Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

Similar documents
STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE

December-2017 Edition-9

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

Reactive Power Document and Voltage Control of North Eastern Region

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

North Eastern Regional Power Committee Agenda For

Agenda of 11 th System Studies Meeting in NER

PDF processed with CutePDF evaluation edition

North Eastern Regional Power Committee Agenda

List of Grid Disturbances above 10 MW. Page 1 of 8

North Eastern Regional Power Committee

Report. the feasibility of

No. NERPC/SE (O)/PCC/2013/ Date: 16th August, 2013

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Indian Power System Framework

HVDC Systems in India

CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

Bangladesh s Power Sector : At a Glance

Ph. No: Fax No: Website:

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

Black StartDrill in Eastern Regional Power System-Case studies

OPERATION & MAINTENANCE OF HVDC STATION

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

24X7 POWER FOR ALL TRIPURA A JOINT INITIATIVE OF GOVERNMENT OF INDIA AND GOVERNMENT OF TRIPURA

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

Thereafter, the agenda items were taken up.

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

Overview of Indian Power Sector. February 29, 2008

Bihar: Transmission System Study for 13 th Plan

An Overview to HVDC links in India

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC

Cross Border Energy Trade by Bhutan. By Gem Tshering, BPC

No.CEA/PS/PSPM/7/1//2012. Subject: Meeting to review the RFD targets in respect of commissioning of transmission lines for the year

Draft National Electricity Plan

Status and Trends of HVDC

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh

RUBBER FOOTWEAR. Introduction :

2016 SDG&E Grid Assessment Results

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 82/MP/2014

Future Power Supply Scenario

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

PRAGATI ENGINEERING COLLEGE

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

Agenda Note for Standing Committee Meeting of Power System Planning in ER

HVDC Multi-Terminal Interconnections a viable and optimal solution for India

Appendix B. Summary of Changes to the Year Assessment

BRIEF OF ALL PROJECTS

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

I. Operational Feedback from NLDC:

2016 INTEGRATED TRANSMISSION PLAN SCHEDULES SEPTEMBER 2016

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Annexure. Technical Details Package 1

APPENDIX E: Project Need and Description

Stability Study for the Mt. Olive Hartburg 500 kv Line

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC

Evacuation system from Chamera III HEP (231 MW).

South Dakota 890 Study

COVER STORY COVER STOR

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

List of the participants is enclosed at Annexure I.

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

Sub Regional RTEP Committee Western Region ATSI

Falcon-Midway 115 kv Line Uprate Project Report

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

15 Nelson-Marlborough Regional Plan

Sub Regional RTEP Committee Mid-Atlantic

TransWest Express Project

IJRASET 2013: All Rights are Reserved

Large Scale Implementation of Control Switching Devices in Indian Power System- A Case Study. N S Sodha,

APPENDIX E: Project Need and Description

'J!TW ~ / Government of India ~ ~ / Ministry of Power ~ ~ ~1~<t1~UI / Central Electricity Authority ~ ~ ~ 4~~'1\J1-11 ~q;-;y ~

Status of PNM s Completed Transmission Construction Projects 11/30/2017

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

ABB POWER SYSTEMS CONSULTING

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

Offshore Wind: Grid Connection & Technology Options. Dietmar Retzmann Focus on. CO 2 Reduction Green Energy Megacities Security of Supply

B4-114 CIGRE Celilo Pacific DC Intertie Upgrade presentation. K ERIKSSON*, O SAKSVIK, T HOLMGREN Bonneville Power Administration

MINUTES OF THE 47 th SLCF MEETING HELD ON

Transcription:

Information regarding of New Transmission Element in North Eastern Region under perview of Element for 1st time for on 1 400 kv Silchar-Azara NETC 16.06.14 18.06.14 23.06.14 25.07.14 18:48 20.08.14 29.08.14 05.09.14 2 3 4 5 400 kv Binaguri - Bongaiagon III 400 kv Binaguri - Bongaiagon IV 400 kv Balipara- Bongaiagon III 400 kv Balipara- Bongaiagon IV ENICL 14.09.14 12.11.14 16:19 ENICL 14.09.14 10.11.14 23:01 POWERGRID 25.10.14 27.10.14 29.10.14 01.11.14 22:40 06.11.14 07.11.14 07.11.14 POWERGRID 25.10.14 27.10.14 29.10.14 01.11.14 00:07 06.11.14 07.11.14 07.11.14 6 400 kv Bongaigaon- Azara NETC 24.12.14 26.12.15 05.01.15 05.01.15 17:10 19.01.15 19.01.15 21.01.15 7 400 kv Bongaigaon- Byrnihat NETC 13.01.15 16.01.15 17.02.15 17.02.15 21:55 25.02.15 26.02.15 27.02.15 8 132 kv Silchar- Imphal I POWERGRID 01.02.15 06.02.15 13.03.15 11.02.15 14:48 21.03.15 23.03.15 24.03.15 9 132 kv Silchar- Imphal II POWERGRID 01.02.15 06.02.15 13.03.15 11.02.15 15:23 21.03.15 23.03.15 24.03.15 10 11 12 13 50 MVAR line Reactor of 400 kv Silchar-Byrnihat line at Byrnihat LILO of 132kV Khandong- Haflong at Umrangshu 132 kv Biswanath Charilai- Pavoi I 132 kv Biswanath Charilai- Pavoi II MePTCL 17.02.15 17.02.15 17.02.15 17.02.15 23:02 AEGCL 01.03.15 02.03.15 02.03.15 02.03.15 15:22 POWERGRID 19.03.15 19.03.15 24.09.15 28.09.15 12:59 06.10.15 06.10.15 08.10.15 POWERGRID 19.03.15 19.03.15 24.09.15 28.09.15 12:59 06.10.15 06.10.15 08.10.15 Page 1 Isuued by

Information regarding of New Transmission Element in North Eastern Region under perview of Element for 1st time for on 14 132 kv Silchar- PK Bari I POWERGRID 27.03.15 30.03.15 03.04.15 29.07.15 20:48 03.08.15 03.08.15 05.08.15 15 132 kv Silchar- PK Bari II POWERGRID 27.03.15 30.03.15 03.04.15 29.07.15 19:02 03.08.15 03.08.15 05.08.15 16 220 kv Mariani- Mokokchung I POWERGRID 30.03.15 31.03.15 24.07.15 28.07.15 14:13 22.08.15 25.08.15 25.08.15 17 220 kv Mariani- Mokokchung II POWERGRID 30.03.15 31.03.15 24.07.15 24.07.15 20:04 29.07.15 29.07.15 31.07.15 18 220/132 kv, 3x10 MVA ICT I at Mokokchung POWERGRID 30.03.15 31.03.15 24.07.15 27.08.15 17:07 08.09.15 09.09.15 10.09.15 19 220/132 kv, 3x10 MVA ICT II at Mokokchung POWERGRID 30.03.15 31.03.15 24.07.15 24.07.15 20:04 29.07.15 29.07.15 31.07.15 20 132 kv Mokokchung- Mokokchung I POWERGRID 30.03.15 31.03.15 24.07.15 25.07.15 12:22 29.07.15 29.07.15 31.07.15 21 132 kv Mokokchung- Mokokchung II POWERGRID 30.03.15 31.03.15 24.07.15 24.07.15 20:04 29.07.15 29.07.15 31.07.15 22 23 24 Chariali III Chariali IV 400/132 kv, 200 MVA ICT II at Biswanath Chariali POWERGRID 02.07.15 03.07.15 09.09.15 10.10.15 05:58 15.10.15 16.10.15 16.10.15 POWERGRID 02.07.15 03.07.15 09.09.15 29.09.15 11:02 07.10.15 08.10.15 12.10.15 POWERGRID 11.08.15 12.08.15 16.09.15 28.09.15 11;42 07.10.15 08.10.15 12.10.15 10.10.15 & 11.10.15 were 10.10.15 & 11.10.15 were 25 HVDC +/- 800 kv Biswanath Chariali-Agra Pole 1 POWERGRID 24.08.15 22.09.15 00:39 Page 2 Isuued by

Information regarding of New Transmission Element in North Eastern Region under perview of Element for 1st time for on 26 HVDC +/- 800 kv Bipole Biswanath Chariali - Agra Line POWERGRID 28.08.15 22.09.15 00:39 27 28 80 MVAR, Bus Reactor I at 400 kv Biswanath Chariali 400 kv AC Filter Bank I at Biswanath Chariali POWERGRID 10.09.15 10.09.15 28.09.15 30.09.15 16:20 08.10.15 09.10.15 12.10.15 POWERGRID 10.09.15 10.09.15 Issued by NLDC 22.09.15 00:39 10.10.15 & 11.10.15 were 29 132 kv Balipara- Sonabil AEGCL 30.09.15 07.10.15 23.12.15 23.07.16 14:50 30 31 32 33 34 35 36 37 38 LILO of 220 kv Balipara- Samaguri I at Sonabil Chariali I Chariali II 400 kv Ranganadi- Biswanath Chariali I 400 kv Ranganadi- Biswanath Chariali II 400/132 kv, 200 MVA ICT I at Biswanath Chariali LILO of 132 kv Agia- Nangalbibra at Mendipathar 132 kv Surajmani Nagar- Comilla I (Indian Portion) 132 kv Surajmani Nagar- Comilla II (Indian Portion) AEGCL 03.10.15 09.10.15 03.11.15 05.01.16 13:00 POWERGRID 19.10.15 20.10.15 22.10.15 26.10.15 21:55 02.11.15 03.11.15 04.11.15 POWERGRID 19.10.15 20.10.15 22.10.15 25.10.15 22:59 02.11.15 03.11.15 04.11.15 POWERGRID 19.10.15 20.10.15 22.10.15 26.10.15 20:43 02.11.15 03.11.15 04.11.15 POWERGRID 19.10.15 20.10.15 22.10.15 25.10.15 18:20 02.11.15 03.11.15 04.11.15 POWERGRID 07.12.15 07.12.15 08.12.15 17.12.15 15:42 19.12.15 21.12.15 22.12.15 MePTCL 18.12.15 21.12.15 22.12.15 22.12.15 14:00 POWERGRID 12.12.15 Forwarded to NLDC since Cross Border Line 16.12.15 16:30 Forwarded to NLDC since Cross POWERGRID 12.12.15 16.12.15 16:38 Border Line Page 3 Isuued by

Information regarding of New Transmission Element in North Eastern Region under perview of Element for 1st time for on 39 40 41 42 132/33 kv, 50 MVA ICT 1 at Nirjuli 400 kv, 80MVAR Bus Reactor II at Biswanath Chariali 400 kv 80MVAR Bus Reactor I at Palatana 132/33 kv, 50 MVA ICT 2 at Nirjuli POWERGRID 06.02.16 08.02.16 11.02.16 11.02.16 20:19 15.02.16 16.02.16 18.02.16 POWERGRID 15.02.16 16.02.16 18.02.16 24.02.16 15:32 02.03.16 02.03.16 04.03.16 OTPC 06.01.16 03.02.16 11.03.16 14.03.16 14:49 POWERGRID 23.03.16 23.03.16 23.03.16 27.03.16 00:00 29.03.17 30.03.16 30.03.16 The reactor is under long outage 43 400 kv Comilla Bay 2 at Surajmaninagar POWERGRID Forwarded to NLDC since Cross Border Line 10.04.16 17:18 44 400 kv Comilla Bay 1 at Surajmaninagar POWERGRID Forwarded to NLDC since Cross Border Line 12.04.16 16:12 45 400/220 kv, 315 MVA ICT 2 at Balipara POWERGRID 19.04.16 20.04.16 10.05.16 24.05.16 03:30 28.05.16 30.05.16 01.06.16 46 HVDC +/- 800 kv Biswanath Chariali - Agra Pole 2 POWERGRID 24.05.16 01.06.16 21:56 47 48 49 50 51 400 kv Lower Subhansiri Bays at Biswanath Chariali LILO of 132 kv Silchar- Dullavchera at Hailakandi 400/132 kv 125 MVA ICT 2 at Palatana LILO of 220 kv Birpara- Salakati at Alipurduar Line I LILO of 220 kv Birpara- Salakati at Alipurduar Line II POWERGRID 13.06.16 13.06.16 23.06.16 29.06.16 16:46 Not applied AEGCL 01.09.16 02.09.16 16.09.16 27.09.16 18:41 OTPC 22.09.16 23.09.16 06.10.16 08.10.16 15:54 07.02.17 21.02.17 22.02.17 POWERGRID 15.11.16 19.11.16 12:23 To be NLDC POWERGRID 15.11.16 19.11.16 13:06 To be NLDC Page 4 Isuued by

Information regarding of New Transmission Element in North Eastern Region under perview of 52 53 54 55 Element LILO of 400 kv Bongaigaon- Binaguri III at Alipurduar Line I LILO of 400 kv Bongaigaon- Binaguri IV at Alipurduar Line II 400/220 kv, 315 MVA ICT 2 at BgTPP 20 Mvar Line Reactor in 220 kv Mariani(PG)- AGBPP at AGBPP for 1st time POWERGRID 16.12.16 22.12.16 20:49 POWERGRID 16.12.16 22.12.16 23:23 NTPC 18.02.17 21.02.17 22.03.17 22.03.17 17:30 POWERGRID 17.03.17 17.03.17 18.03.17 21.03.17 12:53 for on 56 132 kv Pasighat- Roing POWERGRID 30.03.17 31.03.17 10.04.17 10.06.17 13:43 15.06.17 15.06.17 19.06.17 57 58 59 132/33 kv, 3x5 MVA ICT I at Roing S/s 132/33 kv, 3x5 MVA ICT II at Roing S/s 132 kv, 3x6.67 MVAR Bus Reactor at Roing S/s To be NLDC To be NLDC POWERGRID 30.03.17 31.03.17 10.04.17 10.06.17 13:44 15.06.17 15.06.17 19.06.17 POWERGRID 30.03.17 31.03.17 10.04.17 10.06.17 13:44 15.06.17 15.06.17 19.06.17 POWERGRID 30.03.17 31.03.17 10.04.17 10.06.17 13:45 15.06.17 15.06.17 19.06.17 60 132 kv Roing Tezu S/C POWERGRID 30.03.17 31.03.17 03.05.17 10.06.17 14:29 30.08.17 30.08.17 30.08.17 Page 5 Isuued by

Information regarding of New Transmission Element in North Eastern Region under perview of 61 62 63 Element 132/33 kv, 3x5 MVA ICT I at Tezu S/s 132/33 kv, 3x5 MVA ICT II at Tezu S/s 132 kv, 3x6.67 MVAR Bus Reactor at Tezu S/s for 1st time for on POWERGRID 30.03.17 31.03.17 03.05.17 10.06.17 14:30 15.06.17 15.06.17 19.06.17 POWERGRID 30.03.17 31.03.17 03.05.17 10.06.17 14:30 15.06.17 15.06.17 19.06.17 POWERGRID 30.03.17 31.03.17 03.05.17 12.06.17 11:48 15.06.17 15.06.17 19.06.17 64 132 kv Doyang - Wokha DoP, Nagaland 26.04.17 26.04.17 03.05.17 03.05.17 13:50 65 66 67 68 69 420 kv, 63 MVAR Line Reactor (to be used as Bus Reactor) connected to 400 kv Lower Subansiri Biswanath Chariali - I Line Bay at Biswanath Chariali (POWERGRID) 420 kv, 63 MVAR Line Reactor of 400 kv Bongigaon- Balipara 3 at Bongigaon LILO of 132 kv Aizwal- Zemabawk at Melriat(PG) 132 kv Melriat - Sihhmui D/C lines upto Gantry of Sihhmui S/S LILO of 132 kv Doyang- Wokha at Sanis POWERGRID 22.06.17 23.06.17 18.07.17 18.07.17 17:27 31.08.17 01.09.17 01.09.17 POWERGRID 06.07.17 07.07.17 10.07.17 10.07.17 16:00 POWERGRID 13.07.17 13.07.17 28.08.17 30.08.17 18:30 POWERGRID 13.07.17 13.07.17 26.10.17 26.10.17 16:54 DoP, Nagaland 03.08.17 04.08.17 12.10.17 Page 6 Isuued by

Information regarding of New Transmission Element in North Eastern Region under perview of 70 71 72 73 Element Replacement of 220/132 kv, 50 MVA ICT-2 at Balipara (PG) with 160 MVA ICT 420 kv, 63 MVAR Line Reactor (to be used as Bus Reactor) connected to 400 kv Lower Subansiri Biswanath Chariali - III Line Bay at Biswanath Chariali (POWERGRID) 132 kv Silchar- Hailakandi D/C 132 kv AGTCCPP- Agartala II (subsequent to reconductoring with HTLS Conductor) for 1st time for on POWERGRID 24.08.17 25.08.17 26.09.17 26.09.17 23:20 03.10.17 06.10.17 09.10.17 POWERGRID 18.09.17 18.09.17 20.09.17 09.12.17 15:08 12.12.17 18.12.17 18.12.17 POWERGRID 18.10.17 20.10.17 13.11.17 15.11.17 21:45 22.11.17 28.11.17 30.11.17 POWERGRID 15.12.17 18.12.17 18.12.17 22.12.17 15:42 09.02.18 12.02.18 14.02.18 7.10.17 & 8.10.17were 74 LILO of 132 kv Ranganadi- Lekhi S/C at Pare HEP NEEPCO 05.02.18 06.02.18 21.02.18 02.03.18 20:50 Page 7 Isuued by