MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Highway and Heavy Master Job Classifications OLD versus NEW

ATTACHMENT A. Construction Project Safety Checklist

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

Hennepin County Transportation Department ADDENDUM

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

T.A.T Minimum Wage Scale

Hennepin County Transportation Department ADDENDUM

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

Hennepin County Transportation Department ADDENDUM

Modification Number Publication Date 0 04/01/ /23/2016 * SUMN /01/2014

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

All Users of the City of Denver Prevailing Wage Schedules

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

GREASE TIME RATE SINGULARLY OPERATED MACHINES

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

FEMA's Schedule of Equipment Rates

BIDDING REQUIREMENTS Addendum No. 2. June 21, Southern Illinois University School of Medicine Springfield, IL PROSPECTIVE BIDDERS

FEMA's Schedule of Equipment Rates

On-the-Job Training Program. Overview of Training Programs

CITY OF MONTICELLO PIATT COUNTY, ILLINOIS AN ORDINANCE ENACTING THE ILLINOIS PREVAILING RATE OF WAGES FOR PUBLIC WORKS NO

Meredith Creme, Associate Human Resource Professional

SEWER AND WATERMAIN CONSTRUCTION

Kansas Department of Transportation

State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone PO Box 44540, Olympia, WA

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

Auction Ring 1 -Ramp - North Auction Theatre

SEWER AND WATERMAIN CONSTRUCTION

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

Schedule of Equipment Rates

CERTIFICATE. I, Marilyn L. Banks, DO HEREBY CERTIFY THAT I am the Town. of the City of Champaign Township Clerk in and for the Town of the City of

FAIR WAGE SCHEDULE Sewer and Watermain

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF EAST PEORIA, TAZEWELL COUNTY, ILLINOIS, THAT:

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

County Trade Job Classification Wage Holiday Overtime Notes

Auction Ring 1 -Ramp - North Auction Theatre

KENDALL COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5, Base Wage

FAIR WAGE SCHEDULE Road Building

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

ADDENDUM NUMBER ONE PART ONE, VOL. 1 CONTRACT DOCUMENTS

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010

ATTACHMENT 13 DAVIS-BACON WAGE DETERMINATION (HIGHWAY) NUEX Bldg Luke AFB Temporary Lodgin Facility. 20 June 2014

CONSTRUCTION and OFF ROAD EQUIPMENT

LABOR COMMISSIONER'S EXHIBITS

MERCER COUNTY PREVAILING WAGE ORDINANCE FOR

Prevailing Wage Rates for Will County effective August 15, 2018

General Decision Number: OR /06/2013 OR17. Superseded General Decision Number: OR State: Oregon. Construction Type: Residential

Appendix H: Construction Impacts H-3 Air Quality

RESOLUTION OF THE BOARD OF EDUCATION OF. for said CONSOLIDATED SCHOOL DISTRICT 158. PREVAILING WAGE

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

ESSEX COUNTY OFFICE OF THE MANAGER

Kane County Prevailing Wage for July 2015 (See explanation of column headings at bottom of wages)

Why? Faster To reduce the duration of the process

U.S. Department of Labor Wage Determinations

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

Equipment Rental Costs

Whatcom County Invitation to Bid Bid #17-09

STATE OF MICHIGAN Prevailing Wages PO Box Lansing, MI Informational Sheet: Prevailing Wages on State Projects

Bulldozer Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour


ILLINOIS DEPARTMENT OF LABOR

BUILDING AND CONSTRUCTION GENERAL ON-SITE AWARD 2010

Manhole Rehabilitation - Landside CONTRACT NO ADDENDUM NUMBER TWO

Bev Quinn. Govemor. Acting Director. August 31,2017. Bruce Rauner

Transcription:

ADDENDUM # 1 REQUEST FOR PROPOSAL: Elevator Maintenance Services RFP St. Cloud State University St. Cloud, MN 56301-4498 ORIGINAL PUBLICATION : June 23 2014 ADDENDUM # 1 ISSUE : July 8, 2014 REVISED 1. Refer to Exhibit A. The sample contract is incorrect. The correct sample contract is at: http://www.finance.mnscu.edu/facilities/design-construction/pm_emanual/index.html Line # 52 is the sample contract. 2. Ensure that the RFP responding to is dated June 23, 2014. 3. Refer to page 4. Revise the proposal opening date from July 8 to July 15. 4. Note that prevailing wages are required. All hours worked longer than 8 hours/day or 40 hours/week need to be paid overtime. See below for the prevailing wages required in Stearns county. 5. Refer to page 5 of the RFP, bullet point # 7. Include Attachment 4F in your submittal 6. The elevator services contract for last year totaled $82,472.00 7. See below for the list of attendees at the mandatory site visit. These are the only firms allowed to submit a proposal. END OF ADDENDUM # 1 1

2

Construction Type: Commercial County Number: 73 County Name: STEARNS Effective: 2013-11-18 This project is covered by Minnesota prevailing wage statutes. Wage rates listed below are the minimum hourly rates to be paid on this project. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at a rate of one and one half (1 1/2) times the basic hourly rate. Violations should be reported to: Department of Labor and Industry Prevailing Wage Section 443 Lafayette Road N St Paul, MN 55155 (651) 284-5091 DLI.PrevWage@state.mn.us * Indicates that adjacent county rates were used for the labor class listed. County: STEARNS (73) LABOR CODE AND CLASS LABORERS (101-112) (SPECIAL CRAFTS 701-730) 101 LABORER, COMMON (GENERAL LABOR WORK) +950000 2013-11-18 24.10 15.27 39.37 2014-05-01 24.90 15.77 40.67-950000 2013-11-18 22.35 15.27 37.62 2014-05-01 23.15 15.77 38.92 102 LABORER, SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN) +950000 2013-11-18 24.10 15.27 39.37 2014-05-01 24.90 15.77 40.67-950000 2013-11-18 22.35 15.27 37.62 2014-05-01 23.15 15.77 38.92 103* LABORER, LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR) 2013-11-18 18.00 12.43 30.43 104 FLAG PERSON 2013-11-18 16.75 5.38 22.13 105* WATCH PERSON +950000 2013-11-18 22.12 15.27 37.39 2014-05-01 22.92 15.77 38.69-950000 2013-11-18 20.37 15.27 35.64 2014-05-01 21.17 15.77 36.94 106* BLASTER +950000 2013-11-18 25.10 15.27 40.37 2014-05-01 25.90 15.77 41.67 3

-950000 2013-11-18 23.35 15.27 38.62 2014-05-01 24.15 15.77 39.92 107 PIPELAYER (WATER, SEWER AND GAS) 2013-11-18 24.34 15.25 39.59 2014-05-01 24.84 15.73 40.57 108 TUNNEL MINER FOR CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US 109 UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL) 2013-11-18 23.04 15.25 38.29 2014-05-01 23.54 15.73 39.27 110 SURVEY FIELD TECHNICIAN (OPE STATION, GPS RECEIVER, LEVEL, ROD OR RANGE POLES, STEEL TAPE MEASUREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS). THIS CLASSIFICATION DOES NOT APPLY TO THE WORK PERFORMED ON A PREVAILING WAGE PROJECT BY A LAND SURVEYOR WHO IS LICENSED PURSUANT TO MINNESOTA STATUTES, SECTIONS 326.02 TO 326.15. +950,000 2013-11-18 24.10 15.27 39.37 2014-05-01 24.90 15.77 40.67-950000 2013-11-18 22.35 15.27 37.62 2014-05-01 23.15 15.77 38.92 111 TRAFFIC CONTROL PERSON (TEMPORARY SIGNAGE) +950000 2013-11-18 24.10 15.27 39.37 2014-05-01 24.90 15.77 40.67-950000 2013-11-18 22.35 15.27 37.62 2014-05-01 23.15 15.77 38.92 SPECIAL EQUIPMENT (201-204) 201* ARTICULATED HAULER 2013-11-18 19.50 0.00 19.50 202 BOOM TRUCK 2013-11-18 21.00 0.00 21.00 203* LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO- FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS 2013-11-18 18.00 12.43 30.43 204* OFF-ROAD TRUCK FOR CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US 205 PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (ONE OR TWO PERSON OPERATORS); SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS. 2013-11-18 22.50 0.00 22.50 HIGHWAY/HEAVY POWER EQUIPMENT OPERATOR 4

GROUP 2 2013-11-18 24.65 16.70 41.35 2014-05-01 25.05 17.20 42.25 306 GRADER OR MOTOR PATROL 308 TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED (HIGHWAY AND HEAVY ONLY) GROUP 3 2013-11-18 24.25 6.00 30.25 309 ASPHALT BITUMINOUS STABILIZER PLANT 310 CABLEWAY 312 DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY) (HIGHWAY AND HEAVY ONLY) 314 DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER 316 LOCOMOTIVE CRANE OPERATOR 320 TANDEM SCRAPER 322 TUGBOAT 100 H.P AND OVER (HIGHWAY AND HEAVY ONLY) GROUP 4 2013-11-18 23.41 16.70 40.11 323 AIR TRACK ROCK DRILL 324 AUTOMATIC ROAD MACHINE (CMI OR SIMILAR) (HIGHWAY AND HEAVY ONLY) 327 BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER) 2014-05-01 23.81 17.20 41.01 328 BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFACING AND MICRO SURFACING, OR SIMILAR TYPES (OPERATOR AND SCREED PERSON) 329 BROKK OR R.T.C. REMOTE CONTROL OR SIMILAR TYPE WITH ALL ATTACHMENTS 330 CAT CHALLENGER TRACTORS OR SIMILAR TYPES PULLING ROCK WAGONS, BULLDOZERS AND SCRAPERS 331 CHIP HARVESTER AND TREE CUTTER 332 CONCRETE DISTRIBUTOR AND SPREADER FINISHING MACHINE, LONGITUDINAL FLOAT, JOINT MACHINE, AND SPRAY MACHINE 334 CONCRETE MOBIL (HIGHWAY AND HEAVY ONLY) 335 CRUSHING PLANT (GRAVEL AND STONE) OR GRAVEL WASHING, CRUSHING AND SCREENING PLANT 336 CURB MACHINE 337 DIRECTIONAL BORING MACHINE 338 DOPE MACHINE (PIPELINE) 340 DUAL TRACTOR 341 ELEVATING GRADER 345 GPS REMOTE OPERATING OF EQUIPMENT 347 HYDRAULIC TREE PLANTER 348 LAUNCHER PERSON (TANKER PERSON OR PILOT LICENSE) 349 LOCOMOTIVE (HIGHWAY AND HEAVY ONLY) 350 MILLING, GRINDING, PLANNING, FINE GRADE, OR TRIMMER MACHINE 352 PAVEMENT BREAKER OR TAMPING MACHINE (POWER DRIVEN) MIGHTY MITE OR SIMILAR TYPE 354 PIPELINE WRAPPING, CLEANING OR BENDING MACHINE 356 POWER ACTUATED HORIZONTAL BORING MACHINE, OVER SIX INCHES 357 PUGMILL 359 RUBBER-TIRED FARM TRACTOR WITH BACKHOE INCLUDING ATTACHMENTS (HIGHWAY AND HEAVY ONLY) 360 SCRAPER 361 SELF-PROPELLED SOIL STABILIZER 362 SLIP FORM (POWER DRIVEN) (PAVING) 363 TIE TAMPER AND BALLAST MACHINE 367 TUB GRINDER, MORBARK, OR SIMILAR TYPE 5

GROUP 5 2013-11-18 21.70 16.70 38.40 2014-05-01 22.10 17.20 39.30 370 BITUMINOUS ROLLER (UNDER EIGHT TONS) 371 CONCRETE SAW (MULTIPLE BLADE) (POWER OPED) 372 FORM TRENCH DIGGER (POWER) 375 HYDRAULIC LOG SPLITTER 376 LOADER (BARBER GREENE OR SIMILAR TYPE) 377 POST HOLE DRIVING MACHINE/POST HOLE AUGER 379 POWER ACTUATED JACK 381 SELF-PROPELLED CHIP SPREADER (FLAHERTY OR SIMILAR) 382 SHEEP FOOT COMPACTOR WITH BLADE. 200 H.P. AND OVER 383 SHOULDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLUDING SELF-PROPELLED SAND AND CHIP SPREADER 384 STUMP CHIPPER AND TREE CHIPPER 385 TREE FARMER (MACHINE) GROUP 6 2013-11-18 21.10 16.70 37.80 2014-05-01 21.50 17.20 38.70 387 CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER 389 DREDGE DECK HAND 391 GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING) 393 LEVER PERSON 395 POWER SWEEPER 396 SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS COMMERCIAL POWER EQUIPMENT OPERATOR GROUP 1 * 2013-11-18 36.09 15.95 52.04 2014-05-01 36.94 16.45 53.39 501 HELICOPTER PILOT (COMMERCIAL CONSTRUCTION ONLY) 502 TOWER CRANE 250 FEET AND OVER (COMMERCIAL CONSTRUCTION ONLY) 503 TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB (COMMERCIAL CONSTRUCTION ONLY) GROUP 2 2013-11-18 35.75 15.95 51.70 2014-05-01 36.60 16.45 53.05 504 CONCRETE PUMP WITH 50 METERS/164 FEET OF BOOM AND OVER (COMMERCIAL CONSTRUCTION ONLY) 505 PILE DRIVING WHEN THREE DRUMS IN USE (COMMERCIAL CONSTRUCTION ONLY) 506 TOWER CRANE 200 FEET AND OVER (COMMERCIAL CONSTRUCTION ONLY) 507 TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB (COMMERCIAL CONSTRUCTION ONLY) GROUP 3 2013-11-18 34.34 15.95 50.29 508 ALL-TERRAIN VEHICLE CRANES (COMMERCIAL CONSTRUCTION ONLY) 509 CONCRETE PUMP 32-49 METERS/102-164 FEET (COMMERCIAL CONSTRUCTION ONLY) 510 DERRICK (GUY & STIFFLEG) (COMMERCIAL CONSTRUCTION ONLY) 511 STATIONARY TOWER CRANE UP TO 200 FEET 2014-05-01 35.19 16.45 51.64 512 SELF-ERECTING TOWER CRANE 100 FEET AND OVER MEASURED FROM BOOM FOOT PIN (COMMERCIAL CONSTRUCTION ONLY) 6

513 TRAVELING TOWER CRANE (COMMERCIAL CONSTRUCTION ONLY) 514 TRUCK OR CRAWLER CRANE UP TO AND NOT INCLUDING 150 FEET OF BOOM, INCLUDING JIB (COMMERCIAL CONSTRUCTION ONLY) GROUP 4 * 2013-11-18 34.00 15.95 49.95 2014-05-01 34.85 16.45 51.30 515 CRAWLER BACKHOE INCLUDING ATTACHMENTS (COMMERCIAL CONSTRUCTION ONLY) 516 FIREPERSON, CHIEF BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY) 517 HOIST ENGINEER (THREE DRUMS OR MORE) (COMMERCIAL CONSTRUCTION ONLY) 518 LOCOMOTIVE (COMMERCIAL CONSTRUCTION ONLY) 519 OVERHEAD CRANE ( INSIDE BUILDING PERIMETER) (COMMERCIAL CONSTRUCTION ONLY) 520 TRACTOR. BOOM TYPE (COMMERCIAL CONSTRUCTION ONLY) GROUP 5 2013-11-18 33.83 15.95 49.78 2014-05-01 34.68 16.45 51.13 521 AIR COMPRESSOR 450 CFM OR OVER (TWO OR MORE MACHINES) (COMMERCIAL CONSTRUCTION ONLY) 522 CONCRETE MIXER (COMMERCIAL CONSTRUCTION ONLY) 523 CONCRETE PUMP UP TO 31 METERS/101 FEET OF BOOM 524 DRILL RIGS, HEAVY ROTARY OR CHURN OR CABLE DRILL WHEN USED FOR CAISSON FOR ELEVATOR OR BUILDING CONSTRUCTION (COMMERCIAL CONSTRUCTION ONLY) 525 FORKLIFT (COMMERCIAL CONSTRUCTION ONLY) 526 FRONT END, SKID STEER 1 C YD AND OVER 527 HOIST ENGINEER ( ONE OR TWO DRUMS) (COMMERCIAL CONSTRUCTION ONLY) 528 MECHANIC-WELDER (ON POWER EQUIPMENT) (COMMERCIAL CONSTRUCTION ONLY) 529 POWER PLANT (100 KW AND OVER OR MULTIPLES EQUAL TO 100KW AND OVER) (COMMERCIAL CONSTRUCTION ONLY) 530 PUMP OPERATOR AND/OR CONVEYOR (TWO OR MORE MACHINES) (COMMERCIAL CONSTRUCTION ONLY) 531 SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN (COMMERCIAL CONSTRUCTION ONLY) 532 STRADDLE CARRIER (COMMERCIAL CONSTRUCTION ONLY) 533 TRACTOR OVER D2 (COMMERCIAL CONSTRUCTION ONLY) 534 WELL POINT PUMP (COMMERCIAL CONSTRUCTION ONLY) GROUP 6 2013-11-18 24.25 6.23 30.48 535 CONCRETE BATCH PLANT (COMMERCIAL CONSTRUCTION ONLY) 536 FIREPERSON, FIRST CLASS BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY) 537 FRONT END, SKID STEER UP TO 1 C YD 538 GUNITE MACHINE (COMMERCIAL CONSTRUCTION ONLY) 539 TRACTOR OPERATOR D2 OR SIMILAR SIZE (COMMERCIAL CONSTRUCTION ONLY) 540 TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER GROUP 7 2013-11-18 31.20 15.95 47.15 541 AIR COMPRESSOR 600 CFM OR OVER (COMMERCIAL CONSTRUCTION ONLY) 542 BRAKEPERSON (COMMERCIAL CONSTRUCTION ONLY) 543 CONCRETE PUMP/PUMPCRETE OR COMPLACO TYPE (COMMERCIAL CONSTRUCTION ONLY) 2014-05-01 32.05 16.45 48.50 544 FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY) 545 OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER SIMILAR POWER EQUIPMENT) (COMMERCIAL CONSTRUCTION ONLY) 546 PICK UP SWEEPER (ONE CUBIC YARD HOPPER CAPACITY) (COMMERCIAL CONSTRUCTION ONLY) 547 PUMP AND/OR CONVEYOR (COMMERCIAL CONSTRUCTION ONLY) 7

GROUP 8 2013-11-18 16.10 6.00 22.10 548 ELEVATOR OPERATOR (COMMERCIAL CONSTRUCTION ONLY) 549 GREASER (COMMERCIAL CONSTRUCTION ONLY) 550 MECHANICAL SPACE HEATER (TEMPORARY HEAT NO BOILER LICENSE REQUIRED) (COMMERCIAL CONSTRUCTION ONLY) TRUCK DRIVERS GROUP 1 2013-11-18 20.92 14.00 34.92 601 MECHANIC. WELDER 602 TRACTOR TRAILER DRIVER 603 TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPED WINCHES) GROUP 2 2013-11-18 21.15 6.23 27.38 604 FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK GROUP 3 2013-11-18 20.26 14.00 34.26 605 BITUMINOUS DISTRIBUTOR DRIVER 606 BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION) 607 THREE AXLE UNITS GROUP 4 2013-11-18 19.00 6.23 25.23 608 BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER) 609 DUMP PERSON 610 GREASER 611 PILOT CAR DRIVER 612 RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS 613 TWO AXLE UNIT 614 SLURRY OPERATOR 615 TANK TRUCK HELPER (GAS, OIL, ROAD OIL, AND WATER) 616 TRACTOR OPERATOR, UNDER 50 H.P. SPECIAL CRAFTS 701 HEATING AND FROST INSULATORS 2013-11-18 41.17 19.06 60.23 2014-06-01 42.07 19.06 61.13 702 BOILERMAKERS 2013-11-18 32.40 25.37 57.77 703 BRICKLAYERS 2013-11-18 29.84 18.30 48.14 704 CARPENTERS 2013-11-18 26.07 16.73 42.80 705* CARPET LAYERS (LINOLEUM) 2013-11-18 20.42 14.99 35.41 706 CEMENT MASONS 2013-11-18 32.59 16.60 49.19 2014-05-01 33.74 16.60 50.34 707 ELECTRICIANS 2013-11-18 27.75 13.91 41.66 8

708 ELEVATOR CONSTRUCTORS 2013-11-18 43.57 30.01 73.58 709 GLAZIERS 2013-11-18 27.33 12.48 39.81 710* LATHERS 2013-11-18 13.00 0.00 13.00 712 IRONWORKERS 2013-11-18 34.15 21.20 55.35 714 MILLWRIGHT 2013-11-18 30.18 20.24 50.42 715 PAINTERS (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) 2013-11-18 32.04 18.26 50.30 716* PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS) 2013-11-18 26.86 17.76 44.62 717 PIPEFITTERS. STEAMFITTERS 2013-11-18 30.47 26.17 56.64 2014-05-01 31.77 26.17 57.94 718* PLASTERERS 2013-11-18 34.48 14.04 48.52 719 PLUMBERS 2013-11-18 30.95 25.57 56.52 2014-05-01 32.25 25.57 57.82 720 ROOFER 2013-11-18 29.45 15.13 44.58 2014-06-01 30.25 15.13 45.38 721 SHEET METAL WORKERS 2013-11-18 33.02 19.27 52.29 722 SPRINKLER FITTERS 2013-11-18 32.52 16.87 49.39 2014-04-01 33.17 17.22 50.39 723 TERRAZZO WORKERS 2013-11-18 34.33 18.81 53.14 724 TILE SETTERS 2013-11-18 28.09 8.90 36.99 725 TILE FINISHERS 2013-11-18 20.22 4.49 24.71 726 DRYWALL TAPER 2013-11-18 24.96 14.56 39.52 727 WIRING SYSTEM TECHNICIAN 2013-11-18 34.16 12.31 46.47 2014-07-01 35.24 12.31 47.55 728 WIRING SYSTEMS INSTALLER 2013-11-18 22.44 4.52 26.96 729 ASBESTOS ABATEMENT WORKER 2013-11-18 27.53 15.34 42.87 730 SIGN ERECTOR 2013-11-18 25.44 11.13 36.57 9