West. Coordinated Planning. Coordinated Planning. PS (PowerSouth Energy Cooperative) SMEPA (South Mississippi Electric Power Association)

Similar documents
West. Coordinated Planning. PS (PowerSouth Energy Cooperative) SMEPA (South Mississippi Electric Power Association) Southern Company Transmission

West. PS (PowerSouth Energy Cooperative) SMEPA (South Mississippi Electric Power Association) Southern Company Transmission

West. PS (PowerSouth Energy Cooperative) SMEPA (South Mississippi Electric Power Association) Southern Company Transmission

Southeastern Regional Transmission Planning Process 10 Year Preliminary Expansion Plan Meeting. June 24, 2009

Southeastern Region Transmission Planning. 10 Year Transmission Expansion Plan

2010 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting 9:00 AM 3:00 PM

Southern Company Transmission Active OATT Interconnection Agreements

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

SERTP rd Quarter Meeting

2011 SERTP Annual l S E S RTP T P S u S mmit 1

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

1st Division Commander Tina Bush (256)

ALABAMA ASSET QUALITY - JUNE 30, 2017

East. Georgia Integrated Transmission System (ITS) Jointly Planned ITS. Dalton Utilities. GTC (Georgia Transmission Corporation)

Falcon-Midway 115 kv Line Uprate Project Report

SERTP rd Quarter Meeting

East. Georgia Integrated Transmission System (ITS) GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA)

2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

SERTP nd Quarter Meeting

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Sub Regional RTEP Committee Mid-Atlantic

National Grid s 2018 Local Transmission Plan

2016 SPP Transmission Expansion Plan Project List Kansas Projects

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition

National Grid s 2017 Local Transmission Plan

PG&E s 2012 Request Window Proposals

South Dakota 890 Study

Southeastern Regional Transmission Planning (SERTP) PRELIMINARY 10 YEAR TRANSMISSION EXPANSION PLANS

MTEP13 SPM #2- Central Region. March 25, 2013

Gateway South Transmission Project

Sub Regional RTEP Committee - Southern. August 19, 2011

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Western Area Power Administration

Tri-State December 2013 Board Meeting

Transmission Expansion Advisory Committee

Feasibility Study Report

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Southeastern Regional Transmission Planning (SERTP) PRELIMINARY 10 YEAR TRANSMISSION EXPANSION PLANS

Illinois State Report

Appendix D Black Hills Project Summary

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Solution Meeting

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Sub Regional RTEP Committee Mid-Atlantic

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Black Hills Project Summary

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Project #148. Generation Interconnection System Impact Study Report

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Generation Deactivation Notification Update

BC Hydro System 2011 Annual Progress Report

VACAR 2015 SUMMER PEAK RELIABILITY STUDY

APPENDIX F: 2012 Request Window Submittals

Sub-Regional RTEP Committee PJM South

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

APPENDIX E: Project Need and Description

SPP Notification to Construct

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Appendix B. Summary of Changes to the Year Assessment

KEY. Key to Status Fields in the Project List

APPENDIX E: Project Need and Description

Pacific Gas and Electric Company s 2013 Annual Progress Report

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects

15 Nelson-Marlborough Regional Plan

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Sub Regional RTEP Committee Mid-Atlantic

15 Nelson-Marlborough Regional Plan

SPP Notification to Construct

Sub Regional RTEP Committee Mid-Atlantic

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Proposed New Construction for

The Long-Range Transmission Plan

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

SERTP Southeastern Regional Transmission Planning

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

2018 & 22 Final LCR Study Results Greater Bay Area

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

100 MW Wind Generation Project

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

EXCEPTIONS TO NYSRC RELIABILITY RULES

System Impact Study Report

North Oregon Coast Area Study. Adam Lint

Transcription:

Coordinated Planning West PS (PowerSouth Energy Cooperative) SMEPA (South Mississippi Electric Power Association) Coordinated Planning Southern Company Transmission SMEPA PowerSouth

Expansion Item W-1 Gaston Yellow Dirt 230 kv T.L. Upgrade approximately 81 miles along the Gaston Roopville section of the Gaston Yellow Dirt 230 kv T.L. to 100 C operation. 2012 W-1 The loss of the Conasauga Mostellar Springs 500 kv T.L. causes the Gaston Yellow Dirt 230 kv T.L. to become overloaded.

Gaston Yellow Dirt 230 kv T.L. 2012 W-1 The loss of the Conasauga Mostellar Springs 500 kv T.L. causes the Gaston Yellow Dirt 230 kv T.L. to become overloaded. Upgrade approximately 81 miles from Gaston to Roopville to 100 C operation along the Gaston Yellow Dirt 230 kv T.L. Yellow Dirt Plant Gaston

Expansion Item W-2 Montgomery South Montgomery 230 kv T.L. Reconductor 7.71 miles with 1351 ACSS at 160 C along the Montgomery South Montgomery 230 kv T.L. 2012 W-2 The loss of the Snowdoun Autaugaville 500 kv T.L. causes the Montgomery SS South Montgomery 230 kv T.L. to become overloaded. Project need date is 06/01/2013 (due to the installation of Autaugaville 500/230 kv transformer), but is scheduled for 06/01/2012 completion.

Montgomery South Montgomery 230 kv T.L. 2012 W-2 To County Line Road To Autaugaville To Hunter SS West Montgomery Well Rd Montgomery SS Washington Park DS To GE Burkville South Montgomery Lamar Rd Woodcrest Reconductor 7.71 miles along the Montgomery South Montgomery 230 kv T.L. Hyundai Snowdoun

Expansion Item W-3 Autaugaville 500 kv Substation Install a new 500 / 230 kv transformer at Autaugaville (2016 MVA) 2013 W-3 The loss of the Snowdoun Autaugaville 500 kv T.L., with Harris Unit #1 offline, causes the Gaston County Line Road 230 kv T.L. to overload.

Autaugaville 500 / 230 kv Transformer 2013 W-3 AEC Millbroo k Robinson Springs SONAT Elmore ECI Prattville Co Line Road Prattville E. Prattville Prattmont Prattbrook Millbrook Autaugaville S. Prattville International Paper Prattville Ind. Prattville SS Hunter SS Montgomery SS Maxwell Field W. Montgomery Add 2016 MVA 500 / 230 kv Autobank and 230 kv T.L. (1 mile) Catoma WW Well Road Washington Park G E Burkville Mobis Collins Lamar Road

Expansion Item W-4 Greene County Substation Install a second 230 / 115 kv transformer at Greene County substation. 2013 W-4 The loss of the existing 230 / 115kV Transformer at Greene County SP causes the South Tuscaloosa Eutaw 115kV Transmission Line to become overloaded.

Greene County Substation 2013 W-4 Green County Duncanville 230 kv T.L. CPL EPES 230 LIVINGSTON kv T.L. EPES MANNINGTON WOOD FLOORS Greene County Meridian NE BIRDEYE D.S. BIRDEYE T.S. Add 400 MVA 230 / 115 kv Autobank PLANT GREENE COUNTY CUBA BELLAMY BELLAMY S.S. BW EMC COATOPA DEMOPOLIS SONAT GALLION WEST Green Co. N. Selma 230 kv T.L. CEMEX DEMOPOLIS FAUNSDALE DEMOP. IND. PK. ROCK TENN SONAT YORK Greene County Sykes S.S. 230 kv T.L. LINDEN

Expansion Item W-5 Laguna Beach 230 / 115 kv Substation Install a second 230 / 115 kv transformer at Laguna beach substation. 2013 W-5 The loss of the Smith 230 / 115 kv transformer, with Smith unit #1 offline, overloads the Laguna Beach 230 / 115 kv transformer.

Laguna Beach 230 / 115 kv Substation 2013 W-5 Laguna Beach Substation (Add second 400 MVA 230 / 115 kv Transformer)

Expansion Item W-6 Smith Laguna Beach 230 kv T.L. Convert the Smith Laguna Beach 115 kv T.L. to 230 kv operation. 2013 W-6 The loss of one of the Laguna Beach 230 / 115 kv transformers, with Crist unit #7 offline, causes the Smith Laguna Beach 115 kv to exceed its thermal limit.

Smith Laguna Beach 230 kv T.L. 2013 W-6 Smith Laguna Beach Line Conversion to 230 kv

Expansion Item W-7 Pinckard Slocomb 115 kv T.L. Reconductor 12.5 miles of 115 kv T.L. with 1033 ACSS at 160º C. Upgrade the Holmes Creek terminals at Pinckard T.S. to 2000 A. 2013 W-7 The loss of Farley Sinai Cemetery 230 kv T.L., with Smith unit #3 offline, causes the Pinckard Slocomb 115 kv T.L. to overload.

Expansion Item W-8 Slocomb Holmes Creek 115 kv T.L. Reconductor 10.4 miles of 115 kv T.L. from Slocomb to Holmes Creek with 1033 ACSS at 160º C. 2014 W-8 The loss of Farley Sinai Cemetery 230 kv T.L., with Smith unit #3 offline, causes this line to become overloaded.

Pinckard Slocomb 115 kv T.L. 2013 W-7 Slocomb Holmes Creek 115 kv T.L. 2014 W-8 Reconductor 115 kv T.L. from Pinckard Slocomb Holmes Creek (23 miles)

Expansion Item W-9 Snowdoun Pike County 230 kv T.L. Reconductor 32.4 miles of 230 kv T.L. between Snowdoun and Pike County with 1033 ACSS at 160º C. 2014 W-9 The loss of Snowdoun Farley 500 kv T.L., with Farley unit #1 offline, causes the Snowdoun Pike County 230 kv T.L. to become overloaded.

Snowdoun Pike Co. 230 kv T.L. 2014 W-9 Madison Park Montg. SS W. Montg S. Montg Hope Hull Snowdoun Dixie ECI Cecil Reconductor 32.42 miles Snowdoun Pike County 230kV T.L. Union Springs Pike Co Troy S.S City of Troy Luverne

Expansion Item W-10 Kemper County Generation IGCC plant addition in Kemper County, Mississippi and construct all transmission facilities required for firm service from the plant. 2014 W-10 These projects are to support the addition of Kemper County IGCC.

Kemper County Generation 2014 W-10 Lauderdale West (New 230 kv SS) Kemper County IGCC Plant (New 230 kv SS) Construct Kemper Co Lauderdale West 230 kv T.L. (20 miles) Construct Kemper Co Lauderdale East 230 kv T.L. (18 miles) Lauderdale East (New 230 kv SS) Construct Vimville Lauderdale East 230 kv T.L. (6 miles) Greene County (Existing 230 / 115 kv TS) Vimville (New 230 /115 kv TS) Construct Vimville Meridian NE 115 kv T.L. (9.4 miles) Rebuild Plant Sweatt Lost Gap 115 kv T.L. Construct Plant Sweatt Vimville 230 kv T.L. (14 miles) Rebuild Meridian Meridian NE 115 kv T.L. Rebuild Plant Sweatt Stonewall 115 kv T.L.

Expansion Item W-11 Santa Rosa Laguna Beach 230 kv T.L. Construct a new Santa Rosa 230 KV substation with two 230 / 115 kv transformers. Build a new 230 kv T.L. from Laguna Beach to Santa Rosa. Replace Laguna Beach Santa Rosa #1 115 kv T.L. with a new 230 kv T.L. 2015 W-11 Several transmission lines in the Fort Walton Beach area exceed their thermal ratings under contingency conditions.

Santa Rosa Laguna Beach 230 kv T.L. 2015 W-11 New Laguna Beach Santa Rosa 230 kv T.L. Replace existing Laguna Beach Santa Rosa 115 kv T.L. with a parallel 230 kv T.L. Laguna Beach Substation Santa Rosa Substation

Expansion Item W-12 Barry Crist 230 kv T.L. Upgrade the Barry SP Crist SP 230 kv T.L. to 125 C operation. 2015 W-12 The loss of Barry S.P. Chickasaw 230 kv T.L., with Crist unit #7 offline, causes the Barry S.P. Crist S.P. 230 kv T.L. to exceed its thermal rating.

Barry Crist 230 kv T.L. 2015 W-12 Upgrade Barry Crist 230 kv T.L. to 125 degree C Operation from Alabama State Line to Plant Crist

Expansion Item W-13 Barry Chickasaw 230 kv T.L. Reconductor 19.18 miles of 230 kv T.L. from Barry Steam Plant Chickasaw T.S. 2015 W-13 The loss of the Barry Crist 230 kv T.L., with Crist unit #7 offline, causes the Barry Chickasaw 230 kv T.L. to become overloaded.

Barry Chickasaw 230 kv T.L. 2015 W-13 Reconductor the Barry Chickasaw 230 kv TL (19.2 miles)

Expansion Item W-14 Tuscaloosa Area Improvement Install a 230 / 115 kv transformer at a new substation, Moundville TS. Convert Moundville (to be called North Moundville DS) and Akron 44 kv substations to 115 kv Construct a new 115 kv T.L. from North Moundville to Moundville. Construct a new 115 kv T.L. from North Moundville to Big Sandy/Englewood Tap 2015 W-14 Overloads caused by multiple contingencies. Voltage Support.

Expansion Item W-15 Tuscaloosa Area Improvement Install a new 115 kv T.L. from Englewood to South Tuscaloosa Reconductor 3.6 miles of existing 115 kv T.L. from Big Sandy to Big Sandy Tap with 397 ACSR 2016 W-15 The loss of the Duncanville Bradley Rd 230 kv T.L., with Gorgas unit #10 offline, causes the Eutaw Moundville Tap 115 kv T.L. to become overloaded

Tuscaloosa Area Improvement 2015 W-14 PLANT GORGAS 2016 W-15 New Epes Eutaw 115 kv T.L. (22.5 miles in 2014) ALICEVILLE STANSEL BLACK WARRIOR LEWISTON EUTAW GORDO TO GORDO CARROLLS CREEK FAYETTE HWY HUNT OIL GOODRICH LAKELAND YACHT CLUB TUSC. T.S. N MOUNDVILLE D.S. COLONIAL D.S. CPL MOUNDVILLE WESTERVELT AKRON D.S. NUCO R STEEL SONAT BANKHE AD EL PASO DAM HOLT T.S. KELLERMAN JWR #4 J.W. #5 HOLT DAM BLACK WARRIOREUTAW HWY SOUTH ROMULUS TUSC. T.S. STOKES BRADLEY ROAD ENGLEWOOD PPL AKRON BIG SANDY MOUNDVILLE TAYLORS FERRY SHOAL CREEK New South Tuscaloosa Englewood 115 kv T.L. (2016) MERCEDES DUNCANVILLE S.S. LAKEVIEW SOUTH BESSEMER T.S. BLOCTON New Moundville North Moundville 115 kv T.L. (2015) CPL EPES EPES T.S. LIVINGSTON MANNINGTON WOOD FLOORS BIRDEYE T.S. BIRDEYE D.S. PLANT GREENE COUNTY New Moundville 230 / 115 kv Substation (2015)

Expansion Item W-16 Jasper Area Improvements Construct a new switching station, Jasper SS, near Jasper TS tap Loop in the Jasper TS Oakman and Jasper DS Taft Coal 161 kv transmission lines Reconductor 13.8 miles from Gorgas Jasper Tap 161 kv transmission line with 795 ACSR Reconductor 5.3 miles along the Jasper TS Parkland SS 161 kv with 795 ACSR. 2017 W-16 The loss of the Gorgas Scrubber #1 Gorgas 161 kv transmission line causes the Gorgas Taft Coal Jasper Tap 161 kv transmission line to become overloaded.

Jasper Area Improvements 2017 W-16 Reconductor Jasper TS PROSPECT DS Parkland SS 161 kv CURRY BURROWS XRDS SMITH DAM 82.5 MW PARKLAND SS PARKLAND DS JASPER TS JASPER SS N.O. WALSTON RD JASPER DS Reconductor EAST Gorgas Jasper JASPER Tap 161 kv TAFT COAL BANKSTON DS CHEVRON MINIG (TYRO CREEK) BERRY DS NORTH SAMANTHA CHEVRON MINIG (FLAT CREEK) CHEVRON MINIG (CEDAR CREEK) OAKMAN TS N.O. Construct Jasper SS and loop in Jasper TS Oakman and Jasper DS Taft Coal 161 kv T.L.s GORGAS SCRUBBER #1 Gorgas S.P. 1282 MW To Miller Scrubber To Plant Miller To Holt T.S. 230/115 kv #1 Auto To Holt T.S. 230/115 kv #2 Auto

Expansion Item W-17 Silverhill Turkey Hill 115 kv T.L. Reconductor approximately 11.0 miles of 115 kv T.L. from Silverhill to Turkey Hill with 795 ACSR. Construct approximately 2.75 miles of new 115 kv T.L. from Barnwell Tap Turkey Hill to complete the new Silverhill Turkey Hill 115 kv T.L. 2018 W-17 The loss of the Silverhill SW Foley 115 kv T.L., with Crist unit #7 offline, causes several sections from Silverhill to Turkey Hill to become overloaded.

Silverhill Turkey Hill 115 kv T.L. 2018 W-17 BELFOREST Reconductor Silverhill Fish River Tap 115 kv T.L. Reconductor Fish River Tap Point Clear Tap 115kV T.L. SILVERHILL PS - SILVERHILL FAIRHOPE POINT CLEAR C FISH RIVER CAPACITOR FISH RIVER BARNWELL B A MAGNOLIA RIVIERA UTIL. SW FOLEY FOLEY SS TURKEY HILL SS Construct 2.75 miles of new 115 kv T.L. from Barnwell Tap Turkey Hill SS

Expansion Item W-18 Gaston County Line Road 230 kv T.L. Reconductor approximately 51.0 miles of 230 kv T.L. from Power Systems Development Facility to County Line Road with 1351 ACSS at 200º C along the Gaston - County Line Road 230 kv T.L. 2019 W-18 The loss of the Autaugaville Billingsly 500 kv T.L., with Harris unit #1 offline, causes the Gaston County Line Road 230 kv T.L. to become overloaded.

Gaston County Line Road 230 kv T.L. 2019 W-18 Bessemer South Bessemer Gaston Power Systems Development Facility Billingsly Reconductor 51 miles of 230 kv T.L. from P.S.D.F to County Line Road Autaugaville County Line Rd AEC Millbrook Prattville E. Prattville Prattmon t ECI Prattville S. Prattville Prattville SSPrattville Ind. International Paper Montgomery SS Robinson Springs Millbrook Prattbrook Hunter SS SONAT Elmore Maxwell Field W. Montgomery Catoma WW Well Road Washington Park Mobis Collins G E Burkvill e Lamar Road Snowdoun

Expansion Item W-19 Demopolis Selma 115 kv T.L. Reconductor approximately 43.0 miles of 115 kv T.L. from Demopolis to Selma with 795 ACSR at 100º C. 2019 W-19 The loss of the Greene County North Selma 230 kv T.L. causes the Demopolis Selma 115 kv T.L. to become overloaded.

Demopolis Selma 115 kv T.L. 2019 W-19 Reconductor 43 miles of 115 kv GREENSBORO T.L. from Demopolis to Selma BIRDEYE T.S. BIRDEYE D.S. DEMOP. IND. PK. BLACK WARRIOR EMC MILLWOOD PLANT GREENE COUNTY MARION T.S. CEMEX WEST DEMOPOLIS DEMOPOLIS SONAT GALLION FAUNSDALE BLACK WARRIOR EMC PORTER N. SELMA N. SELMA BROWN S D.S. SELMA VALLEY CREEK W. SELMA S. SELMA ALAMET

Expansion Item W-20 Greene County North Selma 230 kv T.L. Reconductor approximately 47.6 miles of 230 kv T.L. from Greene County to North Selma with 1351 ACSS at 200º C. 2020 W-20 The loss of the Billingsly Autaugaville 500 kv T.L., with Harris Unit #1 offline, causes the Greene North Selma 230 kv T.L. to become overloaded.

Greene County North Selma 230 kv T.L. 2020 W-20 BIRDEYE T.S. BIRDEYE D.S. DEMOP. IND. PK. BLACK WARRIOR EMC MILLWOOD PLANT GREENE COUNTY Reconductor 47.6 miles of 230 kv T.L. from Greene County to North Selma GREENSBORO MARION T.S. CEMEX WEST DEMOPOLIS DEMOPOLIS SONAT GALLION FAUNSDALE BLACK WARRIOR EMC PORTER N. SELMA N. SELMA BROWN S D.S. SELMA VALLEY CREEK W. SELMA S. SELMA ALAMET

Expansion Item W-21 Silverhill 230 / 115 kv Substation Install a 3 rd 230 / 115 kv Autobank (400 MVA) at Silverhill T.S. 2021 W-21 The loss of the Silverhill 230 / 115 kv Autobank #1, with Daniel unit #1 offline, overloads the Silverhill 230 / 115 kv Autobank #2

Silverhill 230 / 115 kv Substation 2021 W-21 EASTERN SHORE CTR SPANISH FORT LOXLEY BELFOREST Install a 3 rd 230 / 115 kv Autobank at Silverhill TS SILVERHILL TS FAIRHOPE

Expansion Item W-22 North Brewton Crist 230 kv T.L. Construct approximately 56 miles of new 230 kv transmission line from North Brewton Crist with 1351 ACSS at 200 C.. 2021 W-22 The loss of one Chickasaw Silverhill 230 kv T.L., with Crist #7 offline, causes the parallel Chickasaw Silverhill 230 kv T.L. to become overloaded.

North Brewton Crist 230 kv T.L. 2021 W-22 ELLICOTT PLANT BARRY Construct 56 miles of new 230 kv line from North Brewton to Crist BIG CREEK CHICKASAW WADE PLANT DANIEL THEODORE MOSS POINT EAST SILVERHILL ELSANOR BELLVIEW PLANT CRIST BRENTWOOD

PowerSouth

Expansion Item PS-1 Clio Area Project Construct new 14 miles Texasville Junction Judson with 795 ACSR. 2012 PS-1 This is a project to provide an additional source for a radial load and increase the capacity of an East to West path.

Clio Area Upgrades 2012 PS-1 Current 62 MVA Path limited under contingencies

Expansion Item PS-2 Baldwin County Alabama Construct a new 115 kv T.L. from Miflin Junction Florida Avenue with one mile water crossing. Construct Miflin Switching Station. Thermal uprate Miflin Junction Wolf Bay Junction T.L. 15 MVAR Cap Banks at Florida Avenue and Gulf Shores. This is a project to strengthen the system of the high load growth area, Orange Beach being served radially, to respond to single contingency conditions. 2012 PS-2

Baldwin County Alabama 2012 PS-2 Wolf Bay New 115 kv line 115 kv line Uprate Capacitor Additions MIFLIN JCT. Miflin Junction Florida Avenue

Expansion Item PS-3 Brewton/Atmore Area Upgrade 40 miles of 46kV transmission line to 115kV 795 ACSR. 2013 PS-3 This area experiences line overloads under single contingencies and unacceptable low voltage under a double contingency scenario. Alleviate voltage and overload problems by providing a parallel 115kV path that eliminates the overload and assures that the voltage is supported for the loss of two sources.

Brewton / Atmore Area 2013 PS-3 Upgrade 40 miles of 46kV line to 115kV, 795 ACSR

Expansion Item PS-4 Baldwin County Alabama Turkey Hill 115kV Sw. Station Conversion to 6 terminal Ring bus Design will allow for the addition of a 3 rd line from APCO as well as a future PowerSouth line to be installed without taking a bus outage. APCO will terminate both of their existing lines from Silverhill into the new ring bus. This will greatly increase the reliability of this source and eliminate the overload of the Elsanor Miflin 115 kv line for any single contingency. 2013 PS-4

Baldwin Co. / Turkey Hill Area 2013 PS-4

South Mississippi Electric Power Association

SMEPA s System Expansion Plan 10 Year Transmission Plan Years 2011 2014 Under Construction Included in Transmission Construction Work Plan (TCWP) Years 2015 2021 Not Included in TCWP

Expansion Item SME-1 Prentiss 161 / 69 kv Substation Tap Silver Creek 161 kv Interconnection. Construct Prentiss 161 / 69 kv Substation. This project alleviates 69 kv low voltages and This project alleviates 69 kv low voltages and multiple line overloads during 69 kv contingencies. 2012 SME-1

Prentiss 161 / 69 kv Substation 2012 SME-1

Expansion Item SME-2 South Hoy 161 kv Source Construct a new 161 / 69 kv substation at South Hoy. Construct a new 161 kv T.L. from Moselle to South Hoy. This project alleviates 69 kv low voltages and multiple line overloads during 69 kv contingencies. 2014 SME-2

South Hoy 161 kv Source 2014 SME-2

Expansion Item SME-3 East Waynesboro 230 / 69 kv Substation Tap 230 kv T.L. 230 (PowerSouth Tie) and 69 kv T.L. 23. Construct East Waynesboro 230 / 69 kv Substation. Upgrade supporting 69 kv transmission. This project alleviates 69 kv low voltages and multiple line overloads during 69 kv contingencies. 69 kv transmission capacity. 2017 SME-3

East Waynesboro 230 / 69 kv Substation 2017 SME-3

Questions?