INSTALLATION. NOTICE: Do not scratch the angle sensor of the timing pulley.

Similar documents
REMOVAL. 16. LOOSEN CRANKSHAFT PULLEY BOLT Using SST, loosen the pulley bolt. SST ( ), EM 20 SST TIMING BELT

EM 6 VALVE CLEARANCE ENGINE MECHANICAL EM11I 01 ADJUSTMENT HINT:

INSTALLATION. 6. SET NO.1 CYLINDER TO TDC/COMPRESSION (a) Temporarily install the crankshaft pulley bolt to the crankshaft.

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

INSTALLATION EM 21. Inward. Sensor. Plate Washer. 10 mm Hexagon Wrench SST. Fulcrum Length SST TIMING BELT ENGINE MECHANICAL 2002 AVALON (RM872U)

INSTALLATION. Check that the idler pulley moves smoothly.

EG-34 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

2/17/2017 Timing Belt Service and Repair, Removal and Replacement

Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

10. SEPARATE COMPRESSOR (a) Remove the nut, 3 bolts compressor stay and compressor. HINT: Hang up the hoses instead of detaching.

TIMING BELT COMPONENTS EM 15

TIMING BELT (5S FE) COMPONENTS

REMOVAL. 1. REMOVE ENGINE UNDER COVER 2. DRAIN ENGINE COOLANT 3. REMOVE RADIATOR ASSEMBLY (See page CO 1 5) 4. REMOVE DRIVE BELT (See page 1) CH

Timing Belt: Service and Repair. Toyota Truck Sienna LE V6-3.0L (1MZ-FE) 2002

TIMING BELT (1MZ FE Jan., 2003)

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

1GR-FE ENGINE MECHANICAL: TIMING CHAIN: INSTALLATION (2007 4Runner) Model Year: 2007 Model: 4Runner Doc ID: RM WS002X

REMOVAL & INSTALLATION

REPLACEMENT. 12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 5 bolts, the engine moving control rod and the engine mounting stay.

8/14/2016 8:12 PM. Bolt: Part No for Type B

TIMING BELT (3S FE) COMPONENTS

Toyota Camry CE Sedan L4-2.2L DOHC (5S-FE) MFI Timing Belt: Service and Repair

ALLDATA Online Toyota Camry Wagon L4-2.0L (3S-FE) - Timing Belt Installat... Page 1 of 15. Timing Belt Installation. Timing Belt (3S-FE)

12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 4 bolts, the engine moving control rod and the bracket.

TIMING BELT (4A FE) COMPONENTS

TIMING BELT COMPONENTS

2003 Toyota Truck Highlander 2WD V6-3.0L (1MZ-FE) Copyright 2013, ALLDATA Page 1

TIMING CHAIN COMPONENTS

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

TIMING BELT TIMING BELT

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

11. REMOVE OIL PAN SUB ASSY NO.2 (a) Remove the 18 bolts and 2 nuts.

2004 Toyota CAMRY. Submodel: Engine Type: L4 Liters: 2.4 Fuel Delivery: FI Fuel: GAS

Timing Belt: Service and Repair Timing Belt Replace. Timing Belt Removal

PARTIAL ENGINE ASSY (2TR FE)

25. REMOVE OIL PIPE NO.1 (a) Remove the 2 oil pipe unions, and oil pipe No.1. (b) Remove the oil control valve filter LH and gaskets.

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

3/13/ :32 AM. NOTICE: Do not disconnect the hose.

CAMSHAFT (LH BANK) (2GR FE) ENGINE MECHANICAL 1424N 01 REPLACEMENT

2005 Hyundai Tucson LX. On some models, engine is equipped with a timing belt and timing chain. Inspect timing chain when replacing timing belt.

Page 1 of 25. Service and Repair REMOVAL SIZED FOR PRINT. Related Components

REPLACEMENT HINT: 11. REMOVE V RIBBED BELT TENSIONER ASSY (a) Remove the 5 bolts and V ribbed belt tensioner.

REMOVAL & INSTALLATION

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

REMOVAL & INSTALLATION


REMOVAL & INSTALLATION

VALVE CLEARANCE (3ZZ FE/4ZZ FE)

Timing Belt Replacement

VALVE CLEARANCE (K3-VE)

CO/HC INSPECTION HINT:

REMOVAL 7. DISCONNECT ACCELERATOR CABLE FROM THROTTLE BODY. 8. DISCONNECT HOSES (a) Remove the 2 bolts from the air intake chamber assembly.

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

REMOVE FRONT WHEEL RH

CO/HC INSPECTION HINT:

2012 Kia Soul L4 2.0L

WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

15.Timing Belt. Timing Belt A: REMOVAL ME(STI) TIMING BELT

Technical Service BULLETIN

11.Preparation for Overhaul

COMPONENTS ILLUSTRATION

2.2L 4-CYL - VIN [S]

1995 Mitsubishi Montero LS. Ensure timing marks are aligned. Mark timing belt direction of rotation.

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

2012 Kia Soul L4 2.0L

Intake Manifold: Service and Repair Removal

2.0L 4-CYL & 2.0L 4-CYL TURBO - VIN [S]

Fig. 1: Remove the bolts which fasten the upper timing belt cover... Fig. 2:... and remove the cover

VALVE CLEARANCE (1NZ-FXE)

2001 Toyota MR ENGINES' '1.8L 4-Cylinder

PARTIAL ENGINE ASSY (2ZZ GE)

REPLACEMENT. 1. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 4 nuts and cylinder head cover No. 2.

1990 Nissan-Datsun 300ZX V6-2960cc DOHC Turbo (VG30DETT) Service and Repair TIMING BELT REPLACEMENT

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE OIL FILLER CAP GASKET (a) Using a screwdriver, remove the gasket from the oil filter cap.

PARTIAL ENGINE ASSY COMPONENTS. Clip. Radiator Grille. Clip. Front Bumper Cover. Engine Under Cover LH. N m (kgf cm, ft lbf) : Specified torque

REPLACEMENT 1. REMOVE ENGINE UNDER COVER RH. 2. REMOVE CYLINDER HEAD COVER NO.2 (a) Remove the 2 screw, 3 clips and engine under cover.

Timing Belt: Service and Repair

CHARGING SYSTEM ON-VEHICLE INSPECTION

VALVE CLEARANCE (1ZZ FE)

15.Timing Belt. Timing Belt A: REMOVAL ME(H4DOTC) TIMING BELT

OVERHAUL 1. REMOVE CYLINDER BLOCK WATER DRAIN COCK SUB ASSY

Power Steering Pump REMOVAL AND INSTALLATION OF POWER STEERING PUMP

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE CYLINDER HEAD COVER SUB ASSY (a) Remove the 10 bolts, 2 nuts, cylinder head cover and gasket.

REMOVAL & INSTALLATION

CYLINDER HEAD GASKET (2AZ-FE)

REMOVAL AND REPLACEMENT

1992 Mitsubishi 3000GT VR-4

CHECK ENGINE COOLANT LEVEL AT RADIATOR RESERVOIR

15.Timing Belt Assembly

TIMING CHAIN. TIMING CHAIN Removal and Installation EM-35 PFP:13028 EBS00I2X KBIA2511E

CAMSHAFT POSITION SENSOR

OVERHAUL. 1. REMOVE OIL FILLER CAP SUB ASSY (a) Remove the oil filler cap from the cylinder head cover.

REMOVAL & INSTALLATION

VALVE CLEARANCE INSPECTION

ENGINE TUNE UP. (See steps 1 and 2 on page CO 5)

14-6. TSB Revision ENGINE COOLING ON-VEHICLE SERVICE

1. Remove the crankshaft pulley, engine coolant pump pulley and drive belt. 2. Remove the timing belt cover.

Toyota Truck Tacoma Extra Cab 2WD L4-2.4L (2RZ-FE) Timing Chain: Service and Repair

CAMSHAFT POSITION SENSOR

Transcription:

EM26 INSTALLATION EM11B01 1. INSTALL OIL PUMP PULLEY (a) Align the cutouts of the pulley and shaft, and slide on the pulley. (b) Using, install the pulley nut. 0996010010 (0996201000, 0996300600) Torque: 27 N m (270 kgf cm, 20 ft lbf) A08487 Angle Sensor Inward 2. INSTALL CRANKSHAFT TIMING PULLEY (a) Align the timing pulley set key with the key groove of the pulley. (b) Slide on the timing pulley with the angle sensor facing inward. Do not scratch the angle sensor of the timing pulley. A08517 (c) Install the timing belt plate with the bolt. Torque: 9 N m (90 kgf cm, 78 in. lbf) A08489 8mm A08538 3. INSTALL NO.1 IDLER PULLEY ( TEN- SIONER) Using a 8 mm hexagon wrench, temporarily install the pulley (tensioner). 4. INSTALL NO.2 IDLER PULLEY (a) Install the pulley with the bolt. Torque: 37 N m (370 kgf cm, 27 ft lbf) (b) Check that the idler pulley moves smoothly. 5. INSTALL CAMSHAFT TIMING PULLEY NEVER reuse the campulley set bolt. The campulley set bolt is tightened in 2 progressive steps (steps (b) and (d)). (a) Align the camshaft knock pin with the groove in the pulley and slide on the pulley.

EM27 (b) Using, install and tighten a new campulley set bolt. 0996010010 (0996201000, 0996301000) Torque: 35 N m (350 kgf cm, 25 ft lbf) A08490 (c) Mark the campulley set bolt with paint. (d) Retighten the campulley set bolt by 90. (e) Check that the painted mark is now at a 90 angle to (c). 90 Painted Mark 90 A08491 (Paint Mark) 6. SET NO.1 CYLINDER TO APPROX. 60 BTDC/COM- PRESSION (a) Crankshaft Timing Pulley Position: Using the crankshaft pulley bolt and plate washer, turn the crankshaft, and align the timing mark (paint mark) of the crankshaft timing pulley with the timing mark of the timing belt case. A08435 Dot Mark A08751 (b) Camshaft Timing Pulley Position: Using, turn the camshaft pulley, align the dot mark (60 mark BTDC) of the camshaft timing pulley with the timing mark of the No.1 bearing cap. 0996010010 (0996201000, 0996301000) 7. INSTALL The engine should be cold. (a) Remove any oil or water on the crankshaft timing pulley, oil pump pulley, No.1 idler pulley, No.2 idler pulley and camshaft timing pulley, and keep them clean.

EM28 (b) Install the timing belt on the crankshaft timing pulley, oil pump pulley, No.1 idler pulley and No.2 idler pulley. Only wipe the pulleys; do not use any cleansing agent. When reusing timing belt: Align the marked points during removal, and install the belt with the arrow pointing to the direction of engine revolution. A08493 (c) Install the timing belt, check the tension between the crankshaft timing pulley, oil pump pulley, No.2 idler pulley and camshaft timing pulley. When reusing timing belt: Align the marked points during removal. A08494 10 mm (d) Using a 10 mm hexagon wrench, keep holding the No.1 idler pulley toward the direction of tensing the timing belt. A08516 (e) After confirming that the stay of the No.1 idler pulley touches the pin, install the positioning bolt by hand. A08757 Torx Socket (E8) 10 mm (f) Using a torx socket wrench (E8), tighten the positioning bolt. Torque: 8 N m (80 kgf cm, 69 in. lbf) Be careful not to allow the bolt to come onto the stay of the No.1 idler pulley. A08496

EM29 5mm 8mm (g) (h) Using a 8 mm hexagon wrench, tighten the bolt of the No.1 idler pulley (timing belt tensioner). Torque: 42.5 N m (425 kgf cm, 31 ft lbf) Take the 5 mm hexagon wrench for lock out of the square window. A08498 (Paint Mark) A08580 8. CHECK VALVE TIMING (a) Temporarily install the crankshaft pulley bolt and plate washer. (b) Slowly revolve the crankshaft 2 times, and align the timing mark (paint mark) of the crankshaft timing pulley with the timing mark of the timing belt case. Always turn the crankshaft clockwise. (c) (d) Check that the dot mark (60 mark BTDC) of the camshaft timing pulley is aligned with the timing mark of the No.1 bearing cap. Remove the crankshaft pulley bolt and plate washer. Dot Mark A08753 9. INSTALL GUIDE Install the guide with the cup side facing outward. 10. INSTALL NO.1 COVER (a) Install the gasket to the timing belt cover. (b) Install the timing belt cover with the 4 bolts. Torque: 6 N m (60 kgf cm, 52 in. lbf) A08486 11. INSTALL CRANKSHAFT PULLEY (a) Align the pulley set key with the key groove of the pulley. (b) Using and a hammer, tap in the pulley. 0931660011 (0931600011) A08483

EM30 C A A08470 (c) Using, install the pulley bolt. 0921354015 (9011908216), 0933000021 Torque: 220 N m (2,200 kgf cm, 159 ft lbf) 12. INSTALL NO.2 COVER (a) Install the gasket to the timing belt cover. (b) Install the timing belt cover with the 4 bolts. Torque: 6 N m (60 kgf cm, 52 in. lbf) 13. INSTALL FAN PULLEY AND SPACER Temporarily install the 4 nuts. 14. INSTALL A/C COMPRESSOR BRACKET (a) Install the compressor bracket with the 4 bolts and nut. (b) Tighten the bolt B, nut C and bolt A. Torque: 46.5 N m (475 kgf cm, 34 ft lbf) B A B A08559 A08558 15. INSTALL A/C COMPRESSOR (a) Install the A/C compressor with the 4 bolts. Torque: 24.5 N m (250 kgf cm, 18 ft lbf) (b) Connect the A/C compressor connector. 16. INSTALL DRIVE BELT FOR PS VANE PUMP (See page SR37) 17. INSTALL DRIVE BELT FOR ALTERNATOR (See page CH1 5) 18. INSTALL DRIVE BELT FOR A/C COMPRESSOR (See page AC1 8) 19. TIGHTEN MOUNTING NUTS OF FAN PULLEY AND SPACER Torque: 18.5 N m (185 kgf cm, 13 ft lbf) 20. INSTALL RADIATOR ASSEMBLY (See page CO 21) 21. INSTALL SPARK PLUGS (See page 1) IG 22. INSTALL IGNITION COILS (See page 6) IG 23. INSTALL NO.2 CYLINDER HEAD COVER 24. INSTALL AIR CLEANER ASSEMBLY 25. INSTALL AIR CLEANER INLET 26. FILL ENGINE WITH COOLANT 27. START ENGINE AND CHECK FOR LEAK 28. INSTALL NO.1 ENGINE UNDER COVER 29. ROAD TEST Check abnormal noise, shock, slippage, correct shift points and smooth operation. 30. RECHECK ENGINE COOLANT LEVEL