly. Plug should be in the open position. 2. Personnel performing disassembly must be suitably protected and alert for emission of hazardous process fluid. 3. If there is a pipe plug located at the bottom bowl of the valve, DO NOT remove the pipe plug until the valve plug has been removed. Disassembly Steps NOTE: Refer to Figures 1-3 for parts identification. If an actuator or gearbox operates the valve, alignment marks should be noted to assure correct orientation when reassembled. This may best be accomplished by making matching marks on the plug stem and operator housing with no burrs on the plug stem permitted. 1. Gradually loosen plug adjuster fasteners (Part 12)-DO NOT REMOVE. 2. Turn plug (Part 2) in order to raise the plug to vent any material trapped in the valve (see note below). NOTE: If there is no upward movement of the plug (Part 2), it will be necessary to devise a method of lifting the plug upward. This may require removal of the valve operator (Step 3). This operation should be undertaken noting the above precautionary measures. Methods of plug removal must include protective measures on plug stem and plug end. 3. WARNING: Do not loosen or remove top cap fasteners (Part 10) when removing an operator or accessory. Remove the operator by unfastening it from the bracket. 4. Once the plug (Part 2) has lifted, the adjuster fasteners (Part 12) can be completely removed. 5. Loosen and remove the packing adjuster fasteners (Part 8). 6. Gradually loosen but DO NOT REMOVE all of the top cap fasteners (Part 10). Turn the plug until it is loose from the sleeve (Part 3) and all pressure has been vented. (Again, it may be necessary to use a mechanical means to move the plug upwards.) 7. Remove the top cap fasteners (Part 10) and top cap (Part 9). 8. Remove the plug (Part 2) from the body (Part 1). 9. Remove the grounding spring (Part 16) from the plug. 10. lnspect the valve sleeve (Part 3) for wear or damage, especially scratches near the top, bottom, and port areas. If wear or damage is excessive, the sleeve should be replaced. 11. Remove sleeve (Part 3) as follows: NOTE: Care should be taken not to damage the internal body bore. To remove the sleeve, use a wooden dowel and pry the sleeve upward by engaging the dowel in the sleeve at the top of the port. A sharp blow may be necessary to unseat the sleeve. Both sides may need to be pried upward for removal. (See Figure 4) 12. Thoroughly clean all valve parts with an acceptable cleaner. 13. lnspect parts for damage. Look for marred, scratched, or rough sealing surfaces on the valve plug (Part 2). NOTE: Reinstallation of damaged or unclean parts will ruin any replacement seals installed into the valve. Figure 4 8

SECTION V VALVE ASSEMBLY 1-6 TSQV WITH SLEEVE NOTE: Part number reference is shown in Figures 1-3, Sec III. 1. Mount body (Part 1) on arbor press or table vise holding one flange. Weld-in bodies are repaired in-line. Place sleeve (Part 2) in position in body. Align sleeve ports with body ports. (Figure 5) Figure 5 3. Check that the top seal of the sleeve is seated into the body counterbore. It may be necessary to tap sleeve with soft mallet. Push the plug downward, while still in the closed position, until the top of the plug taper is 1/16 above the top of the sleeve surface. Use an arbor press or c-clamp. Allow the plug to remain in this position for time listed in Table 4. Remove plug. Table 4 Sleeve Material Sizing Time 1"-3" 4"-6" UHMWPE, FEP, Tefzel 30 sec 60 sec PFA 5 min 8 min 2. Apply a thin film of lubricant on the plug (Part 2). Then place the plug in the closed position into the sleeve which is in the body. (Figure 6). Figure 6 NOTE: After sizing the sleeve, the TSQV top works are to be assembled onto the plug prior to pushing the plug into the sleeved valve body 4. The plug bearing is to be placed on the plug as shown in Figure 7. The plug stem and the stuffing box counterbore of the top cap must be repolished, if necessary, until a surface finish of 16 RMS is achieved. 5. The top cap is placed on the plug as shown in Figure 7. Care must be exercised to insure that the plug stem is not scratched as the top cap is lowered onto the plug. 9

6. Install the diaphragm over the plug stem. The diaphragm guide must be used to install the diaphragm. Make sure there are no nicks on the guide. Place the diaphragm over the guide and push downward over the guide. See Figure 7. Push the diaphragm down using the diaphragm pusher. Figure 7 press is required to load the pusher.) See Figure 8. 8. At this time, tap pusher with soft mallet for weld-end valves. Then apply a light coat of silicone, or approved lubricant, to the packing area of the plug stem and the seat area of the top cap stuffing box. Figure 8 7. Remove the diaphragm guide and pusher from the stem. Place the diaphragm gland over the plug stem. Now locate and seat the diaphragm gland by pushing downward with the diaphragm gland pusher. (An arbor 9. The packing is then placed into the stuffing box as shown in Figure 9. Several packing orientations are shown in an earlier section. Under no circumstances shall sharp objects such as screw drivers, cold chisels or knives be used to force the packing into the stuffing box. The packing gland may be used to start the packing into the stuffing box. 10

10. Following insertion of the packing set, the diaphragm gland pusher is placed over the plug stem. Seat the packing by loading the gland pusher with an arbor press. The packing may be seated in sections but the gland pusher will only fit a cone ring. It must not be used to seat against a cup. See Figure 9. The packing gland is now placed over the plug stem and seated with the arbor press. finger tight. Care should be taken such that the packing adjuster remains level with respect to the top cap. 12. The thrust washer is placed over the plug stem and should lay flat against the plug stem bearing surface as shown in Figure 10. Figure 10 Figure 9 13. The plug gland is placed over the plug stem. Next, the grounding spring is pushed onto the plug stem. The adjuster with fasteners is placed over the plug stem and secured by the adjuster fasteners shown in Figure 11. The adjuster fasteners should be tightened to position the top cap gasket surface in line with the flat surface which the plug bearing rests on as shown in Figure 11. 11. The packing adjuster is placed over the plug stem. Each fastener may have on optional twelve Belleville washers placed as shown in Figure 10. The packing adjuster fasteners should be tightened 11

Figure 11 Figure 12 14. Place the top cap gasket into the valve body flange counterbore. 15. Apply a thin, even film of silicone, or approved lubricant, to the entire outside surface of the plug taper. 16. The top works are then placed onto the valve body and oriented as shown in Figure 12. The plug is then pressed into the sleeve with the aid of an arbor press or c-clamp until the top of the plug adjuster falls ¼ below plug adjuster fasteners. The press must provide sufficient force to depress the plug, allowing the gasket surface of the top cap to bottom against the gasket counterbore. The valve must remain in the arbor press for steps 16 thru 19. 17. The top cap fasteners with four optional Belleville washers each (Figure 12 for top cap Belleville washer orientation) should be installed at this time. Do not tighten the top cap fasteners more than finger tight. 18. Tighten the packing adjuster fasteners in a manner such that the packing adjuster does not "tilt". The torque on the packing adjuster fasteners should be per Table 3. (Fig 12). 19. Tighten the top cap fasteners in a crisscross fashion to values listed in Table 1a or 1b. 20. At this time, remove the valve from press or c-clamp. 21. Loosen the plug adjuster fasteners and operate the plug several times. 22. Tighten the plug adjuster fasteners per Table 2. Install stop collar and retainer ring. 23. Operate the plug several times. It will be difficult to turn at first, but will then loosen and turn freely. 24. Pressure testing of the assembled valve should be done at this time. Any additional valve adjustment that might be needed to hold the specified pressure should be made at this time. The valve is now ready for installation 12