STOL CH F8-2 Front Floor Stiffener. Cut and position the Front Floor Stiffener to the Floor 7F8-7. Back drill through the Floor 7F8-7.

Similar documents
ZODIAC 601 XL. Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1.

Section 75-FA-4. Forward Fuselage

FUSELAGE CABIN ASSEMBLY

Section 75-ZA-3 Fin & Rudder Cable Fairing Installation

STOL CH 701. STOL CH701 cabin. Top view: Tunnel 7F11-4 between the Seats. STOL CH701 Seats

AIRCRAFT FINISHING Assembling the Front Seat Frames

12/03 EXPLODED VIEW 1) L angles on first rear rib: moved from inboard to outboard side of rib (12/03)

SECTION 22: FWD LOWER FUSELAGE VAN'S AIRCRAFT, INC F-1257 RUDDER PEDAL SUPPORT CHANNEL, 4 PLACES WD-1204 ENGINE MOUNT BRACKET, 2 PLACES

UPDATES to Revision 3, 9/99 Date this document was printed: 12/20/02

F-1202D-L PANEL ATTACH STRIP F L UPPER FWD FUSELAGE SKIN RIB F CABIN EGRESS HANDLE F-1240B COVER PLATE

REVISION DESCRIPTION:

12.0 CONTROLS 3/3/2006. Page 1

Page REV 1: Added "Step 4: Bend the tabs on the wiring channel to match the slant of the F L & -R Tunnel Sides."

Issue 0/Rev.00-0 Aug Page /

Page: REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS.

SERVICE INSTRUCTION SI Revision 1

Airworthiness Directive Schedule

4-Bulkheads. Bulkheads. December XLR Page 4-1

ROLL BAR FRAME 2 PLACES F-1231A-FL ROLL BAR FRAME F-1231C INBOARD F-1231B OUTBOARD ROLL BAR STRAP BAGGAGE BULKHEAD

Page REV 1: Added 'Step 2: See the "REMOVE THIS TAB, BOTH SIDES" callout near Detail A. Modify four SB375-4 Snap Bushings as shown.

TORNADO II, S, & SS FUSELAGE TRACKING

36-01 REV 1: Updated figure to depict current F Bellcrank configuration.

Ayres service bulletin Corporation

JUNE/JULY. June/July Dakota Territory Air Museum s P-47 Update

VAN S AIRCRAFT, INC.

RV-14 QBF-02 REV 1: In Step 7 (QB), "5-9" was "5-8", and "12-13" was "11-12"

Page: MEMO: In NOTE before Step 5, "Whenever possible, ream using a drill press..." was "Always ream using a drill press...".

Page: MEMO: In Figure 3, "2X 1 3/32 [27.78 mm]" was "2X 1 3/32 [2.75 mm]"

Ballistic Recovery Systems, Inc. PARACHUTE INSTALLATION MANUAL BRS-1350 LS, AMD 601XL Zodiac

performance S T O L Installation Instructions Manual No. PSTOL-013 Double Slotted Flaps for Piper PA-18 Series Aircraft

REVISION DESCRIPTION: REV 2: Steps re-written for clarity REV 2: Steps re-written for clarity.

11 - Fairings. Fairings. February XLF Page 11-1

L 298/70 Official Journal of the European Union

Feb/March-2018 FEB/MARCH. Texas Flying Legends P-47 Update. by Chuck Cravens. The CAD rendering becomes reality in these two images.

SECTION 4: RV-12 PARTS INDEX

SERVICE KIT thru , 631, 634, 675 R thru R F thru F FR thru FR

FUSELAGE ASSEMBLY SECOND SECTION (of three)

SERVICE LETTER NUMBER 173

REVISION DESCRIPTION:

Aeroplane Aerodynamics and Flight Controls 1 2

SD3-60 STRUCTURAL REPAIR MANUAL - STRUCTURAL IDENTIFICATION

N398CM. RC-3 Serial Number 387 Zero Timed Restoration Details

The engine cowling installation and firewall should be inspected and modified as specified in this Service Bulletin.

SD3-60 STRUCTURAL REPAIR MANUAL STABILIZER (FIN) - STRUCTURAL IDENTIFICATION

53-40 ATTACH FITTINGS

ZENITH 601, VLS INSTALLATION

NOTE. KI & KI Revision H

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL STC NO. SA2602NM

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL MOONEY M20 SERIES & M22 STC NO. SA4342NM NOTE: READ THESE DIRECTIONS BEFORE STARTING!

Section 75-CA-2. Elevator Controls

Installation Instructions

FAA approval has been obtained on technical data in this publication that affects airplane type design.

REVISION DESCRIPTION:

REVISION DESCRIPTION:

3500 WINCH KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. P/N Rev 01 06/15 Page 1 of 11

May/June-2018 MAY/JUNE. Dakota Territory Air Museum s P-47 Update. by Chuck Cravens. Skin sections are going on the P-47 forward fuselage.

OCT/NOV Texas Flying Legends P-47D-23RA

SECTION 26iS/U: FUEL TANK VAN'S AIRCRAFT, INC. T R OUTBOARD RIB IE-00001X MECHANICAL FUEL GAUGE T R INBOARD RIB T R

2000 SERIES PA-30 / PA-39 STC NO. SA00233SE PA-24 STC NO. SA4150NM

Airworthiness Directive Schedule

Official Journal of the European Union L 298/53

Appendix D. Vizion PMA Autopilot Piper PA-28/32 Installation

AEROPRAKT SERVICE BULLETIN. No. SB A22LS-17 REPLACEMENT OF RUDDER CONTROL SYSTEM CABLES AND FAIRLEADS OF A-22, A-22L, A-22L2 AND A-22LS AIRCRAFT

Section 1.4 FINAL INSPECTION

Midget Mustang March 2016

12.1 Theory of Flight Rotary Wing Aerodynamics 1 2

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL PA28/PA32 STC # SA00762SE

PARAVION TECHNOLOGY, INC AIRWAY AVENUE FT. COLLINS, COLORADO 80524

SERVICE BULLETIN SB00029 Rev B Page 1 of 19

P68 VARIANTS SERVICE INSTRUCTION. No. 89

The tie to tube front windshield was rounded to avoid a distorted by this point.

REVISION LIST CHAPTER 24: MISCELLANEOUS SYSTEMS

Pitch Control and Trim

Page: REV 1: In Step 4 "a minimum of 1/16 [1.6 mm] gap" was "an approximately 1/16 [1.6 mm] gap."

APPLICABLE MODELS PA , PA , PA , PA , PA PA-28R-180, PA-28R-200, PA-28S-160, PA-28S-180

PIPER AIRCRAFT CORPORATION

June 16, 1947 OPTIONAL CHANGE SERVICE BULLETIN NO. 17 INSTALLATION STEERABLE TAIL WHEEL. (Includes Supplement 1 and Supplement 2)

CIRRUS AIRPLANE MAINTENANCE MANUAL

PAC 750XL PAC 750XL PAC-750XL

SERVICE BULLETIN

Airglas, Inc. Installation Instructions. MANUAL NO. LH MODEL LH4000 Ski Kit For Cessna 180 and 185 Aircraft.

Service Bulletin No.: DAC Date Issued: February 18, 2000 Title: Starting Vibrator Battery Installation Page: 1 of 6

RAF BULLDOG MODIFICATION INDEX T Mk 1 SERIES

P68 VARIANTS SERVICE INSTRUCTION. No. 88

NC Kit # CE-182PQR-00 Air-conditioning installation manual and ICA for Cessna 182 P, Cessna 182 Q and Cessna 182 R

INSTALLATION MANUAL Electrical SPEEDBRAKE 2000 Series

AS 355 F1 S/N 5168 Factual Report Iao Valley Maui, Hawaii Date: July 21, 2000

AIRPLANE PARTS CATALOG

Zenair Europe Service Letter

D'Shannon Products, Ltd County Road 134 Buffalo, MN Supplemental Type Certificate SA2200SW. Installation Instructions

APRIL/MAY. April/May Texas Flying Legends P-47 Update

Seabee Annual Inspection Procedures

AHRS/MAGNETOMETER Installation Considerations

WINCH 3500 AND 4500 KIT P/N ;

FLAP, AILERON, FLAP/FUSELAGE AND STABILATOR GAP SEAL INSTALLATION AND MAINTENANCE MANUAL

CHAPTER 15 FURNISHINGS. Section Title Page

VAN'S AIRCRAFT, INC. SECTION 40: LIGHTING

SU-31 PROFILE ELECTRIC ARF ASSEMBLY MANUAL

A Product Line of Sonex Aircraft LLC 511 Aviation Road Oshkosh, WI Tel. (920) Fax. (920)

Wires banded White are from Sensors or Pick-ups to Sensor positions on components of the Aircraft systems.

Transcription:

Wait to drill the ends of the Seat Front 7F11-1 to the L angle on the cabin side at location A-A Ref 7-F-9 until after the Cabin Frame is installed. Ref Fuselage Cabin Frame, Section 10, page 11. NOTE: The width of the firewall at the front end of the Front Uprights 7F9-7 and the width of the rear fuselage assembly along the aft end of the Cabin Side 7F9-1 will the side angle between the side of the cabin sides and the floor skin. 7F8-2 Front Floor Stiffener Cut and position the Front Floor Stiffener to the Floor 7F8-7. Back drill through the Floor 7F8-7. SECTION 9 - Page 1 of 12

7F8-3 Rear Floor Stiffener Cut and position the Rear Floor Stiffener on the Floor and Cabin Sides and drill. 7F8-1 Center Floor Stiffener Mark the center on the Center Floor Stiffener. SECTION 9 - Page 2 of 12

7F8-1 Center Floor Stiffener Position the Stiffener centerline on the aircraft centerline. Back drill through the Floor 7F8-7. 7F11-2 Front Bearing Top 7F11-3 Front Bearing Bottom Mark a centerline up 14mm for the location of the 1-1/8 hole. Using a 1-1/8 Flat Face Drill bit will work the best. Layout the rivet holes and pitot drill. SECTION 9 - Page 3 of 12

7F11-2 Front Bearing Top 7F11-3 Front Bearing Bottom The top of the hole is 154mm from the bottom of the Seat Front 7F11-1. Position 7F11-2 drill and cleco. Then position the Front Bearing Bottom drill and cleco. 7F11-4 Tunnel Measure from the Seat Front to the Bottom Channel 7F10-1. Measure up 38mm for the Bottom Channel and make the cutout for the Tunnel. At this time the Tunnel will be kept long. SECTION 9 - Page 4 of 12

7F11-4 Tunnel 7F11-4A Tunnel Angles Position the Tunnel to the Seat Front. Cut two Tunnel Angles 7F11-4A for the front section. Lay out the rivet lines pitch 40 and drill. There are two L angles on the front side of the Tunnel to the Seat Front. 7F11-4 Tunnel 7F11-4A Tunnel Angles 7F10-1 Bottom Channel Cut 7F11-4A into two 100mm pieces, and drill and cleco them to the Tunnel and Bottom Channel 7F10-1. SECTION 9 - Page 5 of 12

7F16-3 Central Seat Belt Attachment Mark the centerlines and layout the five A5 rivets and the 5/16 bolt for the Seat Belt. 7F16-2 Lateral Belt Attachment Layout and pilot drill the five A5 rivets and the 5/16" bolthole. SECTION 9 - Page 6 of 12

7F16-2 Lateral Belt Attachment 7F9 Cabin Sides Position the Lateral Belt Attachment to the Cabin Sides on 7F9-3 Rear Upright. The center of the bolthole is 180mm from the bottom of the Fuselage Floor. Drill and cleco. 7F16-2 Lateral Belt Attachment Drill and Cleco each side. SECTION 9 - Page 7 of 12

7F11-4 Tunnel 7F16-3 Central Seat Belt Attachment Position Central Seat Belt Attachment to the Tunnel 7F11-4. It is 300mm from 7F11-1 Seat Front and at the same height as 7F16-2 (7F16). 3 point harness 7F11-4 Tunnel 7F16-3 Central Seat Belt Attachment Drill and Cleco to the Tunnel. SECTION 9 - Page 8 of 12

7C3-3 Flaperon Stop Layout the cut out for the flap position. The Flaperon stop shown is 7C3-3 and limits the flap extension to 15 degrees. 7C3-2 Flaperon Stop 7F11-1 Seat Front 7F8-7 Front Position the Flaperon Stop on the center of the lightening hole in the Seat Front. SECTION 9 - Page 9 of 12

7F10-3 Front Bottom Longeron Cut the Front Bottom Longeron to the proper angle. The front is 30mm and the rear is 100mm (7F10). Position the front Longeron 400mm apart or 200mm from the center. This is very important for the engine mount to fit properly. 7F10-3 Front Bottom Longeron 7F9 Cabin Sides The rear part of the Longeron has seven rivets with the pitch of 15mm. Drill and cleco. The rear is 880mm from longeron to longeron (7F10) for the width. SECTION 9 - Page 10 of 12

7F10-1 Bottom Channel 7F10-2 Channel Doubler Disassemble the forward Fuselage and debur. The Channel Doubler 7F10-2 is riveted from the inside of the Bottom Channel 7F10-1. The rest of the forward Fuselage can now be riveted together. 7F11-1 Seat Front 7F11-1A Seat Front Doubler Installing the Plastic Fairlead for the Rudder Cable. SECTION 9 - Page 11 of 12

7F11-1 Seat Front 1/8 Plastic Fairlead Cut a piece of Plastic Fairlead 45X35 drill and rivet. In the center of the Rudder Cable hole, drill a 1/8 hole for the cable. Forward Fuselage ready for joining to Rear Fuselage. SECTION 9 - Page 12 of 12