BLACKMER BYPASS VALVES

Similar documents
BLACKMER PISTON AIR VALVE SAFETY DATA. For Piston Air Valve Style AVC and Discontinued Style AVB TABLE OF CONTENTS SAFETY DATA...

BLACKMER PISTON AIR/RELIEF VALVE (w/o spring) CONVERSION KIT SAFETY DATA. For Pump Models: TXH3C, TXH3B, TXH3A, TXD2.5A, TXD1225A

MODELS: LGRL1.25, LGRLF1.25A, LGL1.25, LGLF1.25A, LGL1.5

Installation, Operation & Maintenance Manual

BLACKMER TRUCK PUMPS INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS MODEL: TXH3C, TXH35A SAFETY DATA TABLE OF CONTENTS

BLACKMER TRUCK PUMPS MODELS: TX, TXS, TXD, TXSD 1.5, 2A, 2.5A, 3E, 4A TXV 2.5B, 3B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS

BLACKMER TRUCK PUMPS INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS MODELS: STX3, STX2A, STX1220A, STX3-DEF, STX2A-DEF, STX1220A-DEF SAFETY DATA

BLACKMER POWER PUMPS MODELS: LGF1E, LGB1E, LGF1PE, LGB1PE SAFETY DATA NOTICE: INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS

Solutions beyond products...

BLACKMER POWER PUMPS. MODELS: LGRL1.25, LGRLF1.25A, LGL1.25, LGLF1.25A, LGL1.5, LGLF1.5A Discontinued Models: LGRLF1.25, LGLF1.25

BLACKMER POWER PUMPS MODELS: XL2B, XL3B, XL4B DISCONTINUED MODELS: XL(S)2A-N, XL(S)3A-N, XL4, XL4A SAFETY DATA NOTICE:

HYDRIVE 2010A A

Pressure relief valve

Instructions for Installation, Operation, Care and Maintenance

CC CC CC8-65 pumps

Yarway 7100 Series ARC Valve non-filtered design Installation and maintenance instructions

BLACKMER LIQUEFIED GAS PUMPS

BLACKMER LIQUEFIED GAS PUMPS

Fisher 644 and 645 Differential Pressure Pump Governors

Fast-Flo Pump INSTRUCTIONS-PARTS LIST. Table of Contents 1:1 RATIO

ENTERPRISE E56 - E106 - E156

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

Instructions Parts List

TWO-STAGE HYDRAULIC PUMP. RWP55-IBT-Air

Operating instructions Form no safety definitions

TECHNICAL DATA CAUTION

Instructions for Installation, Operation Care and Maintenance

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

TECHNICAL DATA. Table 1: Model F1 Dry Valve Part Numbers and Specifications

Model DFR 070/156/220 Rotary Actuator

SINGLE ACTION FLUID PUMP

BLACKMER POWER PUMPS MODELS: CRL2, CRL3, CRL3-OE1 DISCONTINUED MODELS: TCRL2, TCRL3 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS SAFETY DATA

MAINTENANCE MANUAL FOR THERMOSTATIC TEMPERATURE REGULATING VALVE TRAC STYLE P

INSTALLATION/OPERATION/MAINTENANCE INSTRUCTIONS FOR ARCHON MODELS WD2010L, WD2010, WD2010H WASHDOWN STATIONS. ARCHON Industries, Inc.

Model DV-5 Deluge Valve, Diaphragm Style, 1-1/2 thru 8 Inch (DN40 thru DN200), Deluge System Electric Actuation

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual

Type 644 and 645 Differential Pressure Pump Governors

1/2" AIR DRIVEN DIAPHRAGM PUMP

Swing Piston Compressors and Vacuum Pumps

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

TECHNICAL SERVICE MANUAL

PRODUCT OBSOLETED 4Q16

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Fisher 2052 Diaphragm Rotary Actuator

INSTRUCTION AND REPAIR MANUAL MODELS 341A, 342A AND 344A 6

Fisher 657 Diaphragm Actuator Sizes and 87

EZH and EZHSO Series. Pressure Reducing Regulators. EZH and EZHSO Series. Introduction. Scope of the Manual. Product Description !

SERIES G3DB/AG3DB ELEVATOR

Orifice Flange Union Assembly and Orifice Run Installation and Operation Manual

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Installation, Operation & Maintenance Instructions

H Low Torque Impact Wrench

Instructions for Installation, Operation, Care and Maintenance

LIQUIDYNAMICS Light Viscosity Bulk Transfer Cart

Installation & Parts Manual K-7, K-15, & K-30 Air Actuated & Differential Check Valves

Paint/Solvent/Dump Valve and Flow-Through Valve

NOZZLETECH INC. INSTRUCTION MANUAL CEV10 01/31/ C EAST COLONIAL DRIVE ORLANDO, FL USA

REPAIR PROCEDURES MANUAL

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

Adjustable Differential Relay A1

INSTRUCTION MANUAL AND PARTS LIST FOR 3E CANNED MOTOR PUMPS

Installation, Operation, and Maintenance Manual

STP-MLD. Installation and Owner s Manual

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS DISCONTINUED MODELS LB362 LB362A LB362B

Instructions for Installation, Operation, Care and Maintenance

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

TECHNICAL DATA. Q= C v P S

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1-1/2-2 )

TECHNICAL DATA. Q= C v P Cv = Flow Factor (GPM/1 PSI P)

NOZZLETECH INC. INSTRUCTION MANUAL CEV00 01/31/ C EAST COLONIAL DRIVE ORLANDO, FL USA

BLACKMER LB COMPRESSORS

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1/2-1 )

BLACKMER POWER PUMPS INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS MODELS: MLX4B, MLXW4B, MRLX4B, MRLXW4B MLN4B, MRLN4B SAFETY DATA NOTICE:

Installation Manual For ISL98, ISL03, ISL07, ISC07

INSTALLATION & MAINTENANCE MODEL mm

MERIDIAN, 2 or 3 PIECE, TRUNNION MOUNTED BALL VALVES

OFX7 Operating Maintenance and Troubleshooting Manual L-4219

Type LR128 Relief Valve or Backpressure Liquid Regulator

AUTOGAS 150 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS

DeZURIK DR 125 ROTARY DIAPHRAGM ACTUATOR

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

TECHNICAL SERVICE MANUAL

Steam/Water Washdown Units Safety and Operation Installation and Maintenance Instructions

TECHNICAL DATA. model f-1 2. LISTINGS AND APPROVALS 3. TECHNICAL DATA. Page 1 of 11

SLD series INSTRUCTIONS FOR INSTALLATION, USE & MAINTENANCE

BFMM DC4A SBF EFFECTIVE AUGUST 1, 2016

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

I & M Mark 708ME. Ideal Installation. Start-Up Procedure. Installation & Maintenance Instructions for Mark 708 & Motor Actuator

Installation, Operation and Maintenance Manual. TOM WHEATLEY Piston Check Valve TOM WHEATLEY

Mounting and Operating Instructions EB 8222 EN. Type 3310/AT and Type 3310/3278 Pneumatic Control Valves. Type 3310 Segmented Ball Valve

Welker Jet Insert Model Control Valve

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Pump Operating and Maintenance Manual - Models

Instruction Manual & Parts List For H/G323FXFSX-500_ & 800_ Pumps With Flowserve Type BX Cartridge Seal

DeZURIK DR 40B ROTARY DIAPHRAGM ACTUATOR

METERING VALVE 2" STEM GUIDED

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

Operation & Maintenance Manual for Northern Magnetic Drive Pumps. Operation Manual. Northern Magnetic Drive 4400 and 4600 Series

Underground Tank Applications Installation Guide

Transcription:

BLACKMER BYPASS VALVES INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS EBSRAY MODEL: RV18 RV18CBS2, RV18CBS3, RV18VRS10, RV18VRS14, RV18VRS19 967020 INSTRUCTIONS NO. 551-E00 Section Effective Replaces 551 Aug 2015 Nov 2014 SAFETY DATA This is a SAFETY ALERT SYMBOL. When you see this symbol on the product, or in the manual, look for one of the following signal words and be alert to the potential for personal injury, death or major property damage Warns of hazards that WILL cause serious personal injury, death or major. Warns of hazards that CAN cause serious personal injury, death or major. Warns of hazards that CAN cause personal injury or. Indicates special instructions which are very important and must be followed. TABLE OF CONTENTS Page GENERAL Description... 2 Nameplate codes... 2 INSTALLATION Piping... 3 Checking the External Bypass Valve Pressure... 3 Bypass Valve Adjustment... 4 Operational Checks... 4 MAINTENANCE Periodic Inspection... 4 Preparation for Disassembly... 5 Disassembly... 5 Inspection... 5 Reassembly... 5 PARTS DESIGNATION... 6 Numbers in parentheses following individual parts indicate reference numbers on Parts Designation page. Blackmer instruction manuals and parts lists may be obtained from Blackmer's website (www.blackmer.com) or by contacting Blackmer Customer Service. Blackmer external bypass valves MUST only be installed in systems which have been designed by qualified engineering personnel. The system MUST conform to all applicable local and national regulations and safety standards. This manual is intended to assist in the installation and operation of Blackmer bypass valves, and MUST be kept with the bypass valve. Blackmer bypass valve service shall be performed by qualified technicians ONLY. Service shall conform to all applicable local and national regulations and safety standards. Thoroughly review this manual, all Instructions and hazard warnings, BEFORE performing any work on the Blackmer bypass valves. Maintain ALL system and Blackmer liquefied gas pump operation and hazard warning decals.

SAFETY DATA Hazardous machinery can cause serious personal injury. Failure to disconnect and lockout electrical power or engine drive before attempting maintenance can cause severe death Hazardous or toxic fluids can cause serious injury. If pumping hazardous or toxic fluids, system must be flushed and decontaminated, inside and out, prior to performing service or maintenance Disconnecting fluid or pressure containment components during pump operation personal injury or. Failure to relieve system pressure prior to performing external bypass or pump service personal injury or. Systems with meters will still be pressurized even after the hose is emptied NOTICE Blackmer bypass valves must only be installed in LPG systems that have been designed by qualified engineering personnel and operated and maintained by qualified technicians. The system must conform to all applicable local and national regulations and safety standards (specifically, lpg systems must conform to NFPA 58). This manual must be kept with the bypass valve and be reviewed before installation, putting into operation or performing any maintenance work. DESCRIPTION The EBSRAY Models RV18 Bypass Valves are intended to enable control and setting of pump and system differential pressures only. They are spring actuated devices that by design cannot be positively shut-off. These Bypass Valves are listed by Underwriters Laboratories for liquefied petroleum gas (LPG) service Two configuration options are available: 1. Constant Bleed System (CBS) option which provides for controlled 'bleed-off' of vapor enhancing self priming and vapor clearing capabilities of the pump. 2. Vapor Removal System (VRS) option which provides rapid flow-through of vapor until liquid reaches the valve and then closes off the vapor orifice for maximum pump efficiency. i.e. fulfils an excess-flow valve type of function. Technical Data is for standard materials of construction. Consult Blackmer Material Specs for optional materials of construction. The Ebsray RV Model No. Code on the Nameplate identifies the valve type and spring fitted to the Bypass valve. Example: RV18CBS2-023-02U01 Spring Code Working Differential Pressure Range 01 550 to 950 kpa (80 to 138 PSID) 02 600 to 1350 kpa (87 to 196 PSID) RV18 Springs Spring Code Maximum Differential Pressure at the Rated Maximum Flow 1050 kpa at 200 litre/min (152 PSID at 53 US GPM) 1440 kpa at 200 litre/min (210 PSID at 53 US GPM 551-E00 page 2/6

INSTALLATION INSTALLATION On liquefied gas systems, an external bypass valve, piped back to the supply tank, is necessary for maximum pump performance and longer pump life. The bypass valve must be installed in the correct position on the discharge side of the pump. (The word IN is cast on the inlet port of the bypass valves.) The bypass valve will automatically prevent excessive pressure resulting from accidental pump overspeeding, discharge shut-off, or highly restrictive receiving systems. Correct installation and operation is essential. Service life is enhanced by periodic inspection and careful maintenance. Size the external bypass valve and its piping to accommodate the full flow from the pump when the pump's discharge line is closed and the pump is running at its rated maximum speed. When installing the external bypass valve, it is essential that the pipe and fittings from the discharge port of the bypass valve be sized properly. Excessive backpressure resulting from friction loss in the bypass valve discharge piping will cause a higher pressure than the actual bypass valve setting. For more information on sizing and friction loss, refer to the Blackmer Liquefied Gas Handbook - Bulletin 500-001 (or Bulletin 33 for other liquids) for pipe friction tables. On liquefied gas systems, the external bypass valve discharge must be piped back to the liquid or vapor section of the supply tank never to the pump inlet. This method of piping should also be used when pumping volatile liquids from an underground tank or at high vacuum. NOTICE NEVER allow water or any corrosive product to enter the Bypass Valve (e.g. for hydrostatic testing of pipework). Severe internal damage may result. If the Bypass Valve is not installed and commissioned immediately, special preservative techniques will be required. Low pressure nitrogen can be used to purge, seal and protect the Bypass Valve from the effects of condensation and atmospheric corrosion. Alternately a ¼ cup (60 ml) of diesel may be poured into the valve. PIPING The bypass valve should be installed with the adjusting screw in the 12 O'clock (up) position. Mounting the valve horizontally may cause increased wear on the spool valve. Flow must be into the port marked "IN". Remove pipe scale and other foreign material such as PTFE tape residue from the connecting pipelines. Apply a suitable pipe thread sealant to the male threads before fitting. Never draw piping into place by use of force at the port connections of the Bypass Valve. All piping should be supported independently and line up accurately with the Bypass Valve ports. At temperatures below -20 F (-28.9 C) materials have reduced impact strength. Provisions should be made to prevent tools and other objects from impacting any pressure containing components of the pumping system. CHECKING THE EXTERNAL BYPASS VALVE PRESSURE 1. Install a pressure gauge equipped with a needle valve or snubber in the pump discharge gauge port. Install a pressure gauge on the tank and record the tank pressure. 2. Connect the delivery hose to the receiving tank. 3. Check all valves. The shut-off valve in the pump's discharge line and the shut-off valve in the bypass return line should be open. 4. Start pumping at the normal rate. Make sure the supply tank outlet valve is wide open and check the direction of shaft rotation to be sure it matches the direction of the arrow on the pump. 5. To check the external bypass valve setting, gradually close the shut-off valve in the pump's discharge line and record the gauge pressure. The difference between this reading and the tank pressure (before pumping) is the external bypass valve setting. 6. For pumps with an internal relief valve (i.e., most PD pumps): The external bypass valve must be set at least 25 psi (1.72 bar) less than the pump's internal relief valve setting. To check the pump's internal relief valve pressure setting: Gradually close the shut-off valve in the bypass return line. Then slowly close the shut-off valve in the pump's discharge line while watching the gauge pressure on the discharge side of the pump. Record the peak differential pressure (the difference between the discharge and inlet pressure) when the internal relief valve begins to open. NOTE: It is important to read the peak pressure just before the pump relief valve opens. Once recirculation starts through the pump relief valve, vaporization will cause the pressure to fall quickly. For more information on the pump relief valve settings and adjustments, refer to the installation instructions for the specific pump. After the internal relief valve setting has been determined, reopen the shut-off valve in the pump's discharge line and the shut-off valve in the bypass return line. External bypass valves shall be sized and adjusted so the maximum pressure of the system does not exceed the lowest service pressure rating of any component used in the delivery system. 551-E00 page 3/6

EXTERNAL BYPASS VALVE ADJUSTMENT 1. Remove the seal wire and loosen the locknut (10). 2. To increase the pressure setting, slowly turn the adjusting screw (8) inward, or clockwise. 3. To reduce the pressure setting, slowly turn the adjusting screw (8) outward, or counterclockwise. 4. Ensure that there is an appropriate pressure gauge fitted to Pumps main discharge viewable while setting the Bypass Valve. 5. Rotate the Bypass Adjusting Screw (8) anti-clockwise until there is no resistance against the screw. This is the Bypass Valve's minimum pressure setting. 6. Ensure that the system is set such that 100% of the Pump s flow is directed through the Bypass Valve 7. Start the Pump and ensure that liquid is flowing through Bypass Valve. This should be detectable audibly (by listening) or by feeling the valve/pipework (by hand). 8. Screw in the Bypass Valve Adjusting Screw (8) not exceeding two turns per minute until the desired differential pressure is reached. 9. While retaining the Adjustment Screw (8), tighten the Locknut (10) against the Bypass Valve Cover (2). INSTALLATION MAINTENANCE 10. After setting the Bypass Valve is completed, wire and seal the Adjusting Screw, using the holes provided in the head of Adjusting Screw and lug on Bypass Valve Cover. NOTE: Bypass Valves characteristically exhibit two distinct pressures during their operation: 1) The setting or cracking pressure which occurs when the Bypass Valve first opens i.e. initial bypassing begins against the preset spring load. 2) Maximum pressure, which occurs when the full flow of the bypassed product passes through the Bypass Valve. It is important to ensure both these above characteristics are understood fully in order to correctly apply the Bypass Valve. OPERATIONAL CHECKS Inspect the external Bypass Valve frequently during the first few hours of operation for such conditions as leaks, excessive heating, vibration or unusual noises etc. Hazardous machinery can cause serious personal injury. Failure to disconnect and lockout electrical power or engine drive before attempting maintenance can cause severe death Maintenance shall be performed by qualified technicians only. Follow the appropriate procedures and warnings as presented in this manual. LUBRICATION No in service lubrication is required on Ebsray Model RV18 Bypass Valves. Hazardous or toxic fluids can cause serious injury. Disconnecting fluid or pressure containment components during pump operation personal injury or. If pumping hazardous or toxic fluids, system must be flushed and decontaminated, inside and out, prior to performing service or maintenance Failure to relieve system pressure prior to performing pump service can cause serious property damage. Systems with meters will still be pressurized even after the hose is emptied PERIODIC INSPECTION Periodic Inspection of the Bypass Valve, Pump System and Ancillary Equipment is required to maintain safety, conformity, operational functionality and reliability. Annual inspection and testing of the internal relief valve (if applicable) and the external bypass valve operation and setting is recommended. Maintenance inspections should be performed at a maximum interval of three months or 500 hours operation. More frequent inspections may be necessary dependent upon usage, site conditions, operation, etc. If any abnormal condition is discovered, cease operation of pump system immediately and take action to rectify the problem. For safe operation, the following items should be included in the routine periodic inspection: a. Inspect the Bypass Valve for leaks, vibration, abnormal noises, signs of overheating, discoloration, etc. b. Check Bypass Valve differential pressure setting. 551-E00 Page 4/6

MAINTENANCE PREPARATION FOR DISASSEMBLY 1. Isolate Bypass Valve from liquids/vapor in inlet and discharge lines, depressurize and purge any toxic, flammable, corrosive or air hardening liquid/vapor. 2. Ensure the associated Pump Motor power supply has been isolated, before proceeding with disassembly. 3. Once exposed to the atmosphere, immediately protect the valve with from corrosion. A ¼ cup (60 ml) of diesel may be poured into the valve DISASSEMBLY Refer to the Parts Designation drawings. 1. Unlock Adjusting Screw Locknut (10). 2. Release Spring pressure by rotating Adjusting Screw (8) anti-clockwise. 3. Unscrew four Capscrews (9) holding Valve Cover (2) onto Housing (1). NOTE: There will be a slight spring precompression remaining. 4. Remove the Valve Cover (2) and O-Ring (2), together with the Spring Cap (2) and its O-Ring (6). 5. Remove Spring Cap (2) and O-Ring (6) from Valve Cover (2). 6. Remove Spring (5) and Valve (3a, 3b) from Housing (1). 7. VRS OPTION ONLY: Carefully remove Circlip (14) from inside Valve (3a), then remove Ball (12) and Spring-Vent (13). REASSEMBLY Refer to the Parts Designation drawings. 4. VRS OPTION ONLY: Insert Spring - Vent (13) into Valve (3a) with large end seating in Valve, insert Ball (12) after Spring - Vent and retain in place with Circlip (14), ensuring Circlip locates correctly in groove. 5. Fit Valve (3a, 3b) into Housing (1), ensuring freedom of movement. 6. Fit Spring - Bypass (5) on to top of Valve (3a, 3b). 7. Lightly smear all O-Rings (6, 7) with a compatible good quality detergent free, light oil before assembly. 8. Fit O-Ring (7) to Valve Cover (2). 9. Fit O-Ring (6) to Spring Cap (4) and insert into Valve Cover (2) with spring location boss facing out. 10. Fasten Valve Cover (2) to Housing (1) using four capscrews (9). Torque to 16 ft-lb (22 N-m). 11. After recommissioning, adjust differential pressure as per BYPASS VALVE ADJUSTMENT. INSPECTION 1. Inspect Housing (1) and valve bore for damage or wear. If required, remove Housing and replace. 2. Check Valve (3a, 3b) for damage or wear. If required, replace valve. 3. Inspect Spring - Bypass (5), replace if broken or damaged. 4. It is advised that O-Rings (6, 7) be replaced at every overhaul. 5. Check Valve Cover (2), Spring Cap (4), Adjusting Screw (8) and Locknut (10) for damage. Replace as required. 6. VRS OPTION ONLY: Check condition of Ball (12), Spring - Vent (13) and Circlip (14). Replace as required. 551-E00 Page 5/6

PARTS DESIGNATION MODELS: RV18 Inline Bypass Valves. Ref. Description Qty Ref. Description Qty 1 Housing NPT 1 7 0-Ring, 1/8x2 1 2 Valve Cover 1 8 Adjusting Screw 1 3a Valve 1 9 Socket Hd Capscrew M8x1.25x25 4 3b Valve 1 10 Nut Hexagon Head Metric 1 4 Spring Cap 1 12 Ball 1 5 Spring Bypass 1 13 Spring Vent 1 6 0-Ring, 1/8x1-7/16 1 14 Circlip 1 Spare Parts Inquiries To facilitate Parts inquiries, please provide Blackmer with: a. Model and Serial Number on the valve nameplate. b. Ref. # and Description from the Parts Designation table. c. Quantity required. Visit www.blackmer.com for complete information on all Blackmer products 1809 Century Avenue, Grand Rapids, Michigan 49503-1530 U.S.A. Telephone: (616) 241-1611 Fax: (616) 241-3752 E-mail: blackmer@blackmer.com Internet Address: www.blackmer.com 551-E00 Page 6/6