ESSENTIAL SAFETY RESOURCES

Similar documents
MOBILE CRANES ONSHORE PROGRAM

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

Chapter 22 Mobile Cranes

Crane & Hoist Safety Guidelines

Crane Safety Resource Guide P AGE 1

HEALTH AND SAFETY MANUAL

OVERHEAD & GANTRY CRANE / RIGGING

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

UNIVERSITY OF TOLEDO

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

CRANE & HOIST SAFETY PROGRAM

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

Health, Safety, Security and Environment

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion.

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Ryko Solutions, Inc. Crane and Jib Safety Program

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

Safe Operating Practices & Maintenance Manual

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Computer Aided Analysis and Design Of Hoisting Mechanism Of An EOT Crane

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

Cranes. OSHA Office of Training & Education 1

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

CRANE, HOIST AND SLING SAFETY PROGRAM

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Responsible Unit: Facilities Management

Safelift Overhead Runway Beams & Rolling Beam Cranes

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Crane and Hoist Safety Program

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

Title: Crane Operation Effective Date: 12/3/2014 Control Number: THG_0033 Revision Number: 2 Date: 10/22/2015 Annual Review Completed: 5/13/2015

Owner s Manual Gantry Cranes

Title: Crane Operation Effective Date: 12/3/2014 Control Number: THG_0033 Revision Number: 2 Date: 10/22/2015 Annual Review Completed: 5/13/2015

MOBILE CRANES AND HOIST

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Crane & Derrick Operation Procedures for Construction

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5

29 CFR Ch. XVII ( Edition)

While handling materials, employees must abide by the following requirements:

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES

CRANE OPERATION INSTRUCTION AND GUIDELINES

Crane, Hoist, and Sling Safety Program October 24, 2017

SAFETY GUIDANCE MATERIAL

HOISTING APPARATUS Inspection Guidelines

INSTRUCTION MANUAL CONTRX FORKLIFT JIBS JLT, PBJLT, CHJLT

CHESTER HOIST AIR LOW HEADROOM CHAIN HOISTS AL-680 SECTION A

"CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS"

Moving materials: Crane and hoist safety

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

OVERHEAD CRANE TERMINOLOGY

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

ESSENTIAL SAFETY RESOURCES

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

Health, Safety, Security and Environment

Chapter 1 Safety and Operation

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

Document Number: HSE May 1, 2014 LADDERS. Author: A Holland. Rev Date Rev # Description Revised By 05/01/14 1 Reformat A.

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

OVERHEAD CRANE SAFETY:

DEPARTMENT OF PUBLIC SAFETY

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

UC Santa Barbara Crane Safety Program

British Columbia - Colombie-Britannique. Aerial Lift - Appareil de Levage

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana.

SECTION 14: AERIAL LIFT PROGRAM

Overhead and Gantry Crane Program and Standard Operating Procedure

Provided by: Operating, Maintenance & Parts Manual

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

CRANES & MOBILE LIFTING EQUIPMENT COMPANY POLICY AND PROCEDURE

Powered Industrial Truck Safety Program

OPERATION MANUAL. Before equipment use, please read this operation manual. Serial Number: Date Purchased:

CRANE TESTING REQUIREMENTS FOR PERFORMANCE TESTS

Before equipment use, please read this operation manual. Serial Number: Date Purchased:

Provide a safe working environment, Govern operator use of heavy equipment, and Ensure proper care and maintenance of heavy equipment.

Rev. 10/27/2015 CDL-2000, MANUAL

Powered Industrial Trucks

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

SUNY GENESEO ENVIRONMENTAL HEALTH & SAFETY

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1

RUTGERS UNIVERSITY POWERED INDUSTRIAL TRUCK PROGRAM

Product Line Glossary Terms

POWERED INDUSTRIAL TRUCK PROGRAM September 2015

Owner s Manual. ELECTRIC WIRE ROPE HOIST and TROLLEY RH SERIES

UC DAVIS CRANE, HOIST, AND SLING SAFETY PROGRAM

PLATFORM WHEEL WELL ACCESS STAND

Introduction Dan Swenson

Hand Chain Hoists. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Transcription:

ESSENTIAL SAFETY RESOURCES GS-3027 MOBILE CRANE / OVERHEAD AND GANTRY CRANE / RIGGING Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type Name Table of Contents PURPOSE... 2 SCOPE... 2 DEFINITIONS... 2 KEY RESPONSIBILITIES... 3 Managers and Supervisors... 3 Employees... 4 PROCEDURE... 4 General... 4 Inspections Onshore/Offshore... 5 Operational Procedures... 6 Moving a Load... 8 Parking a Crane or Hoist... 8 Rigging and Sling Inspections and Safety Requirements... 9 Rigging a Load... 10 OFFSHORE... 11 TRAINING... 12 DAILY GUIDE FOR OVERHEAD CRANE INSPECTIONS... 13 PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 1 of 13

1. PURPOSE 1.1 Overhead cranes, hoists, and rigging equipment are used by Your Company Name employees for lifting and moving materials. In order to maintain a safe workplace for its employees, only qualified individuals shall operate these devices. This program outlines the procedures for safe operations and the training requirements regarding overhead cranes, hoists and rigging equipment. 2. SCOPE 2.1 Applies to all Your Company Name employees who operate overhead cranes, hoists, and rigging equipment in the scope of their job duties and assignments. When work is performed on a non-owned or operated site, the operator s program shall take precedence, however, this document covers Your Company Name employees and shall be used on owned premises, or when an operator s program doesn t exist or is less stringent. 3. DEFINITIONS 3.1 ANSI The American National Standards Institute. 3.2 Appointed Assigned specific responsibilities by the employer or the employer s representative. 3.3 Auxiliary Hoist A supplemental hoisting unit of lighter capacity and usually higher speed than provided for the main hoist. 3.4 Brake A device used for retarding or stopping motion by friction or power means. 3.5 Bridge That part of a crane consisting of girders, trucks, end ties, foot-walks, and drive mechanism that carries the trolley or trolleys. 3.6 Bridge Travel The crane movement in a direction parallel to the crane runway. 3.7 Bumper (Buffer) An energy absorbing device for reducing impact when a moving crane or trolley reaches the end of its permitted travel, or when two moving cranes or trolleys come in contact. 3.8 Crane A machine for lifting and lowering a load and moving it horizontally, with the hoisting mechanism an integral part of the machine. Cranes, whether fixed or mobile, are driven manually or by power. 3.9 Designated Selected or assigned by the employer or the employer s representative as being qualified to perform specific duties. 3.10 Drum The cylindrical member around which the ropes are wound for raising or lowering the load. 3.11 Emergency Stop Switch A manually or automatically operated electric switch to cut off electric power independently of the regular operating controls. 3.12 Floor-operated Crane A crane which is pendant or nonconductive rope controlled by an operator on the floor or an independent platform. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 2 of 13

3.13 Hoist An apparatus that may be a part of a crane, exerting a force for lifting or lowering. 3.14 Holding Brake A brake that automatically prevents motion when the power is off. 3.15 Limit Switch A switch that is operated by some part or motion of a power-driven machine or equipment to alter the electric circuit associated with the machine or equipment. 3.16 Load The total superimposed weight on the load block or hook. 3.17 Load Block The assembly of hook or shackle, swivel, bearing, sheaves, pins, and frame suspended by the hoisting rope. 3.18 Main Hoist The hoist mechanism provided for lifting the maximum rated load. 3.19 Main Switch A switch controlling the entire power supply to the crane. 3.20 Overhead Crane A crane with a movable bridge carrying a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure. 3.21 Rated Load The maximum load for which a crane or individual hoist is designed and built by the manufacturer and shown on the equipment nameplate(s). 3.22 Rope Refers to wire rope, unless otherwise specified. 3.23 Runway An assembly of rails, beams, girders, brackets, and framework on which the crane or trolley travels. 3.24 Side Pull That portion of the hoist pull acting horizontally when the hoist lines are not operated vertically. 3.25 Span The horizontal distance center to center of runway rails. 3.26 Standby Crane A crane which is not in regular service but which is used occasionally or intermittently as required. 3.27 Stop A device to limit travel of a trolley or crane bridge. This device normally is attached to a fixed structure and normally does not have energy absorbing ability. 3.28 Trolley The unit that travels on the bridge rails and carries the hoisting mechanism. 3.29 Trolley Travel The trolley movement at right angles to the crane runway. 3.30 Wall Crane A crane having a jib with or without trolley and supported from a sidewall or line of columns of a building. It is a traveling type and operates on a runway attached to the sidewall or columns. 4. KEY RESPONSIBILITIES 4.1 Managers and Supervisors 4.1.1 Are responsible to ensure that employees and contractors are trained and qualified on the proper operations and have been trained in safe work standards. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 3 of 13

Modifications or additions which affect the safe operation of the equipment may only be made with the manufacturer s written approval. 4.1.2 Are responsible to see that all provisions of this program are followed and that crane inspections are performed and the equipment is in safe operating condition. 4.1.3 Are responsible for establishing a preventive maintenance program based upon the crane manufacturer s recommendations at each site. 4.2 Employees 5. PROCEDURE 4.2.1 Employee operators are responsible to follow the requirements of this program and report any damage or needed repairs immediately to their supervisor. 4.2.2 Operators must meet the physical qualifications, pass a physical, a written examination, understand and be able to use a load chart, as well as calculate loads for the crane type operated. 4.2.3 Employees designated as crane operators are responsible for the entire lift. In addition, crane operators are responsible to: 5.1 General 4.2.3.1 Make the required inspections. 4.2.3.2 Ensure that the crane is maintained. 4.2.3.3 Ensure that all personnel working in the area around the crane are kept clear of all hazards related to crane operations. 4.2.3.4 Determine the weights, and correct rigging required for loads to be lifted. 5.1.1 Your Company Name shall comply with the manufacturer s specifications and limitations applicable to the operation of any and all cranes. Where manufacturer s specifications are not available, the limitations assigned to the equipment shall be based on the determination of a qualified engineer competent in this field and such determinations will be appropriately documented and recorded. Attachments used with cranes shall not exceed the capacity, rating, or scope recommended by the manufacturer. 5.1.1.1 This program applies to all cranes including overhead cranes, wall cranes (jib cranes), and others having the same fundamental characteristics. 5.1.1.2 Only designated employees trained in crane and hoist safety shall operate cranes covered by this program. Manufacturer rated load capacities and operating speeds shall be followed. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 4 of 13

5.1.1.3 All cranes in service and utilized by Your Company Name shall meet, as a minimum, the design specifications of the American National Standard Safety Code for Overhead and Gantry Cranes, ANSI B30.2.0-1967. 5.1.1.4 Load Rating Chart A substantial and durable chart with clearly legible letters and figures shall be provided with each crane and securely fixed in and onto the crane cab in a location easily visible to the operator while seated at this control station. 5.1.1.5 All cranes shall be locked and tagged out while repairs are in progress to them or any other equipment or building structure that may have personnel or equipment in their path. 5.1.1.6 Whenever internal combustion engine powered equipment exhausts in enclosed spaces, tests shall be made and recorded to see that employees are not exposed to unsafe concentrations of toxic gases or oxygen deficient atmospheres. 5.2 Inspections Onshore/Offshore 5.2.1 Cranes and hoists that have been overloaded shall be inspected prior to being returned to service. The inspection and testing requirements are included. 5.2.2 Initial inspection and test shall be performed by a qualified third party. 5.2.2.1 Prior to initial use all new and altered cranes shall be inspected and tested to ensure compliance with the provisions of 29 CFR 1910.179 and ABSI B30.2. 5.2.2.2 Only after determining, by this inspection, testing and proper documentation, that the crane is in safe operating condition, shall it be put into service. 5.2.3 Daily pre-use inspections shall be performed by the crane operator (designated as Your Company Name s designated competent person) prior to beginning shift and through observation during normal operation. Daily inspections shall include: 5.2.3.1 Any deficiencies shall be repaired, or defective parts replaced, before continued use. 5.2.3.2 All functional operating mechanisms for maladjustment interfering with proper operation. 5.2.3.3 Deterioration or leakage in lines, tanks, valves, drain pumps, and other parts of air or hydraulic systems. 5.2.3.4 Hooks. If deformations or cracks are found, the hook shall be tagged out-of-service until repaired and tested by qualified personnel. 5.2.3.5 Hoist chains, including end connections, for excessive wear, twist, distorted links interfering with proper function, or stretch beyond manufacturer s recommendations. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 5 of 13

5.2.4 Your Company Name shall make and keep monthly inspection records on critical items in use such as brakes, crane hooks, and ropes. 5.2.5 Your Company Name shall perform a rope inspection once a month and certify the date and signature of the person performing the inspection. 5.2.6 Your Company Name must make a monthly inspection and keep a record of hoist chains (including end connections) for excessive wear, twist, distorted links interfering with proper function and stretch beyond manufacturer s recommendation. The certification records must include date of inspection, signature of person performing the inspection and identifier of the chain inspected. 5.2.7 Quarterly and annual inspections shall be documented with a certification record which includes the signature of the qualified third party (person or agency) who performed the inspection, the date, and identifier (serial number, unit number, etc.) for each piece of equipment. If safety hazards are found during inspections, the equipment in question shall be tagged out and not used until repairs are made. Any deficiencies constituting a safety hazard shall cause the equipment to be tagged out-of-service until repairs are made. 5.2.8 All crawler, truck, or locomotive cranes in use shall meet the applicable requirements for design, inspection, construction, testing, maintenance and operation as prescribed in the ANSI B30.5-1968, Safety Code for Crawler, Locomotive and Truck Cranes. However, the written, dated, and signed inspection reports and records of the monthly inspection of critical items prescribed in Section 5-2.1.5 of the ANSI B30.5-1968 standard are not required. Instead, Your Company Name shall prepare a certification record which includes the date the crane items were inspected, the signature of the person who inspected the crane items, and a serial number or other identifier, for the crane inspected. 5.2.9 If any unsafe condition is found or repairs are necessary, Warning or Out-of- Order signs shall be placed on any crane or other hoisting equipment. 5.3 Operational Procedures 5.3.1 Only qualified personnel shall operate cranes and equipment covered by this program. Operators shall comply with the following safety rules while operating cranes and hoists: 5.3.1.1 Employees shall not be exposed to unsafe concentrations of toxic gases or oxygen deficient atmospheres when internal combustion engine powered equipment is used. Tests shall be conducted and documented. 5.3.1.2 Do not engage in any practice that will divert your attention while operating the crane. 5.3.1.3 Respond to signals only from the person who is directing the lift or any appointed signal person. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 6 of 13

5.3.1.4 Obey a stop signal at all times, no matter who gives it. 5.3.1.5 Do not move a load over people. 5.3.1.6 People shall not be placed in jeopardy by being under a suspended load. 5.3.1.7 Do not work under a suspended load unless the load is supported by blocks, jacks, or a solid footing that will safely support the entire weight. 5.3.1.8 Have a crane or hoist operator remain at the controls or lock open and tag the main electrical disconnect switch. 5.3.1.9 Ensure that the rated load capacity of a crane s bridge, individual hoist, or any sling or fitting is not exceeded. 5.3.1.10 Know the weight of the object being lifted. 5.3.1.11 Check that all controls are in the OFF position before closing the main line disconnect switch. 5.3.1.12 If spring-loaded reels are provided to lift pendants clear off the work area, ease the pendant up into the stop to prevent damaging the wire. 5.3.1.13 Avoid side pulls. These can cause the hoist rope to slip out of the drum groove, damaging the rope or destabilizing the crane or hoist. 5.3.1.14 To prevent shock loading, avoid sudden stops or starts. Shock loading can occur when a suspended load is accelerated or decelerated, and can overload the crane or hoist. When completing an upward or downward motion, ease the load slowly to a stop. 5.3.2 At the start of each work shift, the designated competent person operator shall do the following steps before making lifts with any crane or hoist: 5.3.2.1 For ropes that have not been used during shutdown or storage all ropes must be thoroughly inspected before crane is used, certified by record of date of inspection, ID of the rope inspected and signature of person performing inspection. 5.3.2.2 Using guidelines of 1910.333(c)(3) lines shall be de-energized or grounded or other protective measures shall be provided before work is started. 5.3.2.3 Test the upper-limit switch and slowly raise the unloaded hook block until the limit switch trips. 5.3.2.4 Visually inspect the hook, load lines, trolley, and bridge as much as possible from the operator s station; in most instances, this will be the floor of the building. 5.3.2.5 If provided, test the lower-limit switch. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 7 of 13

5.4 Moving a Load 5.3.2.6 Test all direction and speed controls for both bridge and trolley travel. 5.3.2.7 Test all bridge and trolley limit switches, where provided, if operation will bring the equipment in close proximity to the limit switches. 5.3.2.8 Test the pendant emergency stop. 5.3.2.9 Test the hoist brake to verify there is no drift without a load. 5.3.2.10 If provided, test the bridge movement alarm. 5.3.2.11 Lockout and tag for repair any crane or hoist that fails any of the above tests. 5.3.2.12 Any deficiencies shall be repaired, or defective parts replaced, before continued use. 5.4.1 Center the hook over the load to keep the cables from slipping out of the drum grooves and overlapping, and to prevent the load from swinging when it is lifted. 5.4.2 Inspect the drum to verify that the cable is in the grooves. 5.4.3 Use a tag line when loads must traverse long distances or must otherwise be controlled. 5.4.4 Manila rope may be used for tag lines. 5.4.5 Plan and check the travel path to avoid personnel and obstructions. 5.4.6 Lift the load only high enough to clear the tallest obstruction in the travel path. 5.4.7 Start and stop slowly. 5.4.8 Land the load when the move is finished. 5.4.9 Choose a safe landing area. 5.4.10 Never leave suspended loads unattended. 5.4.11 In an emergency where the crane or hoist has become inoperative, if a load must be left suspended, barricade and post signs in the surrounding area, under the load, and on all four sides. 5.4.12 Lock open and tag the crane or hoist s main electrical disconnect switch. 5.5 Parking a Crane or Hoist 5.5.1 Remove all slings and accessories from the hook. 5.5.2 Return the rigging device to the designated storage racks. 5.5.3 Place the emergency stop switch (or push button) in the OFF position. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 8 of 13

5.6 Rigging and Sling Inspections and Safety Requirements 5.6.1 Only select rigging equipment that is in good condition. 5.6.2 Each sling shall be inspected before being used. Each sling, fastenings, and all attachments shall be inspected by a designated competent person by Your Company Name. 5.6.3 All rigging equipment shall also be inspected annually. 5.6.4 Defective equipment is to be removed from service and destroyed to prevent inadvertent reuse. 5.6.5 The load capacity limits shall be stamped or affixed to all rigging components. 5.6.6 All devices shall be visually inspected prior to use and removed from service for any of the following conditions and to ensure the proper use and care: 5.6.6.1 Synthetic slings with: 5.6.6.1.1 Abnormal wear. 5.6.6.1.2 Torn stitching. 5.6.6.1.3 Broken or cut fibers. 5.6.6.1.4 Discoloration or deterioration. 5.6.6.2 Wire rope slings with: 5.6.6.2.1 Kinking, crushing, bird caging, or other distortions. 5.6.6.2.2 Evidence of heat damage. 5.6.6.2.3 Cracks, deformation, or worn end attachments. 5.6.6.2.4 Six randomly broken wires in a single rope lay. 5.6.6.2.5 Three broken wires in one strand of rope. 5.6.6.2.6 Hooks opened more than 15% at the throat. 5.6.6.2.7 Hooks twisted sideways more than 10 degrees from the plane of the unbent hook. 5.6.6.3 Alloy steel chain slings with: 5.6.6.3.1 Cracked, bent, or elongated links or components. 5.6.6.3.2 Cracked hooks. 5.6.6.3.3 Shackles, eye bolts, turnbuckles, or other components that are damaged or deformed. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 9 of 13

5.7 Rigging a Load 5.7.1 Whenever any sling is used, specific safety practices shall be observed. 5.7.2 Determine the weight of the load do not guess. 5.7.3 Determine the proper size for slings and components. 5.7.4 Do not use manila rope for rigging. 5.7.5 Ensure that shackle pins and shouldered eyebolts are installed in accordance with the manufacturer s recommendations. 5.7.6 Ensure that ordinary (shoulderless) eyebolts are threaded in at least 1.5 times the bolt diameter. 5.7.7 Use safety hoist rings (swivel eyes) as a preferred substitute for eyebolts wherever possible. 5.7.8 Pad sharp edges to protect slings. 5.7.9 Remember that machinery foundations or angle iron edges may not feel sharp to the touch, but could cut into rigging when under several tons of load. 5.7.10 Wood, tire rubber, or other pliable materials may be suitable for padding. 5.7.11 Do not use slings, eyebolts, shackles, or hooks that have been cut, welded, or brazed. 5.7.12 Install wire-rope clips with the base only on the live end and the U-bolt only on the dead end. 5.7.13 Follow the manufacturer s recommendations for the spacing for each specific wire size. 5.7.14 Determine the center of gravity and balance the load before moving it. 5.7.15 Initially lift the load only a few inches to test the rigging and balance. 5.8 Cranes or hoists shall not be loaded beyond their rated capacity for normal operations. 5.8.1 Any crane or hoist suspected of having been overloaded shall be removed from service by locking open and tagging the main disconnect switch. 5.8.2 Overloaded cranes shall be inspected, repaired, load tested, and approved for use before being returned to service. 5.9 Working at heights on cranes or hoists: 5.9.1 Anyone conducting maintenance or repair on cranes or hoists at heights greater than six (6) feet shall use fall protection. 5.9.2 Fall protection includes safety harnesses that are fitted with a lifeline and securely attached to a structural member of the crane or building. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 10 of 13

5.9.3 Properly secured safety nets are another option for fall protection. 5.9.4 Use of a crane as a work platform should only be considered when conventional means of reaching an elevated work site are hazardous or not possible. 5.9.5 Workers shall not ride a moving bridge crane. 5.9.6 Personnel shall not board any bridge crane unless the main disconnect switch is locked and tagged out-of-service. 5.10 Signals to the operator shall be in accordance with the standard hand signals prescribed by the applicable ANSI standard for the type of crane in use unless voice communications equipment (telephone, radio, or equivalent) is used. 5.10.1 Signals shall be discernible or audible at all times. 5.10.2 Some special operations may require addition to or modification of the basic signals. 5.10.3 For all such cases, these special signals shall be agreed upon and thoroughly understood by both the person giving the signals and the operator, and shall not be in conflict with the standard signals. 5.11 All maintenance, tests and inspections shall be conducted in accordance with the manufacturer s recommendations. 5.12 Your Company Name shall keep and maintain written reports on rated load tests showing the test procedures and confirming the adequacy of any repairs or alterations. All maintenance and repair records shall be retained for the life of the equipment. 5.13 Your Company Name shall keep and maintain certification record(s) on running ropes which will include the date(s) of inspection and the signature of person(s) who performed the inspection. The same records must be kept on inspections of all other ropes. 5.14 The use and operation of client owned cranes, hoists and rigging equipment by qualified Your Company Name personnel will occur only at the express permission of the designated client representative. 5.15 A CO 2 or dry chemical fire extinguisher shall be kept in the crane cab or vicinity of the crane. 5.16 When operating cranes near power lines rated 50 KV or below, minimum clearance between the power line and any part of the crane or load shall be 10 feet. 6. OFFSHORE 6.1 Crane operators will be designated who have appropriate offshore experience and training which must comprise of minimum amounts of classroom sessions and hands-on training which will cover lubricating points, adjustments, principles of crane operations, load charts, hand signals and inspections. Refresher training is required every four (4) years. 6.2 Training shall include the use of fire extinguishers. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 11 of 13

6.3 Offshore physical qualifications include: the API 2D physical requirements vision of at least 20/30 Snellen in one eye and 20/50 in the other eye with or without glasses, and have depth perception; be able to distinguish between red, yellow, and green; hearing, with or without a hearing aid, adequate for the specific operation; and no history of disabling medical condition which may be sufficient reason for disqualification. A follow-up evaluation is required every four (4) years. 6.4 Load test records will be furnished showing procedures outlined in Appendix E of API2D, 4.2. 7. TRAINING 7.1 Training shall include: 7.1.1 Documentation of employee, date of training and subject matter, including method used to test knowledge of material. 7.1.2 No employee shall operate cranes or equipment covered by this program until training has been completed and management has approved and designated him or her as a qualified operator. PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 12 of 13

DAILY GUIDE FOR OVERHEAD CRANE INSPECTIONS PRINTED COPIES ARE NOT CONTROLLED PRINTED JULY 17, 2012 Page 13 of 13