PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG DAN JALAN IPOH 13 JUN 2018

Similar documents
MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR, JALAN KEPONG DAN JALAN JINJANG PERMAI 2 21 JUN 2018

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG & JALAN KUCHING 08 JUN 2018

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA DUKE 2, LAMAN RIMBUNAN KEPONG DAN JALAN IPOH

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR DAN JALAN IPOH 15 JANUARI 2019

1. SAMBUNGAN PENUTUPAN PENUH JALAN JANGKA PENDEK SECARA DUA PERINGKAT DI JALAN RAYA SATU (MALAM)

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG 30 DISEMBER 2018

1. PENUTUPAN JALAN JANGKA PANJANG DI LEBUHRAYA KL-SEREMBAN (ARAH KL)

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT SSP CONSTRUCTION ALONG JALAN SULTAN AZLAN SHAH AND JALAN KUCHING 17 OCTOBER 2017

1. SAMBUNGAN PENUTUPAN JALAN BERKALA DI LEBUHRAYA KL-SEREMBAN, KM310.5 ARAH SELATAN

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT SSP CONSTRUCTION JALAN RAYA SATU, JALAN RAYA TIGA & JALAN UTAMA 30 MARCH 2018

Get rewarded, download the Touch n Go e-wallet. Get standard or preferred TGV seats for RM7 before 7pm on 7 July.

Book your flight for the upcoming election and your flight could be on us. 100 lucky winners will receive a cashback up to RM300.

JA606: VEHICLE DYNAMICS. INSTRUCTION: This section consists of SIX (6) structured questions. Answer FOUR (4) questions only.

Free ebook. Cara penggunaan product

REKOD PENGALAMAN KERJA

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

Frequently Asked Questions (FAQ)

MALAYSIA AIRPORTS HOLDINGS BERHAD. QUOTATION NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

EAL 574/4 Perancangan & Dasar Pengangkutan

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD

UNIVERSITI SAINS MALAYSIA EEM 253 REKABENTUK MEKATRONIK I

COMMERCIAL AND RESIDENTIAL SALE REPORT 2016

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

INVOICE. Go Ads Creation Sdn Bhd (S8 86 K)

PEPERIKSAAN JULAI 2010

MALAYSIA AIRPORTS HOLDINGS BERHAD TENDER NOTICE

Line detector robot / Robot garisan

INSTRUCTION: This section consists of SIX (6) structures questions. Answer FOUR (4) questions only.

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

Item Bil Description of Works Remarks Main Switch Board

INSTRUCTION: This section consists of SIX (6) structure questions. Answer FOUR (4) questions only.

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

PENGENALAN MISI SYARIKAT INI ADALAH PENGLIBATAN SECARA AKTIF DALAM ARUS PEMBANGUNAN DAN EKONOMI NEGARA.

EAL 573/4 Kejuruteraan Lalu Lintas

CONTROL OF INVERTED PENDULUM-CART SYSTEM BASED ON FUZZY LOGIC APPROACH HASRULNIZAM BIN HASHIM

1. Mechanics Make a minimum payment of RM 5 with Pay function using the Touch n Go ewallet to receive random cashback up to RM 888.

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

Seminar Penyedia Latihan ezskill Bersama JPK Wilayah Sarawak

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

DINDING / WALL SAIZ PANJANG BIL TIANG PINTU/ DOOR POSTS 2 x x TULANG DINDING / WALL FRAME

INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

OPTIMAL LOCATION OF FACTS FOR ATC ENHANCEMENT BY USING SENSITIVITY ANALYSIS RAIMON OMAR AL SHAIKH SALEM

MALAYSIA AIRPORTS HOLDINGS BERHAD

$'11,n n, Lffi MALAYSIA. PEPERIKSAAI\ AKHIR SEMESTER II sesr PERALATAN BINAAN BPD BPC APRIL 2OO9 2 JAM 30 MINIT

TABLE OF CONTENT 1.0 VISION, MISSION 2.0 COMPANY PROFILE. 2.1 Company Address and Contact Details 2.2 Other Company Details 3.0 CORPORATE INFORMATION

NPM 04/2018 MSN 04/2018

LIVING CARE. Critical Illness Insurance

KAEDAH-KAEDAH LALU LINTAS JALAN (LARANGAN PEMANDUAN KENDERAAN BARANGAN) (NO. 2) 2017

SISTEM BEKALAN AIR TAJUK PROJEK BARU

OPTIMIZATION ON FUEL GAS OPERATION FOR COMBINED CYCLE POWER PLANT MOHD IZAMUDDIN BIN MAHMUD

ARC FLASH ANALYSIS STUDY IN INDUSTRY HARNA A/P ELAVARASU

MALAYSIA AIRPORTS HOLDINGS BERHAD. QUOTATION NOTICE (Via eprocurement)

FINITE ELEMENT (FE) MODEL OF BRAKE INSULATOR IN REDUCING BRAKE SQUEAL NOISE FOR MOTORCYCLES MUNDHER FADHIL ABDULRIDHA UNIVERSITI TEKNOLOGI MALAYSIA

PB604 : BUSINESS FINANCE

OPTIMAL ANTI LOCK BRAKING SYSTEM WITH REGENERATIVE BRAKING IN HYBRID ELECTRIC VEHICLE DANA DEHGHANI UNIVERSITI TEKNOLOGI MALAYSIA

COMPANY PROFILE YOUR ONE-STOP OFFICE FURNITURE SOLUTION

INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

MODELLING OF THROUGH-THE-ROAD HYBRID ELECTRIC VEHICLE OKE PAUL OMEIZA

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

NOTIS PERKAPALAN MALAYSIA MALAYSIAN SHIPPING NOTICE

INSTRUCTION: This paper consists of SIX (6) structure questions. Answer any FOUR (4) questions.

GARNIER MALAYSIA Peraduan Menangi BMW Ice Watch bernilai RM500 setiap satu untuk. 20 pemenang bersama Watsons Malaysia

MALAYSIA AIRPORTS HOLDINGS BERHAD

THESIS DECLARATION. This item is protected by original copyright

STRUCTURE : 100 MARKS STRUKTUR : 100 MARKAH. INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

INSTRUCTION: This section consists of FOUR (4) questions. Answer ALL questions. ARAHAN: Bahagian ini mengandungi EMPAT (4) soalan. Jawab SEMUA soalan.

PRINTED MATTER POSTAGE PAID BRUNEI DARUSSALAM NO. 37

VERTEX SUPERIEUR SDN BHD COMPANY PROFILE. Real Estate Management Project Management Consultant Developer

TERMA DAN SYARAT PERKHIDMATAN DIRECT DEBIT

MyBot Bridge. 2 pasukan 4 peserta (2 wakil politeknik, 2 wakil sekolah) TEAM PELAJAR MyBot Operator Mentor 2

PENGGABUNGAN DAN PENGAMBIALIHAN (M & A) DALAM INSTITUTSI KEWANGAN DARI PERSPEKTIF SYARIAH

Section 9 Residual Impacts

SECTION A : 100 MARKS BAHAGIAN A : 100 MARKAH INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

TERMA & SYARAT KREDIT KAD UOB

KUCHING. MEKANlKAL SULIT POLITEKNIK SULIT 8.30PG PG (2 JAM) TARIKH: 08 NOVEMBER 2010 (ISNIN) Jangan buka kertas soalan ini sehingga diberitahu.

EFFECT OF TRANSVERSE RUMBLE STRIPS ON TRAFFIC FLOW FUNDAMENTAL DIAGRAM ALI TORKZADEH

MEDIA COVERAGE. TITLE : SESB bags US$41.6m Indonesia MEDIA : New Straits Times contract COMPANY : Scomi Energy Services Bhd DATE : 15 January 2016

CALENDAR PROGRAM 2016 CONTINUING PROFESSIONAL DEVELOPMENT (CPD)

PROSES KELULUSAN PERMIT UNTUK KERJA PENGOREKAN JALAN DI WILAYAH PERSEKUTUAN KUALA LUMPUR (WPKL) JABATAN KEJURUTERAAN AWAM & SALIRAN 13 MEI 2015

: Holiday Villa Alor Setar Property Address : Lot 162 & 163, Jalan Tunku Ibrahim, Alor Setar, Kedah Darul Aman.

DEVELOPMENT OF MICROHYDRO GENERATOR SYSTEM AHMAD ZUBAIDI BIN ABDUL MD RANI UNIVERSITI MALAYSIA PAHANG

Enjoy 30% off when you book a Touch 'n Go ewallet-branded SOCAR at selected special zones!

KEMENTERIAN KEWANGAN MALAYSIA

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MODELLING DAMPING ELEMENT TO REDUCE DISC BRAKE SQUEAL NORAIDE BIN MD YUSOP UNIVERSITI TEKNOLOGI MALAYSIA

OPTIMAL LOCATION OF THYRISTOR CONTROLLED SERIES COMPENSATOR USING SENSITIVITY APPROACH NEW HUANG CHIN UNIVERSITI TEKNOLOGI MALAYSIA

HAZILA BINTI NAYAN. A project report submitted in partial fulfillment of the requirement for the award of the Degree of Master of Manufacturing

INQUIRIES. :

UNTUK THE SECRETARY OF THE TRUSTEES OF THE METHODIST CHURCH IN MALAYSIA

Transcription:

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG DAN JALAN IPOH 13 JUN 2018 1. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN KEPONG SECARA BERKALA DAN BERPERINGKAT (ARAH JINJANG DAN ARAH SUNGAI BULOH) Tarikh 15 Jun 2018 22 Ogos 2018 Masa 10:00 malam 6:00 pagi; 24 jam Jangka masa Sebab 67 hari Untuk kerja-kerja mengesan dan mengalih utiliti serta pelebaran jalan bagi pembinaan projek MRT Harap maklum, lanjutan penutupan secara berkala sepanjang Jalan Kepong (Arah Jinjang dan Arah Sungai Buloh) di Desa Jaya, Pekan Lama Kepong dan Metro Prima akan bermula dari 15 Jun 2018 sehingga 22 Ogos 2018, 10:00 malam 6:00 pagi secara berkala. Pelan pengurusan trafik adalah seperti berikut: Penutupan A (11:00malam 6:00pagi) Penutupan lorong kiri secara berperingkat dengan jarak keseluruhan sejauh 600 meter bermula Sungai Keroh ke Jalan Metro Perdana Barat (Arah Jinjang). Jarak setiap peringkat penutupan adalah sejauh 150 meter. Penutupan lorong kiri secara berperingkat dengan jarak keseluruhan sejauh 500 meter bermula dari AEON Jusco Kepong hingga ke Stesen Minyak Caltex (Arah Sungai Buloh). Jarak setiap peringkat penutupan adalah sejauh 100 meter. Sepanjang penutupan, pengguna jalanraya boleh menggunakan satu (1) lorong sedia ada di kedua-dua arah. Penutupan B (10:00 malam 6:00 pagi) - Penutupan lorong kanan di hadapan AEON Big Kepong dengan jarak keseluruhan sejauh 200 meter (Arah Jinjang dan Arah Sungai Buloh). Penutupan C (10.00 malam - 6.00 pagi) - Penutupan lorong kiri bermula dari susur masuk Jalan Kepong ke Jalan Metro Perdana Barat dengan jarak keseluruhan sejauh 100 meter (Arah Taman Maluri). Semasa Penutupan B dan C, pengguna jalanraya boleh menggunakan dua(2) lorong sedia ada. Closure D (24 jam) Penutupan kekal susur keluar dari Jalan Metro Perdana Barat 8 ke Jalan Kepong (Arah Jinjang). Sepanjang penutupan ini, pengguna jalanraya perlu terus ke hadapan dan belok ke kiri (di jalan sebelah penutupan) untuk terus ke Jalan Kepong (Arah-Jinjang). Semua penutupan akan dilaksanakan secara berkala dan dalam pada satu-satu masa, hanya satu (1) penutupan akan dilaksanakan. Page 1 of 12

1. CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH-BOUND AND JINJANG- BOUND) METRO PRIMA Date 15 June 2018 22 August 2108 Time 11pm 6am; 24 hours Duration Reason 67 days To facilitate utilities detection & relocation, road widening and pier construction for MRT SSP Line There will be a continuation of lane closures along Jalan Kepong (Sungai Buloh-bound and Jinjangbound) starting from 15 June 2018 until 22 August 2018, intermittently. The traffic management plan involves the following closures: Closure A (11pm - 5am) Left lane closure by stages for a total stretch of 600 metres starting from Sungai Keroh towards Metro Perdana Barat (Jinjang-bound). Each stage will be approximately for 150 metres. Left lane closure for a total stretch of 500 metres starting from AEON Jusco Mall until Caltex Pekan Lama Kepong (Sungai Buloh-bound). Each stage will be approximately for 100 metres At any one time, there will be one (1) lane made available for Jinjang-bound and Sungai Bulohbound. Closure B (11pm - 5am) Right lane closure (Jinjang-bound and Sungai Buloh-bound) in front of AEON Big Kepong for a stretch of 200 metres. Closure C (11pm - 5am) - Left lane closure after the slip road of Jalan Kepong entering Jalan Metro Perdana for a total stretch of 100 metres (Maluri-bound). At any one time, two (2) lanes will be made available for Closure B and Closure C. Closure D (24 hours) - Permanent slip road closure at Jalan Metro Perdana Barat 8 entering Jalan Besar Kepong (Jinjang - bound). During this closure, motorists need to go straight and turn left (on the road next to the closure) to get to Jalan Kepong (Jinjang-bound) All closures are implemented intermittently and at any one time there will be only one closure. Page 2 of 12

MAP 1: CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH-BOUND AND JINJANG-BOUND) METRO PRIMA Page 3 of 12

2. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN KEPONG (ARAH JINJANG DAN ARAH SUNGAI BULOH) Tarikh 15 Jun 2018 22 Ogos 2018 Masa 10:00 malam 6:00 pagi Jangka masa Sebab 67 hari Untuk kerja-kerja mengesan dan mengalih utiliti serta pelebaran jalan bagi pembinaan projek MRT Harap maklum, lanjutan penutupan lorong secara berkala akan dilaksanakan sepanjang Jalan Kepong (Arah Jinjang dan Arah Sungai Buloh) bermula dari 15 Jun 2018 hingga 22 Ogos 2018, 10:00 malam 6:00 pagi. Pelan pengurusan trafik adalah seperti berikut : Penutupan A: Penutupan sebahagian lorong secara berperingkat dengan jarak keseluruhan sejauh 600 meter bermula dari Jalan West Road ke arah Jinjang Utara (Arah Jinjang). Penutupan B: Penutupan sebahagian lorong secara berperingkat dengan jarak keseluruhan sejauh 500 meter bermula dari Jalan 1/32 hingga ke Stesen BHP Petrol (Arah Sungai Buloh). Penutupan C: Penutupan dua lorong sejauh 150 meter bermula dari Jalan 4/32 hingga ke persimpangan Jalan 1/32 (Arah Sungai Buloh).... 2. CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH-BOUND AND JINJANG- BOUND) JINJANG UTARA Date 15 June 2018 22 August 2018 Time 10pm 6am Duration Reason 67 days To facilitate utilities detection & relocation works and tree cutting for MRT SSP Line construction works There will be a continuation of lane closures along Jalan Kepong (Sungai Buloh-bound and Jinjangbound) starting from 15 June 2018 until 22 August 2018, 10pm to 6am daily, intermittently. The traffic management plan involves the following closures: Closure A: Partial lane closure by stages for a total stretch of 600 metres starting from the West Road towards Jalan Jinjang (Jinjang-bound). Closure B: Partial lane closure by stages for a total stretch of 500 metres starting from Jalan 1/32 until BHP Petrol Station (Sungai Buloh-bound). Closure C: Two (2) lanes closure for a total stretch of 150 metres starting from Jalan 4/32 until Jalan 1/32 (Sungai Buloh-bound). Page 4 of 12

MAP 2: CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH-BOUND AND JINJANG-BOUND) JINJANG UTARA Page 5 of 12

3. LANJUTAN PENUTUPAN LORONG SECARA BERKALA WAKTU MALAM DI JALAN IPOH BERDEKATAN PEJABAT POS MALAYSIA (ARAH KL DAN ARAH KEPONG) Tarikh 19 Jun 2018 19 Disember 2018 Masa 9:00 malam 6:00 pagi; 9:00 malam 10:00 pagi Jangka masa Sebab 6 bulan Untuk kerja- kerja pemunggahan barang, pengesanan awal, pemindahan utiliti, perobohan kerb jalan, pelebaran jalan dan kerja- kerja perparitan dan sebarang kerja yang berkaitan Harap maklum lanjutan penutupan lorong secara berkala di Jalan Ipoh (berdekatan Pejabat Pos Malaysia) akan bermula dari 19 Jun 2018 sehingga 19 Disember 2018, 9:00malam 6:00pagi (hari minggu) dan 9:00malam 10:00pagi (malam Sabtu). Pelan pengurusan lalu lintas melibatkan penutupan seperti berikut: Penutupan 1 Jalan Ipoh (Arah Kepong): Penutupan lorong kiri dari Sri Muniswarar Temple ke Winsin Stationery. Jalan Ipoh (Arah KL): Penutupan lorong kiri dan tengah dari Perodua ke Restoran Uma Rani. Penutupan 2 Jalan Ipoh (Arah Kepong): Penutupan lorong kanan dari Sri Muniswarar Temple ke Winsin Stationery. Jalan Ipoh (Arah KL): Penutupan lorong kanan dan tengah dari Perodua ke Restoran Uma Rani. Penutupan lorong akan dilaksanakan secara berkala dan satu (1) lorong boleh diguna oleh pemandu dari kedua-dua hala pada setiap masa. Untuk maklumat lanjut, sila rujuk peta di bawah.. 3. CONTINUATION OF NIGHT LANE CLOSURES ALONG JALAN IPOH - NEAR POS MALAYSIA (KL-BOUND AND KEPONG-BOUND) Date 19 June 2018 19 December 2018 Time 9pm-6am; 9pm-10am Duration Reason 6 month To facilitate loading/unloading material, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works. There will be continuation of night lane closures by stages along Jalan Ipoh (near Pos Malaysia) from 19 June 2018 to 19 December 2018, 9:00pm 6:00am (weekdays) and 9:00pm 10:00am (Saturday night), intermittently. The traffic management plan involves the following closures: Closure 1 Jalan Ipoh (Kepong-bound) - Slow lane closure from Sri Muniswarar Temple to Winsin Stationery. Page 6 of 12

Jalan Ipoh (Kuala Lumpur-bound) - Slow and middle lane closures from Perodua to Restoran Uma Rani. MAP 3(a) : CONTINUATION OF NIGHT LANE CLOSURES ALONG JALAN IPOH - NEAR POS MALAYSIA (KL-BOUND AND KEPONG-BOUND) Page 7 of 12

Closure 2 Jalan Ipoh (Kepong-bound) - Fast lane closure from Sri Muniswarar Temple to Winsin Stationery. Jalan Ipoh (KL-bound) - Fast and middle lane closures from Perodua to Restoran Uma Rani. MAP 3(b) : CONTINUATION OF NIGHT LANE CLOSURES ALONG JALAN IPOH - NEAR POS MALAYSIA (KL-BOUND AND KEPONG-BOUND) The closures will be implemented intermittently and at any one time there will be one (1) lane made available for motorists on both bounds. Page 8 of 12

4. LANJUTAN PENUTUPAN LORONG DAN LOT PARKIR DI JALAN IPOH (ARAH KL & ARAH KEPONG) Tarikh 19 Jun 2018 19 Disember 2018 Masa 9:00 malam 6:00 pagi; 8:00 pagi 5:00 petang Jangka masa 6 bulan Sebab Untuk kerja-kerja pemindahan utiliti dan sebarang kerja yang berkaitan Harap maklum untuk menjalankan kerja-kerja yang tertera di atas, lanjutan penutupan lorong dan lot parkir secara berkala akan dilaksanakan dari 19 Jun 2018 sehingga 19 Disember 2018, 9:00malam 6:00pagi (hari minggu) dan 8:00pagi 5:00petang (hanya pada hari Ahad). Sementara itu, kerb jalan akan ditutup selama 24-jam. Pelan pengurusan lalu lintas melibatkan penutupan seperti berikut: Penutupan A: Jalan Ipoh (Arah KL): Penutupan bahu jalan, lorong dalam, lot parkir bermula dari CIMB ke Papparich (sebelum Jalan Gunung Semanggol). Penutupan B: Jalan Ipoh (Arah KL): Penutupan bahu jalan, lorong dalam, lot parkir bermula dari Pos Malaysia (selepas Jalan Gunung Semanggol) ke Chai & Chai Trading (sebelum Jalan Batu Kentonmen). Penutupan lorong kiri dari Caltex ke Chai & Chai Trading (sebelum Jalan Batu Kentonmen). Penutupan C: Jalan Ipoh (Arah Kepong): Penutupan bahu jalan, lorong dalam, lot parkir dan lorong kiri bermula dari Jalan Cenderuh ke sebelum Universal Studio. Penutupan bahu jalan, lorong dalam, lot parkir dan lorong kiri bermula dari Universal Studio ke Fo Sin Aluminium. Untuk maklumat lanjut, sila rujuk peta dibawah.. 4. CONTINUATION OF LANE AND PARKING BAYS CLOSURE ALONG JALAN IPOH (KL-BOUND & KEPONG-BOUND) Date 19 June 2018 19 December 2018 Time 9:00pm 6:00am; 8:00am 5:00pm Duration 6 month Reason To facilitate utilities relocation and any other related works for MRT construction works To facilitate the above mentioned works, there will be a continuation of lane closures and parking bay closure by stages intermittently starting from 19 June 2018 until 19 December 2018, 9pm 6am (on weekdays) and from 8am 5pm (only on SUNDAY). Meanwhile, the road curb will be closed 24- hours during this period. The traffic management plan involves the following closures: Closure A: Jalan Ipoh (KL-bound): Road shoulder, the internal road & parking bays closure starting from CIMB bank until Papparich (before Jalan Gunung Semanggol). Closure B: Jalan Ipoh (KL-bound): Road shoulder, internal road & parking bays closure starting from Pos Malaysia (after Jalan Gunung Semanggol) to Chai & Chai Trading (before Jalan Batu Kentonmen). Slow lane closure from Caltex to Chai & Chai Trading (before Jalan Batu Kentonmen). Closure C: Jalan Ipoh (Kepong-bound): Road shoulder, internal road, parking bays and slow lane closure starting from Jalan Cenderuh until before Universal Studio. Road shoulder, internal road, parking bays and slow lane closure starting from Universal Studio until Fo Sin Aluminium. Below is the map for further reference on the closures mentioned above: Page 9 of 12

MAP 4 : CONTINUATION OF LANE AND PARKING BAYS CLOSURE ALONG JALAN IPOH (KL-BOUND & KEPONG-BOUND) Page 10 of 12

5. LANJUTAN PENUTUPAN LORONG PALING KIRI DI JALAN IPOH BERDEKATAN BATU COMPLEX BUSINESS CENTRE (ARAH KEPONG) Tarikh 19 Jun 2018 19 Disember 2018 Masa 24 jam Jangka masa Sebab 6 bulan Untuk kerja- kerja pemunggahan barang, pemindahan utiliti, kerja- kerja perparitan dan sebarang kerja yang berkaitan Harap maklum lanjutan penutupan lorong paling kiri di Jalan Ipoh (Arah Kepong), berdekatan Batu Complex Business Centre akan bermula dari 19 Jun 2018 sehingga 19 Disember 2018, 24 jam setiap hari. Penutupan ini dilaksanakan sepanjang 150 meter, bermula dari Batu Complex Business Centre ke Mercedes-Benz. Pemandu yang ingin menuju ke Jalan Ipoh (Arah Kepong) dari Jalan Murai 2 perlu membelok kiri ke Jalan Murai 2, menghala terus melalui Batu Complex Business Centre, belok kiri ke Jalan Murai 1 dan belok kiri untuk meghala ke Jalan Ipoh (Arah Kepong). Semasa penutupan lorong dilaksanakan, tiga (3) lorong boleh diguna oleh pemandu di Jalan Kepong (Arah Kepong). Pengawal bendera akan berada di pintu masuk bilik pameran Mercedes - Benz untuk mengawal kereta masuk dan keluar. Untuk maklumat lanjut, sila rujuk peta di bawah.. 5. CONTINUATION OF LEFT-MOST LANE CLOSURE ALONG JALAN IPOH NEAR BATU COMPLEX BUSINESS CENTRE (KEPONG-BOUND) Date 19 June 2018 19 December 2018 Time 24 hours Duration 6 month Reason To facilitate loading/unloading material, utilities relocation, drainage works and any other related works for MRT construction There will be a continuation of left-most lane closure along Jalan Ipoh (Kepong-bound), near Batu Complex Business Centre from 19 June 2018 to 19 December 2018, 24 hours, daily. The closure is for a stretch of 150 metres starting from Batu Complex Business Centre to Mercedes- Benz. Motorist heading to Jalan Ipoh (Kepong-bound) from Jalan Murai 2 will have to turn left to Jalan Murai 2, pass by Batu Complex Business Centre, make a left turn to Jalan Murai 1 and turn left to connect to Jalan Ipoh (Kepong-bound). During the closure, there will be three (3) lanes made available for motorists on Jalan Ipoh (Kepong- Bound). A flagman will be stationed at the Mercedes - Benz Showroom entrance to guide cars going in and out of the showroom. Please refer to the map for further reference on the closures mentioned above: Page 11 of 12

MAP 5 : CONTINUATION OF LEFT-MOST LANE CLOSURE ALONG JALAN IPOH NEAR BATU COMPLEX BUSINESS CENTRE (KEPONG-BOUND) For media enquiries, please contact: Zaini Ghazali (Item 1-2) Tel: +6012 328 1821 zainighazali@azrb.com Irynn Eng Poh Ling (Item 3-5) Tel: +6012 228 9270 engpl@ijm.com Leanne Ann Susau (Item 1-5) Tel: +603 7493 3832 leanne@mgjv-kvmrt.com.my MMC GAMUDA KVMRT (PDP SSP) SDN BHD (1117100-V) Block A, Level 17, Menara Mustapha Kamal, PJ Trade Centre No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya Selangor Darul Ehsan, Malaysia T: +603-7494 2222 F: +603-7727 0222 www.mymrt.com.my Page 12 of 12